Contoh Anggaran LC Tahun 2012
Contoh Anggaran LC Tahun 2012
Divisi
Biaya
Uraian Labour Material VRA
M S Total Rp/Unit Jenis Total Rp/Unit Total Rp/Unit
Sub Total
02 00 Terraces
01 Pemancangan Teras 2.50 50,000 - -
02 Pembentukan Teras @ 100 m /ha (15 %) - - - - 1.06 900,000
Sub Total
03 00 Drains
Pembuatan Parit : - -
01 Main Drains - 5 m / ha @ Rp.12000 / m - - - - 0.07 900,000
02 Collection Drain - 30 m / ha @ Rp.10000 / m - - - - 0.33 900,000
03 Field Drain - 75 m / ha @ Rp.5000 / m - - - - 0.42 900,000
10 Miscellanous
Sub Total
TOTAL
Luas : 1,000.00 Ha -
Biaya/Ha Total Total
Rotasi (Rp/Ha) Biaya
Labour Material VRA Rp / ha. Rp / ha. Januari Februari Maret
-
-
10,000,000
16,000,000
5,000,000
3,500,000
4,000,000
45,000,000
11,718,750 75,000,000
95,218,750
32,125,000
62,350,000 498,800,000
94,475,000
189,693,750 17,408,420,000