ORIGINAL
ii Pipeline Projects Department
Axgpnunt gSoy) Crude Delivery Project Division-CDPD
‘Date February 2, 2018
‘ransmital No 1483-PL-7.05548 ]
Reference No.: T-CPP-ARAMCO-00074
‘se00080841
I-10-01483, (JPS) 1-1 Pipeline for
cscs: SSLFE Bldg. 3" Floor A-Rakkah
Phone: 055-5014835
‘Abdulazis¥. AL-Youseh, Company Representative
POIGrae Detvery Project Dison
esos: 2.326 3° Flo, SLFE Big, Raskan
Phone 050-6914670 $
Tes
Sonaure 723
‘Subject: Uuzation of HOPE Conduit for FOC Crossing - TO.018)
In response to CONTRACTOR: above Technica! Query. CONTRACTOR shall support the request wih al tas
incu cost ard sohedul savingCOPY
SAUDI ARABIAN OL COMPANY {AUDI ARINICO)
sexi ll
crap
[cone na
lenoutcr LE aciootena Jest Paw ar Kaan any aay
[earnest Jost andes
sic rie cn conn fore arGrr (000)
(ssid feet oem
sooncror[iai M Redooney eral
Seon rae | oR GFR
Resea isin clean
‘scrines [Dieter Raper OMEN WTO (Prcse UhCI Y > Technical Query Form
Praja Tile | JB Pa A Dy EPG “awa | ra-orrsra0ie | Rew [A
Tarrae_| ian ORE FOE senraleed | Gonna soonest
From _| BRANCH OF CNA ETROLELI ‘sie Fe. 20 208
Te | savor rani COMPANY Tesporse Requred ale | fap
{QUERY oEScRIFTION
“Ta Description (nclude any Safety or Envronmental impact)
‘Gurront Desian as per November, 2014 Standard:
“The standard cutoff for this project ie February, 2017. As per SAES-T.911 Sec 6.1.26, concrete encased
conduits are reqied forthe protection of sub-conduts at road crossing and ppsine crossing. The curent
project has been designed considering the concrete encased condult for FOC cable at road crossings (open
cut and pipeline crossing. The project has 28 locations of ressng existing pipalins and roads.
‘Design Required as per Apri 2017 Standard:
However, 98 por atest edton of SAES-T-811, Sec 6.1.56 point Otis alowed to use High Densty Poly
Ethylene (HOPE) pipe with 4.0 inch inside dlameter instead of concrete encased PVC conduits for sub-condut
protection. This statement isnot mentioned in the previous SAES-T-911, issued in November 2014.
‘Recommendation:
Iti recommenced to us HOPE pipe vith 4.0 inches inside diameter instead of concrete encased PVC
‘conduits for road crossing and pipeline crossing as consrucion has tobe cared out under active pipelines
‘and roads. Therefore, periting the project o apply the revised standard using HDPE pipes instead of
‘concrete encased PVC conduits wil alo fo faster constustion of FOC.
‘tachment:
Cut pages of SAES-T-011 from November 2014 and Apr 2017
REQUIRED ACTION:
‘SAPMIT is requested ta allow us to proceed wit the recommended slution stated above
‘Affected Disciplines: Communication
‘Documents/Drawings Affected:
Design Development
Recommended Solution:
(Use HOPE insted of PVC cuct bank or road and pipeline crossings.