Kurva Massa Ganda Data Hujan Sebelum Dikonsistensikan
Kurva Massa Ganda Data Hujan Sebelum Dikonsistensikan
Tahun Kum dx di
dx (Sta.
(Sta. Tlogomas) Sta. Blimbing Sta. Kauman
Tlogomas)
2016 69.000 69.000 105.000 118.000
2015 106.000 175.000 47.000 67.000
2014 68.000 243.000 72.000 92.000
2013 80.000 323.000 115.000 78.000
2012 94.000 417.000 68.000 95.000
2011 64.000 481.000 89.000 85.000
2010 130.000 611.000 39.000 143.000
2009 57.000 668.000 47.000 79.000
2008 70.000 738.000 69.000 83.000
2007 69.000 807.000 87.000 72.000
1000
600
400
200 149.000
0
00
0 00 00 00 00 00 00 00 00 00 00 00 00 00 00
0. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10 20 30 40 50 60 70 80 90 10
0
11
0
12
0
13
0
14
0
1400
Komulatif Sta. Blimbing
1200
1000
843.908
800
600
400
200
0
0.000 100.000 200.000 300.000 400.000 500.000 600.000 700.000 800.000 900.000 1000.000
x - 170.1291002654
Col umn K
Li nea r (Col umn K)
00
00 00 00 00 00 00 00 00 00
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0 70 80 90 0 0 0 0 0
10 11 12 13 14
3.3333311548
Col umn K
Li near (Col umn K)
Tahun
dx (Sta. Dau) Kum dx (Sta. Dau)
93.500 700
496.454 600
572.954
658.954 500
752.954
400
851.954
923.393 300
1014.654
200
1119.547
1223.522 100
0
0.000 200.000 400.000 600.000
Curah Hujan Maksimum Setahun (d) (mm)
Tahun Kum dx di
dx (Sta.
(Sta. Tlogomas) Sta. Blimbing Sta. Kauman
Tlogomas)
2016 69.000 69.000 105.000 118.000
2015 106.000 175.000 47.000 67.000
2014 68.000 243.000 72.000 92.000
2013 80.000 323.000 115.000 78.000
2012 94.000 417.000 68.000 95.000
2011 64.000 481.000 89.000 85.000
2010 130.000 611.000 39.000 143.000
2009 57.000 668.000 47.000 79.000
2008 70.000 738.000 69.000 83.000
2007 69.000 807.000 87.000 72.000
1000
600
400
200 149.000
0
00
0 00 00 00 00 00 00 00 00 00 00 00 00 00 00
0. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
10 20 30 40 50 60 70 80 90 10
0
11
0
12
0
13
0
14
0
1400
Komulatif Sta. Blimbing
1200
1000
843.908
800
600
400
200
0
0.000 100.000 200.000 300.000 400.000 500.000 600.000 700.000 800.000 900.000 1000.000
- 170.1291002654
Col umn K
Li near (Col umn K)
00
0 00 00 00 00 00 00 00 00
0. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
70 80 90 10
0
11
0
12
0
13
0
14
0
.3333311548
Col umn K
Li near (Col umn K)
Yt= - ln 〖 ( 〖 − ln 〗
〖 (𝑇𝑅 −1)/𝑇𝑅 〗 ) 〗
Yt = 2.674 3.902 2.970 2.250
= 261.842 mm/hari
Uji Simpangan Horisontal SMIRNOV-KOLMOGOROV
e 2.718
n 10.000
α 0.05 |∆P| < Do OK
Do 41%
|∆P| 0.081%
|∆P|
TR empiris X empiris X teoritis X²hit
0.030
0.047 11.000 98.533 102.8 0.177
0.030 5.500 97.333 92.9 0.212
0.029 3.667 85.667 86.75 0.014
0.051 2.750 81.000 82.3 0.021
0.043 2.200 77.333 77.6 0.001
0.081 1.833 76.160 74.9 0.021
0.013 1.571 75.000 71.4 0.182
0.049 1.375 73.333 68.1 0.402
0.008 1.222 67.458 64.5 0.136
8.08% 1.100 60.987 60.5 0.004
∑Xhit 1.168
X2 hit = 1.168
df = 7
α= 5%
X2 tabel = 14.067
X2 hit < X2 tabel
Sesuai
1.168 < 14.067
DEBIT BANJIR
C = 0.7 (aspal)
nd = 0.013 (Lapisan aspal)
Lo = 2.60 m
Ld = 167 m
s = 2.0 %
V = 1.5 m/dt
to = 0.611 menit
td = 1.856 menit
tc = 2.466 menit
= 0.041 jam
R24 = 261.842 mm/hari
I = 762.125 mm/jam
A = 434.200 m2
Q = 0.0643496629 m3/det
C =
(Lapisan aspal) nd =
Lo =
Ld =
s =
(pas.batu kali) V =
to =
td =
tc =
=
R24 =
I =
A =
Q =
(multiunit, tergabung) C =
(lapisan semen) nd =
Lo =
Ld =
s =
(pas.batu kali) V =
to =
td =
tc =
=
R24 =
I =
A =
Q =
DEBIT AIR LIMBA
0.7 (aspal)
0.013 (Lapisan aspal)
3.60 m
159 m
1.0 %
1.5 m/dt (pas.batu kali)
0.683 menit
1.767 menit
2.450 menit
0.041 jam
261.842 mm/hari
765.510 mm/jam
572.400 m2
0.0852081 m3/det
2_5 - -
Q limbah Q total Saluran Q Saluran Q
m3/det m3/det Sebelumnya Sebelumnya m3/det
0.000250 0.2444 - 0 0.2444
- 0.0257 - 0 0.0257
0.000194 0.2604 1_4 0.0257 0.2861
- 0.0270 4_3 0.2861 0.3131
3_2 0.3131
- - 0.5575
1_2 0.2444
Tabel perencanaan dimensi saluran
(38) El MA - h
(39) El MA + jagaan
(40) Jika tidak ada galian/terjunan, gunakan S asli
Jika ada terjunan, gunakan S renc dikurangi ke
Jika ada galian, gunakan S renc
(41) El MA - h
Jika titik awal saluran, muka air dihitung dari jagaan (42) El MA + jagaan
Jika saluran merupakan lanjutan dari saluran sebelumnya, sesuaikan dengan (43) Harus negatif. Untuk gorong-gorong, usahaka
saluran
Jika adasebelumnya
terjunan, elevasi tanah awal tidak berubah (44) Harus negatif. Untuk gorong-gorong, usahaka
Jika gorong-gorong, turunkan muka air +50cm
Kontrol Muka Air terhadap
Elevasi Akhir
Tanah Asli
Muka Air Dasar Pas. Atas Pas. Awal Akhir
Inlet 1-4
Kemiringan Kemiringan Kapasitas
Saluran Jalan (%) (m³/dt) Luas (m²) b=h (m)
Inlet 4-3
Kemiringan Kemiringan Kapasitas
Saluran Jalan (%) (m³/dt) Luas (m²) b=h (m)
Inlet 3-2
Kemiringan Kemiringan Kapasitas
Saluran Jalan (%) (m³/dt) Luas (m²) b=h (m)