You are on page 1of 44
Barge Documentetion Tha Owner of tha-barga shall make the following im-date documents aveilable for sighting during the condition and suitability survey: a. b Cartficate of Reg s:ry. Cenificate of Cllass for Hull. International Loadline Certificate, Tonnage Centificate. Certificates for Towing Equipment. Gertificate of Approval or Statemant of Fact for navigation fights and shapes. Deratting Exe mation Certificate. Fort Clearence. 1 bi) Barge Towing Gear General Tovage shail ba fromthe baw of the barge. The componeints of the towing gear are: a) Bridie connection points, faireads, bridle legs anc bridla apax. b) Bridla recovery system. e} Emergency towing gear. Nt i in The witimate load capacity of the bridle connection points and faireads shall not ba less than (2 x BP) + 40 tonres. rid les " The bridla connection paints to the targe shall be of an approved type. Preferably thay shoulc be able to be released ta allow a fouled tridie to be claared They shall be secured agaiost prernature release. Sufficient urderdeck strength must be proviciec ‘for the bridle connection points, They should preferably be sited at the intersecticn of transwerse and lengitudiral bulkheads Faitloads Where fitted. the cosed chacks or otner gppvoved types of capped faitleads, shall ba located close te the deck edge. in ine with the bridte connection paints, Where the bridle can bear on the déek edgs, the dack edce shall 2¢ strengthened and suitably falred. 1.2.5 1.2.5.4 1.2,5.2 1.2.5.3 4.2.5.4 1.2.6 1.2.7 1.2.7.4 142 7.2 V2.2 Bridie Legs Each bridle ‘eg shall ba of studlink chalin. A composite studlink chain and wire bridle may be used when the chain is of sufficient dength and extends bayond the deck ecga end other protrusions to srevent chafing of the wire ops. The andlink of each studlink chain shatl be an enlarged open link, not & common link with the situd removed, All wire rope components of the bridle shall have gusseted :himbles or closed spelter sockats sittad. The length of each bridle tag shall be at feast equal to the distance between the bridle connectiom points but less than 1.5 times the distance between the oricle connection points. The ultimate load capacity of the bridia lags, brid!e apex and shackles forrring part of the tridle shall mat be less than {2 x BP) + 40 tomnes. Brigla Apex The bridle apex legs shal be connected at tre apex by 2 celta plate of towing ring. Bridle Recovery Svsten Tihe bridle recovery system shali consist of a winch and a recovery wire connected to the orldle apex via a suitable laad which nay be a block suspardad from an “A” ‘:ame, a rolier or a bolster p ate. Tha recovery winch shall have its own power source and shall have an adequate barral capacity for the required recovery wire. Prior to departure or during the on~-+* survey it sihall be demonstrated that the recovery winch is capable ot handling the weight of the bridle plus attachments including the jatermediste towing pennant wire. Tha breaking load of the-recovery wire, shackles, leads etc shall be at least 60 tonnes.

You might also like