sr. | Parameter | Conventional ii | Hermeticaily sealed- | Benefit
No. filled Maintenance free oil
filled
1 | Construction | Fabricated tank with ‘Welded tani design with | Compact & space saving
\etachablefboted) onugated fnsfinstead of
radiators and equipped | radialors} and without
with breather & conservator | breather & conservator
2 | Cooling ‘ii nced io undergo flow | Comugated firs are welded | Higher surface area leads
process through radiators | to fankto increase serface | to better heat afssization
fo achieve cooing area thereky enfancing | which in tur enhances
cooling process efciency
3 [ow Yes, sicetransformeris | Not possi since ther is_| OF BDV maintained
contamination | equipped with breather | no breather and ais Sled | throughout the ffe. Of
wit air which leads to oxidation | inside tank in factory under | properties are unaffected
and reduction in BDV of ei | vacuum and affer which the | & hence requires no
tank i seated ‘maintenance
+ — | Oi ftration & | OW fitration is required | Not required ‘Since no titration &
Too up during pre-commissioning ‘preventive maintenance
and Top up is requied required operation is
during preventive trouble ree, without
‘maintenance interuption and does not
require any shutdown.
& [Owieatags | Yes oie t conventional ‘No need for of top-up
possiity | design ‘defo leakage
6 | sie Bully due fo conservator & Less bot pant and hence
radiator and other tings requires less space at
site
7 [tosses ‘Lnsses inereases with 23 ‘This resus in proved
‘operational fife eficienty
@ | Emected ite | 15-20 years ue fo nega
‘maintenance it enhances
product ie.
9 [insulation — | Ati comesin contact | Since fi notin condad’ | This hes in redrcion oF
wth atmoistre) which in| withexiemal atmosphere, | mechanical and voltage
‘urn comes in cantact with | no such deterioration takes | stress on ination
insulion materia, fe of | place preventing fate
the insulation material
eteciorates with the
passage of ime
10 | Toa High: Relatively low capital | Marginal high ial cost but | lial high capil cost
‘Oumerstip | cost but high operating | less operating cast due to | makes he transformer
cost TOG) | cast Bosses overa period | negigible maintenance & | TOG economical and
of time ‘no deterioration ofc bance RO! {return on
‘property(vitual imesiment) are quickly
mantenance fee) realized,
| Faire More shoe trequies of | | Lessasitis highiy table | High retabity as iis
chances ‘ration, lop up and regular ‘maintenance free
maintenance
12 | Proledion | Forprotection & ‘One single integrated Only one cut-out for
measurement separate | deve can provide mounting is required
devices such as OT, WTL | protection against gas, | instead of fours} in
PRV and buchate relay ae | pressive and temperature | conventional transformer
0 be mounted