You are on page 1of 18

PROVINCE: REGION:

CITY/ MUNICIPALITY:

BARANGAY:

YEARS COVERED: DATE OF ASSESSMENT:

NAME AND SIGNATURE OF REVIEWER:


Name: ___________________________________ Signature: _________________________________
Contact Number: __________________________

NAME/S OF RESPONDENT/S: (Provide Attendance Sheet if necessary)


1. ______________________________________________________
2. ______________________________________________________
3. ______________________________________________________

REFERENCE DOCUMENTS: (Please check the box if available during the assessment, if not then put X.
☐ BDRRM Plan with the following related documents:
☐ Contingency Plan
☐ Evacuation Plan (if separated) and Map
☐ Documentation/ Minutes of Meetings
☐ Certification of Safety of the identified Evacuation Centers
☐ Local Policies on the Creation of BDRRMC, Appropriation of the LDRRM Fund and
Adaptation of BDRRM Plan, and other policies related to DRRM and CCA.
☐ Capacity building Certificates of the BDRRMC members
☐ MOA/MOU with private sectors or business sectors on preposition of goods.
☐ Local Development Plans and Annual Investment Plans

INSTRUCTIONS:
Check (√) the box if the criterion/ criteria and its sub-section are present in the BDRRM plan.
Put an X if the criterion/ criteria and its subsection are not in the BDRRM Plan (Paper QAT only).
Encircle the rating based on the given conditions (Paper QAT only).
Add all the scores to indicate the level of Quality of the BDRRM Plan (Paper QAT only).
A. ORGANIZATION OF BARANGAY DISASTER RISK REDUCTION AND MANAGEMENT STRUCTURE

A1. BARANGAY DRRM COMMITTEE IS ORGANIZED AND SATIFIES THE FOLLOWING CRITERIA

CRITERIA:
☐ A .With illustrative organizational structure of the BDRRM Committee (i.e. organogram) reflecting the four
thematic areas – Mitigation and Prevention, Preparedness, Response and, Recovery and Rehabilitation –
as mandated by RA 10121.
☐ B. Members of the BDRRM Committee are identified with representing organization
☐ C. Has specific roles and responsibilities of the BDRRMC
☐ D. With regular quarterly meeting of the BDRRMC

☐ E. With tasks identified for each of ☐ Communication and Warning


the BDRRMC members/ Sub- ☐ Transportation
committees that are specific to ☐ Search and Rescue
at least five (5) of the following
☐ Relief Distribution
functions.
☐ Security and Safety
☐ Damage Control
☐ Fire Management
☐ Supplies and Logistics
☐ Evacuation Center Management
☐ Health and Psychosocial
☐ Damage Assessment and Needs Analysis
☐ Education
☐ Protection of vulnerable groups, pregnant women, children, persons with
disabilities and elderly.

Remarks:

Rating: Please encircle the score based on the presence of the required criteria for the QB.

3 If Criteria A to E with at least 5 sub-section under E are present in the BDRRM Plan
2 If Criteria A to C are present in the plan
1 If any of the Criteria from A to E (with at least 5 sub-section under E) are present
0 If none of the criteria is present
A2. MEMBERSHIP IN THE BARANGAY DRRM COMMITTEE INCLUDES
REPRESENTATION FROM SECTORAL

GROUPS IN THE COMMUNITY


CRITERIA: The BDRRMC is represented by organized and active sectoral groups in the barangay.

☐ A. At least 2 civil society organizations representing most vulnerable and marginalized sector,
primarily representing the youth and children, persons with disability and the elderly
☐ B. Schools – specifically by the appointed DRRM Coordinator or school principal/ person in
authority
☐ C. Faith-based organization
☐ D. Livelihood sector (ex. Fisher folks, farmers, business, cooperatives, informal workers)
☐ E. Environmental sector (if there is any)

Remarks:

Rating: Please encircle the score based on the presence of the required criteria for the QB.

3 If all the Criteria from A to E are present in the plan

2 If Criteria A plus 1 Sector are present in the plan

1 If any of the Criteria from A to E is present in the plan

0 If none of the criteria is present in the plan


B. RISK ASSESSMENT

1
An organized and active sectoral group is at least registered legally and recognize by the barangay or LGUs, or any of the national
or local government agencies; with members attending the organizational meetings as well as documentation of meetings.

B1. COMMUNITY RISK ASSESSMENT IS PARTICIPATED BY THE VULNERABLE GROUPS


CRITERIA:

☐ A. Community risk assessment is participated by:


☐ Children/youth
☐ Elderly
☐ Persons with disability (if applicable)
☐ Indigenous People (if applicable)
☐ B. The following vulnerable groups identified the risks themselves during the assessment:
☐ Children/Youth Organization
☐ Elderly
☐ Persons with disability (if applicable)
☐ Indigenous People (if applicable)

Remarks:

Rating: Please encircle the score based on the presence of the required criteria for the QB.
3 If all the Criteria A and B are present in the Plan
2 If Criteria A and all of the vulnerable population is present in the plan

1 If Criteria A is present in the plan and any of the vulnerable population

0 If none of the criteria is present in the plan

2
Except for criterion with “if Applicable”
B2. RISK ASSESSMENT IS SPECIFIC TO THE IDENTIFIED HAZARD AND IS LINKED TO THE DEVELOP-
MENT OF PROGRAMS, PROJECTS AND ACTIVITIES.
CRITERIA:

☐ A. Priority hazards in the community are identified


☐ B. Hazard, vulnerability and capacity maps are included in the plan

☐ C. Database of elements at-risk ☐ Number of affected families


with the following information is ☐ Number of affected population disaggregated by age, sex and
organized into high, medium and low ability
risk: ☐ Number affected community structures and business
establishments
☐ Number of affected livelihood
☐ Affected ecosystem e.g. terrestrial, aquatic (as applicable)
☐ D. Major issues concerning chil- ☐ Issues on child and PWD protection (neglect, abuse, child labor or trafficking)
dren and PWDs such as, but not ☐ Disruption of classes; schools used as evacuation centers
limited to the following, are identi- ☐ Prone to disease and illnesses
fied:
☐ Loss of important documents; birth certificate and school documents
☐ Loss of shelter
☐ Separation from family members during disaster
☐ E. Analysis of vulnerabilities and capacities is specific to the identified hazard (in narrative or tabular format)
☐ F. The identified vulnerabilities were linked to the development of programs, projects and activities per thematic- mitigation
and prevention, preparedness, response and, recovery and rehabilitation – area.

Remarks:

Rating: Please encircle the score based on the presence of the required criteria for the QB.

If all the Criteria from A to F with all the sub-section under C and at least 3 of the sub-section under D are present in the plan.
3
If Criteria A to D with all the sub-section under C and at least 3 of the sub-section under D are present in the plan.
2
1 If any of the Criteria from A to F is present in the plan

0 If none of the criteria is present in the plan


C. RESOURCE ALLOCATION

C1. PROGRAMS, PROJECTS, AND ACTIVITIES IN THE PLAN ARE PER THEMATIC AREA
WITH CLEAR TARGETS, TIMEFRAME AND RESOURCED PROPERLY.
CRITERIA:
☐ A. Programs, projects and activities in the ☐ Per thematic area
CBDRRM plan are: ☐ With expected output and
☐ Timeframe

☐ B. Budget estimates and other possible ☐ 5% DRRM fund (70%)


sources of funds are determined in the the- ☐ 20% development fund
matic plan
☐ 5% GAD fund
☐ 10% SK fund
☐ 1% BCPC fund
☐ Other sources such as municipal/city or provincial DRRM fund, I/NGOs

☐ C. Programs, projects and activities ad- ☐Issues on child and PWD protection
dressing the major issues/concerns for chil- (neglect, abuse, child labor or trafficking)
dren and PWDs such as, but not limited to, ☐Disruption of classes, schools used as evacuation centers
are identified in the plan: ☐Prone to disease and illnesses
☐Loss of important documents: birth certificate and school documents
☐Loss of shelter
☐Separation from family members during disasters

☐ D. DRRM plan is integrated in the approved barangay development plan and annual investment plan

Remarks:

Rating: Please encircle the score based on the presence of the required criteria for the QB.

If all the Criteria from A with all its sub-section, B with its first sub-section, C with at least 3 of its sub-section and D
3 are present in the plan.
2 If Criteria A with all its sub-section and B with its first sub-section are present in the plan.
1 If any of the Criteria from A to D is present in the plan.
0 If none of the Criteria is present in the plan
D. INVOLVEMENT OF RELEVANT STAKEHOLDERS

D1. RELEVANT STAKEHOLDERS ARE WITH SPECIFIC ROLES IN THE IMPLEMENTATION OF THE PLAN
CRITERIA:

☐ A. Stakeholders are assigned with specific ☐ Families


roles in the identified programs, projects and ☐ Sectoral groups (ex. academe, church, livelihood sector)
activities in any of the thematic area
☐ Barangay officials
☐ Local government units/agencies (at the municipal, provincial or national level)

☐ B. Issues concerning the following most ☐ Children/Youth Organization


vulnerable groups were addressed in the ☐ Elderly
identified programs, projects and activities in ☐ Pregnant and lactating women
any of the thematic area
☐ Persons with disability (if applicable)
☐ Indigenous People (IP, if applicable)

Remarks:

Rating: Please encircle the score based on the presence of the required criteria for the QB.

3 If all of Criteria A with all its sub-section and B with its first 4 sub-section are present in the plan.

2 If Criteria A with all its sub-section are present in the plan.

1 If any of Criteria A with all its sub-section or B with its first 4 sub-section are present in the plan

0 If none of the Criteria is present in the plan


E. CAPACITY BUILDING

E1. MINIMUM CAPACITY BUILDING NEEDS OF AND PROCUREMENT OF


BASIC EMERGENCY RESPONSE EQUIPMENT FOR THE LDRRMC ARE IDENTIFIED IN THE PLAN
CRITERIA:

☐ A. The identification of the following ☐ Orientation/Training on CBDRRM


capacity building needs, if not yet identi- ☐ Orientation on Pre-Disaster Risk Assessment
fied as current capacities of the LDRRMC
☐ Standard First Aid and Basic Life Support Training
and relevant stakeholders, should be in-
cluded in the plan. (Also check the box if ☐ Orientation on Incident Command System
the capacity-building is already acquired.) ☐ Search and Rescue (Basic) Training
☐ Orientation on Camp Management
☐ Psychosocial Support Training
☐ How to conduct Simulation/Drills for priority hazards
☐ Orientation on Protocol for Management of the Dead & Missing
☐ Rapid Damage Assessment and Needs Analysis (RDANA) Training
☐ Orientation on RA 10821 (Children’s Emergency Relief and Protection Act)

☐ Check if there are additional capacity List down the title of the training/s:
building/ training acquired that are not in __________________________________________________
the list above. __________________________________________________

☐ B. The procurement of the following ☐ chain saw ☐ spine board


basic emergency response equipment, if ☐ axe ☐ ropes
not yet included in the current capacity of ☐ fuel ☐ search light
the barangay, should be included in the
☐ emergency kit ☐ flash light
plan. (Also check the box if item is already
acquired.) ☐ hand-held radio ☐ megaphone
☐ helmet/hard hat
☐ boots
☐ batteries
☐ life vest
☐ whistle
☐ portable generator or equivalent (e.g. solar panel)
Remarks:

Rating: Please encircle the score based on the presence of the required criteria for the QB.

3 If all the Criteria A with all its sub-section and B with all its sub-section plus additional capacity building acquired are
present in the plan.
2 If all the Criteria A with all its sub-section and B with all its sub-section are present in the plan.
1 If any of the Criteria A with all its sub-section and B with all its sub-section are present in the plan.
0 If none of the Criteria is present in the plan
F. COMMUNITY AWARENESS RAISING AND EDUCATION

F1. REGULAR COMMUNITY AWARENESS ACTIVITIES AND OPPORTUNITIES FOR EDUCATING


HIGH-RISK HOUSEHOLDS ON FAMILY PREPAREDNESS ARE IDENTIFIED IN THE PLAN.
CRITERIA

☐ With identified activities but no specific regularity


☐ A. Regular conduct of community drill/simulation exercises for the priority hazard at least twice a year is included in the plan

☐ B. Plan includes opportunities to be con- ☐ Family development sessions


ducted at least every quarter where families ☐ Community assembly/forum
can be educated on developing preparedness ☐ Distribution of IEC material
plan, such as but not limited to:

Remarks:

Rating: Please encircle the score based on the presence of the required criteria for the QB.

3 If All the Criteria A and B with its sub-criteria is present in the plan
2 If Any of Criteria A and B with its sub-section are present in the plan
1 If an Activity is identified but no specific regularity
0 If none of the Criteria is present in the plan
G. MONITORING AND EVALUATION

G1. PARTICIPATORY MONITORING AND EVALUATION MECHANISM


FOR PLAN IMPLEMENTATION IS IDENTIFIED
CRITERIA:

☐ A. There is an identified mechanism ☐ Regular meeting of the BDRRMC


to monitor and evaluate progress of ☐ Conduct of simulation/drill
DRRM plan implementation such as
☐ Community assembly/forums
but not limited to:
☐ Comments/feedback through suggestion box

☐ B. The identified M & E mechanism ☐ What to monitor/evaluate


includes: ☐ Frequency of monitoring/evaluation
☐ Who will monitor/evaluate
☐ Means of verification

☐ C. Sectoral and vulnerable groups have roles and responsibilities in monitoring and evaluation of the plan.
Remarks:

Rating: Please encircle the score based on the presence of the required criteria for the QB.

3 If all the Criteria from A with all its sub-section, B with all its sub-section and C are in the plan.
2 If Criteria A with all its sub-section and B with all its sub-section are present in the plan
1 If Criteria A with all its sub-section are present in the plan
0 If none of the criteria is present in the plan
H. POLICY SUPPORT

H1. LOCAL POLICIES ARE IN PLACE TO SUPPORT IMPLEMENTATION OF LDRRM PLAN.


CRITERIA:

☐ A. A local policy (ex. EO, ordinance) creating the barangay DRRM committee with roles and responsibilities is approved
☐ B. With a resolution adopting the CBDRRM plan
☐ C. Approved appropriation ordinance of the barangay that includes utilization of the local DRRM fund
☐ D. With other local policies (ex. EO, ordinance) institutionalizing DRR measures, e.g. conduct of regular community drill, solid
waste management, etc. Enumerate the local policies in place.

______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

Remarks:

Rating: Please encircle the score based on the presence of the required criteria for the QB.

3 If all the Criteria from A to D are present in the plan

2 If Criteria A to C are present in the plan

1 If any of the Criteria is present in the plan

0 If none of the Criteria is present in the plan


I. EARLY WARNING SYSTEM AND EVACUATION PLAN

I1. THE IDENTIFIED EARLY WARNING SYSTEM IS SPECIFIC TO PRIORITY HAZARD AND APPROPRIATE
FOR THE MOST VULNERABLE POPULATION.
CRITERIA:

☐ Early Warning System not specific to hazard


☐ A. Early Warning System is specific for priority hazard in the community

☐ B. Early warning system is appropriate for the most vulnera- ☐ Children


ble population: ☐ Elderly
☐ Persons with disability (PWD)
☐ Pregnant and Lactating Women

Remarks:

Rating: Please encircle the score based on the presence of the required criteria for the QB.

3 If A and B with all its sub-section are present in the plan

2 If Criteria A is present in the plan

1 If EWS is identified but not related to specific hazard

0 If none of the Criteria is present in the plan


I2. EVACUATION PLAN TAKES INTO CONSIDERATION THE CAPACITY OF IDENTIFIED EVACUATION
CENTERS, SAFE ROUTES, NEEDS OF EVACUEES AND SYSTEM FOR REGISTRATION.

CRITERIA:

☐ A. Has a tabulation of identified and appropriate (an appropriate evacuation center/facility should have undergone assessment
of municipal engineer and has passed the assessment) evacuation centers/facilities in the community and the capacity of each
evacuation center/facility to accommodate families.
☐ B. If the identified evacuation centers are private residences and schools (public or private), a written agreement (ex. MOA,
MOU) should be in place stating evacuation coordination and management.
☐ C. A map is available that locates the identified evacuation centers/facilities in the community and the safe routes to access it

☐ D. Plan describes how the following ☐ Food and Non-Food Items (ex. clothing, blanket, mosquito net)
basic services will be delivered to evacuees ☐ Drinking water
in the identified evacuation center/facility: ☐ Basic drugs/medicines and medical supplies
☐ Hygiene kits
☐ Child, woman, elderly and PWD-friendly spaces
☐ Breastfeeding space/station
☐ Non-human spaces (ex. spaces for livestock)
☐ Genderized WASH facilities like toilet, bathroom
☐ Family reunification

☐ E. Plan includes a master list of families to be accommodated for each identified evacuation center/facility or a system of regis-
tration for each evacuation center/facility is identified
☐ F. Plan includes construction of an evacuation center

Remarks:

Rating: Please encircle the score based on the presence of the required criteria for the QB.

3 If All of the Criteria from A, B, C, D with all its sub-section, E and F is present in the plan.

2 If all Criteria from A to C are present in the plan

1 If any of the Criteria from A, B, C, D with all its sub-section, E and F is present in the plan.

0 If none of the Criteria is present in the plan


INNOVATIVE APPROACH TO DRRM

SCORE: 20 and below 21-30 31-36

INTERPRETATION: Low Quality Medium Quality High Quality


The plan has some of the key The plan has met some of the The plan has adequately met
elements of a CBDRRM plan but criteria of a quality CBDRRM plan. the criteria of a quality
needs improvement. CBDRRM plan.

(Note any DRR measures innovated by the barangay as reflected in the plan.)

Rating:

Level of Quality:
OVERALL RATING OF THE BDRRM PLAN (Add all the scores from A1
to I2)
PART II. RECOMMENDATIONS FOR IMPROVEMENT OF PLAN
Identify major findings (per element) based on the review of the plan and recommend next action steps for improvement of the plan. Discuss
this with the local DRRM Committee/ focal person or community members and ask them the technical assistance (TA) and timeframe that
they need to be able to perform the recommended next action steps and eventually address the gaps.

Element Summary of Gaps Recommendation and Next Technical Assistance TA Provider Timeframe
Action Steps Needs

I
PART III. FEEDBACK ON THE USE OF THE TOOL
For the USER - Kindly answer the following questions for purposes of enhancing the tool:

No Questions Responses

1 Based on your experience, what is your overall impression


on the usefulness and applicability of the tool? (Ex. Did you
find it easy and/or manageable to use? Why?)

2 Please identify any difficulty or challenges/concerns encoun-


tered while administering the tool and why?

3 Is there any specific item/ element in the tool that you find
challenging to get responses / feedback? Please identify
them and how were you able to address it/ them?

4 Do you have any suggestions and/or recommendations on


how to improve this tool? What specific part or element?

5 Do have any recommended or suggested element or item


that you think should be or not be in the tool? Please iden-
tify and provide justification.

END OF THE QUALITY ASSESSMENT

You might also like