Professional Documents
Culture Documents
CITY/ MUNICIPALITY:
BARANGAY:
REFERENCE DOCUMENTS: (Please check the box if available during the assessment, if not then put X.
☐ BDRRM Plan with the following related documents:
☐ Contingency Plan
☐ Evacuation Plan (if separated) and Map
☐ Documentation/ Minutes of Meetings
☐ Certification of Safety of the identified Evacuation Centers
☐ Local Policies on the Creation of BDRRMC, Appropriation of the LDRRM Fund and
Adaptation of BDRRM Plan, and other policies related to DRRM and CCA.
☐ Capacity building Certificates of the BDRRMC members
☐ MOA/MOU with private sectors or business sectors on preposition of goods.
☐ Local Development Plans and Annual Investment Plans
INSTRUCTIONS:
Check (√) the box if the criterion/ criteria and its sub-section are present in the BDRRM plan.
Put an X if the criterion/ criteria and its subsection are not in the BDRRM Plan (Paper QAT only).
Encircle the rating based on the given conditions (Paper QAT only).
Add all the scores to indicate the level of Quality of the BDRRM Plan (Paper QAT only).
A. ORGANIZATION OF BARANGAY DISASTER RISK REDUCTION AND MANAGEMENT STRUCTURE
A1. BARANGAY DRRM COMMITTEE IS ORGANIZED AND SATIFIES THE FOLLOWING CRITERIA
CRITERIA:
☐ A .With illustrative organizational structure of the BDRRM Committee (i.e. organogram) reflecting the four
thematic areas – Mitigation and Prevention, Preparedness, Response and, Recovery and Rehabilitation –
as mandated by RA 10121.
☐ B. Members of the BDRRM Committee are identified with representing organization
☐ C. Has specific roles and responsibilities of the BDRRMC
☐ D. With regular quarterly meeting of the BDRRMC
Remarks:
Rating: Please encircle the score based on the presence of the required criteria for the QB.
3 If Criteria A to E with at least 5 sub-section under E are present in the BDRRM Plan
2 If Criteria A to C are present in the plan
1 If any of the Criteria from A to E (with at least 5 sub-section under E) are present
0 If none of the criteria is present
A2. MEMBERSHIP IN THE BARANGAY DRRM COMMITTEE INCLUDES
REPRESENTATION FROM SECTORAL
☐ A. At least 2 civil society organizations representing most vulnerable and marginalized sector,
primarily representing the youth and children, persons with disability and the elderly
☐ B. Schools – specifically by the appointed DRRM Coordinator or school principal/ person in
authority
☐ C. Faith-based organization
☐ D. Livelihood sector (ex. Fisher folks, farmers, business, cooperatives, informal workers)
☐ E. Environmental sector (if there is any)
Remarks:
Rating: Please encircle the score based on the presence of the required criteria for the QB.
1
An organized and active sectoral group is at least registered legally and recognize by the barangay or LGUs, or any of the national
or local government agencies; with members attending the organizational meetings as well as documentation of meetings.
Remarks:
Rating: Please encircle the score based on the presence of the required criteria for the QB.
3 If all the Criteria A and B are present in the Plan
2 If Criteria A and all of the vulnerable population is present in the plan
2
Except for criterion with “if Applicable”
B2. RISK ASSESSMENT IS SPECIFIC TO THE IDENTIFIED HAZARD AND IS LINKED TO THE DEVELOP-
MENT OF PROGRAMS, PROJECTS AND ACTIVITIES.
CRITERIA:
Remarks:
Rating: Please encircle the score based on the presence of the required criteria for the QB.
If all the Criteria from A to F with all the sub-section under C and at least 3 of the sub-section under D are present in the plan.
3
If Criteria A to D with all the sub-section under C and at least 3 of the sub-section under D are present in the plan.
2
1 If any of the Criteria from A to F is present in the plan
C1. PROGRAMS, PROJECTS, AND ACTIVITIES IN THE PLAN ARE PER THEMATIC AREA
WITH CLEAR TARGETS, TIMEFRAME AND RESOURCED PROPERLY.
CRITERIA:
☐ A. Programs, projects and activities in the ☐ Per thematic area
CBDRRM plan are: ☐ With expected output and
☐ Timeframe
☐ C. Programs, projects and activities ad- ☐Issues on child and PWD protection
dressing the major issues/concerns for chil- (neglect, abuse, child labor or trafficking)
dren and PWDs such as, but not limited to, ☐Disruption of classes, schools used as evacuation centers
are identified in the plan: ☐Prone to disease and illnesses
☐Loss of important documents: birth certificate and school documents
☐Loss of shelter
☐Separation from family members during disasters
☐ D. DRRM plan is integrated in the approved barangay development plan and annual investment plan
Remarks:
Rating: Please encircle the score based on the presence of the required criteria for the QB.
If all the Criteria from A with all its sub-section, B with its first sub-section, C with at least 3 of its sub-section and D
3 are present in the plan.
2 If Criteria A with all its sub-section and B with its first sub-section are present in the plan.
1 If any of the Criteria from A to D is present in the plan.
0 If none of the Criteria is present in the plan
D. INVOLVEMENT OF RELEVANT STAKEHOLDERS
D1. RELEVANT STAKEHOLDERS ARE WITH SPECIFIC ROLES IN THE IMPLEMENTATION OF THE PLAN
CRITERIA:
Remarks:
Rating: Please encircle the score based on the presence of the required criteria for the QB.
3 If all of Criteria A with all its sub-section and B with its first 4 sub-section are present in the plan.
1 If any of Criteria A with all its sub-section or B with its first 4 sub-section are present in the plan
☐ Check if there are additional capacity List down the title of the training/s:
building/ training acquired that are not in __________________________________________________
the list above. __________________________________________________
Rating: Please encircle the score based on the presence of the required criteria for the QB.
3 If all the Criteria A with all its sub-section and B with all its sub-section plus additional capacity building acquired are
present in the plan.
2 If all the Criteria A with all its sub-section and B with all its sub-section are present in the plan.
1 If any of the Criteria A with all its sub-section and B with all its sub-section are present in the plan.
0 If none of the Criteria is present in the plan
F. COMMUNITY AWARENESS RAISING AND EDUCATION
Remarks:
Rating: Please encircle the score based on the presence of the required criteria for the QB.
3 If All the Criteria A and B with its sub-criteria is present in the plan
2 If Any of Criteria A and B with its sub-section are present in the plan
1 If an Activity is identified but no specific regularity
0 If none of the Criteria is present in the plan
G. MONITORING AND EVALUATION
☐ C. Sectoral and vulnerable groups have roles and responsibilities in monitoring and evaluation of the plan.
Remarks:
Rating: Please encircle the score based on the presence of the required criteria for the QB.
3 If all the Criteria from A with all its sub-section, B with all its sub-section and C are in the plan.
2 If Criteria A with all its sub-section and B with all its sub-section are present in the plan
1 If Criteria A with all its sub-section are present in the plan
0 If none of the criteria is present in the plan
H. POLICY SUPPORT
☐ A. A local policy (ex. EO, ordinance) creating the barangay DRRM committee with roles and responsibilities is approved
☐ B. With a resolution adopting the CBDRRM plan
☐ C. Approved appropriation ordinance of the barangay that includes utilization of the local DRRM fund
☐ D. With other local policies (ex. EO, ordinance) institutionalizing DRR measures, e.g. conduct of regular community drill, solid
waste management, etc. Enumerate the local policies in place.
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
Remarks:
Rating: Please encircle the score based on the presence of the required criteria for the QB.
I1. THE IDENTIFIED EARLY WARNING SYSTEM IS SPECIFIC TO PRIORITY HAZARD AND APPROPRIATE
FOR THE MOST VULNERABLE POPULATION.
CRITERIA:
Remarks:
Rating: Please encircle the score based on the presence of the required criteria for the QB.
CRITERIA:
☐ A. Has a tabulation of identified and appropriate (an appropriate evacuation center/facility should have undergone assessment
of municipal engineer and has passed the assessment) evacuation centers/facilities in the community and the capacity of each
evacuation center/facility to accommodate families.
☐ B. If the identified evacuation centers are private residences and schools (public or private), a written agreement (ex. MOA,
MOU) should be in place stating evacuation coordination and management.
☐ C. A map is available that locates the identified evacuation centers/facilities in the community and the safe routes to access it
☐ D. Plan describes how the following ☐ Food and Non-Food Items (ex. clothing, blanket, mosquito net)
basic services will be delivered to evacuees ☐ Drinking water
in the identified evacuation center/facility: ☐ Basic drugs/medicines and medical supplies
☐ Hygiene kits
☐ Child, woman, elderly and PWD-friendly spaces
☐ Breastfeeding space/station
☐ Non-human spaces (ex. spaces for livestock)
☐ Genderized WASH facilities like toilet, bathroom
☐ Family reunification
☐ E. Plan includes a master list of families to be accommodated for each identified evacuation center/facility or a system of regis-
tration for each evacuation center/facility is identified
☐ F. Plan includes construction of an evacuation center
Remarks:
Rating: Please encircle the score based on the presence of the required criteria for the QB.
3 If All of the Criteria from A, B, C, D with all its sub-section, E and F is present in the plan.
1 If any of the Criteria from A, B, C, D with all its sub-section, E and F is present in the plan.
(Note any DRR measures innovated by the barangay as reflected in the plan.)
Rating:
Level of Quality:
OVERALL RATING OF THE BDRRM PLAN (Add all the scores from A1
to I2)
PART II. RECOMMENDATIONS FOR IMPROVEMENT OF PLAN
Identify major findings (per element) based on the review of the plan and recommend next action steps for improvement of the plan. Discuss
this with the local DRRM Committee/ focal person or community members and ask them the technical assistance (TA) and timeframe that
they need to be able to perform the recommended next action steps and eventually address the gaps.
Element Summary of Gaps Recommendation and Next Technical Assistance TA Provider Timeframe
Action Steps Needs
I
PART III. FEEDBACK ON THE USE OF THE TOOL
For the USER - Kindly answer the following questions for purposes of enhancing the tool:
No Questions Responses
3 Is there any specific item/ element in the tool that you find
challenging to get responses / feedback? Please identify
them and how were you able to address it/ them?