HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
01 ESTRUCTURAS 0.00
01.01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD 0.00
01.01.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 0.00
01.01.01.01 CONSTRUCCIONES PROVISIONALES 0.00
01.01.01.01.01 ALMACENES m2 72.00 0.00
1.00 1.00 12.00 6.00 72.00

01.01.01.01.02 CARTEL DE IDENTIFICACIÓN DE OBRA DE 2.40x3.60 m. und 1.00 0.00


1.00 1.00 1.00

01.01.01.02 TRABAJOS PRELIMINARES 0.00


01.01.01.02.01 LIMPIEZA DEL TERRENO 0.00
01.01.01.02.01.0 ELIMINACION DE MALEZA Y ARBUSTOS DE FÁCIL EXTRA m2 3989.90 0.00
1.00 1.00 3989.90 3989.90

01.01.01.03 REMOCIONES 0.00

01.01.01.03.01 REMOCION DE PUERTAS und 26.00 0.00


Primer piso 1.00 20.00 20.00
Segundo piso 1.00 6.00 6.00

01.01.01.03.02 REMOCION DE VENTANAS und 79.00 0.00

Primer piso 1.00 49.00 49.00


Segundo piso 1.00 30.00 30.00

01.01.01.03.03 REMOCION DE ARCOS DE LOSA DEPORTIVA und 2.00 0.00

1.00 2.00 2.00

01.01.01.03.04 REMOCION DE APARATOS SANITARIOS und 25.00 0.00


1.00 25.00 25.00

REMOCION DE COBERTURA LIVIANA


01.01.01.03.05 m2 1134.74 0.00

Módulo I 51.41 51.41


Módulo II 145.80 145.80
Módulo III y IV 516.90 516.90
Módulo V 200.68 200.68
Módulo VI 219.95 219.95

01.01.01.04 DEMOLICIONES 0.00

01.01.01.04.01 DEMOLICION DE MURO TAPIAL m3 638.65 0.00

Primer Piso
Cerco perimétrico 96.51 0.40 2.40 92.65
Módulo I 28.75 0.40 2.60 29.90
Módulo II 47.40 0.40 2.60 49.30
Módulo III y IV 68.60 0.40 2.60 71.34
106.35 0.40 2.60 110.60
Módulo V 66.76 0.40 2.60 69.43
Módulo VI 61.34 0.40 2.60 63.79
Segundo Piso
Módulo III y IV 145.80 0.40 2.60 151.63

01.01.01.04.02 DEMOLICION DE ENTREPISO DE MADERA m3 135.00 0.00

Módulo III y IV 135.00 135.00

01.01.01.04.03 DEMOLICION DE ALBAÑILERIA m2 33.30 0.00


Antena 9.30 9.30
Gruta 24.00 24.00
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO

01.01.01.04.04 DEMOLICION DE ESTRUCTURAS DE CONCRETO SIMPLE m3 209.89 0.00

Losa Multideportiva 91.20 91.20


Tribuna 74.80 74.80
Pisos y Pavimentos 43.89 43.89

01.01.01.04.05 DEMOLICION DE ESTRUCTURAS DE CONCRETO ARMADO m3 105.92 0.00

Escaleras 20.71 20.71


Concreto en cerco de fachada 27.67 27.67
Columnas y Vigas Módulo III y IV 40.01 40.01
Columnas y Vigas Módulo V 17.53 17.53

01.01.01.04.06 ELIMINACION DE DEMOLICIONES m3 1433.61


Total 1102.78 1.30 1433.61

01.01.01.05 MOVILIZACIÓN DE EQUIPOS Y HERRAMIENTAS


01.01.01.05.01 MOVILIZACION DE EQUIPOS Y HERRAMIENTAS AL LUGAR GLB 1.00
1.00 1.00 1.00

01.01.01.05.02 FLETE TRANSPORTE DE MATERIALES A OBRA GLB 1.00 0.00


1.00 1.00 1.00

01.01.01.06 TRAZOS NIVELES Y REPLANTEO 0.00


01.01.01.06.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 3989.90 0.00
1.00 1.00 3989.90 3989.90

01.01.01.06.02 REPLANTEO DURANTE EL PROCESO m2 3989.90 0.00


1.00 1.00 3989.90 3989.90

01.01.01.07 EXPLANACIONES
01.01.01.07.01 RELLENO Y COMPACTADO DE TERRENO CON MAQUINARIA m3 604.16
MODULO I 1.00 1.00 0.35 316.00 110.60
MODULO II 1.00 1.00 0.35 347.89 121.76
MODULO III 1.00 1.00 0.35 166.44 58.25
MODULO IV 1.00 1.00 0.35 295.83 103.54
LOSA DEPORTIVA 1.00 1.00 0.35 600.00 210.00

01.01.02 SEGURIDAD Y SALUD 0.00

01.01.02.01 ELABORACIÓN, IMPLEMENTACIÓN Y ADMINISTRACIÓN DEL GLB 1.00 0.00

1.00 1.00 1.00

01.01.02.02 EQUIPOS DE PROTECCIÓN INDIVIDUAL und 90.00 0.00


1.00 90.00 90.00

01.01.02.03 EQUIPOS DE PROTECCIÓN COLECTIVA GLB 1.00 0.00

1.00 1.00 1.00

01.01.02.04 SEÑALIZACIÓN TEMPORAL DE SEGURIDAD GLB 1.00 0.00


1.00 1.00 1.00

01.01.02.05 CAPACITACIÓN EN SEGURIDAD Y SALUD GLB 1.00 0.00

1.00 1.00 1.00

01.01.02.06 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SE GLB 1.00 0.00

1.00 1.00 1.00


HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO

01.02 MODULO I: CENTRO DE RECURSOS TECNOLÓGICOS, LABORATORIO DE FÍSICA, QUÍMICA Y BIOLOGÍA, DEPÓSITO DE MATERIALES, DEPÓSIT 0.00
01.02.01 TRABAJOS PRELIMINARES 0.00
01.02.01.01 LIMPIEZA DEL TERRENO 0.00
01.02.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 316.00 0.00
AREA INCLUIDA EL VOLADO DE ZAPATAS MAS UN METRO PARA BALIZAS 1.00 1.00 30.65 10.31 316.00

01.02.01.02 TRAZOS NIVELES Y REPLANTEO 0.00


01.02.01.02.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 316.00 0.00
AREA INCLUIDA EL VOLADO DE ZAPATAS MAS UN METRO PARA BALIZAS 1.00 1.00 30.65 10.31 316.00

01.02.01.02.02 REPLANTEO DURANTE EL PROCESO m2 316.00 0.00


AREA INCLUIDA EL VOLADO DE ZAPATAS MAS UN METRO PARA BALIZAS 1.00 1.00 30.65 10.31 316.00
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
01.02.02 MOVIMIENTO DE TIERRAS 0.00
01.02.02.01 EXCAVACIÓN DE ZANJAS PARA CIMIENTOS CORRIDOS EN m3 22.78 0.00
CIMIENTOS CORRIDOS 0.00
EJE C-C 1.00 2.00 1.90 0.40 0.70 1.06
1.00 4.00 2.23 0.40 0.70 2.50
EJE J-J 1.00 1.00 0.89 0.40 0.70 0.25
1.00 2.00 2.23 0.40 0.70 1.25
1.00 1.00 1.63 0.40 0.70 0.46
1.00 1.00 1.53 0.40 0.70 0.43
1.00 1.00 1.22 0.40 0.70 0.34
EJE 15-15 1.00 1.00 4.86 0.40 0.70 1.36
1.00 1.00 2.04 0.40 0.70 0.57
1.00 1.00 1.93 0.40 0.70 0.54
1.00 1.00 1.94 0.40 0.70 0.54
VIGAS DE CIMENTACION
EJE 8-8 1.00 1.00 4.48 0.55 1.00 2.46
EJE 9-9 1.00 1.00 4.48 0.55 1.00 2.46
EJE 10-10 1.00 1.00 4.61 0.85 1.00 3.92
EJE 12-12 1.00 1.00 4.61 0.85 1.00 3.92
ARRANQUE DE ESCALERA
ESCALERA 1.00 1.00 1.20 0.60 1.00 0.72

01.02.02.02 EXCAVACION PARA ZAPATAS 2.00M =<H<=2.50M. DE PROFUN m3 97.36 0.00


Z-1 2.00 1.00 2.20 1.70 2.00 14.96
Z-2 2.00 1.00 1.50 1.40 2.00 8.40
Z-3 10.00 1.00 1.60 1.90 2.00 60.80
Z-4 4.00 1.00 1.50 1.10 2.00 13.20

01.02.02.03 RELLENO Y COMPACTADO DE ZANJAS CON EQUIPO LIVIANO m3 61.72 0.00


RELLENO EN ZAPATAS
INTERSECCION DE LOS EJES 2D, 3D 1.00 2.00 1.17 1.40 3.28
INTERSECCION DE LOS EJES 4C, 12C 1.00 2.00 1.19 1.40 3.34
INTERSECCION DE LOS EJE 5C, 7C,10C, 11C 1.00 4.00 2.34 1.40 13.11
INTERSECCION DE LOS EJES 8 Y C 1.00 1.00 2.13 1.40 2.98
INTERSECCION DE LOS EJES 2I, 3I 1.00 1.00 1.17 1.40 1.64
INTERSECCION DE LOS EJES 4I 1.00 1.00 2.24 1.40 3.13
INTERSECCION DE LOS EJES 5I, 10I 1.00 1.00 2.55 1.40 3.57
INTERSECCION DE LOS EJES 7I, 11I 1.00 1.00 2.34 1.40 3.28
INTERSECCION DE LOS EJES 8I 1.00 1.00 2.33 1.40 3.26
INTERSECCION DE LOS EJES 12I 1.00 1.00 2.57 1.40 3.60
RELLENO EN VIGAS DE CIMENTACION 0.00
EJE 2-2 1.00 1.00 4.48 0.25 0.60 0.67
EJE 3-3 1.00 1.00 3.88 0.25 0.60 0.58
EJE 4-4 1.00 1.00 4.41 0.55 0.60 1.46
POR DEBAJO DE LOS MURETES DE CLOSET EN EL EJE 4-4 1.00 3.00 0.60 0.55 0.40 0.40
EJE 12-12 1.00 1.00 6.21 0.55 0.60 2.05
PARA OBTENER EL NIVEL DE +0.10 PARA LOS PISOS INTERIORES
1.00 1.00 153.93 0.10 15.39

01.02.02.04 NIVELACION INT.Y APISONADO FINAL DEL TERRENO PREVIO m2 173.26 0.00
LABORATORIO Y CENTRO DE RECURSOS TECNOLOGICOS 1.00 1.00 153.93 153.93
ESCALERA 1.00 1.00 19.33 19.33

01.02.02.05 ELIMINACIÓN DE MATERIAL EXCEDENTE CON CARRETILLA HAm3 73.01 0.00


VOLUMEN DE CORTE 0.00
EXCAVACIÓN DE ZANJAS PARA CIMIENTOS CORRIDOS EN TERRENO NORMAL 1.00 1.00 22.78 1.25 28.47
EXCAVACION PARA ZAPATAS 2.00M =<H<=2.50M. DE PROFUNDIDAD 1.00 1.00 97.36 1.25 121.70
VOLUMEN DE RELLENO 0.00
RELLENO Y COMPACTADO DE ZANJAS CON EQUIPO LIVIANO CON MATERIAL PROPIO -1.00 1.00 61.72 1.25 -77.16

01.02.02.06 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO PESA m3 73.01 0.00


VOLUMEN DE CORTE 0.00
EXCAVACIÓN DE ZANJAS PARA CIMIENTOS CORRIDOS EN TERRENO NORMAL 1.00 1.00 22.78 1.25 28.47
EXCAVACION PARA ZAPATAS 2.00M =<H<=2.50M. DE PROFUNDIDAD 1.00 1.00 97.36 1.25 121.70
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
VOLUMEN DE RELLENO 0.00
RELLENO Y COMPACTADO DE ZANJAS CON EQUIPO LIVIANO CON MATERIAL PROPIO -1.00 1.00 61.72 1.25 -77.16

01.02.03 OBRAS DE CONCRETO SIMPLE 0.00


01.02.03.01 CIMIENTOS CORRIDOS 0.00
01.02.03.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON m3 10.28 0.00
EJE C-C 1.00 2.00 2.74 0.40 0.60 1.32
1.00 4.00 3.05 0.40 0.60 2.93
EJE J-J 1.00 1.00 1.63 0.40 0.60 0.39
1.00 2.00 3.05 0.40 0.60 1.46
1.00 1.00 2.04 0.40 0.60 0.49
1.00 1.00 1.94 0.40 0.60 0.46
1.00 1.00 1.63 0.40 0.60 0.39
EJE 15-15 1.00 1.00 5.91 0.40 0.60 1.42
1.00 1.00 2.04 0.40 0.60 0.49
1.00 1.00 1.93 0.40 0.60 0.46
1.00 1.00 1.94 0.40 0.60 0.47

01.02.03.02 SOLADOS 0.00


01.02.03.02.01 CONCRETO EN SOLADO MEZCLA 1:12 CEMENTO-HORMIG m2 61.45 0.00
ZAPATAS
Z-1 2.00 1.00 2.20 1.70 7.48
Z-2 2.00 1.00 1.50 1.40 4.20
Z-3 10.00 1.00 1.60 1.90 30.40
Z-4 4.00 1.00 1.50 1.10 6.60
VIGAS DE CIMENTACION 0.00
EJE 2-2 1.00 1.00 4.48 0.55 2.46
EJE 3-3 1.00 1.00 4.48 0.55 2.46
EJE 4-4 1.00 1.00 4.61 0.85 3.92
EJE 12-12 1.00 1.00 4.61 0.85 3.92

01.02.03.03 SOBRECIMIENTO 0.00


01.02.03.03.01 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 4.32 0.00
EJE C-C 1.00 2.00 2.74 0.13 0.45 0.32
1.00 4.00 3.05 0.13 0.45 0.71
EJE J-J 1.00 1.00 1.63 0.13 0.45 0.10
1.00 2.00 3.05 0.13 0.45 0.36
1.00 1.00 2.04 0.13 0.45 0.12
1.00 1.00 1.94 0.13 0.45 0.11
1.00 1.00 1.63 0.13 0.45 0.10
EJE 15-15 1.00 1.00 5.91 0.13 0.45 0.35
1.00 1.00 2.18 0.13 0.45 0.13
1.00 1.00 2.06 0.13 0.45 0.12
1.00 1.00 2.08 0.13 0.45 0.12
EJE 8-8 1.00 1.00 5.50 0.23 0.35 0.44
EJE 9-9 1.00 1.00 5.50 0.23 0.35 0.44
EJE 10-10 1.00 1.00 5.61 0.23 0.35 0.45
EJE 19-19 1.00 1.00 5.61 0.23 0.35 0.45

01.02.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN SOBRECIMIE m2 54.46 0.00


EJE C-C 2.00 2.00 2.74 0.45 4.93
2.00 4.00 3.05 0.45 10.98
EJE J-J 2.00 1.00 1.63 0.45 1.46
2.00 2.00 3.05 0.45 5.49
2.00 1.00 2.04 0.45 1.83
2.00 1.00 1.94 0.45 1.74
2.00 1.00 1.63 0.45 1.46
EJE 15-15 2.00 1.00 5.91 0.45 5.32
2.00 1.00 2.18 0.45 1.96
2.00 1.00 2.06 0.45 1.86
2.00 1.00 2.08 0.45 1.87
EJE 8-8 2.00 1.00 5.50 0.35 3.85
EJE 9-9 2.00 1.00 5.50 0.35 3.85
EJE 10-10 2.00 1.00 5.61 0.35 3.93
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
EJE 19-19 2.00 1.00 5.61 0.35 3.93

01.02.03.04 FALSO PISO 0.00


01.02.03.04.01 CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTO-HORMI m2 173.26 0.00
LABORATORIO Y CENTRO DE RECURSOS TECNOLOGICOS 1.00 1.00 153.93 153.93
ESCALERA 1.00 1.00 19.33 19.33

01.02.04 OBRAS DE CONCRETO ARMADO 0.00


01.02.04.01 ZAPATAS 0.00
01.02.04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 24.34 0.00
Z-1 2.00 1.00 2.20 1.70 0.50 3.74
Z-2 2.00 1.00 1.50 1.40 0.50 2.10
Z-3 10.00 1.00 1.60 1.90 0.50 15.20
Z-4 4.00 1.00 1.50 1.10 0.50 3.30
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
01.02.04.01.02 ACERO EN ZAPATAS F'Y=4,200 Kg/cm2 GRADO 60 kg 1178.88 0.00
Z-1 2.00 12.00 2.20 1.60 84.48
2.00 15.00 1.70 1.60 81.60
Z-2 2.00 10.00 1.50 1.60 48.00
2.00 10.00 1.40 1.60 44.80
Z-3 10.00 13.00 1.60 1.60 332.80
10.00 11.00 1.90 1.60 334.40
Z-4 4.00 8.00 1.50 1.60 76.80
10.00 10.00 1.10 1.60 176.00

01.02.04.02 VIGAS DE CIMENTACIÓN 0.00


01.02.04.02.01 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 10.40 0.00
EJE 8-8 1.00 1.00 6.23 0.55 0.30 1.03
1.00 1.00 6.23 0.30 0.60 1.12
EJE 9-9 1.00 1.00 6.23 0.55 0.30 1.03
1.00 1.00 6.23 0.30 0.60 1.12
EJE 10-10 1.00 1.00 7.01 0.85 0.30 1.79
1.00 1.00 7.01 0.30 0.60 1.26
EJE 19-19 1.00 1.00 7.01 0.85 0.30 1.79
1.00 1.00 7.01 0.30 0.60 1.26

01.02.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CI m2 20.09 0.00


EJE 8-8 1.00 1.00 6.23 0.60 3.74
EJE 9-9 1.00 1.00 6.23 0.60 3.74
EJE 10-10 1.00 2.00 7.01 0.60 8.41
EJE 19-19 1.00 1.00 7.01 0.60 4.21

01.02.04.02.03 ACERO EN VIGAS DE CIMENTACION F'Y=4200 Kg/cm2 GRAD kg 759.20 0.00


EJE 8-8 0.00
ACERO DE ZAPATA LONGITUDINAL 1.00 2.00 6.60 0.58 7.66
ACERO DE ZAPATA TRANSVERSAL 1.00 39.00 0.55 0.58 12.44
ACERO LONGITUDINAL 1.00 6.00 6.60 1.60 63.36
1.00 4.00 6.60 1.02 26.93
ESTRIBOS 1.00 50.00 2.28 0.58 66.12
EJE 9-9 0.00
ACERO DE ZAPATA LONGITUDINAL 1.00 2.00 6.60 0.58 7.66
ACERO DE ZAPATA TRANSVERSAL 1.00 39.00 0.55 0.58 12.44
ACERO LONGITUDINAL 1.00 6.00 6.60 1.60 63.36
1.00 4.00 6.60 1.02 26.93
ESTRIBOS 1.00 50.00 2.28 0.58 66.12
EJE 10-10 0.00
ACERO DE ZAPATA LONGITUDINAL 1.00 2.00 7.40 0.58 8.58
ACERO DE ZAPATA TRANSVERSAL 1.00 39.00 0.85 0.58 19.23
ACERO LONGITUDINAL 1.00 6.00 7.40 1.60 71.04
1.00 4.00 7.40 1.02 30.19
ESTRIBOS 1.00 56.00 2.28 0.58 74.05
EJE 19-19 0.00
ACERO DE ZAPATA LONGITUDINAL 1.00 2.00 7.40 0.58 8.58
ACERO DE ZAPATA TRANSVERSAL 1.00 39.00 0.85 0.58 19.23
ACERO LONGITUDINAL 1.00 6.00 7.40 1.60 71.04
1.00 4.00 7.40 1.02 30.19
ESTRIBOS 1.00 56.00 2.28 0.58 74.05

01.02.04.03 COLUMNAS 0.00


01.02.04.03.01 CONCRETO EN COLUMNAS F'c = 210 KG/CM2 m3 38.15 0.00
EJE 8-8 1.00 1.00 0.25 0.40 5.44 0.54
1.00 1.00 0.23 0.23 7.30 0.39
1.00 1.00 0.25 0.40 6.77 0.68
EJE 9-9 1.00 1.00 0.25 0.40 5.44 0.54
1.00 1.00 0.23 0.23 7.30 0.39
1.00 1.00 0.25 0.40 6.77 0.68
EJE 10-10 1.00 2.00 0.3125 6.37 3.98
1.00 1.00 0.23 0.30 7.91 0.55
EJE 12-12, 13-13, 15-15, 16-16, 18-18 5.00 2.00 0.3375 7.67 25.89
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
EJE 19-19 1.00 2.00 0.3125 6.37 3.98
1.00 1.00 0.23 0.30 7.91 0.55

01.02.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 322.58 0.00


EJE 8-8 1.00 1.00 1.07 5.44 5.82
1.00 2.00 0.23 7.30 3.36
1.00 1.00 1.07 6.77 7.24
EJE 9-9 1.00 1.00 1.07 5.44 5.82
1.00 2.00 0.23 7.30 3.36
1.00 1.00 1.07 6.77 7.24
EJE 10-10 1.00 2.00 2.57 6.37 32.74
1.00 2.00 0.30 7.91 4.75
EJE 12-12, 13-13, 15-15, 16-16, 18-18 5.00 2.00 2.80 7.67 214.76
EJE 19-19 1.00 2.00 2.57 6.37 32.74
1.00 2.00 0.30 7.91 4.75

01.02.04.03.03 ACERO EN COLUMNAS Fy=4200 KG/CM2 GRADO 60 kg 7261.73 0.00


EJE 8-8 1.00 4.00 8.30 1.60 53.12
1.00 2.00 8.30 1.02 16.93
1.00 62.00 1.50 0.58 53.94
1.00 4.00 9.90 1.60 63.36
1.00 69.00 1.12 0.58 44.82
1.00 2.00 10.50 1.02 21.42
1.00 4.00 10.50 1.60 67.20
1.00 79.00 1.50 0.58 68.73
EJE 9-9 1.00 4.00 8.30 1.60 53.12
1.00 2.00 8.30 1.02 16.93
1.00 62.00 1.50 0.58 53.94
1.00 4.00 9.90 1.60 63.36
1.00 69.00 1.12 0.58 44.82
1.00 2.00 10.50 1.02 21.42
1.00 4.00 10.50 1.60 67.20
1.00 79.00 1.50 0.58 68.73
EJE 10-10 2.00 6.00 10.40 2.26 282.05
2.00 10.00 10.40 1.60 332.80
2.00 73.00 1.80 0.58 152.42
2.00 73.00 2.40 0.58 203.23
1.00 4.00 10.70 1.60 68.48
1.00 2.00 10.70 1.02 21.83
1.00 84.00 1.26 0.58 61.39
EJE 12-12, 13-13, 15-15, 16-16, 18-18 10.00 3.00 9.00 2.26 610.20
10.00 12.00 9.00 1.60 1728.00
10.00 78.00 2.40 0.58 1085.76
10.00 78.00 1.80 0.58 814.32
EJE 19-19 2.00 6.00 10.40 2.26 282.05
2.00 10.00 10.40 1.60 332.80
2.00 73.00 1.80 0.58 152.42
2.00 73.00 2.40 0.58 203.23
1.00 4.00 10.70 1.60 68.48
1.00 2.00 10.70 1.02 21.83
1.00 84.00 1.26 0.58 61.39

01.02.04.04 COLUMNAS DE CONFINAMIENTO 0.00


01.02.04.04.01 CONCRETO EN COLUMNAS DE CONFINAMIENTO F'c=175 K m3 3.53 0.00
PRIMER PISO
24.00 1.00 0.13 0.20 2.15 1.34
6.00 1.00 0.13 0.20 2.87 0.45
SEGUNDO PISO
9.00 1.00 0.13 0.20 2.15 0.50
9.00 1.00 0.13 0.20 2.87 0.67
24.00 1.00 0.13 0.20 0.90 0.56

01.02.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 54.24 0.00


PRIMER PISO
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
24.00 2.00 0.20 2.15 20.64
6.00 2.00 0.20 2.87 6.89
SEGUNDO PISO
9.00 2.00 0.20 2.15 7.74
9.00 2.00 0.20 2.87 10.33
24.00 2.00 0.20 0.90 8.64

01.02.04.04.03 ACERO EN COLUMNAS DE CONFINEMIENTO F'c=4,200 KG/ kg 533.13 0.00


PRIMER PISO
24.00 4.00 2.15 0.58 119.71
24.00 21.00 0.66 0.25 83.16
6.00 4.00 2.87 0.58 39.95
6.00 28.00 0.66 0.25 27.72
SEGUNDO PISO
9.00 4.00 2.15 0.58 44.89
9.00 21.00 0.66 0.25 31.19
9.00 4.00 2.87 0.58 59.93
9.00 28.00 0.66 0.25 41.58
24.00 4.00 1.10 0.58 61.25
24.00 6.00 0.66 0.25 23.76

01.02.04.05 VIGAS 0.00


01.02.04.05.01 CONCRETO EN VIGAS F'c=210 KG/CM2 m3 22.58 0.00
EJE 8-8 1.00 1.00 6.23 0.23 0.50 0.72
1.00 1.00 2.36 0.23 0.35 0.19
1.00 1.00 3.16 0.23 0.73
EJE 9-9 1.00 1.00 6.23 0.23 0.50 0.72
1.00 1.00 2.36 0.23 0.35 0.19
1.00 1.00 3.16 0.23 0.73
EJE 10-10 1.00 1.00 6.46 0.23 0.50 0.74
1.00 1.00 2.36 0.23 0.35 0.19
1.00 1.00 6.46 0.23 0.40 0.59
1.00 1.00 7.46 0.23 1.72
EJE 12-12, 13-13, 15-15, 16-16, 18-18 5.00 1.00 7.01 0.25 0.50 4.38
5.00 1.00 2.36 0.25 0.35 1.03
EJE 19-19 1.00 1.00 5.66 0.23 0.50 0.65
1.00 1.00 3.00 0.15 0.44
1.00 1.00 6.46 0.23 0.40 0.59
1.00 1.00 7.46 0.23 1.72
PORTICO C-C, J-J 2.00 1.00 25.00 0.25 0.40 5.00
VIGA DE BORDE 1.00 1.00 25.00 0.15 0.20 0.75
ESCALERA 0.00
2.00 1.00 3.13 0.25 0.40 0.63
1.00 1.00 3.13 0.40 0.20 0.25
2.00 1.00 3.13 0.25 0.40 0.63

01.02.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 196.89 0.00


EJE 8-8 1.00 2.00 6.23 0.50 6.23
1.00 2.00 2.36 0.35 1.65
1.00 2.00 3.16 6.32
EJE 9-9 1.00 2.00 6.23 0.50 6.23
1.00 2.00 2.36 0.35 1.65
1.00 2.00 3.16 6.32
EJE 10-10 1.00 2.00 6.46 0.50 6.46
1.00 2.00 2.36 0.35 1.65
1.00 2.00 6.46 0.40 5.17
1.00 2.00 7.46 14.92
EJE 12-12, 13-13, 15-15, 16-16, 18-18 5.00 2.00 7.01 0.50 35.05
5.00 2.00 2.36 0.35 8.26
EJE 19-19 1.00 2.00 5.66 0.50 5.66
1.00 2.00 3.00 1.45 8.70
1.00 2.00 6.46 0.40 5.17
1.00 2.00 7.46 14.92
PORTICO C-C, J-J 2.00 2.00 25.00 0.40 40.00
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
VIGA DE BORDE 1.00 2.00 25.00 0.20 10.00
ESCALERA 0.00
2.00 2.00 3.13 0.40 5.01
1.00 2.00 3.13 0.40 2.50
2.00 2.00 3.13 0.40 5.01

01.02.04.05.03 ACERO EN VIGAS F'y=4,200 KG/CM2 GRADO 60 kg 3720.71 0.00


EJE 8-8, 9-9 2.00 2.00 8.90 1.60 56.96
2.00 1.00 4.70 1.02 9.59
2.00 2.00 3.60 1.60 23.04
2.00 1.00 4.60 1.60 14.72
2.00 2.00 8.90 1.60 56.96
2.00 2.00 7.85 1.02 32.03
ESTRIBOS 2.00 69.00 1.60 0.58 128.06
2.00 2.00 1.20 1.02 4.90
2.00 2.00 6.10 1.02 24.89
2.00 2.00 6.10 1.02 24.89
2.00 2.00 4.40 1.02 17.95
2.00 2.00 4.40 1.02 17.95
2.00 2.00 2.40 1.02 9.79
2.00 2.00 2.80 1.02 11.42
ESTRIBOS 2.00 71.00 1.10 0.58 90.60
EJE 10-10 1.00 2.00 10.30 1.60 32.96
1.00 2.00 10.30 1.60 32.96
1.00 2.00 8.95 1.02 18.26
1.00 1.00 4.90 1.60 7.84
1.00 1.00 4.90 1.02 5.00
1.00 2.00 3.90 1.60 12.48
ESTRIBOS 1.00 75.00 1.60 0.58 69.60
0.00
1.00 4.00 7.90 1.02 32.23
1.00 58.00 1.40 0.58 47.10
1.00 2.00 2.20 1.02 4.49
1.00 2.00 2.10 1.02 4.28
1.00 2.00 5.80 1.02 11.83
1.00 2.00 5.60 1.02 11.42
1.00 2.00 6.40 1.02 13.06
1.00 2.00 6.40 1.02 13.06
1.00 2.00 2.75 1.02 5.61
1.00 2.00 3.10 1.02 6.32
ESTRIBOS 1.00 88.00 1.10 0.58 56.14
EJE 12-12, 13-13, 15-15, 16-16, 18-18 5.00 3.00 10.30 1.60 247.20
5.00 2.00 10.30 1.60 164.80
5.00 2.00 3.30 1.60 52.80
5.00 2.00 3.10 1.60 49.60
5.00 2.00 5.40 1.60 86.40
5.00 2.00 4.50 2.26 101.70
5.00 2.00 9.75 1.02 99.45
5.00 61.00 1.60 0.58 283.04
EJE 19-19 1.00 2.00 10.30 1.60 32.96
1.00 2.00 10.30 1.60 32.96
1.00 2.00 8.95 1.02 18.26
1.00 2.00 4.10 1.60 13.12
1.00 1.00 5.10 1.02 5.20
1.00 1.00 3.40 1.02 3.47
1.00 77.00 0.33 1.02 25.53
1.00 17.00 1.10 1.60 29.92
ESTRIBOS 1.00 75.00 1.60 0.58 69.60
0.00
1.00 4.00 7.50 1.02 30.60
1.00 56.00 1.40 0.58 45.47
1.00 2.00 2.20 1.02 4.49
1.00 2.00 2.10 1.02 4.28
1.00 2.00 5.80 1.02 11.83
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
1.00 2.00 5.60 1.02 11.42
1.00 2.00 6.40 1.02 13.06
1.00 2.00 6.40 1.02 13.06
1.00 2.00 2.75 1.02 5.61
1.00 2.00 3.10 1.02 6.32
ESTRIBOS 1.00 88.00 1.10 0.58 56.14
PORTICO C-C, I-I 4.00 4.00 27.30 1.60 698.88
4.00 128.00 1.40 0.58 415.74
VIGA DE BORDE 1.00 4.00 27.30 0.58 63.34
ESCALERA 1.00 182.00 0.70 0.25 31.85
2.00 4.00 4.10 0.25 0.40 1.60 5.25
2.00 20.00 1.10 0.58 25.52
1.00 6.00 4.10 0.40 0.20 1.60 3.15
1.00 20.00 1.30 0.58 15.08
2.00 4.00 4.10 0.25 0.40 1.60 5.25
2.00 20.00 1.10 0.58 25.52
VIGA DE BORDE 1.00 4.00 3.59 0.15 0.20 0.58 0.25
1.00 24.00 0.70 0.25 4.20

01.02.04.06 VIGAS DE CONFINAMIENTO 0.00


01.02.04.06.01 CONCRETO EN VIGAS DE CONFINAMIENTO F'C=175 KG/CM2m3 2.86 0.00
PRIMER PISO
2.00 1.00 2.58 0.13 0.20 0.13
4.00 1.00 2.88 0.13 0.20 0.30
1.00 1.00 1.46 0.13 0.20 0.04
2.00 1.00 2.88 0.13 0.20 0.15
2.00 1.00 1.77 0.13 0.20 0.09
1.00 1.00 1.46 0.13 0.20 0.04
2.00 1.00 2.67 0.13 0.20 0.14
SEGUNDO PISO 1.00 1.00 28.80 0.13 0.20 0.75
1.00 1.00 1.96 0.13 0.20 0.05
1.00 1.00 2.97 0.13 0.20 0.08
2.00 1.00 2.15 0.13 0.20 0.11
2.00 1.00 3.28 0.13 0.20 0.17
1.00 1.00 1.84 0.13 0.20 0.05
1.00 1.00 1.13 0.13 0.20 0.03
1.00 1.00 3.43 0.13 0.20 0.09
1.00 1.00 5.91 0.13 0.20 0.15
2.00 1.00 2.97 0.13 0.20 0.15
4.00 1.00 3.28 0.13 0.20 0.34

01.02.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE C m2 44.07 0.00


PRIMER PISO
2.00 2.00 2.58 0.20 2.06
4.00 2.00 2.88 0.20 4.61
1.00 2.00 1.46 0.20 0.58
2.00 2.00 2.88 0.20 2.30
2.00 2.00 1.77 0.20 1.42
1.00 2.00 1.46 0.20 0.58
2.00 2.00 2.67 0.20 2.13
SEGUNDO PISO 1.00 2.00 28.80 0.20 11.52
1.00 2.00 1.96 0.20 0.78
1.00 2.00 2.97 0.20 1.19
2.00 2.00 2.15 0.20 1.72
2.00 2.00 3.28 0.20 2.62
1.00 2.00 1.84 0.20 0.74
1.00 2.00 1.13 0.20 0.45
1.00 2.00 3.43 0.20 1.37
1.00 2.00 5.91 0.20 2.36
2.00 2.00 2.97 0.20 2.38
4.00 2.00 3.28 0.20 5.25

01.02.04.06.03 ACERO EN VIGAS DE CONFINAMIENTO F'y=4,200 KG/CM2 kg 611.31 0.00


PRIMER PISO
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
2.00 4.00 34.22 0.58 158.78
ESTRIBOS 1.00 340.00 0.76 0.25 64.60
SEGUNDO PISO 1.00 4.00 91.95 0.58 213.32
ESTRIBOS 1.00 919.00 0.76 0.25 174.61

01.02.04.07 LOSAS ALIGERADAS 0.00


01.02.04.07.01 CONCRETO EN LOSAS ALIGERADAS F'c=210 KG/CM2 m3 18.08 0.00
1.00 1.00 3.44 0.0875 0.30
1.00 1.00 6.92 0.0875 0.61
1.00 1.00 24.16 0.0875 2.11
1.00 1.00 8.60 0.0875 0.75
1.00 1.00 24.09 0.0875 2.11
1.00 1.00 8.58 0.0875 0.75
1.00 1.00 24.09 0.0875 2.11
1.00 1.00 8.58 0.0875 0.75
1.00 1.00 24.09 0.0875 2.11
1.00 1.00 8.58 0.0875 0.75
1.00 1.00 24.09 0.0875 2.11
1.00 1.00 8.58 0.0875 0.75
1.00 1.00 24.16 0.0875 2.11
1.00 1.00 8.60 0.0875 0.75

01.02.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIG m2 206.58 0.00


1.00 1.00 3.44 3.44
1.00 1.00 6.92 6.92
1.00 1.00 24.16 24.16
1.00 1.00 8.60 8.60
1.00 1.00 24.09 24.09
1.00 1.00 8.58 8.58
1.00 1.00 24.09 24.09
1.00 1.00 8.58 8.58
1.00 1.00 24.09 24.09
1.00 1.00 8.58 8.58
1.00 1.00 24.09 24.09
1.00 1.00 8.58 8.58
1.00 1.00 24.16 24.16
1.00 1.00 8.60 8.60
ACERO EN LOSAS ALIGERADAS Fy=4,200 KG/CM2 GRADO 60
01.02.04.07.03 kg 1387.56 0.00
ESCALERA 8.00 1.00 3.69 1.02 30.11
MODULO 8.00 2.00 1.15 1.02 18.77
21.00 1.00 7.53 1.02 161.29
21.00 1.00 8.66 1.02 185.50
21.00 1.00 6.52 1.02 139.66
21.00 1.00 3.60 1.02 77.11
21.00 2.00 1.05 1.02 44.98
21.00 5.00 2.85 1.60 478.80
TEMPERATURA (ESCALERA) 21.00 1.00 3.56 0.25 18.69
TEMPERATURA (MODULO) 99.00 1.00 9.40 0.25 232.65

01.02.04.07.04 LADRILLO HUECO DE ARCILLA DE 15x30x30 PARA LOSA ALI und 1727.00 0.00
ENTRE LOS EJES GI, 2,3 1.00 1.00 3.44 8.3333 29.00
ENTRE EL VOLADO Y LOS EJES 2,3 1.00 1.00 6.92 8.3333 58.00
ENTRE LOS EJES 4,5 C,I 1.00 1.00 24.16 8.3333 202.00
ENTRE LOS EJES 4,5 VOLADO 1.00 1.00 8.60 8.3333 72.00
ENTRE LOS EJES 5,7 C,I 1.00 1.00 24.09 8.3333 201.00
ENTRE LOS EJES 5,7 VOLADO 1.00 1.00 8.58 8.3333 72.00
ENTRE LOS EJES 78 C,I 1.00 1.00 24.09 8.3333 201.00
ENTRE LOS EJES 7,8 VOLADO 1.00 1.00 8.58 8.3333 72.00
ENTRE LOS EJES 8,10, C,I 1.00 1.00 24.09 8.3333 201.00
ENTRE LOS EJES 8,10 VOLADO 1.00 1.00 8.58 8.3333 72.00
ENTRE LOS EJES 10,11, C,I 1.00 1.00 24.09 8.3333 201.00
ENTRE LOS EJES 10,11 VOLADO 1.00 1.00 8.58 8.3333 72.00
ENTRE LOS EJES 11,12, C,I 1.00 1.00 24.16 8.3333 202.00
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
ENTRE LOS EJES 11,12 VOLADO 1.00 1.00 8.60 8.3333 72.00

01.02.04.08 ESCALERAS 0.00


01.02.04.08.01 CONCRETO EN ESCALERAS F'c= 210 KG/CM2 m3 4.03 0.00
TRAMO 1 1.00 1.00 1.60 1.55 2.48
TRAMO 2 1.00 1.00 1.00 1.55 1.55

01.02.04.08.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERA m2 14.03 0.00


1.00 1.00 4.25 1.55 6.59
1.00 1.00 4.80 1.55 7.44

01.02.04.08.03 ACERO EN ESCALERA F'y=4,200 KG/CM2 GRADO 60 kg 548.88 0.00


TRAMO 1 1.00 10.00 1.85 1.60 29.60
1.00 10.00 4.30 1.60 68.80
1.00 10.00 2.55 1.60 40.80
1.00 8.00 5.56 1.60 71.17
1.00 20.00 1.55 1.02 31.62
1.00 12.00 1.55 1.02 18.97
1.00 8.00 1.55 1.60 19.84
TRAMO 2 1.00 10.00 5.65 1.60 90.40
1.00 8.00 4.35 1.60 55.68
1.00 8.00 2.60 1.60 33.28
1.00 42.00 1.55 1.02 66.40
1.00 9.00 1.55 1.60 22.32

01.02.04.09 GARGOLAS 0.00


01.02.04.09.01 CONCRETO EN GARGOLAS F'c = 210 KG/CM2 m3 0.06 0.00
4.00 1.00 0.10 0.10 0.20 0.01
4.00 2.00 0.25 0.25 0.10 0.05

01.02.04.09.02 ENCOFRADO Y DESENCOFRADO NORMAL EN GARGOLAS m2 1.60 0.00


4.00 1.00 0.20 0.20 0.16
4.00 4.00 0.25 0.25 1.00
4.00 1.00 0.25 0.20 0.20
4.00 2.00 0.20 0.15 0.24

01.02.04.09.03 ACERO EN GARGOLAS Fy=4200 KG/CM2 GRADO 60 kg 3.60 0.00


4.00 2.00 1.10 0.25 2.20
4.00 2.00 0.70 0.25 1.40

01.02.04.10 MESA DE CONCRETO 0.00


01.02.04.10.01 CONCRETO EN MESA DE CONCRETO F'c=175 Kg/cm2 m3 3.99 0.00
5.00 4.00 0.60 0.15 0.89 1.60
5.00 2.00 3.98 0.60 0.10 2.39
01.02.04.10.02 ENCOFRADO Y DESENCOFRADO NORMAL MESA DE CONC m2 43.60 0.00
5.00 2.00 1.45 0.60 8.70
5.00 1.00 0.48 0.60 1.44
5.00 2.00 0.60 0.89 5.34
5.00 6.00 0.60 0.79 14.22
5.00 2.00 9.16 0.10 9.16
5.00 8.00 0.15 0.79 4.74

01.02.04.10.03 ACERO EN MESA DE CONCRETO Fy=4200 KG/CM2 GRADO kg 198.01 0.00


5.00 16.00 1.20 0.58 55.68
5.00 28.00 0.55 0.58 44.66
5.00 4.00 4.37 0.58 50.69
5.00 27.00 0.60 0.58 46.98

01.02.05 ESTRUCTURAS MADERA Y COBERTURAS 0.00


01.02.05.01 ESTRUCTURAS MADERA 0.00
01.02.05.01.01 TIJERAL MADERA TORNILLO DE 2"x6" SEGÚN DISEÑO p2 592.51 0.00
5.00 1.00 11.50 2.00 6.00 0.27 188.65
5.00 1.00 10.90 2.00 6.00 0.27 178.81
5.00 1.00 0.93 2.00 4.00 0.27 10.12
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
5.00 1.00 0.71 2.00 4.00 0.27 7.77
5.00 1.00 1.18 2.00 4.00 0.27 12.86
5.00 1.00 1.05 2.00 4.00 0.27 11.50
5.00 1.00 1.47 2.00 4.00 0.27 16.09
5.00 1.00 1.40 2.00 4.00 0.27 15.31
5.00 1.00 1.70 2.00 4.00 0.27 18.59
5.00 1.00 1.89 2.00 4.00 0.27 20.67
5.00 1.00 1.77 2.00 4.00 0.27 19.30
5.00 1.00 1.46 2.00 4.00 0.27 16.00
5.00 1.00 1.53 2.00 4.00 0.27 16.71
5.00 1.00 1.18 2.00 4.00 0.27 12.92
5.00 1.00 1.20 2.00 4.00 0.27 13.12
5.00 1.00 0.94 2.00 4.00 0.27 10.24
5.00 1.00 0.87 2.00 4.00 0.27 9.53
5.00 1.00 0.88 2.00 4.00 0.27 9.64
5.00 1.00 0.43 2.00 4.00 0.27 4.67

01.02.05.01.02 TIJERAL TIMPANO DE MADERA TORNILLO DE 2"X3" p2 94.93 0.00


1.00 2.00 11.50 2.00 4.00 0.27 50.31
1.00 2.00 10.20 2.00 4.00 0.27 44.62

01.02.05.01.03 CORREAS DE MADERA TORNILLO DE 3"X4" p2 167.95 0.00


ESCALERA 1.00 5.00 3.59 17.95
MODULO 1.00 6.00 25.00 150.00

01.02.05.02 COBERTURAS 0.00


01.02.05.02.01 COBERTURA CON TEJA ANDINA 1.14X0.72m, e=5 mm m2 326.84 0.00
MODULO 1.00 1.00 25.00 5.38 134.50
1.00 1.00 25.00 6.20 155.00
ESCALERA 1.00 1.00 3.59 6.40 22.98
1.00 1.00 3.59 4.00 14.36

01.02.05.02.02 CUMBRERA TEJA ANDINA 0.35X0.72 m, e=5 mm m 28.59 0.00


ESCALERA 1.00 1.00 3.59 3.59
MODULO 1.00 1.00 25.00 25.00

01.03 MODULO II: AULA N° 01, TÓPICO, SALA DE PROFESORES, DIRECCIÓN, SECRETARÍA, HALL-ESPERA, SERVICIOS HIGIÉNICOS, ESCALERAS, AUL 0.00
01.03.01 TRABAJOS PRELIMINARES 0.00
01.03.01.01 LIMPIEZA DEL TERRENO 0.00
01.03.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 371.65 0.00
1.00 1.00 32.15 11.56 371.65

01.03.01.02 TRAZOS NIVELES Y REPLANTEO 0.00


01.03.01.02.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 371.65 0.00
1.00 1.00 32.15 11.56 371.65

01.03.01.02.02 REPLANTEO DURANTE EL PROCESO m2 371.65 0.00


1.00 1.00 32.15 11.56 371.65

01.03.02 MOVIMIENTO DE TIERRAS 0.00


01.03.02.01 EXCAVACIÓN DE ZANJAS PARA CIMIENTOS CORRIDOS EN m3 14.03 0.00
EJE P-P 1.00 2.00 1.89 0.40 0.60 0.91
1.00 4.00 2.23 0.40 0.60 2.14
EJE U-U 1.00 1.00 1.59 0.40 0.60 0.38
1.00 1.00 1.52 0.40 0.60 0.36
1.00 1.00 1.62 0.40 0.60 0.39
1.00 1.00 0.66 0.40 0.60 0.16
1.00 1.00 0.67 0.40 0.60 0.16
1.00 1.00 0.46 0.40 0.60 0.11
1.00 1.00 0.84 0.40 0.60 0.20
ENTRE EL EJE P-P Y U-U 1.00 1.00 3.75 0.40 0.60 0.90
1.00 1.00 4.95 0.40 0.60 1.19
1.00 1.00 1.97 0.40 0.60 0.47
EJE 24-24 1.00 1.00 4.86 0.40 0.60 1.17
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
EJE 24-25 1.00 1.00 2.32 0.40 0.60 0.56
EJE 25-26 1.00 1.00 3.21 0.40 0.60 0.77
1.00 1.00 2.12 0.40 0.60 0.51
EJE 26-26 1.00 1.00 4.86 0.40 0.60 1.17
EJE 26-27 1.00 1.00 2.94 0.40 0.60 0.71
EJE 27-27 1.00 1.00 4.86 0.40 0.60 1.17
EJE 27-28 1.00 1.00 2.56 0.40 0.60 0.61

01.03.02.02 EXCAVACION PARA ZAPATAS 2.00M =<H<=2.50M. DE PROFUN m3 143.44 0.00


Z-1 1.00 2.00 1.70 2.20 2.00 14.96
Z-2 1.00 2.00 1.40 1.50 2.00 8.40
Z-3 1.00 10.00 1.90 1.60 2.00 60.80
Z-4 1.00 4.00 1.10 1.50 2.00 13.20
Z-5 1.00 8.00 2.40 1.20 2.00 46.08

01.03.02.03 RELLENO Y COMPACTADO DE ZANJAS CON EQUIPO LIVIANO m3 79.07 0.00


1.00 1.00 1.01 1.4 1.41
1.00 1.00 2.34 1.4 3.28
1.00 1.00 2.13 1.4 2.98
1.00 1.00 2.23 1.4 3.12
1.00 1.00 2.13 1.4 2.98
1.00 1.00 2.13 1.4 2.98
1.00 1.00 0.89 1.4 1.25
1.00 1.00 2.24 1.4 3.14
1.00 1.00 2.34 1.4 3.28
1.00 1.00 2.54 1.4 3.56
1.00 1.00 2.55 1.4 3.57
1.00 1.00 2.29 1.4 3.21
1.00 1.00 2.54 1.4 3.56
1.00 1.00 2.57 1.4 3.60
1.00 1.00 1.17 1.4 1.64
1.00 1.00 1.17 1.4 1.64
1.00 1.00 1.17 1.4 1.64
1.00 8.00 2.88 1.4 32.26

01.03.02.04 NIVELACION INT.Y APISONADO FINAL DEL TERRENO PREVIO m2 168.24 0.00

MODULOS 1.00 1.00 149.84 149.84


ESCALERA 1.00 1.00 18.40 18.40

01.03.02.05 ELIMINACIÓN DE MATERIAL EXCEDENTE CON CARRETILLA HAm3 98.00 0.00


EXCAVACION DE ZAPATAS 1.00 1.00 143.44 1.25 179.30
EXCAVACION DE CIMIENTOS CORRIDOS 1.00 1.00 14.03 1.25 17.54
RELLENO CON MATERIAL PROPIO -1.00 1.00 79.07 1.25 -98.84

01.03.02.06 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO PESA m3 98.00 0.00


EXCAVACION DE ZAPATAS 1.00 1.00 143.44 1.25 179.30
EXCAVACION DE CIMIENTOS CORRIDOS 1.00 1.00 14.03 1.25 17.54
RELLENO CON MATERIAL PROPIO -1.00 1.00 79.07 1.25 -98.84

01.03.03 OBRAS DE CONCRETO SIMPLE 0.00


01.03.03.01 CIMIENTOS CORRIDOS 0.00
01.03.03.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON m3 16.81 0.00
1.00 2.00 2.75 0.4 0.6 1.32
1.00 4.00 3.06 0.4 0.6 2.94
1.00 1.00 2.74 0.4 0.6 0.66
1.00 1.00 1.93 0.4 0.6 0.46
1.00 1.00 2.05 0.4 0.6 0.49
1.00 1.00 1.09 0.4 0.6 0.26
1.00 1.00 1.08 0.4 0.6 0.26
1.00 1.00 0.87 0.4 0.6 0.21
1.00 1.00 0.84 0.4 0.6 0.20
1.00 1.00 3.75 0.4 0.6 0.90
1.00 1.00 2.01 0.4 0.6 0.48
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
1.00 1.00 2.54 0.4 0.6 0.61
1.00 1.00 2.59 0.4 0.6 0.62
1.00 1.00 5.19 0.4 0.6 1.25
1.00 1.00 2.32 0.4 0.6 0.56
1.00 1.00 3.56 0.4 0.6 0.85
1.00 1.00 2.12 0.4 0.6 0.51
1.00 1.00 6.21 0.4 0.6 1.49
1.00 1.00 2.94 0.4 0.6 0.71
1.00 1.00 5.91 0.4 0.6 1.42
1.00 1.00 2.56 0.4 0.6 0.61

01.03.03.02 SOLADOS 0.00


01.03.03.02.01 CONCRETO EN SOLADO MEZCLA 1:12 CEMENTO-HORMIG m2 71.72 0.00
Z-1 1.00 2.00 1.7 2.2 7.48
Z-2 1.00 2.00 1.4 1.5 4.20
Z-3 1.00 10.00 1.9 1.6 30.40
Z-4 1.00 4.00 1.1 1.5 6.60
Z-5 1.00 8.00 2.4 1.2 23.04

01.03.03.03 SOBRECIMIENTO 0.00


01.03.03.03.01 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 4.62 0.00
1.00 2.00 2.38 0.13 0.35 0.22
1.00 4.00 2.68 0.13 0.35 0.49
1.00 1.00 2.37 0.13 0.35 0.11
1.00 1.00 1.57 0.13 0.35 0.07
1.00 1.00 1.65 0.13 0.35 0.08
1.00 1.00 0.7 0.13 0.35 0.03
1.00 1.00 0.63 0.13 0.35 0.03
1.00 1.00 0.89 0.13 0.35 0.04
1.00 1.00 0.39 0.13 0.35 0.02
1.00 1.00 3.66 0.13 0.35 0.17
1.00 1.00 1.97 0.13 0.35 0.09
1.00 1.00 2.21 0.13 0.35 0.10
1.00 1.00 2.08 0.13 0.35 0.09
1.00 1.00 5.91 0.23 0.35 0.48
1.00 1.00 5.51 0.13 0.35 0.25
1.00 1.00 2.49 0.13 0.35 0.11
1.00 1.00 3.38 0.13 0.35 0.15
1.00 1.00 5.51 0.13 0.35 0.25
1.00 1.00 2.37 0.13 0.35 0.11
1.00 1.00 5.51 0.13 0.35 0.25
1.00 1.00 1.98 0.13 0.35 0.09
1.00 1.00 5.91 0.23 0.35 0.48
1.00 1.00 5.73 0.23 0.35 0.46
1.00 1.00 5.73 0.23 0.35 0.46

01.03.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN SOBRECIMIE m2 58.54 0.00


2.00 2.00 2.38 0.35 3.33
2.00 4.00 2.68 0.35 7.50
2.00 1.00 2.37 0.35 1.66
2.00 1.00 1.57 0.35 1.10
2.00 1.00 1.65 0.35 1.16
2.00 1.00 0.7 0.35 0.49
2.00 1.00 0.63 0.35 0.44
2.00 1.00 0.89 0.35 0.62
2.00 1.00 0.39 0.35 0.27
2.00 1.00 3.66 0.35 2.56
2.00 1.00 1.97 0.35 1.38
2.00 1.00 2.21 0.35 1.55
2.00 1.00 2.08 0.35 1.46
2.00 1.00 5.91 0.35 4.14
2.00 1.00 5.51 0.35 3.86
2.00 1.00 2.49 0.35 1.74
2.00 1.00 3.38 0.35 2.37
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
2.00 1.00 5.51 0.35 3.86
2.00 1.00 2.37 0.35 1.66
2.00 1.00 5.51 0.35 3.86
2.00 1.00 1.98 0.35 1.39
2.00 1.00 5.91 0.35 4.14
2.00 1.00 5.73 0.35 4.01
2.00 1.00 5.73 0.35 4.01

01.03.03.05 FALSO PISO 0.00


01.03.03.05.01 CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTO-HORMI m2 168.24 0.00
MODULOS 1.00 1.00 149.84 149.84
ESCALERA 1.00 1.00 18.40 18.40

01.03.04 OBRAS DE CONCRETO ARMADO 0.00


01.03.04.01 ZAPATAS 0.00
01.03.04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 35.86 0.00
Z-1 2.00 1.00 2.20 1.70 0.50 3.74
Z-2 2.00 1.00 1.50 1.40 0.50 2.10
Z-3 10.00 1.00 1.60 1.90 0.50 15.20
Z-4 4.00 1.00 1.50 1.10 0.50 3.30
Z-5 8.00 1.00 1.20 2.40 0.50 11.52

01.03.04.01.02 ACERO EN ZAPATAS F'Y=4,200 Kg/cm2 GRADO 60 kg 1564.80 0.00


Z-1 2.00 12.00 2.20 1.60 84.48
2.00 15.00 1.70 1.60 81.60
Z-2 2.00 10.00 1.50 1.60 48.00
2.00 10.00 1.40 1.60 44.80
Z-3 10.00 13.00 1.60 1.60 332.80
10.00 11.00 1.90 1.60 334.40
Z-4 4.00 8.00 1.50 1.60 76.80
4.00 10.00 1.10 1.60 70.40
Z-5 8.00 8.00 2.40 1.60 245.76
8.00 16.00 1.20 1.60 245.76

01.03.04.02 VIGAS DE CIMENTACIÓN 0.00


01.03.04.02.01 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 10.40 0.00
EJE 2-2 1.00 1.00 6.23 0.55 0.30 1.03
1.00 1.00 6.23 0.30 0.60 1.12
EJE 3-3 1.00 1.00 6.23 0.55 0.30 1.03
1.00 1.00 6.23 0.30 0.60 1.12
EJE 4-4 1.00 1.00 7.01 0.85 0.30 1.79
1.00 1.00 7.01 0.30 0.60 1.26
EJE 12-12 1.00 1.00 7.01 0.85 0.30 1.79
1.00 1.00 7.01 0.30 0.60 1.26

01.03.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CI m2 20.09 0.00


EJE 2-2 1.00 1.00 6.23 0.60 3.74
EJE 3-3 1.00 1.00 6.23 0.60 3.74
EJE 4-4 1.00 2.00 7.01 0.60 8.41
EJE 12-12 1.00 1.00 7.01 0.60 4.21

01.03.04.02.03 ACERO EN VIGAS DE CIMENTACION F'Y=4200 Kg/cm2 GRAD kg 759.20 0.00


EJE 2-2 0.00
ACERO DE ZAPATA LONGITUDINAL 1.00 2.00 6.60 0.58 7.66
ACERO DE ZAPATA TRANSVERSAL 1.00 39.00 0.55 0.58 12.44
ACERO LONGITUDINAL 1.00 6.00 6.60 1.60 63.36
1.00 4.00 6.60 1.02 26.93
ESTRIBOS 1.00 50.00 2.28 0.58 66.12
EJE 3-3 0.00
ACERO DE ZAPATA LONGITUDINAL 1.00 2.00 6.60 0.58 7.66
ACERO DE ZAPATA TRANSVERSAL 1.00 39.00 0.55 0.58 12.44
ACERO LONGITUDINAL 1.00 6.00 6.60 1.60 63.36
1.00 4.00 6.60 1.02 26.93
ESTRIBOS 1.00 50.00 2.28 0.58 66.12
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
EJE 4-4 0.00
ACERO DE ZAPATA LONGITUDINAL 1.00 2.00 7.40 0.58 8.58
ACERO DE ZAPATA TRANSVERSAL 1.00 39.00 0.85 0.58 19.23
ACERO LONGITUDINAL 1.00 6.00 7.40 1.60 71.04
1.00 4.00 7.40 1.02 30.19
ESTRIBOS 1.00 56.00 2.28 0.58 74.05
EJE 12-12 0.00
ACERO DE ZAPATA LONGITUDINAL 1.00 2.00 7.40 0.58 8.58
ACERO DE ZAPATA TRANSVERSAL 1.00 39.00 0.85 0.58 19.23
ACERO LONGITUDINAL 1.00 6.00 7.40 1.60 71.04
1.00 4.00 7.40 1.02 30.19
ESTRIBOS 1.00 56.00 2.28 0.58 74.05

01.03.04.03 COLUMNAS 0.00


01.03.04.03.01 CONCRETO EN COLUMNAS F'c = 210 KG/CM2 m3 33.68 0.00
EJE 2-2 1.00 1.00 0.25 0.40 5.44 0.54
1.00 1.00 0.23 0.23 7.30 0.39
1.00 1.00 0.25 0.40 6.77 0.68
EJE 3-3 1.00 1.00 0.25 0.40 5.44 0.54
1.00 1.00 0.23 0.23 7.30 0.39
1.00 1.00 0.25 0.40 6.77 0.68
EJE 4-4 1.00 2.00 0.29 6.37 3.66
1.00 1.00 0.23 0.30 7.91 0.55
EJE 5-5, 7-7, 8-8, 10-10, 11-11 5.00 2.00 0.29 7.67 22.05
EJE 12-12 1.00 2.00 0.29 6.37 3.66
1.00 1.00 0.23 0.30 7.91 0.55

01.03.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 322.58 0.00


EJE 2-2 1.00 1.00 1.07 5.44 5.82
1.00 2.00 0.23 7.30 3.36
1.00 1.00 1.07 6.77 7.24
EJE 3-3 1.00 1.00 1.07 5.44 5.82
1.00 2.00 0.23 7.30 3.36
1.00 1.00 1.07 6.77 7.24
EJE 4-4 1.00 2.00 2.57 6.37 32.74
1.00 2.00 0.30 7.91 4.75
EJE 5-5, 7-7, 8-8, 10-10, 11-11 5.00 2.00 2.80 7.67 214.76
EJE 12-12 1.00 2.00 2.57 6.37 32.74
1.00 2.00 0.30 7.91 4.75

01.03.04.03.03 ACERO EN COLUMNAS Fy=4200 KG/CM2 GRADO 60 kg 6874.81 0.00


EJE 2-2 1.00 4.00 8.30 1.60 53.12
1.00 2.00 8.30 1.02 16.93
1.00 62.00 1.50 0.58 53.94
1.00 4.00 9.90 1.60 63.36
1.00 69.00 1.12 0.58 44.82
1.00 2.00 10.50 1.02 21.42
1.00 4.00 10.50 1.60 67.20
1.00 79.00 1.50 0.58 68.73
EJE 3-3 1.00 4.00 8.30 1.60 53.12
1.00 2.00 8.30 1.02 16.93
1.00 62.00 1.50 0.58 53.94
1.00 4.00 9.90 1.60 63.36
1.00 69.00 1.12 0.58 44.82
1.00 2.00 10.50 1.02 21.42
1.00 4.00 10.50 1.60 67.20
1.00 79.00 1.50 0.58 68.73
EJE 4-4 2.00 6.00 10.40 2.26 282.05
2.00 8.00 10.40 1.60 266.24
2.00 73.00 1.80 0.58 152.42
2.00 73.00 2.40 0.58 203.23
1.00 4.00 10.70 1.60 68.48
1.00 2.00 10.70 1.02 21.83
1.00 84.00 1.26 0.58 61.39
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
EJE 5-5, 7-7, 8-8, 10-10, 11-11 10.00 6.00 9.00 2.26 1220.40
10.00 6.00 9.00 1.60 864.00
10.00 78.00 2.40 0.58 1085.76
10.00 78.00 1.80 0.58 814.32
EJE 12-12 2.00 6.00 10.40 2.26 282.05
2.00 8.00 10.40 1.60 266.24
2.00 73.00 1.80 0.58 152.42
2.00 73.00 2.40 0.58 203.23
1.00 4.00 10.70 1.60 68.48
1.00 2.00 10.70 1.02 21.83
1.00 84.00 1.26 0.58 61.39

01.03.04.04 COLUMNAS DE CONFINAMIENTO 0.00


01.03.04.04.01 CONCRETO EN COLUMNAS DE CONFINAMIENTO F'c=175 K m3 5.15 0.00
PRIMER PISO 0.00
6.00 1.00 0.15 0.20 2.25 0.41
12.00 1.00 0.15 0.20 1.25 0.45
25.00 1.00 0.15 0.20 2.95 2.21
SEGUNDO PISO 0.00
7.00 1.00 0.15 0.20 2.25 0.47
21.00 1.00 0.15 0.20 1.00 0.63
6.00 1.00 0.15 0.20 2.95 0.53
12.00 1.00 0.15 0.20 1.25 0.45

01.03.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 68.68 0.00


PRIMER PISO 0.00
6.00 2.00 0.20 2.25 5.40
12.00 2.00 0.20 1.25 6.00
25.00 2.00 0.20 2.95 29.50
SEGUNDO PISO 0.00
7.00 2.00 0.20 2.25 6.30
21.00 2.00 0.20 1.00 8.40
6.00 2.00 0.20 2.95 7.08
12.00 2.00 0.20 1.25 6.00

01.03.04.04.03 ACERO EN COLUMNAS DE CONFINAMIENTO F'c=4,200 KG/ kg 592.71 0.00


PRIMER PISO 0.00
6.00 4.00 2.25 0.58 31.32
6.00 15.00 0.66 0.25 14.85
12.00 4.00 1.25 0.58 34.80
12.00 9.00 0.66 0.25 17.82
25.00 4.00 2.95 0.58 171.10
25.00 20.00 0.66 0.25 82.50
SEGUNDO PISO 0.00
7.00 4.00 2.25 0.58 36.54
7.00 15.00 0.66 0.25 17.33
21.00 4.00 1.00 0.58 48.72
21.00 7.00 0.66 0.25 24.26
6.00 4.00 2.95 0.58 41.06
6.00 20.00 0.66 0.25 19.80
12.00 4.00 1.25 0.58 34.80
12.00 9.00 0.66 0.25 17.82

01.03.04.05 VIGAS 0.00


01.02.04.05.01 CONCRETO EN VIGAS F'c=210 KG/CM2 m3 28.36 0.00
EJE 2-2 1.00 1.00 6.23 0.23 0.50 0.72
1.00 1.00 2.36 0.23 0.35 0.19
1.00 1.00 3.16 0.23 0.73
EJE 3-3 1.00 1.00 6.23 0.23 0.50 0.72
1.00 1.00 2.36 0.23 0.35 0.19
1.00 1.00 3.16 0.23 0.73
EJE 4-4 1.00 1.00 6.46 0.23 0.50 0.74
1.00 1.00 2.36 0.23 0.35 0.19
1.00 1.00 6.46 0.23 0.40 0.59
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
1.00 1.00 7.46 0.23 1.72
EJE 5-5, 7-7, 8-8, 10-10, 11-11 5.00 1.00 7.01 0.25 0.50 4.38
5.00 1.00 2.36 0.25 0.35 1.03
EJE 12-12 1.00 1.00 5.66 0.23 0.50 0.65
1.00 1.00 3.00 0.15 0.44
1.00 1.00 6.46 0.23 0.40 0.59
1.00 1.00 7.46 0.23 1.72
PORTICO C-C, I-I 2.00 1.00 25.00 0.25 0.40 5.00
VIGA DE BORDE 1.00 1.00 25.00 0.15 0.20 0.75
ESCALERA 0.00
2.00 1.00 3.13 0.25 0.40 0.63
1.00 1.00 3.13 0.40 0.20 0.25
2.00 1.00 3.13 0.25 0.40 0.63
PASE AEREO 4.00 1.00 9.20 0.25 0.40 3.68
6.00 1.00 3.50 0.25 0.40 2.10

01.03.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 316.03 0.00


EJE 2-2 1.00 2.00 6.23 0.50 6.23
1.00 2.00 1.96 0.35 1.37
1.00 2.00 3.16 6.32
EJE 3-3 1.00 2.00 6.23 0.50 6.23
1.00 2.00 1.96 0.35 1.37
1.00 2.00 3.16 6.32
EJE 4-4 1.00 2.00 6.46 0.50 6.46
1.00 2.00 1.96 0.35 1.37
1.00 2.00 6.46 0.40 5.17
1.00 2.00 7.46 14.92
EJE 5-5, 7-7, 8-8, 10-10, 11-11 5.00 2.00 7.01 0.50 35.05
5.00 2.00 1.96 0.35 6.86
EJE 12-12 1.00 2.00 5.66 0.50 5.66
1.00 2.00 3.00 1.45 8.70
1.00 2.00 6.46 0.40 5.17
1.00 2.00 7.46 14.92
PORTICO C-C, I-I 2.00 2.00 25.00 0.40 40.00
VIGA DE BORDE 1.00 2.00 25.00 0.20 10.00
ESCALERA 0.00
2.00 2.00 3.13 0.40 5.01
1.00 2.00 3.13 0.40 2.50
2.00 2.00 3.13 0.40 5.01
PASE AEREO 4.00 2.00 9.20 1.05 77.28
6.00 2.00 3.50 1.05 44.10

01.03.04.05.03 ACERO EN VIGAS F'y=4,200 KG/CM2 GRADO 60 kg 5130.08 0.00


EJE 2-2, 3-3 2.00 2.00 8.50 1.60 54.40
2.00 1.00 4.30 1.02 8.77
2.00 2.00 3.20 1.60 20.48
2.00 1.00 4.20 1.60 13.44
2.00 2.00 8.50 1.60 54.40
2.00 2.00 7.45 1.02 30.40
ESTRIBOS 2.00 67.00 1.60 0.58 124.35
2.00 2.00 1.20 1.02 4.90
2.00 2.00 6.10 1.02 24.89
2.00 2.00 6.10 1.02 24.89
2.00 2.00 4.40 1.02 17.95
2.00 2.00 4.40 1.02 17.95
2.00 2.00 2.40 1.02 9.79
2.00 2.00 2.80 1.02 11.42
ESTRIBOS 2.00 69.00 1.10 0.58 88.04
EJE 4-4 1.00 2.00 10.90 1.60 34.88
1.00 2.00 10.90 1.60 34.88
1.00 2.00 9.55 1.02 19.48
1.00 1.00 5.50 1.60 8.80
1.00 1.00 5.50 1.02 5.61
1.00 2.00 4.50 1.60 14.40
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
ESTRIBOS 1.00 73.00 1.60 0.58 67.74
0.00
1.00 4.00 7.50 1.02 30.60
1.00 56.00 1.40 0.58 45.47
1.00 2.00 2.20 1.02 4.49
1.00 2.00 2.10 1.02 4.28
1.00 2.00 5.80 1.02 11.83
1.00 2.00 5.60 1.02 11.42
1.00 2.00 6.40 1.02 13.06
1.00 2.00 6.40 1.02 13.06
1.00 2.00 2.75 1.02 5.61
1.00 2.00 3.10 1.02 6.32
ESTRIBOS 1.00 88.00 1.10 0.58 56.14
EJE 5-5, 7-7, 8-8, 10-10, 11-11 5.00 3.00 9.90 1.60 237.60
5.00 2.00 9.90 1.60 158.40
5.00 2.00 2.90 1.60 46.40
5.00 2.00 2.70 1.60 43.20
5.00 2.00 5.00 1.60 80.00
5.00 2.00 4.10 2.26 92.66
5.00 2.00 8.85 1.02 90.27
5.00 59.00 1.60 0.58 273.76
EJE 12-12 1.00 2.00 9.90 1.60 31.68
1.00 2.00 9.90 1.60 31.68
1.00 2.00 8.55 1.02 17.44
1.00 2.00 3.70 1.60 11.84
1.00 1.00 4.70 1.02 4.79
1.00 1.00 3.00 1.02 3.06
1.00 75.00 0.33 1.02 24.86
1.00 15.00 1.10 1.60 26.40
ESTRIBOS 1.00 73.00 1.60 0.58 67.74
0.00
1.00 4.00 7.50 1.02 30.60
1.00 56.00 1.40 0.58 45.47
1.00 2.00 2.20 1.02 4.49
1.00 2.00 2.10 1.02 4.28
1.00 2.00 5.80 1.02 11.83
1.00 2.00 5.60 1.02 11.42
1.00 2.00 6.40 1.02 13.06
1.00 2.00 6.40 1.02 13.06
1.00 2.00 2.75 1.02 5.61
1.00 2.00 3.10 1.02 6.32
ESTRIBOS 1.00 88.00 1.10 0.58 56.14
PORTICO C-C, I-I 4.00 4.00 27.30 1.60 698.88
4.00 128.00 1.40 0.58 415.74
VIGA DE BORDE 1.00 4.00 27.30 0.58 63.34
ESCALERA 1.00 182.00 0.70 0.25 31.85
2.00 4.00 4.10 1.60 52.48
2.00 20.00 1.10 0.58 25.52
1.00 6.00 4.10 1.60 39.36
1.00 20.00 1.30 0.58 15.08
2.00 4.00 4.10 1.60 52.48
2.00 20.00 1.10 0.58 25.52
VIGA DE BORDE 1.00 4.00 3.59 0.58 8.33
1.00 24.00 0.70 0.25 4.20
4.00 4.00 9.80 1.98 310.46
4.00 67.00 1.50 0.58 233.16
6.00 4.00 9.80 1.98 465.70
6.00 67.00 1.50 0.58 349.74

01.03.04.06 VIGAS DE CONFINAMIENTO 0.00


01.03.04.06.01 CONCRETO EN VIGAS DE CONFINAMIENTO F'C=175 KG/CM2m3 3.86 0.00
PRIMER PISO 0.00
EJE I-I 1.00 1.00 2.57 0.13 0.20 0.07
1.00 1.00 1.77 0.13 0.20 0.05
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
1.00 1.00 1.73 0.13 0.20 0.04
1.00 1.00 1.87 0.13 0.20 0.05
1.00 1.00 0.91 0.13 0.20 0.02
1.00 1.00 0.60 0.13 0.20 0.02
EJE C-C 1.00 2.00 2.58 0.13 0.20 0.13
1.00 4.00 2.88 0.13 0.20 0.30
ENTRE LOS EJES C e I 1.00 1.00 3.53 0.13 0.20 0.09
1.00 1.00 1.97 0.13 0.20 0.05
1.00 1.00 2.31 0.13 0.20 0.06
1.00 1.00 2.18 0.13 0.20 0.06
EJE 15-15 1.00 1.00 5.31 0.13 0.20 0.14
1.00 1.00 2.49 0.13 0.20 0.06
1.00 1.00 3.38 0.13 0.20 0.09
1.00 1.00 1.68 0.13 0.20 0.04
EJE 17-17 1.00 1.00 5.31 0.13 0.20 0.14
1.00 1.00 1.98 0.13 0.20 0.05
EJE 18-18 1.00 1.00 5.31 0.13 0.20 0.14
1.00 1.00 1.98 0.13 0.20 0.05
SEGUNDO PISO 0.00
1.00 1.00 32.58 0.13 0.20 0.85
1.00 1.00 1.86 0.13 0.20 0.05
1.00 1.00 1.57 0.13 0.20 0.04
2.00 1.00 2.93 0.13 0.20 0.15
2.00 1.00 2.13 0.13 0.20 0.11
2.00 1.00 3.24 0.13 0.20 0.17
1.00 1.00 1.82 0.13 0.20 0.05
2.00 1.00 2.93 0.13 0.20 0.15
4.00 1.00 3.24 0.13 0.20 0.34
2.00 1.00 5.89 0.13 0.20 0.31

01.03.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE C m2 59.43 0.00


PRIMER PISO 0.00
EJE I-I 1.00 2.00 2.57 0.20 1.03
1.00 2.00 1.77 0.20 0.71
1.00 2.00 1.73 0.20 0.69
1.00 2.00 1.87 0.20 0.75
1.00 2.00 0.91 0.20 0.36
1.00 2.00 0.60 0.20 0.24
EJE C-C 2.00 2.00 2.58 0.20 2.06
4.00 2.00 2.88 0.20 4.61
ENTRE LOS EJES C e I 1.00 2.00 3.53 0.20 1.41
1.00 2.00 1.97 0.20 0.79
1.00 2.00 2.31 0.20 0.92
1.00 2.00 2.18 0.20 0.87
EJE 15-15 1.00 2.00 5.31 0.20 2.12
1.00 2.00 2.49 0.20 1.00
1.00 2.00 3.38 0.20 1.35
1.00 2.00 1.68 0.20 0.67
EJE 17-17 1.00 2.00 5.31 0.20 2.12
1.00 2.00 1.98 0.20 0.79
EJE 18-18 1.00 2.00 5.31 0.20 2.12
1.00 2.00 1.98 0.20 0.79
SEGUNDO PISO 0.00
1.00 2.00 32.58 0.20 13.03
1.00 2.00 1.86 0.20 0.74
1.00 2.00 1.57 0.20 0.63
2.00 2.00 2.93 0.20 2.34
2.00 2.00 2.13 0.20 1.70
2.00 2.00 3.24 0.20 2.59
1.00 2.00 1.82 0.20 0.73
2.00 2.00 2.93 0.20 2.34
4.00 2.00 3.24 0.20 5.18
2.00 2.00 5.89 0.20 4.71
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
01.03.04.06.03 ACERO EN VIGAS DE CONFINAMIENTO F'y=4,200 KG/CM2 kg 370.08 0.00
1.00 4.00 148.85 0.58 345.33
1.00 150.00 0.66 0.25 24.75

01.03.04.07 LOSAS ALIGERADAS 0.00


01.03.04.07.01 CONCRETO EN LOSAS ALIGERADAS F'c=210 KG/CM2 m3 19.46 0.00
1.00 1.00 3.44 0.0875 0.30
1.00 1.00 5.67 0.0875 0.50
1.00 1.00 24.16 0.0875 2.11
1.00 1.00 7.04 0.0875 0.62
1.00 1.00 24.09 0.0875 2.11
1.00 1.00 7.02 0.0875 0.61
1.00 1.00 24.09 0.0875 2.11
1.00 1.00 7.02 0.0875 0.61
1.00 1.00 24.09 0.0875 2.11
1.00 1.00 7.02 0.0875 0.61
1.00 1.00 24.09 0.0875 2.11
1.00 1.00 7.02 0.0875 0.61
1.00 1.00 24.16 0.0875 2.11
1.00 1.00 7.04 0.0875 0.62
1.00 1.00 8.31 0.0875 0.73
1.00 1.00 7.79 0.0875 0.68
1.00 1.00 10.37 0.0875 0.91

01.03.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIG m2 222.44 0.00


1.00 1.00 3.44 3.44
1.00 1.00 5.67 5.67
1.00 1.00 24.16 24.16
1.00 1.00 7.04 7.04
1.00 1.00 24.09 24.09
1.00 1.00 7.02 7.02
1.00 1.00 24.09 24.09
1.00 1.00 7.02 7.02
1.00 1.00 24.09 24.09
1.00 1.00 7.02 7.02
1.00 1.00 24.09 24.09
1.00 1.00 7.02 7.02
1.00 1.00 24.16 24.16
1.00 1.00 7.04 7.04
1.00 1.00 8.31 8.31
1.00 1.00 7.79 7.79
1.00 1.00 10.37 10.37
ACERO EN LOSAS ALIGERADAS Fy=4,200 KG/CM2 GRADO 60
01.03.04.07.03 kg 1246.04 0.00
6.00 1.00 3.69 1.02 22.58
6.00 2.00 1.15 1.02 14.08
19.00 1.00 7.53 1.02 145.93
19.00 1.00 8.66 1.02 167.83
19.00 1.00 6.52 1.02 126.36
19.00 1.00 3.60 1.02 69.77
19.00 2.00 1.05 1.02 40.70
19.00 5.00 2.85 1.60 433.20
13.00 1.00 3.16 0.25 10.27
99.00 1.00 8.70 0.25 215.33
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
01.03.04.07.04 LADRILLO HUECO DE ARCILLA DE 15x30x30 PARA LOSA ALI und 1854.00 0.00
1.00 1.00 3.44 8.3333 28.69
1.00 1.00 5.67 8.3333 47.21
1.00 1.00 24.16 8.3333 201.31
1.00 1.00 7.04 8.3333 58.67
1.00 1.00 24.09 8.3333 200.79
1.00 1.00 7.02 8.3333 58.52
1.00 1.00 24.09 8.3333 200.79
1.00 1.00 7.02 8.3333 58.52
1.00 1.00 24.09 8.3333 200.79
1.00 1.00 7.02 8.3333 58.52
1.00 1.00 24.09 8.3333 200.79
1.00 1.00 7.02 8.3333 58.52
1.00 1.00 24.16 8.3333 201.31
1.00 1.00 7.04 8.3333 58.67
1.00 1.00 8.31 8.3333 69.25
1.00 1.00 7.79 8.3333 64.92
1.00 1.00 10.37 8.3333 86.42

01.03.04.08 ESCALERAS 0.00


01.03.04.08.01 CONCRETO EN ESCALERAS F'c= 210 KG/CM2 m3 4.03 0.00
TRAMO 1 1.00 1.00 1.60 1.55 2.48
TRAMO 2 1.00 1.00 1.00 1.55 1.55

01.03.04.08.02 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERA m2 14.03 0.00


1.00 1.00 4.25 1.55 6.59
1.00 1.00 4.80 1.55 7.44

01.03.04.08.03 ACERO EN ESCALERA F'y=4,200 KG/CM2 GRADO 60 kg 548.88 0.00


TRAMO 1 1.00 10.00 1.85 1.60 29.60
1.00 10.00 4.30 1.60 68.80
1.00 10.00 2.55 1.60 40.80
1.00 8.00 5.56 1.60 71.17
1.00 20.00 1.55 1.02 31.62
1.00 12.00 1.55 1.02 18.97
1.00 8.00 1.55 1.60 19.84
TRAMO 2 1.00 10.00 5.65 1.60 90.40
1.00 8.00 4.35 1.60 55.68
1.00 8.00 2.60 1.60 33.28
1.00 42.00 1.55 1.02 66.40
1.00 9.00 1.55 1.60 22.32

01.03.04.09 GARGOLAS 0.00


01.03.04.09.01 CONCRETO EN GARGOLAS F'c = 210 KG/CM2 m3 0.07 0.00
5.00 1.00 0.10 0.10 0.20 0.01
5.00 2.00 0.25 0.25 0.10 0.06

01.03.04.09.02 ENCOFRADO Y DESENCOFRADO NORMAL EN GARGOLAS m2 2.00 0.00


5.00 1.00 0.20 0.20 0.20
5.00 4.00 0.25 0.25 1.25
5.00 1.00 0.25 0.20 0.25
5.00 2.00 0.20 0.15 0.30

01.03.04.09.03 ACERO EN GARGOLAS Fy=4200 KG/CM2 GRADO 60 kg 4.50 0.00


5.00 2.00 1.10 0.25 2.75
5.00 2.00 0.70 0.25 1.75

01.03.04.10 MESA DE CONCRETO 0.00

01.03.04.10.01 CONCRETO EN MESA DE CONCRETO F'c = 175 KG/CM2 m3 0.63 0.00

SS. HH. 2.00 1.00 0.50 2.48 0.15 0.37


SS. HH. 2.00 2.00 0.10 0.70 0.45 0.13
TOPICO 1.00 1.00 0.15 0.82 0.50 0.06
TOPICO 1.00 2.00 0.10 0.70 0.50 0.07
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO

01.03.04.10.02 ENCOFRADO Y DESENCOFRADO NORMAL EN MESA DE TR m2 6.11 0.00

SS. HH. 2.00 1.00 0.50 2.48 2.48


SS. HH. 2.00 4.00 0.70 0.45 2.52
TOPICO 1.00 1.00 0.82 0.50 0.41
TOPICO 1.00 2.00 0.70 0.50 0.70

01.03.04.10.03 ACERO EN MESA DE TRABAJO Fy=4200 KG/CM2 GRADO 6 kg 49.82 0.00


2.00 16.00 0.45 0.58 8.35
2.00 5.00 2.40 0.58 13.92
4.00 5.00 0.65 0.58 7.54
4.00 4.00 0.90 0.58 8.35
1.00 7.00 0.45 0.58 1.83
1.00 5.00 0.65 0.58 1.89
2.00 5.00 0.65 0.58 3.77
2.00 4.00 0.90 0.58 4.18

01.03.05 ESTRUCTURAS DE MADERA Y COBERTURAS 0.00


01.03.05.01 ESTRUCTURAS DE MADERA 0.00
01.03.05.01.01 TIJERAL DE MADERA TORNILLO DE 2"X6" SEGÚN DISEÑO p2 592.51 0.00
5.00 1.00 11.50 2.00 6.00 0.27 188.65
5.00 1.00 10.90 2.00 6.00 0.27 178.81
5.00 1.00 0.93 2.00 4.00 0.27 10.12
5.00 1.00 0.71 2.00 4.00 0.27 7.77
5.00 1.00 1.18 2.00 4.00 0.27 12.86
5.00 1.00 1.05 2.00 4.00 0.27 11.50
5.00 1.00 1.47 2.00 4.00 0.27 16.09
5.00 1.00 1.40 2.00 4.00 0.27 15.31
5.00 1.00 1.70 2.00 4.00 0.27 18.59
5.00 1.00 1.89 2.00 4.00 0.27 20.67
5.00 1.00 1.77 2.00 4.00 0.27 19.30
5.00 1.00 1.46 2.00 4.00 0.27 16.00
5.00 1.00 1.53 2.00 4.00 0.27 16.71
5.00 1.00 1.18 2.00 4.00 0.27 12.92
5.00 1.00 1.20 2.00 4.00 0.27 13.12
5.00 1.00 0.94 2.00 4.00 0.27 10.24
5.00 1.00 0.87 2.00 4.00 0.27 9.53
5.00 1.00 0.88 2.00 4.00 0.27 9.64
5.00 1.00 0.43 2.00 4.00 0.27 4.67

01.03.05.01.02 TIJERAL TIMPANO DE MADERA TORNILLO DE 2"X3" p2 259.84 0.00


1.00 12.00 7.00 2.00 3.00 0.27 137.80
1.00 12.00 6.20 2.00 3.00 0.27 122.05

01.03.05.01.03 CORREAS DE MADERA TORNILLO DE 3"X4" p2 628.38 0.00


ESCALERA 1.00 5.00 3.59 3.00 4.00 0.27 58.89
MODULO 1.00 6.00 25.00 3.00 4.00 0.27 492.13
VOLADO 1.00 6.00 3.93 3.00 4.00 0.27 77.36

01.03.05.02 COBERTURAS 0.00


01.03.05.02.01 COBERTURA CON TEJA ANDINA 1.14X0.72m, e=5 mm m2 366.56 0.00
MODULO 1.00 1.00 25.00 5.38 134.50
1.00 1.00 25.00 6.00 150.00
JUNTA DE MODULOS 1.00 1.00 3.93 5.38 21.14
1.00 1.00 3.93 6.00 23.58
ESCALERA 1.00 1.00 3.59 6.40 22.98
1.00 1.00 3.59 4.00 14.36

01.03.05.02.02 CUMBRERA TEJA ANDINA 0.35X0.72 m, e=5 mm m 32.52 0.00


ESCALERA 1.00 1.00 3.59 3.59
MODULO 1.00 1.00 25.00 25.00
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
JUNTA DE MODULOS 1.00 1.00 3.93 3.93

01.04 MODULO III: TALLER DE CARPINTERÍA - ZONA DE BANCOS, ÁREA DE PROFESOR, DEPÓSITO, CENTRO DE CARGAS, TALLER DE INDUSTRIA D 0.00
01.04.01 TRABAJOS PRELIMINARES 0.00
01.04.01.01 LIMPIEZA DEL TERRENO 0.00
01.04.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 199.95 0.00
1.00 1.00 11.29 17.71 199.95

01.04.01.02 TRAZOS NIVELES Y REPLANTEO 0.00


01.04.01.02.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 199.95 0.00
1.00 1.00 11.29 17.71 199.95

01.04.01.02.02 REPLANTEO DURANTE EL PROCESO m2 199.95 0.00


1.00 1.00 11.29 17.71 199.95

01.04.02 MOVIMIENTO DE TIERRAS 0.00


01.04.02.01 EXCAVACIÓN DE ZANJAS PARA CIMIENTOS CORRIDOS EN m3 17.76 0.00
1.00 1.00 1.15 0.40 0.70 0.32
1.00 1.00 1.30 0.40 0.70 0.36
1.00 1.00 1.89 0.40 0.70 0.53
1.00 1.00 1.72 0.40 0.70 0.48
1.00 1.00 1.14 0.40 0.70 0.32
1.00 1.00 1.30 0.40 0.70 0.36
1.00 1.00 1.89 0.40 0.70 0.53
1.00 1.00 0.82 0.40 0.70 0.23
1.00 1.00 2.25 0.40 0.70 0.63
1.00 1.00 4.93 0.40 0.70 1.38
1.00 1.00 3.55 0.40 0.70 0.99
1.00 1.00 1.72 0.40 0.70 0.48
1.00 1.00 5.84 0.40 0.70 1.64
1.00 2.00 5.59 0.85 1.00 9.50

01.04.02.02 EXCAVACION PARA ZAPATAS 2.00M =<H<=2.50M. DE PROFUN m3 59.84 0.00


Z-1 1.00 2.00 2.20 1.70 2.00 14.96
Z-2 1.00 2.00 1.50 1.40 2.00 8.40
Z-3 1.00 6.00 1.60 1.90 2.00 36.48

01.04.02.03 RELLENO Y COMPACTADO DE ZANJAS CON EQUIPO LIVIANO m3 36.50 0.00


1.00 1.00 1.01 1.40 1.42
1.00 1.00 2.13 1.40 2.98
1.00 1.00 3.92 1.40 5.48
1.00 1.00 2.77 1.40 3.88
1.00 1.00 1.23 1.40 1.72
1.00 1.00 2.57 1.40 3.60
1.00 1.00 2.34 1.40 3.28
1.00 1.00 2.55 1.40 3.57
1.00 1.00 2.34 1.40 3.28
1.00 1.00 2.24 1.40 3.14
1.00 2.00 5.59 0.62 0.60 4.16

01.04.02.04 NIVELACION INT.Y APISONADO FINAL DEL TERRENO PREVIO m2 145.95 0.00
1.00 1.00 9.29 15.71 145.95

01.04.02.05 ELIMINACIÓN DE MATERIAL EXCEDENTE CON CARRETILLA HAm3 51.38 0.00


EXCAVACION DE CIMIENTOS CORRIDOS 1.00 1.00 17.76 1.25 22.20
EXVACACION DE ZAPATAS 1.00 1.00 59.84 1.25 74.80
RELLENO CON MATEIAL PROPIO -1.00 1.00 36.50 1.25 -45.62

01.04.02.06 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO PESA m3 51.38 0.00


EXCAVACION DE CIMIENTOS CORRIDOS 1.00 1.00 17.76 1.25 22.20
EXVACACION DE ZAPATAS 1.00 1.00 59.84 1.25 74.80
RELLENO CON MATEIAL PROPIO -1.00 1.00 36.50 1.25 -45.62

01.04.03 OBRAS DE CONCRETO SIMPLE 0.00


HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
01.04.03.01 CIMIENTOS CORRIDOS 0.00
01.04.03.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON m3 5.84 0.00
CIMIENTOS CORRIDOS 1.00 1.00 1.66 0.4 0.6 0.40
1.00 1.00 1.81 0.4 0.6 0.43
1.00 1.00 2.91 0.4 0.6 0.70
1.00 1.00 2.76 0.4 0.6 0.66
1.00 1.00 1.645 0.4 0.6 0.39
1.00 1.00 1.81 0.4 0.6 0.43
1.00 1.00 2.91 0.4 0.6 0.70
1.00 1.00 1.645 0.4 0.6 0.39
1.00 1.00 2.245 0.4 0.6 0.54
1.00 1.00 4.925 0.4 0.6 1.18

01.04.03.02 SOLADOS 0.00


01.04.03.02.01 CONCRETO EN SOLADO MEZCLA 1:12 CEMENTO-HORMIG m2 39.42 0.00
Z-1 1.00 2.00 2.20 1.70 7.48
Z-2 1.00 2.00 1.50 1.40 4.20
Z-3 1.00 6.00 1.60 1.90 18.24
VIGAS DE CIMENTACION 1.00 2.00 5.59 0.85 9.50

01.04.03.03 SOBRECIMIENTO 0.00


01.04.03.03.01 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS m3 3.67 0.00
1.00 1.00 1.29 0.13 0.35 0.06
1.00 1.00 1.44 0.13 0.35 0.07
1.00 1.00 0.78 0.13 0.35 0.04
1.00 1.00 1.43 0.13 0.35 0.07
1.00 1.00 2.39 0.13 0.35 0.11
1.00 1.00 1.28 0.13 0.35 0.06
1.00 1.00 1.44 0.13 0.35 0.07
1.00 1.00 0.785 0.13 0.35 0.04
1.00 1.00 1.43 0.13 0.35 0.07
1.00 1.00 1.27 0.13 0.35 0.06
1.00 1.00 6.49 0.13 0.35 0.30
1.00 1.00 2.2 0.13 0.35 0.10
1.00 1.00 3.5 0.13 0.35 0.16
1.00 1.00 1.68 0.13 0.35 0.08
1.00 1.00 4.565 0.13 0.35 0.21
1.00 4.00 6.89 0.23 0.35 2.22

01.04.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN SOBRECIMIE m2 32.03 0.00


1.00 2.00 1.29 0.35 0.90
1.00 2.00 1.44 0.35 1.01
1.00 2.00 0.78 0.35 0.55
1.00 2.00 1.43 0.35 1.00
1.00 2.00 2.39 0.35 1.67
1.00 2.00 1.28 0.35 0.90
1.00 2.00 1.44 0.35 1.01
1.00 2.00 0.785 0.35 0.55
1.00 2.00 1.43 0.35 1.00
1.00 2.00 1.27 0.35 0.89
1.00 2.00 6.49 0.35 4.54
1.00 2.00 2.2 0.35 1.54
1.00 2.00 3.5 0.35 2.45
1.00 2.00 1.68 0.35 1.18
1.00 2.00 4.565 0.35 3.20
1.00 4.00 6.89 0.35 9.65

01.04.03.04 FALSO PISO 0.00


01.04.03.04.01 CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTO-HORMI m2 145.95 0.00
1.00 1.00 9.29 15.71 145.95

01.04.04 OBRAS DE CONCRETO ARMADO 0.00


01.04.04.01 ZAPATAS 0.00
01.04.04.01.01 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 14.96 0.00
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
Z-1 1.00 2.00 2.20 1.70 0.50 3.74
Z-2 1.00 2.00 1.50 1.40 0.50 2.10
Z-3 1.00 6.00 1.60 1.90 0.50 9.12

01.04.04.01.02 ACERO EN ZAPATAS F'Y=4,200 Kg/cm2 GRADO 60 kg 95.74 0.00


Z-1 1.00 2.00 2.20 1.70 3.20 23.94
Z-2 1.00 2.00 1.50 1.40 3.20 13.44
Z-3 1.00 6.00 1.60 1.90 3.20 58.37

01.04.04.02 VIGAS DE CIMENTACIÓN 0.00


01.04.04.02.01 CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2 m3 6.95 0.00
1.00 2.00 7.99 0.85 0.3 4.07
1.00 2.00 7.99 0.3 0.6 2.88

01.04.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE CI m2 5.75 0.00


2.00 2.00 7.99 0.3 0.6 5.75

01.04.04.02.03 ACERO EN VIGAS DE CIMENTACION F'Y=4200 Kg/cm2 GRAD kg 384.14 0.00


2.00 6.00 8.5 1.98 201.96
2.00 4.00 8.5 1.27 86.36
2.00 59.00 1.4 0.58 95.82

01.04.04.03 COLUMNAS 0.00


01.04.04.03.01 CONCRETO EN COLUMNAS F'c = 210 KG/CM2 m3 29.76 0.00
1.00 2.00 0.31 6.37 3.98
1.00 1.00 0.23 0.30 7.91 0.55
4.00 2.00 0.34 7.67 20.71
1.00 2.00 0.31 6.37 3.98
1.00 1.00 0.23 0.30 7.91 0.55
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
01.04.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 264.15 0.00
1.00 2.00 2.77 6.37 35.29
1.00 2.00 0.30 7.91 4.75
4.00 2.00 3.00 7.67 184.08
1.00 2.00 2.77 6.37 35.29
1.00 2.00 0.30 7.91 4.75

01.04.04.03.03 ACERO EN COLUMNAS Fy=4200 KG/CM2 GRADO 60 kg 6095.76 0.00


2.00 6.00 10.40 2.26 282.05
2.00 8.00 10.40 1.60 266.24
2.00 73.00 1.80 0.58 152.42
2.00 73.00 2.40 0.58 203.23
1.00 4.00 10.70 1.60 68.48
1.00 2.00 10.70 1.02 21.83
1.00 84.00 1.26 0.58 61.39
10.00 6.00 9.00 2.26 1220.40
10.00 6.00 9.00 1.60 864.00
10.00 78.00 2.40 0.58 1085.76
10.00 78.00 1.80 0.58 814.32
2.00 6.00 10.40 2.26 282.05
2.00 8.00 10.40 1.60 266.24
2.00 73.00 1.80 0.58 152.42
2.00 73.00 2.40 0.58 203.23
1.00 4.00 10.70 1.60 68.48
1.00 2.00 10.70 1.02 21.83
1.00 84.00 1.26 0.58 61.39

01.04.04.04 COLUMNAS DE CONFINAMIENTO 0.00


01.04.04.04.01 CONCRETO EN COLUMNAS DE CONFINAMIENTO F'c=175 K m3 2.46 0.00
1.00 27.00 0.13 0.25 2.8 2.46

01.04.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 37.80 0.00


2.00 27.00 0.25 2.8 37.80

01.04.04.04.03 ACERO EN COLUMNAS DE CONFINEMIENTO F'c=4,200 KG/ kg 327.24 0.00


27.00 4.00 3.50 0.58 219.24
27.00 20.00 0.80 0.25 108.00

01.04.04.05 VIGAS 0.00


01.04.04.05.01 CONCRETO EN VIGAS F'c=210 KG/CM2 m3 16.55 0.00
EJE 4-4 1.00 1.00 6.46 0.23 0.50 0.74
1.00 1.00 1.96 0.23 0.35 0.16
1.00 1.00 6.46 0.23 0.40 0.59
1.00 1.00 7.46 0.23 1.72
EJE 5-5, 7-7, 8-8, 10-10, 11-11 4.00 1.00 7.01 0.25 0.50 3.51
4.00 1.00 1.96 0.25 0.35 0.69
EJE 12-12 1.00 1.00 5.66 0.23 0.50 0.65
1.00 1.00 3.00 0.15 0.44
1.00 1.00 6.46 0.23 0.40 0.59
1.00 1.00 7.46 0.23 1.72
PORTICO C-C, I-I 2.00 1.00 25.00 0.25 0.40 5.00
VIGA DE BORDE 1.00 1.00 25.00 0.15 0.20 0.75

01.04.04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 145.90 0.00


EJE 4-4 1.00 2.00 6.46 0.50 6.46
1.00 2.00 1.96 0.35 1.37
1.00 2.00 6.46 0.40 5.17
1.00 2.00 7.46 14.92
EJE 5-5, 7-7, 8-8, 10-10, 11-11 4.00 2.00 7.01 0.50 28.04
4.00 2.00 1.96 0.35 5.49
EJE 12-12 1.00 2.00 5.66 0.50 5.66
1.00 2.00 3.00 1.45 8.70
1.00 2.00 6.46 0.40 5.17
1.00 2.00 7.46 14.92
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
PORTICO C-C, I-I 2.00 2.00 25.00 0.40 40.00
VIGA DE BORDE 1.00 2.00 25.00 0.20 10.00

01.04.04.05.03 ACERO EN VIGAS F'y=4,200 KG/CM2 GRADO 60 kg 3501.94 0.00


2.00 2.00 8.50 1.60 54.40
2.00 1.00 4.30 1.02 8.77
2.00 2.00 3.20 1.60 20.48
2.00 1.00 4.20 1.60 13.44
2.00 2.00 8.50 1.60 54.40
2.00 2.00 7.45 1.02 30.40
2.00 67.00 1.60 0.58 124.35
2.00 2.00 1.20 1.02 4.90
2.00 2.00 6.10 1.02 24.89
2.00 2.00 6.10 1.02 24.89
2.00 2.00 4.40 1.02 17.95
2.00 2.00 4.40 1.02 17.95
2.00 2.00 2.40 1.02 9.79
2.00 2.00 2.80 1.02 11.42
2.00 69.00 1.10 0.58 88.04
1.00 2.00 9.90 1.60 31.68
1.00 2.00 9.90 1.60 31.68
1.00 2.00 8.55 1.02 17.44
1.00 1.00 4.50 1.60 7.20
1.00 1.00 4.50 1.02 4.59
1.00 2.00 3.50 1.60 11.20
1.00 73.00 1.60 0.58 67.74
0.00
1.00 4.00 7.50 1.02 30.60
1.00 56.00 1.40 0.58 45.47
1.00 2.00 2.20 1.02 4.49
1.00 2.00 2.10 1.02 4.28
1.00 2.00 5.80 1.02 11.83
1.00 2.00 5.60 1.02 11.42
1.00 2.00 6.40 1.02 13.06
1.00 2.00 6.40 1.02 13.06
1.00 2.00 2.75 1.02 5.61
1.00 2.00 3.10 1.02 6.32
1.00 88.00 1.10 0.58 56.14
5.00 3.00 9.90 1.60 237.60
5.00 2.00 9.90 1.60 158.40
5.00 2.00 2.90 1.60 46.40
5.00 2.00 2.70 1.60 43.20
5.00 2.00 5.00 1.60 80.00
5.00 2.00 4.10 2.26 92.66
5.00 2.00 8.85 1.02 90.27
5.00 59.00 1.60 0.58 273.76
1.00 2.00 9.90 1.60 31.68
1.00 2.00 9.90 1.60 31.68
1.00 2.00 8.55 1.02 17.44
1.00 2.00 3.70 1.60 11.84
1.00 1.00 4.70 1.02 4.79
1.00 1.00 3.00 1.02 3.06
1.00 75.00 0.33 1.02 24.86
1.00 15.00 1.10 1.60 26.40
1.00 73.00 1.60 0.58 67.74
0.00
1.00 4.00 7.50 1.02 30.60
1.00 56.00 1.40 0.58 45.47
1.00 2.00 2.20 1.02 4.49
1.00 2.00 2.10 1.02 4.28
1.00 2.00 5.80 1.02 11.83
1.00 2.00 5.60 1.02 11.42
1.00 2.00 6.40 1.02 13.06
1.00 2.00 6.40 1.02 13.06
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
1.00 2.00 2.75 1.02 5.61
1.00 2.00 3.10 1.02 6.32
1.00 88.00 1.10 0.58 56.14
4.00 4.00 27.30 1.60 698.88
4.00 128.00 1.40 0.58 415.74
1.00 4.00 27.30 0.58 63.34

01.04.04.06 VIGAS DE CONFINAMIENTO 0.00


01.04.04.06.01 CONCRETO EN VIGAS DE CONFINAMIENTO F'C=175 KG/CM2m3 2.30 0.00
1.00 2.00 1.29 0.13 0.2 0.07
1.00 2.00 1.44 0.13 0.2 0.07
1.00 2.00 0.78 0.13 0.2 0.04
1.00 2.00 1.43 0.13 0.2 0.07
1.00 2.00 2.39 0.13 0.2 0.12
1.00 2.00 1.28 0.13 0.2 0.07
1.00 2.00 1.44 0.13 0.2 0.07
1.00 2.00 0.785 0.13 0.2 0.04
1.00 2.00 1.43 0.13 0.2 0.07
1.00 2.00 1.27 0.13 0.2 0.07
1.00 2.00 6.49 0.13 0.2 0.34
1.00 2.00 2.2 0.13 0.2 0.11
1.00 2.00 3.5 0.13 0.2 0.18
1.00 2.00 1.68 0.13 0.2 0.09
1.00 2.00 4.565 0.13 0.2 0.24
1.00 2.00 6.89 0.23 0.2 0.63

01.04.04.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE C m2 31.09 0.00


2.00 2.00 1.29 0.2 1.03
2.00 2.00 1.44 0.2 1.15
2.00 2.00 0.78 0.2 0.62
2.00 2.00 1.43 0.2 1.14
2.00 2.00 2.39 0.2 1.91
2.00 2.00 1.28 0.2 1.02
2.00 2.00 1.44 0.2 1.15
2.00 2.00 0.785 0.2 0.63
2.00 2.00 1.43 0.2 1.14
2.00 2.00 1.27 0.2 1.02
2.00 2.00 6.49 0.2 5.19
2.00 2.00 2.2 0.2 1.76
2.00 2.00 3.5 0.2 2.80
2.00 2.00 1.68 0.2 1.34
2.00 2.00 4.565 0.2 3.65
2.00 2.00 6.89 0.2 5.51

01.04.04.06.03 ACERO EN VIGAS DE CONFINAMIENTO F'y=4,200 KG/CM2 kg 180.31 0.00


2.00 4.00 1.29 0.58 5.99
2.00 4.00 1.44 0.58 6.68
2.00 4.00 0.78 0.58 3.62
2.00 4.00 1.43 0.58 6.64
2.00 4.00 2.39 0.58 11.09
2.00 4.00 1.28 0.58 5.94
2.00 4.00 1.44 0.58 6.68
2.00 4.00 0.785 0.58 3.64
2.00 4.00 1.43 0.58 6.64
2.00 4.00 1.27 0.58 5.89
2.00 4.00 6.49 0.58 30.11
2.00 4.00 2.2 0.58 10.21
2.00 4.00 3.5 0.58 16.24
2.00 4.00 1.68 0.58 7.80
2.00 4.00 4.565 0.58 21.18
2.00 4.00 6.89 0.58 31.97

01.04.04.07 LOSAS ALIGERADAS 0.00


01.04.04.07.01 CONCRETO EN LOSAS ALIGERADAS F'c=210 KG/CM2 m3 90.96 0.00
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
1.00 2.00 7.49 3.71 0.8375 46.54
1.00 2.00 7.49 3.54 0.8375 44.41

01.04.04.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIG m2 108.61 0.00


1.00 2.00 7.49 3.71 55.58
1.00 2.00 7.49 3.54 53.03
ACERO EN LOSAS ALIGERADAS Fy=4,200 KG/CM2 GRADO 60
01.04.04.07.03 kg 955.06 0.00
1.00 23.00 18.75 1.02 439.88
1.00 69.00 2.85 1.60 314.64
1.00 46.00 0.80 1.02 37.54
1.00 63.00 10.35 0.25 163.01

01.04.04.07.04 LADRILLO HUECO DE ARCILLA DE 15x30x30 PARA LOSA ALI und 906.00 0.00
1.00 2.00 7.49 3.71 8.333333 463.13
1.00 2.00 7.49 3.54 8.333333 441.91

01.04.04.08 GARGOLAS 0.00


01.04.04.09.01 CONCRETO EN GARGOLAS F'c = 210 KG/CM2 m3 0.07 0.00
5.00 1.00 0.10 0.10 0.20 0.01
5.00 2.00 0.25 0.25 0.10 0.06
HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
01.04.04.09.02 ENCOFRADO Y DESENCOFRADO NORMAL EN GARGOLAS m2 2.00 0.00
5.00 1.00 0.20 0.20 0.20
5.00 4.00 0.25 0.25 1.25
5.00 1.00 0.25 0.20 0.25
5.00 2.00 0.20 0.15 0.30

01.04.04.09.03 ACERO EN GARGOLAS Fy=4200 KG/CM2 GRADO 60 kg 4.50 0.00


5.00 2.00 1.10 0.25 2.75
5.00 2.00 0.70 0.25 1.75

01.04.04.09 MESA DE CONCRETO 0.00


01.04.04.09.01 CONCRETO EN MESA DE CONCRETO F'c = 175 KG/CM2 m3 0.26 0.00
SS. HH. MUJERES 1.00 1.00 0.15 0.82 0.50 0.06
1.00 2.00 0.10 0.70 0.50 0.07
SS. HH. VARONES 1.00 1.00 0.15 0.82 0.50 0.06
1.00 2.00 0.10 0.70 0.50 0.07

01.04.04.09.02 ENCOFRADO Y DESENCOFRADO NORMAL EN MESA DE TR m2 2.22 0.00

SS. HH. MUJERES 1.00 1.00 0.82 0.50 0.41


1.00 2.00 0.70 0.50 0.70
SS. HH. VARONES 1.00 1.00 0.82 0.50 0.41
1.00 2.00 0.70 0.50 0.70

01.04.04.09.03 ACERO EN MESA DE TRABAJO Fy=4200 KG/CM2 GRADO 6 kg 11.66 0.00


1.00 7.00 0.45 0.58 1.83
1.00 5.00 0.65 0.58 1.89
2.00 5.00 0.65 0.58 3.77
2.00 4.00 0.90 0.58 4.18

01.04.05 ESTRUCTURAS DE MADERA Y COBERTURAS 0.00


01.04.05.01 ESTRUCTURAS DE MADERA 0.00
01.04.05.01.01 TIJERAL DE MADERA TORNILLO DE 2"X6" SEGÚN DISEÑO p2 133.92 0.00
1.00 1.00 12.41 2 6 0.273403 40.72
1.00 1.00 11.88 2 6 0.273403 38.98
1.00 1.00 0.64 2 4 0.273403 1.40
1.00 1.00 0.7634 2 4 0.273403 1.67
1.00 1.00 0.8593 2 4 0.273403 1.88
1.00 1.00 1.0395 2 4 0.273403 2.27
1.00 1.00 1.13 2 4 0.273403 2.47
1.00 1.00 1.33 2 4 0.273403 2.91
1.00 1.00 1.42 2 4 0.273403 3.11
1.00 1.00 1.55 2 4 0.273403 3.39
1.00 1.00 1.65 2 4 0.273403 3.61
1.00 1.00 1.81 2 4 0.273403 3.96
1.00 1.00 1.68 2 4 0.273403 3.67
1.00 1.00 1.57 2 4 0.273403 3.43
1.00 1.00 1.51 2 4 0.273403 3.30
1.00 1.00 1.4 2 4 0.273403 3.06
1.00 1.00 1.27 2 4 0.273403 2.78
1.00 1.00 1.14 2 4 0.273403 2.49
1.00 1.00 1.04 2 4 0.273403 2.27
1.00 1.00 0.88 2 4 0.273403 1.92
1.00 1.00 0.84 2 4 0.273403 1.84
1.00 1.00 0.87 2 4 0.273403 1.90
1.00 1.00 0.4 2 4 0.273403 0.87

01.04.05.01.02 TIJERAL TIMPANO DE MADERA TORNILLO DE 2"X3" p2 40.68 0.00


1.00 2.00 12.4 2 3 0.273403 40.68

01.04.05.01.03 CORREAS DE MADERA TORNILLO DE 3"X4" p2 773.13 0.00


HOJA DE METRADOS

“RECONSTRUCCION, MEJORAMIENTO DE LA INSTITUCION EDUCATIVA NUESTRA SEÑORA DEL ROSARIO DE LA


OBRA: ACERO KG/ML ACERO KG/ML
LOCALIDAD DE AYAVIRI, DISTRITO DE AYAVIRI, PROVINCIA DE YAUYOS - LIMA."

FORMULA: : 01 ESTRUCTURAS DISTRITO: AYAVIRÍ 1/4" 0.25 5/8" 1.60


ESPECIALIDAD : ESTRUCTURAS PROVINCIA: YAUYOS 3/8" 0.58 3/4" 2.26
FECHA: : FEBRERO 2012 REGIÓN LIMA 1/2" 1.02 1" 4.04

VOLUMEN
Nº DE
Item Descripción Und. Metrado CANTIDAD AREA FACTOR PARCIAL
VECES ALTO
LARGO ANCHO
1.00 15.00 15.71 3 4 0.273403 773.13

01.04.05.02 COBERTURAS 0.00


01.04.05.02.01 COBERTURA CON TEJA ANDINA 1.14X0.72m, e=5 mm m2 188.05 0.00
1.00 1.00 15.71 11.97 188.05

01.04.05.02.02 CUMBRERA TEJA ANDINA 0.35X0.72 m, e=5 mm m 15.71 0.00


1.00 1.00 15.71 15.71