KING ABDULLAH FINANCIAL bistrict NY, K AFD
Contract No:0516°506 ‘Work Package: 08160506,
Title: PARCEL 5.05 HARDWARE SCHEDULE Submittal Number: DB16°505-DC-4-0083,
From: Sou Sintdin Group : °
Dar aby 6 /Ap2005|
[Atn: Do Roch ‘Sulpmital Package: boc No.of Copies:1
category: Other
Discipline: (A ) ARCH
Parcel No: 5:05 Building: 5.08
cry ah howe ited vs oe ewe etal an ae cost andi ae cfm i
‘onivact drawings ard speietons exept etre tated
pepo sort elo th cantata fs cbgatns an abies under he Contact er anaiaeaubrzton fry rae
to Canvect Documents, 2nd teers, sal ot ml ny region whasceve of adnate cect o he Canta.
fae eb
aewnnne (7
7 | Aegan Seer.
EB psp oes 2mComments on Material Submittal No. DB16PS06-DC-A.0033
Rev 00
Dated Apri o6. 2035
Tile: DORMA Hardware Schedule
Comments:
Action Code
Approved As Noted
Contractor has to acquire the approval of OBA and NG forall hardware sets/unts
Al ardware sets must bein compliance withthe Technical Spec /Materal
Approval and Design Drawing:
Final approvals subject of VMUspprovl
Contractorhas to ensure the compliance and compatibility of
stents with al types of doors
Contractor has o conform wth ll specie codes and standards Incuding but not
lied ofr ting ad seerearements .
hardware
Reviewed by: Al Bajes~Sr. Architect - Dar A Riyadh.
Sign.“For ifeemation Oly FI
For Review/Comment nd
| Constuction Coadiration
| ested fr Construction
Hand
SkBrancaom ef0te
saa
TRANS. NO: PP-CBAZ3 SbiDoc 0008
DATE: 06 APRIL 2015
)
|
| ‘Description
| 1 Ratt sen es | — Ra
|=
eee an’
|. Sxmsenckninsoen tems recivetoy, _ .
a
bos