You are on page 1of 3
IIDIIIIIIIV II DID THT HOTT es Sixth Semester B.Arch. Degree Examination, June/July 2011 Estimation and Costing Time: 3 hrs. {I Max. Marks:100 Note: 1. Answer Question No.1 compulsorily, and any THREE questions of the remaining . 2. Missing data may be assumed and clearly mentioned the same. ‘The accompanying Fig.Q(1) shows the details of three roomed building, Estimate the below mentioned items of work by centre line method. a. Earthwork excavation for foundation in hard soil. (08 Marks) b. Providing and laying P.C.C (1 : 4: 8) for foundation using 40 mm and downsize coarse aggregates. (07 Marks) ©. Providing and constructing SSM in CM (1 : 6) for foundation and basement (coarsed random rubble masonry) (10 Marks) d. Providing and laying P.C.C (1 : 3 : 6) for foundation plinth. (05 Marks) e. Providing and constructing 30 cm thick bumt brick masonry in CM (1 : 6) for superstructure (lintels are through lintel of size of 0.30 m x 0.20 m), (10 Marks) f. Providing painting over the T.W. doors, windows and ventilators. (05 Marks) & Calculation of centre line diagram and number of junctions. (10 Marks) Write detailed technical specifications for any THREE of the following : R.C.C. roofing of 12 cm thick with M20 grade conerete. Coarsed rubble masonry in CM (1 : 6) in foundation coarse. 20 mm thick cement plastering in CM (1 : 6) over brick masonry. Cement pointing in CM (1 : 2) over the joints of the stone masonry. (15 Marks) Be oP From the first principles, arrive at the rate per unit for any THREE of the following items of work : Brick masonry in CM (1 : 4) for super structure. R.C.C. roofing of 120 mm thick slab of (1 : 1% : 3) with 1% steel reinforcement. Mosaic tile flooring over C.C. bed (| : 3 : 6) of 7.5 om thick. Mangalore tile roofing over Teakwood Rafters and Battens. (5 Marks) apse Following table gives RL for a portion of 400 m length of road. Compute the quality of earthwork. Pan 1000 | 1040 | 1080 | 1120 | 1160 | 1200 | 1240 | 1280 | 1320 | 1360 | 1400 RL of - of | 31.00 | 30.90 | 30.50 | 30.80 | 30.60 | 30.70 | 31.20 | 31.40 | 31.30 | 31.00 | 30.60 RL of ; formation | 32-00 DOWN GRADIENT 1 in 100 ‘Road width = 10 m, side slope = 2: | in filling and 1.5: 1 in cutting. (U5 Marks) po gp ARC6.4 ‘The longitudinal section and cross-section of a RCC beam is shown in Fig.Q5. Calculate the quantity of steel required, diameter wise given weight of rod in kg/m. Clear cover to reinforcements is 25 mm. 8mm > 0.4 kg/m, 20 mm = 2.5 kg/m, 10 mm > 0.6 kg/m, 25 mm > 3.8 kg/m, 16 mm —> 1.6 kg/m. (15 Marks) 3205S Sort long, Babi C re £ % f ee mee > oa iT 1 om | esge__ | ake eR @Iromfe 1 Nasal gS + x Tt eauqe int ke imt i a-eke + 3-208, feet DI-BEe@ rower Bade t325F coral Qsani- aa e/g ot KO Fig.Q5 Write short notes on any THREE of the following : Mode of measurements Interium and final certificate Schedule of rates Tender notification and procedures. (15 Marks) olsmt Section Y-y. SECTION X-X (MAIN Wnt Footing) » eo 3 IED IN 30f3 (Scheie of fag. [pp esqa40. Wo [Dy -> 9-Fox2-a=6No D,> 0-720 «Io ote: ALywrets Wee Tieougt, SIZE OF Lg > OB OS DCL ConcreTe 1S BS one Thick, « (Paar non wale & Re taming We Ft3. QD

You might also like