PENANGUNG PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES
PAKET KORDINATOR PROGRES NO NAMA PEKERJAAN JAWAB 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% NGE TIM MC-0 MC-100 DO-PO TEST TEKAN BAST %
1 JL LEBAK JAYA 2A RT.05, RW.03 KEL GADING , KEC TAMBAKSARI SURABAYA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 93%
2 L LEBAK JAYA 2B RT.05, RW.03 KEL GADING , KEC TAMBAKSARI SURABAYA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 93%
3 JL LEBAK JAYA 2C RT.05, RW.03 KEL GADING , KEC TAMBAKSARI SURABAYA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 93%
4 Jl Ploso Gg VII , RT 07 , RW 05 Kel.Ploso , Kec Tambaksari 1 1 1 1 1 1 1 1 1 1 1 1 1 1 93%
5 JL PLOSO IX RT.09, RW.05 KEL PLOSO , KEC TAMBAKSARI SURABAYA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 93%
PAKET KORDINATOR PROGRES NO NAMA PEKERJAAN PENANGUNG PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES NGE TIM MC-0 MC-100 DO-PO TEST TEKAN BAST %
JAWAB 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
1 JL. DUKUH BULAK BANTENG TIMUR Gang VI 1 1 1 1 1 1 1 1 1 72%
2 Jl. Dukuh Bulak Banteng Gang VII 1 1 1 1 1 1 1 1 1 72%
3 Jl. Dukuh Bulak Banteng Timur Gang VIII 1 1 1 1 1 1 1 1 1 72%
4 Jl. Dukuh Bulak Banteng Patriot Gang III-A 1 1 1 1 1 1 48%
5 Jl. Dukuh Bulak Banteng Sekolah Gang III 0%
6 Jl. Tambak Wedi Baru Utara Gang XVIII-B 1 1 1 1 1 1 1 1 1 72%
7 Jl. Tambak Wedi Baru Utara Gang XVIII-C 1 1 1 1 1 1 1 1 1 72%
PAKET L41 LAKANG 46% 8 Jl. Tambak Wedi Utara Gang IA 1 1 1 1 1 1 48%
9 Jl. Tanah Merah Gg. Buntu 1 1 1 1 1 1 48%
10 Jl. Tanah Merah Utara Gang XI 1 1 1 1 1 1 48%
11 Jl. Sidotopo gang IV ` 0%
12 JL. RANDU BARAT GG VII RT 02 RW XII 0%
0%
0%
12 0.72 0.72 0.72 0.72 0.72 0.72 0.4 0.4 0.4 0 0 0 0 0 0 0
PAKET KORDINATOR PROGRES NO NAMA PEKERJAAN PENANGUNG PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES NGE TIM MC-0 MC-100 DO-PO TEST TEKAN BAST %
JAWAB 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
1 Jl. Tambak Wedi Utara Gg. I-A RT 06 RW IV 1 1 16%
2 Jl. Tanah Merah Utara Gg XI RT 01 RW IX 1 1 1 1 32%
3 Jl. Randu Barat Gg VII RT 02 RW XII 0%
4 Jl. Sidotopo Gg IV RT 04 RW IV 0%
5 Jl. Tambak Wedi Masjid VI RT 8 RW 2 1 1 1 1 1 1 1 1 1 72%
6 Jl. Bulak Rukem Timur 1-D RT 2 RW 1 1 1 1 1 1 1 1 1 1 72%
7 Jl. Pogot Baru Gg IX RT 9 RW 6 1 1 1 1 1 1 1 1 1 1 80%
PAKET L42 LAKANG 36% 8 Jl. Pogot Baru Gg X RT 9 RW 6 1 1 1 1 1 1 48%
9 Jl. Krembangan Jaya Selatan III A 0%
0%
` 0%
0%
0%
0%
9 0.48 0.48 0.4 0.4 0.32 0.32 0.24 0.24 0.24 0.08 0 0 0 0 0 0
PAKET KORDINATOR PROGRES NO NAMA PEKERJAAN PENANGUNG PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES PROGRES NGE TIM MC-0 MC-100 DO-PO TEST TEKAN BAST %
JAWAB 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
1 Jl. Nambangan Perak 1 1 1 1 1 1 48%
0%
0%
0%
0%
0%
PAKET 0%
NAMBANG LAKANG 48% 0%
AN L48 0%
0%
` 0%
0%
0%
0%
1 0.08 0.08 0.08 0.08 0.08 0.08 0 0 0 0 0 0 0 0 0 0
17 November 2017
24 November 2017
01 Desember 2017
08 Desember 2017
15 Desember 2017
22 Desember 2017
29 Desember 2017
PAKET KORDINATOR