ROTAM. Paterno St, San an, MM,
‘euroasia
PRoScENUN
44P. Rial, Cor, Estrela St, Guadalupe Visio, Maat Cty
‘SUMMARY OF BILLING
DATE
EUROASIA MARBLE & GRANITE INC.
5
{ ‘Level 37 Unit = {| 6 |
(i = Level 37 Unit C 5
Ls Level 37 Unit pesresnseeeee — Z.
I = Level 38 Unit A . - L
I = Level 38 Unit eS 8
formvaon] 7 |
The i aa al
Is = Level 39 Unit A 5 -
~_ [Level 39 Unit 8 7 -
= [Level 39 Unit C 7 — | cam
a 5 +
{3 |
| 5
L — — 4 oo
‘Level 41 UnitD a 2
[ Level 42 Unit P3
Ee ~ Level 36 Unit ABCD Threshold Ss) _
=__Level 41 UnitD Threshold — 1
|= Level 42 Unit ABCD Threshold [a
I |
L —
[ |GRAND TOTAL z T
Propared by ‘checked by: Noted by: Approved by:
Sees
Romar Santiago Mr. Jimmy Lam
Pic Engineering Head \VP-Operations
Lara Roto Ronnie Estrada / Winean Ledripae
aarac.#2074. Pate S, Son an
@® EUROASIA MARBLE & GRANITE INC.
eunonsia
Proscenium
Sub-contractor LARA RONILO, Perio January 16,2018
Bling No. 005; Levek 7
phase of Work Stone Works Unit No. Unita
‘ACCOMPLISHMENT
tom Description Unit cae Brevious This Period Te Date.
alt Cost [TotaiAmt | “Sent [Amount Sewe_[ Amount | Se we] amount
C nstfilation Works
Unit A
0 Masters Teo
jal 600x600 (Gis Argento) | 728 [a 350 253550) — Om 0.00 0%, 0 Oe o
fa very White) 408 Pa 360.0 1431.50 0%, 0.00) 0%. a 0.
oor 300x600 (Gris Argento) —} 662 [mF 300.00] 988-90 —0% 0.00] —0%6 0.0 — 0% o
[Zocalo (Gris Argento) 8.10 [tm 150. 1.215.001 0% 0.00 0% 0.00] 0% e
a Bedroom 2785
Wat 600x600 (Eramosa) 300) me 35004 3.180.00) 60% | 250000) Ox ‘Ooo 80% _| 2.500,
[Beseboard 150mm (Eramosa) | 3.82 | im 150.001 573.00) 90% ‘515.70 0% 0.00) 00% 518.
Room
0 Floor 3003600 (Eramosa) a7 _[ at 306) 307.00] 80% Si08| 0% ar 0.
rs. s0OmmW (Eremosa) | 3.82 —[ tor 150. ‘573.00 80% 458.40) 0% 9.00) 60% 458,
0 Perimeter Cutting 3728 _| im 3: 113040) 40% 55.76 30% 318A 70% 797.
Hauling 2964 | me 704 2.07673] 60% | 1.650.76l 10% ‘2or.aT| 90% | 1867.
[TOTAL CONTRACT AMOUNT 43) 40.37% 335% | ss2d asim | e707:
‘This bling is for the following scope of works only TOTAL AMOUNT 6790.78
tess:
5% Retention (330.99)
Biting No.4 (4,200.06)
‘Bling No. 2 (2788.20)
Bing No. 3 (508.15)
Biting No.4 (135150)
TOTAL AMOUNT DUE. P 521.83
Prepared by: (Checked by: Noted by. Approved by:
EM Calléon Romar Santiago Mr, Jimmy Lam
Pic Engineering Head \VP-OperationsEUROASIA MARBLE & GRANITE INC,
‘IOTAM Paae 6, San Jan,
eunonsin
Proscenium
Sub-contactor LARA RONILO Period: January 16,2018
ling No. a! Level: 7.
Phase of Work ‘Stone Wiens Unita, Unit
ACCOMPLISHMENT
tem Description ty. | Unie om Previous This Period Te Date
UnitCost_[Totat Amt | sont amount | Swe | Amount | Sow heoame
-Instlation Works
Unit A
asters Ta
Jal 600x600 (Gis Agents) —| 725 350 2EG0_ GOR _| T5576] a 307.95 60% | —z.08T
al White) ——| 4.09 "a 350.0 143150 50% 573] — 0:00) 50% 77
loot 300x600 (Gris Argento) —| 6.62 300,00] 7,986 50] 60% | —T1e2 tal “20% 3738 80% | 158
[Zocalo (Gris Argento) 8.10 [tm 150.00 1.215.00] 100% | 1218.00) 076 0.00 100% | 1.215.
z Tas.
[Wa 600x600 (Eramosay 00 | a 380.00] "3.180.00] 60% | 3590.00) ox ‘00 s0% | 75001
boars 150mm (Erase) | 3.82 | Im 150. ‘573.00 s0% 51570 0% 2.00] 90% S157
oom
0 Fioor 300x600 (Eramosa) 27 | we 305. [201.00 80% $40.80) 0% (0.00) 80%, 640.
[Beseboard 100mm (Eramosa) | 3.82 | im 50 573.00 90% 515.70) 0%. 2.00] sox EE
Perimeter Cutting 3738 im 30: 19840 10% Tas) 60% e864) 70% 727:
a cd 70. 207a7a 80% | 1,037.37] 40%. 229.89 90% | 1.967.
[TOTAL CONTRACT AMOUNT is.404.13| e450% | 99906] 56%] — aareaal eorex | 7a,
TE: This bling is forthe following scope of works only ‘TOTAL AMOUNT 1240899
Less:
5 Retenton (20.45)
Baing No.1 85137)
Bing No.2 (4.28280)
Bing No.3 (70730)
Bing No.4 (2,384.00)
bing No.5 (1288.18)
TOTAL AMOUNT DUE P 2297.89
Prepared by: ‘Checked by. Noted by: Approved by:
ta EM Calleon Romar Santiago Me. Jimmy Lam
iS Pic Engineering Head \VP-Operations