Republic of the Philippines
ENERGY REGULATORY COMMISSION
San Miguel Avenue, Pasig City
Posting
oo
wwe,
RESOLUTION NO. _» __, SERIES OF 2006
ADOPTING THE RULES FOR SETTING DISTRIBUTION
WHEELING RATES (RDWR) FOR PRIVATELY OWNED
DISTRIBUTION UTILITIES ENTERING PERFORMANCE BASED
REGULATION (FIRST ENTRY POINT)
WHEREAS, on December 10, 2004 the Commission adopted Resolution
No. 12-02, Series of 2004 entitled “Adopting a Methodology for Setting
Distribution Wheeling Rates” thereby promulgating the Distribution Wheeling
Rates Guidelines (DWRG),
WHEREAS, the DWRG provides for a new methodology for setting the
distribution rates of private distribution utilities (DUs) denominated as
Performance Based Regulation (PBR);
WHEREAS, the DWRG provided five (5) entry groups for privately owned
distribution utilities (PUs) to be subject to PBR with a limit of five (5) PUs for each
group, to wit
Group Reset Process Second Regulatory Period
‘A__| January, 2006 — June 30, 2007 | July 1, 2007 — June 30, 2071
_B | April 1, 2007 - September 30, 2008
c January 1, 2008 ~ June 09 = June 30, 2013"
D
ie
[April 1, 2008 - September 30, 2010 | October 1, 2010 - September 30, 2014
January 1, 2010 ~ June 30,2011 _| July 1, 2011 — June 30, 2015
WHEREAS, for Group A, entry to the PBR was made optional by the
Commission on a first come — first in basis;
WHEREAS, the Manila Electric Company (MERALCO), Dagupan Electric
Corporation (DECORP) and Cagayan Electric Power & Light Company, Inc.
(CEPALCO) were qualified to enter the PBR and were deemed as those
belonging to Group A being the first entrants to the said methodology;
gaResolution No. , Series of 2006
Adopting The Rules For Setting Distribution Wheeling Rates (ROWR) For
Privately Owned Distribution Utilities Entering Performance Based Regulation
(First Entry Point)
Page 2 of 3
WHEREAS, the draft of the Rules For Setting Distribution Wheeling Rates
(RDWR) For Privately Owned Distribution Utilities Entering Pertormance Based
Regulation (First Entry Point) was published on May 3, 2006 and June 30, 2006
for the first (1") and second (2™') drafts, respectively, and subjected to several
public consultations;
WHEREAS, the RDWR is an update of the DWRG, and takes into account
changes in the rules following the publication of and consultation on the Issues
Paper in September 2005, the Position Paper in December 2005 and subsequent
amendments to some calculations for determining the maximum annual price cap
for PUs subject to PBR;
WHEREAS, consultation on the draft RDWR was conducted on June 13,
2006 and for which final comments were received,
WHEREAS, after consideration of the comments made and clarifications
sought, the Commission now finds the final version of the RDWR as appropriate
reference in the PBR process for Group A or the First Entry Group;
NOW, THEREFORE, be it RESOLVED, as the Commission hereby
RESOLVES,
1, to APPROVE and ADOPT, as it hereby APPROVES and ADOPTS,
the “RULES FOR SETTING DISTRIBUTION WHEELING RATES
(RDWR) FOR PRIVATELY OWNED DISTRIBUTION UTILITIES
ENTERING PERFORMANCE BASED REGULATION” hereto
attached as Annex “A” and made an integral part of this Resolution
2. to REQUIRE entrants to Group A (First Entry Point), namely, the
Manila Electric Company (MERALCO), Dagupan Electric Corporation
(DECORP) and Cagayan Electric Power & Light Company, Inc.
(CEPALCO) to use the said RDWR for reference in the PBR processResolution No. . Series of 2006
Adopting The Rules For Setting Distribution Wheeling Rates (RDWR) For
Privately Owned Distribution Utilities Entering Performance Based Regulation
(First Entry Point)
Page 3 of 3
This Resolution shall take effect immediately. This resolution is hereby
ordered to be posted on the website, filed with the University of the Philippines
Law Center Office of the National Administrative Register (ONAR) and published
in a newspaper of general circulation
Pasig City, July 26, 2006.
Se
ROBOLFO 5 ALBANO, JR.
Chairman