SEPTEMBER 2013
LIST OF DRAWINGS LIST OF DRAWINGS
03 GENERAL NOTES (BRIDGE SUPERSTRUCTURE) STD - 02 22 LEFT ABUTMENT DRAWING (03) S24 - C7 - 21
06 BRIDGE DECK END JOINT STD - 05 25 LEFT RETURN WALL DRAWING (01) S24 - C7 - 24
07 REBAR CODES & SHAPE DETAILS STD - 06 26 LEFT RETURN WALL DRAWING (02) S24 - C7 - 25
08 GENERAL PLAN OF THE BRIDGE (01) S24 - C7 - 07 27 BRIDGE BEARING PLAN ON THE ABUTMENT DETAILS S24 - C7 - 26
09 GENERAL PLAN OF THE BRIDGE (02) S24 - C7 - 08 28 RIGHT ABUTMENT DRAWING (01) S24 - C7 - 27
10 GENERAL ELEVATION OF THE BRIDGE S24 - C7 - 09 29 RIGHT ABUTMENT DRAWING (02) S24 - C7 - 28
12 PLAN, SECTION & ELEVATION OF DECK S24 - C7 - 11 31 DETAILS OF KERB BEAM AT APPROACH S24 - C7 - 30
13 REINFORCEMENT DETAILS OF DECK SLAB S24 - C7 - 12 32 SEISMIC ARRESTOR BLOCK DETAILS S24 - C7 - 31
15 REINFORCEMENT DETAILS OF CROSS GIRDER & KERB BEAM S24 - C7 - 14 34 REBAR SCHEDULE S24 - C7 - 33
A. GENERAL
3. MINIMUM LAP LENGTH OF REINFORCEMENT SHALL BE CONFORM TO
AASHTO/2007 AS SHOWN BELOW:
1. THE NOTES IN THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL
RELEVANT DRAWING PERTAINING TO THE BRIDGE.
E. SUPERVISION
C. REINFORCEMENT
CONSTRUCTION WORK MUST BE SUPERVISED BY A COMPETENT
SUPERVISION ENGINEER.
1. ALL REINFORCEMENT SHALL BE OF HIGH YIELD STRENGTH
DEFORMED BARS (MIN fy 500 MPa).
GOM
BRIDGE SPAN = 24.00 METERS
FLOW DIRECTON
STN1
100.00
PANBANG SIDE
GENERAL PLAN
GOM
BRIDGE SPAN = 24.00 METERS
FLOW DIRECTON
STN1
100.00
PANBANG SIDE
GENERAL PLAN
RL=100.967 RL=101.207
(AT-BS) RL=100.9565 (AT-RS) RL=101.1965 (AT-RS) (AT-BS)
1% LONGITUDINAL SLOPE
RL=100.1965 (FB)
LOOSE SOIL
SOLID ROCK
BOULDER
PROTECTION ROCK
RIGHT BANK
HFL=97.297
RL=96.9665 (FT)
RL=95.9665 (FB)
LWL=95.432
LEFT BANK
LEGEND:
* FRL : FINISHED ROAD LEVEL
* AT-RS : ABUTMENT TOP - RIVER SIDE
GENERAL ELEVATION * AT-BS : ABUTMENT TOP - BACKFILL SIDE
* FT : FOOTING TOP
* FB : FOOTING BASE
* LWL : LOWEST WATER LEVEL
* HFL : HIGHEST FLOOD LEVEL
RL=100.967 RL=101.207
(AT-BS) RL=100.9565 (AT-RS) RL=101.1965 (AT-RS) (AT-BS)
1% LONGITUDINAL SLOPE
RL=100.1965 (FB)
LOOSE SOIL
SOLID ROCK
BOULDER
PROTECTION ROCK
RIGHT BANK
HFL=97.297
RL=96.9665 (FT)
RL=95.9665 (FB)
LWL=95.432
LEFT BANK
LEGEND:
* FRL : FINISHED ROAD LEVEL
SECTIONAL ELEVATION * AT-RS : ABUTMENT TOP - RIVER SIDE
* AT-BS : ABUTMENT TOP - BACKFILL SIDE
* FT : FOOTING TOP
* FB : FOOTING BASE
* LWL : LOWEST WATER LEVEL
* HFL : HIGHEST FLOOD LEVEL
DETAIL
RETURN WALL "A" A
(DIRT WALL)
L OF ABUTMENT WALL
ALONG THE WIDTH
DETAIL
"B"
C
1.5% SLOPE
ABUTMENT WALL
DETAIL "A"
(ABUTMENT WALL)
SCALE 1:15
1.5% SLOPE
SLOPE 1 IN 20
(FOOTING SLAB)
CONSTRUCTION
JOINT
HAUNCH
DETAIL "B"
A SCALE 1:20
RETURN WALL
SIDE
ELEVATION
NOTES
GENERAL MATERIAL
TABLE 1: CONCRETE SCHEDULE FOR LEFT ABUTMENT 1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS 1. 28 DAYS CONCRETE STRENGTH IN CUBE, fck = 25MPa.
OTHERWISE MENTIONED. 2. YIELD STRENGTH OF STEEL, fy = 500MPa (GRADE Fe500, IS 1786)
TYPE NO SIZE VOLUME MATERIAL MANUFACTURER 2. DO NOT SCALE THIS DRAWING. USE GIVEN
FOOTING PLAN RCC ABUTMENT 1 ABUTMENT 48.62 M25 CAST IN PLACE CONCRETE DIMENSION ONLY
RCC RETURN WALL 2 RETURN WALL 6.70 M25 CAST IN PLACE CONCRETE
RCC DIRT WALL 1 DIRT WALL 7.09 M25 CAST IN PLACE CONCRETE
(DIRT WALL)
(DIRT WALL)
L OF ABUTMENT WALL
PCC (80 CM THICK)
BEARING
C
BEARING SEAT
10 CM THICK
1.5% SLOPE
(TOTAL HEIGHT OF ABUTMENT)
(ABUTMENT WALL)
WEEP HOLE
SLOPE 1 IN 20 SLOPE 1 IN 20
FILTER MATERIAL
50 CM THICK
(FOOTING SLAB)
CONSTRUCTION
CONSTRUCTION JOINT
JOINT
B M
SECTION "B - B"
NOTES
FRONT ELEVATION
TABLE 1: CONCRETE SCHEDULE FOR LEFT ABUTMENT
VIEW "A - A" TYPE NO SIZE VOLUME MATERIAL MANUFACTURER
GENERAL MATERIAL
RCC ABUTMENT 1 ABUTMENT 48.62 M25 CAST IN PLACE CONCRETE 1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS 1. 28 DAYS CONCRETE STRENGTH IN CUBE, fck = 25MPa.
RCC RETURN WALL 2 RETURN WALL 6.70 M25 CAST IN PLACE CONCRETE OTHERWISE MENTIONED. 2. YIELD STRENGTH OF STEEL, fy = 500MPa (GRADE Fe500, IS 1786)
RCC DIRT WALL 1 DIRT WALL 7.09 M25 CAST IN PLACE CONCRETE 2. DO NOT SCALE THIS DRAWING. USE GIVEN
DIMENSION ONLY
RETURN WALL
08 11 ABUTMENT WALL
12 09
FOOTING SLAB
F F
52-08-T16-150-BACK NOTES
GENERAL
MATERIALS
7-20-T12-100
4-25-T12-DWR 25
11-24a-T12-200-DWR
11-24-T12-200-DWR
24
DETAIL
48-22-T12-150-DWR "D"
4-14-T12-EQ-TOP 24a
2X2=4-22a-T12-150
1-16-T12-TOP (DWR)
52-13-T16-150-TOP 19
3-15-T12-EQ-BACK 16 20
36-12-T12-110-VALL. 14
12
LEGEND: 08
10
32-11-T12-110-BACK
4-10-T12-FACE *** EQ - EQUAL DISTANCE
*** RA - ROCK ANCHORAGE 11
09
*** VALL. - VALLEY
9-17-T12-1000-SPACER *** DWR - DIRT WALL REINFORCEMENT
DRAWING 'A'
*** BOTT. - BOTTOM
NOTES SCALE 1:25
70-9-T12-110-VALL. GENERAL
52-8-T16-150-BACK NOTE ON DRAWING 'A'
1. ALL THE DIMENSIONS ARE IN MILLIMETER
UNLESS OTHERWISE MENTIONED.
9-17-T12-1000-SPACER 1. BAR 22a SHOULD CONTINUE INTO TO KERB
2. DO NOT SCALE THIS DRAWINGS. BEAM ABOVE BUT THE THE REINFORCEMENT FOR
52-6-T16-150-TOP USE GIVEN DIMENSIONS ONLY. DIRT WALL IN BETWEEN KERB WILL REMAIN AS BAR No. 22.
G G
20-7-T12-150-TOP 3. DURING THE CONSTRUCTION, THE 2. BAR No. 22a WILL BE ONLY THERE UNDER THE AREA
CONTRACTOR MUST CHECK THE WHERE KERB BEAM OCCUPY ON THE DIRT WALL TOP.
DIMENSIONS, LEVELS AND
MEASUREMENTS. DISCREPANCY
8-4-T20-1000-CHAIR
IF ANY TO BE REPORTED TO THE
ENGINEER BEFORE EXECUTION.
4-5-T12-FACE
4-5-T12-FACE
MATERIALS
BAR MARK
1. CONCRETE 28 DAYS STRENGTH
BAR MARK SPACING
20-2-T12-150-BOTT. IN CUBE, fck = 25 MPa.
4-3-T12-FACE 52-01-T 16-150-BOTT
52-1-T16-150-BOTT. 2. YIELD STRENGTH OF STEEL, NOS. OF
LOCATION / REMARK
BAR
fy = 500 MPa (GRADE Fe 500, IS 1786).
TYPE OF REBAR DIA. OF REBAR
20-2-T12-150-BOTT.
20-7-T12-150-TOP
HAUNCH
(150X150)
52-1-T16-150-BOTT.
14-26-T12-150
52-6-T16-150-TOP
OUTER EDGE OF
DIRT WALL
HAUNCH
(150X150)
INNER EDGE OF
ABUTMENT WALL
BAR MARK
T - HIGH YIELD DEFORMED BAR
BAR MARK SPACING Y - DEFORMED MS BAR
FOOTING REINF. LAYOUT R - ROUND MS BAR
TOP BAR VIEW "G - G" 52-01-T 16-150-BOTT
NOS. OF
LOCATION / REMARK
ROCK ANCHORAGE PLAN BAR
BOTT. BAR LEGEND:
TYPE OF REBAR DIA. OF REBAR
*** BOTT. - BOTTOM
*** RA - ROCK ANCHORAGE
CL OF ABUTMENT WALL
ALONG THE WIDTH
3. DURING THE CONSTRUCTION, THE
CONTRACTOR MUST CHECK THE
P P DIMENSIONS, LEVELS AND
02 4a MEASUREMENTS. DISCREPANCY
IF ANY TO BE REPORTED TO THE
SECTION "P - P" ENGINEER BEFORE EXECUTION.
MATERIALS
1.5% SLOPE
12-2-T12-150-VALL. 02 04
COVERING
SECTION "O - O"
O O ABUTMENT (ALL SIDES) = 50 MM
4a
NOTES
PCC (80 CM THICK)
3-06-T12-1000 GENERAL MATERIALS
(SPACER)
1. CONCRETE 28 DAYS STRENGTH
1. ALL THE DIMENSIONS ARE IN MILLIMETER
IN CUBE, fck = 25 MPa.
ABUTMENT WALL
04
3. DETAILS OF STEEL IS MENTIONED
3. DURING THE CONSTRUCTION, THE
IN THE DRAWING AND ITS QUANTITY
CONTRACTOR MUST CHECK THE
IN THE BAR BENDING SCHEDULE.
DIMENSIONS, LEVELS AND
3-06-T12-1000 MEASUREMENTS. DISCREPANCY
(SPACER) IF ANY TO BE REPORTED TO THE COVERING
RETURN WALL
ENGINEER BEFORE EXECUTION.
ABUTMENT (ALL SIDES) = 40 MM
03
3-06-T12-1000
FILTER MATERIAL
50 CM THICK
(SPACER)
01
3-06-T12-1000
02
(SPACER)
BAR MARK
CONSTRUCTION
JOINT 12-01-T 16-150-BACK
NOS. OF
LOCATION / T - HIGH YIELD DEFORMED BAR
BAR
REMARK
Y - DEFORMED MS BAR
TYPE OF REBAR DIA. OF REBAR R - ROUND MS BAR
SEISMIC
ARRESTOR BLOCK
BEARING
BEARING SEAT NEAUROPRENE BEARING SEAT
10 CM THICK RUBBER PAD 10 CM THICK
2 CM THICK
1.5% SLOPE
1.5% SLOPE
RUBBER BEARING
BEARING
C DETAIL "C"
OF BEARING L
SCALE 1:15
X X
ABUTMENT
Y Y
SEISMIC
ARRESTOR BLOCK PLAN
1.5% SLOPE
FRONT VIEW
CONSTRUCTION
JOINT
NOTES
GENERAL MATERIALS
4-13-T12-DW
52-12-T12-150-DW
7-09-T12-100
11-11a-T12-200-DW
8-02-T12-150-BOTT.
4-06-T12-EQ-TOP
DETAIL
48-10-T12-150-DW 6-08-T12-100
"2" DETAIL "2"
52-05-T16-150-TOP SCALE 1:15
5-06-T12-EQ-TOP
47-12-T25-500-RA
NOTES
GENERAL
4-03-T12-FACE
52-05-T16-150-TOP
52-01-T16-150-BOTT. MATERIALS
SCALE 1:25
09 COVERING
ABUTMENT (ALL SIDES) = 50 MM
10
11a BAR MARK
2x2=4-10a-T12-150
(DWR)
TOP BAR
5 @ 50 = 250
10-02-T12-150-BOTT.
10-04-T12-150-TOP
100 MM DIA. SPRING COIL
MADE FROM 12 MM DIA BAR 20 MM DIA. ROD
APPROACH SLAB
8 CM THICK PCC
3 3 4 4
BAR MARK
47-01-T 12-150-BOTT.
04 03 NOS. OF
BAR
LOCATION /
47-01-T12-150-BOTT.
REMARK
47-03-T12-150-TOP
TYPE OF REBAR DIA. OF REBAR
01 02
T - HIGH YIELD DEFORMED BAR
Y - DEFORMED MS BAR
8 CM THICK PCC R - ROUND MS BAR
NOTES
GENERAL
SECTION "4 - 4" 1. ALL THE DIMENSIONS ARE IN MILLIMETER
SCALE 1:20 UNLESS OTHERWISE MENTIONED.
COVERING
PLAN
APPROACH SLAB (ALL SIDES) = 40 MM
5 CM THICK 3-02-T16-EQ-TOP
WEARING COURSE KERB BEAM KERB BEAM
13-01-T12-150
(STIRRUP)
3-03-T16-EQ-BOTT.
APPROACH SLAB
01
4b
3b
02
8 CM THICK PCC
RETURN WALL
KERB BEAM
3-02-T16-EQ-TOP BAR MARK GENERAL
1. ALL THE DIMENSIONS ARE IN MILLIMETER
(ROAD SIDE) UNLESS OTHERWISE MENTIONED.
BAR MARK SPACING
2. DO NOT SCALE THE DRAWINGS.
USE GIVEN DIMENSIONS ONLY.
SECTION 3-03-T 16-EQ-BOTT.
ABUTMENT WALL
ROUGHENED
3-03-T16-EQ-BOTT. NOS. OF MATERIALS
FOR KERB
LOCATION /
CONSTRUCTION BAR 1. CONCRETE 28 DAYS STRENGTH
20a
REMARK
IN CUBE, fck = 30 MPa.
13-01-T12-150-STIRRUP
TYPE OF REBAR DIA. OF REBAR
2. YIELD STRENGTH OF STEEL,
fy = 500 MPa (GRADE Fe 500, IS 1786).
RETURN WALL
18a
*** EQ - EQUAL DISTANCE
3. DETAILS OF STEEL IS MENTIONED
IN THE DRAWING AND ITS QUANTITY
IN THE BAR BENDING SCHEDULE.
COVERING
T - HIGH YIELD DEFORMED BAR ALL SIDES = 25 MM
20 Y - DEFORMED MS BAR
R - ROUND MS BAR
NOTES
GENERAL MATERIALS
1. ALL THE DIMENSIONS ARE IN MILLIMETER 1. CONCRETE 28 DAYS STRENGTH
UNLESS OTHERWISE MENTIONED. IN CUBE, fck = 30 MPa.
PLAN
2. DO NOT SCALE THE DRAWING. 2. YIELD STRENGTH OF STEEL,
USE GIVEN DIMENSIONS ONLY. fy = 500 MPa (GRADE Fe 500, IS 1786).
FRONT ELEVATION
1.5% SLOPE COVERING
3. DETAILS OF STEEL IS MENTIONED
IN THE DRAWING AND ITS QUANTITY
SIDE ELEVATION IN THE BAR BENDING SCHEDULE.
ALL SIDES = 40 MM
7-03-T16-150-STIRRUP
7-03-T16-150-STIRRUP
03 (STIRRUP)
BAR MARK
03 (STIRRUP)
03 (STIRRUP)
BAR MARK SPACING
03 (STIRRUP)
5-02-T20-150
2-01-T20-EQ
8 8
5-05-T 20-150
NOS. OF
5-02-T20-150
2-01-T20-EQ
BAR
TYPE OF REBAR DIA. OF REBAR
5-02-T20-150
2-01-T20-EQ
7-03-T16-150-STIRRUP
SECTION "8 - 8"
REINFORCEMENT DETAILS OF SEISMIC ARRESTOR BLOCK
RAIL
RAIL
T - HIGH YIELD DEFORMED BAR
KERB BEAM TOP Y - DEFORMED MS BAR
R - ROUND MS BAR
DRAIN 2.5 % CROSS SLOPE
SPOUT
DECK SLAB TOP
NOTES
GENERAL
1. ALL THE DIMENSIONS ARE IN MILLIMETER
UNLESS OTHERWISE MENTIONED.
GIRDER 2. DO NOT SCALE THE DRAWING.
USE GIVEN DIMENSIONS ONLY.
5
ELEVATION OF RAILING TABLE 6: CONCRETE SCHEDULE FOR RAIL POST MATERIALS
TYPE NO SIZE VOLUME MATERIAL MANUFACTURER 2X2=4-(04)-T12
RCC RAIL POST 50 200 X 200 2.16 M30 CAST IN PLACE CONCRETE 1. CONCRETE 28 DAYS STRENGTH
IN CUBE, fck = 30 MPa.
04 04 04 04 SCALE=1:30
COVERING
03 03 03 03 2X2=4-(01)-T16
ALL SIDES = 25 MM
02 - KB
04 - DS 03 - DS
01 - KB *** 01 - KB : BAR NO. 01 OF KERB BEAM
02 02 02 02
*** 01 - DS : BAR NO. 01 OF DECK SLAB
03 - KB
01 01 01 01
01 - DS 02 - DS
2-(01)-T16
6-(02)-T10-150
GIRDER (STIRRUPS)
2-(01)-T16
SECTION 6-6
SCALE=1:30 CROSS GIRDER SECTION " 7 - 7"
6
RAILING POST REINF. DETAILS SCALE 1 : 10
Horizontal bar in valley side return wall T - HIGH YIELD DEFORMED BAR
Y - DEFORMED MS BAR
R - ROUND MS BAR
Top bar in transverse direction of
return wall
Spacer bar in the return wall
C. REINFORCEMENT
1. ALL REINFORCING STEEL SHALL BE OF HIGH YIELD STRENGTH D. WATER
DEFORMED BARS (MIN fy = 500 MPa) CONFORMING TO IS 1786 WATER TO BE USED IN CONCRETING AND CURING SHALL BE POTABLE
2. BENDING OF REINFORCEMENT BARS SHALL BE AS PER ARTICLE 5.10.2 WATER TO BE TESTED AS PER AASHTO T26-79.
A. GENERAL OF AASHTO / 2007.
1. THE NOTES IN THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL 3. LAPS IN REINFORCEMENT BARS IN TENSION ZONE SHALL BE AVOIDED AS E. MATERIAL SPECIFICATION
RELEVANT DRAWINGS PERTAINING TO THE BRIDGE. FAR AS POSSIBLE. LAPS MAY BE PROVIDED, IF UNAVOIDABLE. HOWEVER, MATERIAL SPECIFICATIONS AND WORKMANSHIP SHALL BE IN ACCORDANCE
IN SUCH CASES: WITH THE TECHNICAL SPECIFICATION AS SPELT OUT IN THE CONTRACT
DOCUMENT.
2. UNLESS OTHERWISE SPECIFIED, ALL DIMENSIONS ARE IN MILLIMETER (mm)
(A) NOT MORE THAN 50 % OF REINFORCEMENT BARS SHALL BE
AND ALL LEVELS ARE IN m. DIMENSIONS ARE NOT TO BE SCALED AND ONLY LAPPED AT ANY ONE SECTION. F. WORKMANSHIP / DETAILING
WRITTEN DIMENSIONS ARE TO BE FOLLOWED.
1. ALL SHARP EDGES OF CONCRETE SHALL BE CHAMFERED
(B) FOR CLOSELY SPACED BARS LAPPING MAY BE AVOIDED BY (10mm x 10mm). OR AS PER DIRECTED BY THE ENGINEER
3. THE CONTRACTOR SHALL VERIFY ALL CHAINAGES, REDUCED LEVELS, PROVIDING SUITABLE TYPE OF MECHANICAL ANCHORAGE
COORDINATES AND DIMENSIONS BEFORE START OF THE WORK. IN CASE (WITH PRIOR APPROVAL). 2. FORM WORK DETAILS SHALL BE SUBMITTED BY THE CONTRACTOR
OF ANY DISCREPANCY, THE MATTER SHALL BE BROUGHT TO THE NOTICE FOR THE APPROVAL AND SHALL BE TESTED IN ACCORDANCE WITH
(C) SPLICES SHALL BE STAGGERED AT LEAST 600 mm. THE SPECIFICATION.
OF THE ENGINEER.
(D) ALL SPLICES SHALL BE CLASS B SPLICES. 3. CONSTRUCTION JOINT : THE LOCATIONS AND PROVISION OF
4. BRIDGES/CULVERTS ARE DESIGNED AS PER AASHTO LRFD BRIDGE DESIGN
CONSTRUCTION JOINTS SHALL BE APPROVED BY THE
SPECIFICATION 2007 (E) MINIMUM LAP LENGTH OF REINFORCEMENT SHALL ENGINEER-IN-CHARGE. THE CONCRETING OPERATION SHALL
CONFORM TO ARTICLE 5.11.2 AND 5.11.5 OF AASHTO / 2007 BE CARRIED CONTINUOUSLY UP TO THE CONSTRUCTION JOINT.
VEHICULAR LIVE LOAD : IRC 6 : 2000 STANDARD LOAD SPECIFIED LENGTH OF THE LAP SPLICE SHALL BE
KERB BEAM
RAIL POST
GI BOLT
DRAIN SPOUT
SEE DETAIL 'C'
50mm WEARING
2.5 % CROSS COURSE 130X130X6
KERB BEAM SLOPE DRAIN PIPE MS PLATE
SOFFIT OF DECK WELDED
DECK SLAB
WITH PIPE
WELD TYPE
SEE DETAIL 'B'
DETAIL 'B'
SCALE 1:10
GIRDER
CROSS GIRDER
SECTION 1-1
SCALE 1 : 40
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
BOLTS
RAIL POST
A. GENERAL
OF BRIDGE 1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS
OTHERWISE MENTIONED
2. DO NOT SCALE THIS DRAWING. USE GIVEN
20X20X6 MS DIMENSIONS ONLY DURING CONSTRUCTION
ANGLE FRAME OF THE WORK, THE CONTRACTOR MUST
CHECK THE DIMENSIONS, LEVELS AND
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
MEASUREMENT. DISCREPANCIES IF ANY TO
BE REPORTED TO THE ENGINEER BEFORE
EXECUTION
G RADE
MATERIAL PROPERTIES :
CROSS GIRDER a. Shear modulus of ELASTOMER shall be in the
range of 0.9~1.0 mPa
AS PER
b. Min. yield strength of reinforcing steel shall be,
W
LONG AXIS OF fy = 240 mPa.
ADDITIONAL CONCRETE
BRIDGE TO MAKE GIRDER
BOTTOM HORIZONTAL
TESTS ON ELASTOMERIC BEARINGS
BEARING
BEARING CONCRETE SEAT A. Test of Elastomer
GIRDER
(HORIZONTAL TOP)
A.1. Physical properties
SEE DETAIL 'A' 1:10
DRAIN
h
CL OF BEARING
ABUTMENT WALL BACK WALL D. Short Duration Compression Test Design
Maximim Load per Bearing :
NOTES
X X
A. GENERAL
50mm WC OVER
@ 300mm C/C. DECK SLAB
KERB BEAM DECK
MS ANGLE
100X100X10
2
STEEL PLATE
30X4 mm WELDED 5
1 1 TO ANGLE.
GRID GIRDER
MS ANGLE
4 WELDED TO
@ 300mm C/C. 5
KERB BEAM ANGLE @
WELDED TO
300mm C/C
ANGLE
4
T16 @ 300mm C/C.
WING WALL WELDED TO ANGLE 100X100X10
ANGLE
2
PLAN OF DECK END JOINT SECTION
OVER ABUTMENT PLAN OF MS ANGLE 4-4SCALE 1:2
SCALE 1:10
SCALE=1:40
NOTES
T12 48 72 72 75 144 65
BAR DIA
ER T16 64 96 96 96 192 65
ET
IA
M T20 - 120 240 120 240 80
D
ND T25 - 150 300 150 300 100 T - HIGH YIELD DEFORMED BAR
BE Y - DEFORMED MS BAR
T28 - 168 168 336 112
R - ROUND MS BAR
T32 - 256 192 384 128
1
ALL REINFORCEMENT SHALL BE COLD BEND
1
2 BEND + BAR
DETAILED LENGTH HOOK LENGTH
UNBEND HOOK LENGTH
.
TN
EX
K
O
BAR DIA
O
H
ER
ET
AM
DI
ND
BE OFFSET LENGTH
SHAPE CODE AS PER ISO 4066 : 2000
SHAPE CODE 00 11 21 51
c
a r
1
2 BEND + BAR a
c d
DETAILED LENGTH HOOK LENGTH
SHPAE b
UNBEND HOOK LENGTH a b b
a
Total Length : Total Length : Total Length : Total Length :
BEND DIAMETER
a a+b - r-d a+b+c-r-2d 2(a+b)+16d
BAR DIA
HOOK EXTENSION
LEGEND :
OFFSET LENGTH
1
GIRDER (500X1900) KERB BEAM (350X350)
1 DRAIN SPOUT 1
2.5 % X-SLOPE
CROSS GIRDER (300X1700)
OF BRIDGE
2.5 % X-SLOPE
DRAIN
GIRDER PIPE
3
GIRDER (500X1900)
SECTION 2-2
2 RAILLING SCALE 1 : 80
1
DECK PLAN
SCALE 1 : 100 RAILING
DRAIN SPOUT
A B C D
50 WEARING
COURSE
200 DECK SLAB
2.5 % X-SLOPE
BRICK DECK END JOINT
50mm WEARING COURSE RAILING KERB BEAM (KB) (SEE STD-06)
DETAIL
2
GIRDER
90-3b-T16-250- EXT.TOP
2 NOTES
90-3a-T12-250- EXT.TOP
A. GENERAL
91-03-T12-250-TOP 1. ALL DIMENSIONS ARE IN MILLIMETER
UNLESS OTHERWISE MENTIONED.
1 B. MATERIAL
30-04-T12-200-TOP 1. CONCRETE 28 DAYS STRENGTH IN CUBE,
REINFORCEMENT PLAN OF DECK SLAB 30-02-T12-200-BOTT. f'ck = 30.0 MPa. [UNLESS OTHERWISE
SCALE 1:100 MENTIONED IN THE SPECIFICATION,THE
TRIAL MIX DESIGN STRENGTH SHALL BE
38.25.0 MPa]
REFERENCE DRAWINGS
1. GENERAL NOTES FOR RCC CONSTRUCTION STD-02
2. REBAR CODES & SHAPE DETAILS STD-06
3. PLAN, SECTION ELEVATION OF DECK S24-C7-11
01 GIRDER 4. MISCELLANEOUS DETAILS S24-C7-15
5. REBAR SCHEDULE S24-C7-16
DETAIL 'A'
SCALE 1:20
Room No. 09
Department of Roads, Bridge Division Thimphu Central Building. 24m SPAN RCC GIRDER DETAILS OF DECK SLAB APPROVED BY :
Thimphu, Bhutan Thimphu, Bhutan (7.00m CARRIAGEWAY) SCALE: AS SHOWN
(as Sheet A3 size)
1 2 LAP IN ALTERNATE POSITION 3 4 LAP IN ALTERNATE POSITION
A B C D
10 12 11 10
17 16 15 13 14
1 2 3 4
LAP IN ALTERNATE POSITION LAP IN ALTERNATE POSITION
NOTES
2-12-T20-EQ-TOP 12 12 12 A. GENERAL
1. ALL DIMENSIONS ARE IN MILLIMETER
UNLESS OTHERWISE MENTIONED.
SEE S24-C7-12 FOR
DECK REINF. DETAIL 2. DO NOT SCALE THIS DRAWING. USE GIVEN
DIMENSIONS ONLY.
10 10 11 11
3. DURING CONSTRUCTION OF THE WORK,
THE CONTRACTOR MUST CHECK THE
DIMENSIONS, LEVELS AND MEASUREMENT.
DISCREPANCIES IF ANY
TO BE REPORTED TO THE ENGINEER
2X5-13-T16-190- FACE BAR 13 13 13 BEFORE EXECUTION.
B. MATERIAL
1. CONCRETE 28 DAYS STRENGTH IN CUBE, f'c
= 30.0 MPa. [UNLESS OTHERWISE
MENTIONED IN THE SPECIFICATION,THE
2-14-T25-EQ-BOTT. TRIAL MIX DESIGN
4-15-T32-EQ-BOTT. 15 STRENGTH SHALL BE 38.25 MPa]
4-16-T32-EQ-BOTT. 16 16
4-17-T32-EQ-BOTT. 17 17 17
2. YIELD STRENGTH OF STEEL, fy = 500 MPa
(GRADE Fe500, IS 1786)
** C. COVERING
a. MAIN GIRDER ALL SIDE = 40mm
SECTION 1-1 SECTION 2-2 SECTION 3-3 SECTION 4-4
SCALE 1:30 SCALE 1:30 SCALE 1:30 SCALE 1:30 BAR MARK
BAR MARK SPACING
20 - 05 - T 20 - 150 - EF
NOS. LOCATION /
OF BAR REMARKS
TYPE OF REBAR DIA OF REBAR
NOTES
A. GENERAL
1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS
OTHERWISE MENTIONED.
B. MATERIAL
1. CONCRETE 28 DAYS STRENGTH IN CUBE,
f'c = 30.0 MPa. [UNLESS OTHERWISE MENTIONED
04 04
8-04-T10-190-STR IN THE SPECIFICATION,THE TRIAL MIX DESIGN
STRENGTH SHALL BE 38.25 MPa]
4-06 -T16-EQ-BOTT.
CROSS GIRDER REINF. DETAILS 2. YIELD STRENGTH OF STEEL, fy = 500 MPa
SCALE 1: 30 (GRADE Fe500, IS 1786)
C. COVERING
a. ALL SIDE = 40mm
FOR RAILING 1 D. CONSTRUCTION
REINF. 1. KEEP CROSS GIRDER BAR FOLDED INSIDE
(SEE S24-C7-32) SHUTTERING DURING CONSTRUCTION OF
3-02-T16-EQ-TOP
MAIN GIEDER
150-01-T12-150-STR.
BAR MARK
BAR MARK SPACING
3 -03 -T16-EQ-BOTT.
20 - 05 - T 20 - 150 - EF
NOS. LOCATION /
OF BAR REMARKS
TYPE OF REBAR DIA OF REBAR
REFERENCE DRAWINGS
06
1. GENERAL NOTES FOR RCC CONSTRUCTION STD-02
2. REBAR CODES & SHAPE DETAILS STD-06
DETAIL '1' 3. PLAN, SECTION ELEVATION OF DECK S24-C7-11
SCALE 1: 30 4. REBAR SCHEDULE S24-C7-16
LENGTH CAMBER
IN m IN mm
0 0
1 4
DECK TOP 2 7
3 9
4 12
5 14
6 16
25X30 DEEP COLD 7 18
APPLIED POLYSULPHATE 8 19
JOINT SEALER 9 20
10 21
11 22
DETAIL 'A' 12 22
13 22
14 21
15 20
16 19
17 18
HIGH POINT OF CAMBER
18 16
SEE DETAIL 'A'
DECK TOP 19 14
20 12
21 9
22 7
23 4
24 0
1
Camber Provided Considering
Girder Self Weight.
Deck Weight
2
CONSTRUCTION JOINT Upward camber in millimeter
WITH SHEAR KEY
CONSTRUCTION SEQUANCE :
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3
GIRDER
SCAFFOLDING
SHUTTER
ARRANGEMENT
4 3 2
ABUTMENT
SCAFFOLDING
SCAFFOLDING REMOVED
BRIDGE SUPPORTED ON
Y
ABUTMENT
SEQ : 1 GIRDER CASTING SEQ : 2 CROSS GIRDER & DECK CASTINGSEQ : 3 KERB BEAM & RAILING CASTING SEQ : 4 WEARING COURSE CASTING
READY FOR TRAFFIC
SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.
STANDARDIZATION OF
ROYAL GOVERNMENT OF BHUTAN ZORIG-DPM JV. BRIDGE DESIGNS FIRST ISSUE Sept., 2013 DRAWN: S. HOSSAIN DESIGN: S. SIDDIQUE
Ministry of Works & Human settlement P.O. Box No. 797 MISCELLANEOUS S24-C7-15
Room No. 09
Department of Roads, Bridge Division Thimphu Central Building. 24m SPAN RCC GIRDER DETAILS APPROVED BY :
Thimphu, Bhutan Thimphu, Bhutan (7.00m CARRIAGEWAY) SCALE: AS SHOWN
(as Sheet A3 size)
NOTES
A. GENERAL
1. ALL DIMENSIONS ARE IN MILLIMETER
UNLESS OTHERWISE MENTIONED.
B. MATERIAL
1. CONCRETE 28 DAYS STRENGTH IN CUBE,
f'c = 30.0 MPa. [UNLESS OTHERWISE
MENTIONED IN THE SPECIFICATION,THE
TRIAL MIX DESIGN STRENGTH SHALL BE
38.25 MPa]
C. COVERING
DECK:
a. TOP OF DECK = 50mm
b. BOTTOM OF DECK = 25mm
c. SIDE OF DECK = 40mm
KERB BEAM:
a. ALL SIDE = 40mm
CROSS GIRDER:
a. ALL SIDE = 40mm
MAIN GIRDER:
a. ALL SIDE = 40mm
RAILING:
a. RAILING POST ALL SIDE = 40mm
b. RAIL ALL SIDE = 25mm
BAR MARK
BAR MARK SPACING
20 - 05 - T 20 - 150 - EF
NOS. LOCATION /
OF BAR REMARKS
TYPE OF REBAR DIA OF REBAR
REFERENCE DRAWINGS
1. GENERAL NOTES FOR RCC CONSTRUCTION STD-02
2. REBAR CODES & SHAPE DETAILS STD-06
3. REINF. DETAILS OF DECK SLAB S24-C7-12
4. REINF. DETAILS OF CROSS GIRDER AND KERB BEAM S24-C7-14
STANDARDIZATION OF SHEET CONTENTS : REVISION DATE NAME & SIGNATURE DRAWING NO.
ROYAL GOVERNMENT OF BHUTAN ZORIG-DPM JV. BRIDGE DESIGNS FIRST ISSUE Sept., 2013 DRAWN: S. HOSSAIN DESIGN: S. SIDDIQUE
P.O. Box No. 797
Ministry of Works & Human settlement
Department of Roads, Bridge Division
Room No. 09
REBAR SCHEDULE
APPROVED BY :
S24-C7-16
Thimphu Central Building. 24m SPAN RCC GIRDER
Thimphu, Bhutan Thimphu, Bhutan (7.00m CARRIAGEWAY) SCALE: NTS
(as Sheet A3 size)
NOTES
A. GENERAL
1. ALL DIMENSIONS ARE IN MILLIMETER
UNLESS OTHERWISE MENTIONED.
B. MATERIAL
1. CONCRETE 28 DAYS STRENGTH IN CUBE,
f'c = 30.0 MPa. [UNLESS OTHERWISE
MENTIONED IN THE SPECIFICATION,THE
TRIAL MIX DESIGN STRENGTH SHALL BE
38.25 MPa]
C. COVERING
DECK:
a. TOP OF DECK = 50mm
b. BOTTOM OF DECK = 25mm
c. SIDE OF DECK = 40mm
KERB BEAM:
a. ALL SIDE = 40mm
CROSS GIRDER:
a. ALL SIDE = 40mm
MAIN GIRDER:
a. ALL SIDE = 40mm
RAILING:
a. RAILING POST ALL SIDE = 40mm
b. RAIL ALL SIDE = 25mm
BAR MARK
BAR MARK SPACING
20 - 05 - T 20 - 150 - EF
NOS. LOCATION /
OF BAR REMARKS
TYPE OF REBAR DIA OF REBAR
REFERENCE DRAWINGS
1. GENERAL NOTES FOR RCC CONSTRUCTION STD-02
2. REBAR CODES & SHAPE DETAILS STD-06
3. REINF. DETAILS OF MAIN GIRDER S24-C7-13