Professional Documents
Culture Documents
Pineapple Waste Pics
Pineapple Waste Pics
Pineapple waste (PW) collected from Lee Pineapple Factory, Skudai at 100 °C for 2 days before grind the sample at Applied Geology
Lab
The samples were filtered by gravity after pre-treatment The PW grinded & collected the mesh at size < 250 µM