You are on page 1of 1

The PW is dried under the sun for 7 days & continued in the oven

Pineapple waste (PW) collected from Lee Pineapple Factory, Skudai at 100 °C for 2 days before grind the sample at Applied Geology
Lab

The samples were filtered by gravity after pre-treatment The PW grinded & collected the mesh at size < 250 µM

You might also like