Professional Documents
Culture Documents
Sample Hse Plan
Sample Hse Plan
Warning Letter
low potential impact Final
Rule is broken for the
first time
Warning Dismissal
Final Warning Letter Letter
high potential impact
Rule is broken for the
second time or several
rules are broken at the Final Warning Letter Dismissal
same time
Rule is broken for the
third time, or rule-
breaking caused injury Dismissal
or death, or was done
recklessly or wilfully
COPY HOLDERS
Controlled copies of the HSE Plan shall be issued to above copy holders, Suggestions to amend
the HSE Plan shall be addressed to the HSE Manager.
The copy holders shall be responsible for maintenance of their respective copies of the HSE Plan.
On receipt of year 20.. HSE plan, the copy holder is responsible to remove and destroy old copy
of the HSE Plan.
Target
No Performance Indicator
2009
Mandatory HSE Training
1 95%
Report Mandatory HSE Training Compliance.
Planned in-house training
2 95%
Follow in-house training plan included in HSE plan.
3 Execution of Planned HSE Audits
95%
HSE audit plan implementation
4 HSE Plan action
90%
Close-out actions specified in the HSE Plan.
5 Drivers/Operators Competent
Ensure drivers/operators are assessed and confirmed as competent to 100%
work.
6 Vehicle RAS Compliance 100%
7 Employee medical Check-up 90%
8 Food safety and work hazards 15 different poster preparation. 90%
3.1 Visibility
Serious Services Management will ensure that all concerned parties (including subcontractors and
LCC) are provided with a copy of the HSE policy statement. The policy shall be displayed on
relevant notice boards, and made available in the relevant working languages of the employees.
4.5 Objectives
The main objective of this plan is to drive HSE improvement throughout the contract in all
Serious Services locations in a consistent manner and to ensure that the HSE performance targets
set out in this plan are achieved through action items planned.
4.6 Challenges
Road Safety
Improving QHSE awareness of staff
Compliance to ISO/HACCP requirements
SERIOUS SERVICES recognizes that to fulfill the requirement of HSE is the responsibility of
line management, hence the Contract Manager/Operations Managers, being overall in charge, is
responsible for the implementation and maintaining HSE and Hygiene requirements. Operations
Manager, Site Manager, Camp Boss, Section Heads is held responsible for their respective areas.
The role played by HSE Manager, Hygienist, HSE advisors are for consultation, guidance
monitoring of the implementation of the HSE plan and for developing and maintaining HSE
Management System.
Operations Manager being overall in charge is accountable for the Management of HSE
throughout the contract. However, the team of Operations Manager, Site Manager, Supervisors,
Camp Boss and work co-coordinators, Permit Applicant, Permit Holders and Foreman are
responsible for ensuring that activities are carried out in accordance with the Serious Services
HSE Plan.
HSE Manager shall be responsible for monitoring of HSE Plan in the contract and providing
professional HSE advice to the line management. HSE Advisors, Hygienist are responsible to
provide professional HSE & Hygiene advice to the line management, monitoring implementation
of HSE Plan of the respective location, facilities and line management for continuous
improvement in HSE across the operation.
5.3 Resources
Serious Services Management shall provide adequate competent human resources, equipment,
vehicles, tools and financial resources for the effective HSE Management System throughout the
project.
5.4 Competence
Responsible
Qarn
Training Type Person Fahud Yibal Lekhwair
Alam
(Leader)
Hygiene Hygienist Feb-2009 Jan-2009 Mar-2009 Feb-2009
HACCP Hygienist May-09 Apr-2009 May-2009 Jan-2009
Aug-
Work hazards (HEMP) HSE Advisor Sep-2009 July-2009 Aug-2009
2009
Dec- Nov-
5-S Refresher Training Hygienist Oct-2009 Dec-2009
2009 2009
Road Safety HSE Advisor Jan-2009 Feb-2009 Jan-2009 Mar-2009
Mar- Mar-
Emergency Procedures HSE Advisor Feb-2009 Apr-2009
2009 2009
Fire Safety HSE Advisor Apr-0907 June-09 Apr-2009 May-2009
Health Hazards (HRA) HSE Advisor Jun-2009 May-09 June-2009 Nov-2009
July- July-
Food Poison & Control Hygienist Aug-2009 Sep-2009
2009 2009
Aug-
Environmental Protection HSE Advisor Sep-2009 Sep-2009 July-2009
2009
Journey Management HSE Advisor Oct-2009 Oct-2009 Nov-2009 June-2009
Manual Nov- Dec-
HSE Advisor Dec-2009 Oct-2009
Handling/Equipment Safety 2009 2009
5.9 Sub-Contractors
The sub-contractors shall be subject to the same standard, as SERIOUS SERVICES is required to
comply in the performance of contract. Regular audits/inspections will be planned and conducted
to verify and assess sub-contractors compliance to HSE Management System.
The HSE Advisor will monitor sub-contractors compliance at site and non-compliance shall be
reported to site manager and contract manager for appropriate action.
Related HSE statistics of sub-contractors shall be included into SERIOUS SERVICES statistics.
All sub-contractors are accountable for their respective HSE performance and shall be required to
meet Key Performance Indicator and targets in line with Serious Services and PDO HSE
objectives.
The sub-contractors HSE Statistics shall be included into contract HSE Statistics. Sub-contractors
performance shall be closely monitored and incorporated in the Serious Services overall HSE
performance/Statistics.
The sub-contractor HSE Performance will also be included on the agenda of regular Serious
Services HSE Management System reviews for this contract.
5.10 Communication
Communication is a two way process to ensure that relevant HSE information is communicated to
all concerned.
Review previous Minutes of meeting and ensure that actions are closed-out.
Active participation and commitment to the HSE-MS.
Communicate HSE performance and resolve any HSE issues and outstanding items
Interact between Serious Services and Sub-contractors key personals to cascade the HSE
messages to the staff.
Discuss and find way to control hazards, unsafe acts & conditions.
Get the feed back from employees and pass appropriate message
Encourage communication and debate
Applicable Serious Services HSE Procedures, standards, guidelines and documents shall be used
for the entire scope of work in different locations. Serious Services documents shall be revised as
and when required. HSE Manager shall maintain these documents for reference and use.
The work coordinators and Supervisors will ensure that control measures mentioned on the
HEMP sheets are implemented. The HSE Advisor will carry out periodic check on awareness
among site personnel of the hazards and report any non-compliance for corrective action. The
HEMP sheets will be reviewed for the changes required and will be updated accordingly.
6.3STOP
No Action Action Party Schedule
Analyze STOP findings and report to contract
1 HSE Manager Monthly
holder.
Site Manager/
2 Carry out STOP observation. Supervisor/ Monthly
HSE Advisor
7.5 Hygiene
Line management and as a team all employees shall be held responsible for HSE performance.
HSE personnel will assist in implementing various activities and will monitor HSE performance
by visits, inspections and audits.
Performance Indicators: HSE Manager will monitor the compliance every month. Contract
Manager will check the compliance every month and performance will be discussed in corporate
quarterly HSE meeting.
Achievement of Milestones: The HSE Manager will specify achievement of milestone in the
month end report. Achievement will be discussed in Quarterly HSE meeting.
Close out action items: The reports of closing items from inspections and audits shall be sent to
the particular location Operations Managers for action and the HSE Manager will monitor the
actions.
Road Safety Checks: Daily and monthly vehicle checks will be conducted at site and report will
be maintained by HSE Advisor and for further action report will be sent to transportation
manager through HSE Manager.
Compliance against targets: SERIOUS SERVICES HSE plan sets the targets for the contract.
The HSE Manager shall monitor and update the performance achieved against targets on monthly
basis.
Feedback / Analysis:
The results of performance indicators shall be reviewed in management review meeting and
corrective actions shall be allocated to the responsible persons.
Comparison of performance:
The HSE Manager shall maintain comparison of performance between different locations.
8.2 Monitoring
No Action Action Party Schedule
Monitor HSE Performance Indicator, identify areas
HSE Manager/
1 for improvement and recommend corrective action in Quarterly
Quality Mgr
corporate Management HSE Meeting
Monitor and report the progress on HSE compliance
2 Site Manager Monthly
of sub-contractors in HSE meeting.
9.1Audit Plan
Four types of audits will be carried out as shown below:
Responsible Qarn
Audit Fahud Yibal Lekhwair
Person (Leader) Alam
Carry out food safety
HSE Manager/ Mar-
& QHSE Compliance Nov-2009 June-2009 Aug-2009
Quality Manager 2009
audit in the locations.
Conduct audit on
head office journey HSE Manager May-2009
management system.
Level-2 Audits: Organised and run Serious Services Management & Certified internal audit
team
Responsible Qarn
Audit Fahud Yibal Lekhwair
Person (Leader) Alam
Carry out
Certified internal
ISO/HACCP internal Sep-2009 Nov-2009 Sep-2009 Oct-2009
auditor
audit.
Level-3 Audits: External Surveillance Audit Organised by Serious Services and run by
External ISO/HACCP audit team
Responsible Qarn
Audit Fahud Yibal Lekhwair
Person (Leader) Alam
Carry out journey management
audit on commuting bus
HSE Manager June-2009
services at Cold Line Trading,
Adam.
Conduct audit on Gardening
Services at Rabou office, HSE Manager July-2009
Fahud.
Carry out Environmental
Services Compliance audit at HSE Manager Mar-2009
Al-Katheery office, Fahud.
9.2 Inspections
No Action Action Party Schedule
Carry out inspection in location during site
1 HSE Manager/ Monthly
visit.
Quality Manager
Conduct inspection in sub-contractors
HSE Advisor/
2 worksite, maintenance workshop, sludge Monthly
Site Manager
farm, waste yard, STP and call of work.
Carry out inspection in catering facilities and
3 Hygienist Monthly
accommodations.
10.0 REVIEW
Management review meeting will be held quarterly at SERIOUS SERVICES head office.
Effectiveness of the HSE activities will be reviewed. Senior Management, Operations team and
QHSE team will be participated in the review meeting and reviews HSE Management System, its
effectiveness and suitability in:
Managing HSE risks
Reinforcing efforts to continually improve HSE performance
Ensuring its continuing suitability and effectiveness