PROJECT: Terminal 4~ Container [MSS No. JT4-DBB-YAGA -CLMES.0535 Rov-00
Terminal Topside Package
‘To: Wi. Nidal kay — Resident Engr. From: BB Sr, Project Manager
[Mis Halrow interatonal Partnership | Name: Lue De Ville
P.O, Box: 960
Dubai, UAE For DB: Df
Ce: Mr Amalde Abad Project anager, OPW | Date: 2041-2016
DOCUMENT ISSUED FOR: revew — (1 recor>
Tie Mothod Statement for Conerote Crack Repal
Document no. JT4-DBB-YAQA.-C-MES-0535,
Revision: 0
Revision date: 20411-2016,
other remarks:
Please find enclosed method statement of the above Including Aecom response sheet for your
review and comments,
Permission to proceed requled by (date: 3041-2016
CLIENTIENGINEER'S RESPONSE (ck relevant box
om)
1 1-ncompuance C 2- comments To BE ADDRESSED To CLOSE REVIEW
CO 3-NoT IN comPuaNce wiTH ErisPEciFicATION — [[] 4~REVIEWNOT REQUIRED
ther Comments:
FOR CLIENTIENGINEER
Name: Reference:
Signature: Date:
‘Abe Bt Baty Campy one. 208
aDutco Balfour Beatty LLC
Earl
‘Main Contractor
[woe
ZER@HARM
SAFETY PERS Contractor's Designer
A=COM
Document Title: Method Statement for Conerete Crack Repair
Document No: JT4-DBB-YAQA-CI-MES.0S35,
ev Date pared Reviewed Authored
0 20Nou16 Issued for Review uN vw wDutco Balfour Beatty LLC
to Sen i ont i ea
snow vaoncis.ess
Table of Contents
Contract overview
Introduction
Background.
Seope of work - General Deser
Methodology.
Mapping and Investigation of Defects.
Defect Identification and Treatment Method,
Surface Preparation, Application of Rep:
Health, Safety and Environment.
Appendiees eur