1. Minimum transport velocity needed – plus safety factor
2. High velocity = high pressure drop – thus more work/pump power needed 3. Function of a. Slip conditions b. Pipe size c. Piping design i.e. recirculation loop to ensure slurry movement) d. Static head & available NPSH e. Solid characteristics – hard, abrasive, corrosive?
HSE - A Methodology for the Assignment of Safety Integrity Levels (SILs) to Safety-related Control Functions Implemented by Safety-related Electrical, Electronic and Programmable Electronic Control Systems of Machines