- SMAW Annular End plate removal (312 completed)

- End plate fillet weld leg

- 313 Bottom distortion repair (on progress)

- All QC Mom

- HiTest Testing evaluation result (2 batch)

- Tankage report tracing (continue)

- 310 SP-9B Marking

- PAR 302 Bottom Plate Surface

- Welding Map Tank Structural

- NDT RI & PT IMSN personnel certificate

- Revised WPS to Migas WPS 69 & 73

- Shop MRIR attach fab drawing

- Kalkulasi & drawing lifting lug 313 (revised)

- Lifting Lug requirement

- MRIR for consumable

- ToC MDR and Filing

- PAUT procedure

- Determine PAUT spot

- PAR Welding Sequence

- PAR Unidentified Material

- Signed MTC Material KOS (MRIR 29-Jan-19)