የየየየ የየ የየየየየ የየየ የየየ “Three month BSC”

የየየየ የየ : የየየየየየ የየየየ የየ የየየየየየየ የየየ


የየየየየየ የየየ: የየየየየ የየ የየየየ የየየ
የየየ የየየ: የየየየየየየየ የየ የየየየየየ የየየየየየየ & የየየየየየየ
የየየየ የየ: የ የየየየ 21 2011 የየየ የየ 21 2011 የ/የ
የ.የ የየ የየ የየየየየ የየየየ የየየየየ(የየየየ) የየየየ(% የየየ(%) የየየ(%) የየየ የየየ የየየየየየ የየየየየ የየየየ
የየየየ(%) ) የየ የየ የየየየ

1 Design and development 65  .Understanding EQSW 10 0 10 If we are able to get the necessary D.D.D
of equipment software Prototypical Equipment
resource at the right time.
 Requirement and Architecture 10 0 10 Software
If we are able to cover our skill
Development.
and knowledge gaps.
 Interfacing 6DOF accelero and Gyro, 30 2 28 If our joint partner commit to
Angular Sensors. the contract we already signed.
If all sensors and other
 Testing 15 1 14
equipment are known and
available.

2 Training 35  Model Based Design and 20 2 18 If the training progress according to The capability of doing the
Development (By FCC team @INSA) the schedule. project by ourselves.
 Auto Code Generation If there is the necessary documents.
 Sensor Software

 Navigation, Guidance and Control 15 5 10


(By Vladmir and his colleagues).

የየየየየ የየ የየየየ የየየየ የየ -------------------የየየየየ የየ

የየየየየ የየየየ የየ የየየየየየየ የየየ የየ --------------------------የየየ የየየየየየየ የየየ

የየየየየየየየ የየ የየየየየየ የየየየየየየ & የየየየየየየ የየየ የየየ የየየየየየየ----------------

--የየየየ የየየ

የየየየ የየየ

የየ የየየ

1. የየየ የየየየ -------------------

የየየ 21/06/2011 የ.የ