Cutting & Assembly Fit-up Inspection Checklist
[ CNCEC-OF-06-PO36
Item Description: Cutting & Assembly Fit-up Item No.
P.O. No. Inspection Classification Area/Unit
sub
ct m
Contractor: eee Company ‘Tumover System:
Work Package contractor. | Wi | Other Sub - System
Test Reports:
(Mention associated report
numbers)
Like third party reports)
tem
ne ACCEPTANCE CRITERIA
Contractor | Company
Sign
Sign
General:
‘Contractor has prepared detailed shop fabrication drawings,
01 | and the latest approved Revision of these is available at
WORK place.
Pipe ends and Pipe spooks to be joined by welds during field
02 | instalation, are prepared and matched to facilitate fitup in
the field
Bevel ends:
1 | Welding ends are beveled with an angle of 35 degrees+_5
degrees, and with a 1.6 mm root face.
2. | The bevels are either machine-cut bevels or smooth, clean,
slag-free flame cut.
3 _| The end plane is normal to the pipe axis as defined on the
piping drawing, within 0.25 degrees.
Dimensional Tolerances:
7 | The tolerance for axial dimensions, face-fo-face, center-to-
face and location of attachment’s, is + 3mm maximum.
2 _| Larger offset of branches and connections from centerline of
run does not exceed +1.6mm.
Flang
7 [Flange bolt holes shall straddle the established centerlines,
[Rotation of flanges .taken as offset between elevation of bolt
2 hholes on opposite sides of flange centerline does not exceed
[4.6mm
3 |The tit of a flange measured at the periphery across eny
liameter, does not exceed 1mm from the square position
REMARKS: