You are on page 1of 1
GHEMBDA coma cao ssoueetaD 60 U0 F UGRATESRZA Cutting & Assembly Fit-up Inspection Checklist [ CNCEC-OF-06-PO36 Item Description: Cutting & Assembly Fit-up Item No. P.O. No. Inspection Classification Area/Unit sub ct m Contractor: eee Company ‘Tumover System: Work Package contractor. | Wi | Other Sub - System Test Reports: (Mention associated report numbers) Like third party reports) tem ne ACCEPTANCE CRITERIA Contractor | Company Sign Sign General: ‘Contractor has prepared detailed shop fabrication drawings, 01 | and the latest approved Revision of these is available at WORK place. Pipe ends and Pipe spooks to be joined by welds during field 02 | instalation, are prepared and matched to facilitate fitup in the field Bevel ends: 1 | Welding ends are beveled with an angle of 35 degrees+_5 degrees, and with a 1.6 mm root face. 2. | The bevels are either machine-cut bevels or smooth, clean, slag-free flame cut. 3 _| The end plane is normal to the pipe axis as defined on the piping drawing, within 0.25 degrees. Dimensional Tolerances: 7 | The tolerance for axial dimensions, face-fo-face, center-to- face and location of attachment’s, is + 3mm maximum. 2 _| Larger offset of branches and connections from centerline of run does not exceed +1.6mm. Flang 7 [Flange bolt holes shall straddle the established centerlines, [Rotation of flanges .taken as offset between elevation of bolt 2 hholes on opposite sides of flange centerline does not exceed [4.6mm 3 |The tit of a flange measured at the periphery across eny liameter, does not exceed 1mm from the square position REMARKS: ‘Sub Contractor Contractor ‘Company Name. Date: Page No! ao

You might also like