LS/D 10 Ls = 10 d dp

Vt 9517.30268 ft3 f 14812.8 din


T 262.4 F E 0.8 tn
P 44.0878 psig C 0.06 ts
t 180 menit

Vt = V3 + V2
9517.30268 = 0.000049 d3 + 0.785 d2 Ls
9517.30268 = 0.000049 d3 + 0.785 x 10
9517.30268 = 0.000049 d3 + 7.85 d3
9517.30268 = 7.850049 d3
d3 = 1212.3876781 ft3
d = 10.663026895 ft
d = 127.95632274 inc
Ls = 106.63026895 ft2
ha(torispherical) =
h total
ts ((pi x di)/2x(fxe-0.6.pi))+c
ts 0.301057774
standarisasi ts 4.8169243833 / 16 = 0.31
do 128.58132274
standarisasi do 132
di baru 131.375

tebal tutup
18 inc two 0.50
11 inc twi 0.56
0.50 inc tp 0.50
0.31 inc

d3

trs 0.3074314491
trn 0.0830080566
tmin 0.3125
twomin 0.15625 memadai pengelasan
twimin 0.21875

A 3.3817459404 inc2
A1 -0.6317459404
A2 0.531737915
-0.1000080254 A lebih besar, perlu penguat
A3 0.56640625
A4 3
Atotal 3.4663982246 A kurang dari A total, uk penguat memadai
delta A 0.0250321241
2.5032124135 %
LS/D 10 Ls = 10.00 d dp
Vt 9517.30268 ft3 f 14812.8 din
T 262.4 F E 0.8 tn
P 44.0878 psig C 0.06 ts(asumsi)
t 180 menit

Vt = V3 + V2
9517.30268 = 0.000049 d3 + 0.785 d2 Ls
9517.30268 = 0.000049 d3 + 0.785 x 10
9517.30268 = 0.000049 d3 + 7.85 d3
9517.30268 = 7.850049 d3
d3 = 1212.3876781 ft3
d = 10.663026895 ft
d = 127.95632274 inc
Ls = 106.63026895 ft2
ha(torispherical) =
h total
ts ((pi x di)/2x(fxe-0.6.pi))+c
ts 0.301057774
standarisasi ts 4.8169243833 / 16 = 0.31
do 128.58132274
standarisasi do 132
di baru 131.375

tebal tutup
DO=132 i(ts)=7/16. karena 5/16 tidak ada r dan icr nya
r icr
130 8
W 1.7577822185
tha 0.4877372598 inch2
standarisasi tha 7.8037961569 /16 = 0.50

ta
OA = i + b+ sf
i(ts) 0.44
bc 122.00
ab 57.69
b 22.50
sf 1.5-3.5
sf 2.00
ta 24.94 inch
ta 2.08 ft
15 inc two 0.75 tmin ts,tn, tp
12 inc twi 0.81
0.31 inc tp 0.44
0.50 inc

d3

trs 0.3074314491
trn 0.0848724254
tmin 0.31
twomin 0.155 memadai pengelasan
twimin 0.217

A 3.6891773896 inc2
A1 1.5608226104
A2 0.1960889948
1.7569116052 A lebih besar, perlu penguat
A3 1.22265625
A4 1.0390625
Atotal 4.0186303552 A kurang dari A total, uk penguat memadai
delta A 0.0893025547
8.9302554713 %

Handhole

dp 60 inc two 0.75 tmin ts,tn, tp


din 30 inc twi 0.8125
tn 0.3125 inc tp 0.4375
ts(asumsi) 0.5 inc
LS/D 10 Ls = 10.00 d dp
Vt 9517.30268 ft3 f 14812.8 din
T 262.4 F E 0.8 tn
P 44.0878 psig C 0.06 ts(asumsi)
t 180 menit

Vt = V3 + V2
9517.30268 = 0.000049 d3 + 0.785 d2 Ls
9517.30268 = 0.000049 d3 + 0.785 x 10
9517.30268 = 0.000049 d3 + 7.85 d3
9517.30268 = 7.850049 d3
d3 = 1212.3876781 ft3
d = 10.663026895 ft
d = 127.95632274 inc
Ls = 106.63026895 ft2
ha(torispherical) =
h total
ts ((pi x di)/2x(fxe-0.6.pi))+c
ts 0.301057774
standarisasi ts 4.8169243833 / 16 = 0.31
do 128.58132274
standarisasi do 132
di baru 131.375

tebal tutup
DO=132 i(ts)=7/16. karena 5/16 tidak ada r dan icr nya
r icr
130 8
W 1.7577822185
tha 0.4877372598 inch2
standarisasi tha 7.8037961569 /16 = 0.50

ta
OA = i + b+ sf
i(ts) 0.44
bc 122.00
ab 57.69
b 22.50
sf 1.5-3.5
sf 2.00
ta 24.94 inch
ta 2.08 ft
40 inc two 0.13 tmin ts,tn, tp
20 inc twi 0.19
0.25 inc tp 0.44
0.50 inc

d3

trs 0.3074314491
trn 0.0997873757
tmin 0.25
twomin 0.125 memadai pengelasan
twimin 0.175

A 6.1486289826 inc2
A1 2.6013710174
A2 0.0986767023
2.7000477197 A lebih besar, perlu penguat
A3 0.05078125
A4 8.53125
Atotal 11.2820789697 A kurang dari A total, uk penguat memadai
delta A 0.8348934375
83.4893437485 %

Handhole

dp 60 inc two 0.75 tmin ts,tn, tp


din 30 inc twi 0.8125
tn 0.3125 inc tp 0.4375
ts(asumsi) 0.5 inc
LS/D 10 Ls = 10.00 d dp
Vt 9517.30268 ft3 f 14812.8 din
T 262.4 F E 0.8 tn
P 44.0878 psig C 0.06 ts(asumsi)
t 180 menit

Vt = V3 + V2
9517.30268 = 0.000049 d3 + 0.785 d2 Ls
9517.30268 = 0.000049 d3 + 0.785 x 10
9517.30268 = 0.000049 d3 + 7.85 d3
9517.30268 = 7.850049 d3
d3 = 1212.3876781 ft3
d = 10.663026895 ft
d = 127.95632274 inc
Ls = 106.63026895 ft2
ha(torispherical) =
h total
ts ((pi x di)/2x(fxe-0.6.pi))+c
ts 0.301057774
standarisasi ts 4.8169243833 / 16 = 0.31
do 128.58132274
standarisasi do 132
di baru 131.375

tebal tutup
DO=132 i(ts)=7/16. karena 5/16 tidak ada r dan icr nya
r icr
130 8
W 1.7577822185
tha 0.4877372598 inch2
standarisasi tha 7.8037961569 /16 = 0.50

ta
OA = i + b+ sf
i(ts) 0.44
bc 122.00
ab 57.69
b 22.50
sf 1.5-3.5
sf 2.00
ta 24.94 inch
ta 2.08 ft
18 inc two 0.13 tmin ts,tn, tp
9 inc twi 0.19
0.19 inc tp 0.44
0.50 inc

d3

trs 0.3074314491
trn 0.0792793191
tmin 0.19
twomin 0.095 memadai pengelasan
twimin 0.133

A 2.7668830422 inc2
A1 1.1706169578
A2 0.0485782235
1.2191951813 A lebih besar, perlu penguat
A3 0.05078125
A4 3.7734375
Atotal 5.0434139313 A kurang dari A total, uk penguat memadai
delta A 0.8227781422
82.2778142206 %

Handhole

dp 60 inc two 0.75 tmin ts,tn, tp


din 30 inc twi 0.8125
tn 0.3125 inc tp 0.4375
ts(asumsi) 0.5 inc