Green.tek
417 € Futon Street Edgerton, 53534
200-747-5440. Fa 608-880-9459
ASSEMBLY &
STORAGE GUIDE
Polycarbonate Multi-Wall Sheets
SHIPMENT HANDLING AND CARE
INSPECTING YOUR PANELS
Itisimportant that youiaspect your panels upon receipt ofthe shipment
‘THSWLL SAVEYOUR COMPANY HONEY. Count al panels and inspect ll
Dane's for domage, especialy concealed éamage. Make a notation ofthe
damaged or shot shipped material on the il of tang BEFORE you sign
‘the document, Report al shertages and damage to your dealer an keep 3
‘signed copy of the document. Faure to inspect and ign wil esutin you
purchasing new panes
‘STORAGE REQUIREMENTS
Polycarbonate crates should be stored in
warehouse areas not exposed to dec
heat o ight whic could make the
‘removal or protective fim ficult. Sup-
porte sloped sacking Isrecornmended,
but sheers may be stacked uptoa"high on
afl, even, supported surface
GENERAL INSTALLATION
PROTECTIVE MASKING FILM
The pands are supplied with prosecive masking or fm
‘on the panel, Remove the underside ayer of fm pre to
Inston ad the outer fm 28 soon asthe stallion i
completed Do not leave the fin onthe pana fora pro
longed period af time ast may"bake” ont the panels and make Rect
uvsipeour
Insta the panel U side out-The panel shouldbe labeled "This Side Ou IF
no labels found, ook fora production date stamp along the vertical edge
‘ofthe panel andinsal this side out,
SCAFFOLDS.
Apply panels with a professions greenhouse roo scafeld Lay the cafes
legsintheguttr ofthe roctand and the ridge ofthe house. DO NOT WALK,
‘on tha panels at any time. Thi can cue damage tthe panel
PROTECT AGAINST DUST INFILTRATION.
‘The upper end af the pane should besesled using ThermaGls
anadhesve backed sold tape Thetower pane! Sold Tape
‘edge shouldbe sealed wih an adhesive Dacked