CONSTRUCTION METHOD,
PROJECT TITLE ; DESIGN AND BUILD FOR THE.
BUILDING TERMINATION PHASE ~ TA
LOCATION
Site Works! Earth Works
Mobilization, Layout and Permits
Provide Temporary
Workshop/Stockpile Warehouse AI expenditures for temporary water, power,
hone supply and all required testing of materials, ete. for this project and
shal be ineluded in the contractor's proposals.
ropoved Site Area before and after the
construction period
Ean Works
|. Includes. the
A
Excavation, Back
es! Selected Borrow.
and Embankment of
Reinforcement Bars
|. Reinforcing Steel Bars to be use shall Grade 60 for RSB of diameter above
{ismm and Grade 40fee 16mm below,
Scaffolding and Formworks
1. Provide Scaffolding and Formworks either using
“Lumber or Steel Frames, Braces and Forms tow
Conereting Works
1. Use 3,000 psi or 20.7 MPa a 28 days
Masonry Works
1
cleaning, rubbing and hauling shall be
ed or retouched by plastered finish
6 per plans, supplemental drawings and specifications ete to complete
these items of works
three (3) comings and follow standard procedures in paimting
Color will be approve by University Engineers,
Use premium quality and brands of pa
Engineers
2
3
4
5
per recommendations of TWGVIL Doors and Windows
‘new proposed Water Line Supply System
tes Required Gate Valves, Hose Bibb, Faucet and Ete
Follow as pr plans, supplemental drawings and specifications etc to complete
these items of works.
im the presence of CHMSC representatives and the end-users is @
must prior to concealing of pipes
PVC Pipes,
ind scope of works 0 complete the
‘operational
EQUIPMENT
|. Make use of the necessary minor and major equipment for all items of works to
complete the project.
GE ADMINISTRATIVE ORDERS,
MS PERTAINING TO THE MANAGEMENT OF THE
CONSTRUCTION AND REGULATIONS,
|.‘ contractor shall comply with all CHMSC administrative ores, eireulars
and memorandums pertaining tothe management of consiruc
2. The Contractor shall comply with all CHMSC rales and regu