Project Title: Document Number
HEAFoPV and Pan ~= BRAVO-HSP-0128-V
laintenance Services
st PERTAMINA Validation
Author's Org. PHE ONWJ NA
PT. Tri Mulya Gemiang Expired Date
PT. Gemaia Saranaupaya vA
INSPECTION AND TEST PLAN
FOR
PRODUCTION SEPARATOR BC (Ex LLB)
BC-V-201
Approval Sheet
Name Title Date i
Mohamad Abdurrang | NURI Project Delivery Manager
Zulfian Arun NURI Project Asst. Manager i denial (
Bahrudin Project Engineer [vp
ole [19 M4
Micko Leomart NURI QW/QC Lead c1/2l/ ty nae
Totok HaryantoroP | Contract Holder
Faisal Reza Contract Coordinator
Revision Status -
TwG- GSU
Rev. | IssueDate_ | —3—)~ Ga | app. Issue Purpose Owner Signature
0 | 02-Jan-2019 tay| ZA a Issue for ApprovalPT. PHE ONWJ Inspection Test Plan for Production Separator 8C-V-201 (Ex LLB)
REVISION LOG REGISTER
Document Number BRAVO--ISP-0128-V
Document Title : INSPECTION TEST PLAN FOR
PRODUCTION SEPARATOR BC-V-201 (Ex LLB)
Revision =e
Page Date Revision
Doc. No. BRAVO-HISP.0128.V Rev. OPT. PHE ONWJ Inspection Test Pian for Production Separator 8C-V-201 (Ex LLB)
Definition’
1. Hold Point
The next activity should not be executed / implemented until those instruction
approved by authorized personnel in this officers must come to inspect.
2. Witness Point.
Witness points an activity during fabrication or construction where the inspection and
measurement or test must be done in place and documented
Doc. No. BRAVO-HSP.0128V Rev. 0