IR No.

Soft Copy
IR CE-C 0010 IR scan\CE-C 0010.PDF
IR CE-C 0022 IR scan\CE-C 0022.PDF
IR CE-C 0023 IR scan\CE-C 0023.PDF
IR CE-C 0027 IR scan\CE-C 0027.PDF
IR CE-C 0036 IR scan\CE-C 0036.PDF
IR CE-C 0038 IR scan\CE-C 0038.PDF
IR CE-C 0063 IR scan\CE-C 0063.pdf
IR CE-C 0071 IR scan\CE-C 0071.pdf
IR CE-C 0072 IR scan\CE-C 0072.pdf
IR CE-C 0075 IR scan\CE-C 0075.pdf
IR CE-C 0090 IR scan\CE-C 0090.pdf
IR CE-C 0091 IR scan\CE-C 0091.pdf
IR CE-C 0092 IR scan\CE-C 0092.pdf
IR CE-C 0093 IR scan\CE-C 0093.pdf
IR CE-C 0105 IR scan\CE-C 0105.pdf
IR CE-C 0109 IR scan\CE-C 0109.pdf
IR CE-C 0126 IR scan\CE-C 0126.pdf
IR CE-C 0129 IR scan\CE-C 0129.pdf
IR CE-C 0130 IR scan\CE-C 0130.pdf
IR CE-C 0131 IR scan\CE-C 0131.pdf
IR CE-C 0141 IR scan\CE-C 0141.pdf
IR CE-C 0142 IR scan\CE-C 0142.pdf
IR CE-C 0143 IR scan\CE-C 0143.pdf
IR CE-C 0144 IR scan\CE-C 0144.pdf
IR CE-C 0145 IR scan\CE-C 0145.pdf
IR CE-C 0154 IR scan\CE-C 0154.pdf
IR CE-C 0156 IR scan\CE-C 0156.pdf
IR CE-C 0162 IR scan\CE-C 0162.pdf
IR CE-C 0166 IR scan\CE-C 0166.pdf
IR CE-C 0170 IR scan\CE-C 0170.pdf
IR CE-C 0175 IR scan\CE-C 0175.pdf
IR CE-C 0186 IR scan\CE-C 0186.PDF
IR CE-C 0187 IR scan\CE-C 0187.pdf
IR CE-C 0189 IR scan\CE-C 0189.pdf
IR CE-C 0190 IR scan\CE-C 0190.PDF
IR CE-C 0193 IR scan\CE-C 0193.pdf
IR CE-C 0196 IR scan\CE-C 0196.pdf
IR CE-C 0199 R/1 IR scan\CE-C 0199.pdf
IR CE-C 0202 IR scan\CE-C 0202.pdf
IR CE-C 0204 R1 IR scan\CE-C 0204 R1.pdf
IR CE-C 0207 IR scan\CE-C 0207.pdf
IR CE-C 0209 IR scan\CE-C 0209.pdf
IR CE-C 0210 IR scan\CE-C 0210.pdf
IR CE-C 0211 IR scan\CE-C 0211.pdf
IR CE-C 0212 IR scan\CE-C 0212.pdf
IR CE-C 0221 IR scan\CE-C 0221.pdf
IR CE-C 0222 IR scan\CE-C 0222.pdf
IR CE-C 0223 IR scan\CE-C 0223.pdf
IR CE-C 0225 IR scan\CE-C 0225.pdf
IR CE-C 0226 IR scan\CE-C 0226.pdf
IR CE-C 0227 IR scan\CE-C 0227.pdf
IR CE-C 0231 IR scan\CE-C 0231.PDF
IR CE-C 0232 IR scan\CE-C 0232.pdf
IR CE-C 0233 IR scan\CE-C 0233.pdf
IR CE-C 0235 IR scan\CE-C 0235.pdf
IR CE-C 0236 IR scan\CE-C 0236.pdf
IR CE-C 0241 IR scan\CE-C 0241.pdf
IR CE-C 0245 IR scan\CE-C 0245.pdf
IR CE-C 0246 IR scan\CE-C 0246.pdf
IR CE-C 0247 IR scan\CE-C 0247.pdf
IR CE-C 0248 IR scan\CE-C 0248.pdf
IR CE-C 0253 IR scan\CE-C 0253.pdf
IR CE-C 0255 IR scan\CE-C 0255.pdf
IR CE-C 0256 IR scan\CE-C 0256.pdf
IR CE-C 0257 IR scan\CE-C 0257.pdf
IR CE-C 0268 IR scan\CE-C 0268.pdf
IR CE-C 0284 IR scan\CE-C 0284.pdf
IR CE-C 0286 IR scan\CE-C 0286.pdf
IR CE-C 0298 IR scan\CE-C 0298.pdf
IR CE-C 0302 IR scan\CE-C 0302.pdf
IR CE-C 0319 IR scan\CE-C 0319.pdf
IR CE-C 0322 IR scan\CE-C 0320.pdf
IR CE-C 0324 R/1 IR scan\CE-C 0324 R1.pdf
IR CE-C 0339 IR scan\CE-C 0339.pdf
IR CE-C 0349 IR scan\CE-C 0349.pdf
IR CE-C 0360 IR scan\CE-C 0360.pdf
IR CE-C 0366 IR scan\CE-C 0366.pdf
IR CE-C 0368 IR scan\CE-C 0368.pdf
IR CE-C 0373 IR scan\CE-C 0373.pdf
IR CE-C 0375 IR scan\CE-C 0375.pdf
IR CE-C 0376 IR scan\CE-C 0376.pdf
IR CE-C 0378 IR scan\CE-C 0378.pdf
IR CE-C 0383 IR scan\CE-C 0383.pdf
IR CE-C 0387 IR scan\CE-C 0387.pdf
IR CE-C 0388 IR scan\CE-C 0388.pdf
IR CE-C 0392 IR scan\CE-C 0392.pdf
IR CE-C 0395 IR scan\CE-C 0394.pdf
IR CE-C 0401 IR scan\CE-C 0401.pdf
IR CE-C 0402 IR scan\CE-C 0402.pdf
IR CE-C 0403 IR scan\CE-C 0403.pdf
IR CE-C 0406 IR scan\CE-C 0406.pdf
IR CE-C 0407 IR scan\CE-C 0407.pdf
IR CE-C 0413 IR scan\CE-C 0413.pdf
IR CE-C 0419 IR scan\CE-C 0419-R1.pdf
IR CE-C 0420 IR scan\CE-C 0420.pdf
IR CE-C 0425 IR scan\CE-C 0425.pdf
IR CE-C 0430 IR scan\CE-C 0430.pdf
IR CE-C 0431 IR scan\CE-C 0431.pdf
IR CE-C 0432 IR scan\CE-C 0432.pdf
IR CE-C 0442 IR scan\CE-C 0442.pdf
IR CE-C 0448 IR scan\CE-C 0448.pdf
IR CE-C 0450 IR scan\CE-C 0450.pdf
IR CE-C 0451 IR scan\CE-C 0451.pdf
IR CE-C 0452/R1 IR scan\CE-C 0452-R1.pdf
IR CE-C 0467 IR scan\CE-C 0467.pdf
IR CE-C 0474 IR scan\CE-C 0474.pdf
IR CE-C 0475 IR scan\CE-C 0475.pdf
IR CE-C 0477 IR scan\CE-C 0477.pdf
IR CE-C 0485 IR scan\CE-C 0485.pdf
IR CE-C 0486 IR scan\CE-C 0486.PDF
IR CE-C 0487 IR scan\CE-C 0487.pdf
IR CE-C 0492 IR scan\CE-C 0492.pdf
IR CE-C 0493 IR scan\CE-C 0493.pdf
IR CE-C 0494 IR scan\CE-C 0494.pdf
IR CE-C 0496 IR scan\CE-C 0496.pdf
IR CE-C 0497 IR scan\CE-C 0497.pdf
IR CE-C 0503/R1 IR scan\CE-C 0503-R1.pdf
IR CE-C 0505/R1 IR scan\CE-C 0505-R1.pdf
IR CE-C 0515 IR scan\CE-C 0515.pdf
IR CE-C 0524 IR scan\CE-C 0524.pdf
IR CE-C 0533 IR scan\CE-C 0533.pdf
IR CE-C 0537 IR scan\CE-C 0537.pdf
IR CE-C 0538 IR scan\CE-C 0538.pdf
IR CE-C 0542 IR scan\CE-C 0542.pdf
IR CE-C 0544/R1 IR scan\CE-C 0544-R1.pdf
IR CE-C 0549 IR scan\CE-C 0549.pdf
IR CE-C 0553 IR scan\CE-C 0553.pdf
IR CE-C 0558 IR scan\CE-C 0558.pdf
IR CE-C 0559 IR scan\CE-C 0559.pdf
IR CE-C 0563 IR scan\CE-C 0563.pdf
IR CE-C 0571/R1 IR scan\CE-C 0571-R1.pdf
IR CE-C 0571/R2 IR scan\CE-C 0571-R2.pdf
IR CE-C 0578 IR scan\CE-C 0578.pdf
IR CE-C 0583 IR scan\CE-C 0583.pdf
IR CE-C 0592 IR scan\CE-C 0592.pdf
IR CE-C 0593 IR scan\CE-C 0593.pdf
IR CE-C 0596 IR scan\CE-C 0596.pdf
IR CE-C 0597/R2 IR scan\CE-C 0579-R2.pdf
IR CE-C 0599
IR CE-C 0602 IR scan\CE-C 0602.pdf
IR CE-C 0606/R1 IR scan\CE-C 0606-R1.pdf
IR CE-C 0615 IR scan\CE-C 0615.pdf
CE-C 0615-R1 IR scan\CE-C 0615-R1.pdf
IR CE-C 0616 IR scan\CE-C 0616.pdf
IR CE-C 0624 IR scan\CE-C 0624.PDF
IR CE-C 0626/R1
IR CE-C 0629 IR scan\CE-C 0629.pdf
IR CE-C 0630 IR scan\CE-C 0630.pdf
IR CE-C 0640 IR scan\CE-C 0640.pdf
IR CE-C 0683 IR scan\CE-C 0683.pdf
IR CE-C 0763
IR CE-C 0773
IR CE-C 0812 IR scan\CE-C 0812.pdf
IR CE-C 0813 IR scan\CE-C 0813.pdf
IR CE-C 0814 IR scan\CE-C 0814.PDF
IR CE-C 0835
IR CE-C 0840 IR scan\CE-C 0840.pdf
IR CE-C 0848
IR CE-C 0849 IR scan\CE-C 0849.PDF
IR CE-C 0850 IR scan\CE-C 0850.PDF
IR CE-C 0884 IR scan\CE-C 0884.pdf
IR CE-C 0888 IR scan\CE-C 0888.PDF
IR CE-C 0889 IR scan\CE-C 0889.PDF
IR CE-C 0946 IR scan\CE-C 0946.PDF
IR CE-C 0947
IR CE-C 0948 IR scan\CE-C 0948.PDF
IR CE-C 0963 IR scan\CE-C 0963.PDF
IR CE-C 0969 IR scan\CE-C 0969.pdf
IR CE-C 0990 IR scan\CE-C 0990.PDF
IR CE-C 1003 IR scan\CE-C 1003.PDF
IR CE-C 1005 IR scan\CE-C 1005.PDF
IR CE-C 1006 IR scan\CE-C 1006.PDF
IR CE-C 1007 IR scan\CE-C 1007.PDF
IR CE-C 1033 IR scan\CE-C 1033.PDF
IR CE-C 1037 IR scan\CE-C 1037.PDF
IR CE-C 1045 IR scan\CE-C 1045.PDF
IR CE-C 1055 canceld
IR CE-C 1055/R1 IR scan\CE-C 1055-R1.PDF
IR CE-C 1062 IR scan\CE-C 1062.PDF
IR CE-C 1068 IR scan\CE-C 1068.PDF
IR CE-C 1077
IR CE-C 1078 IR scan\CE-C 1078.PDF
IR CE-C 1079 IR scan\CE-C 1079.PDF
IR CE-C 1088 IR scan\CE-C 1088.PDF
IR CE-C 1093 IR scan\CE-C 1093.PDF
IR CE-C 1105 IR scan\CE-C 1005.PDF
IR CE-C 1110 IR scan\CE-C 1110.PDF
IR CE-C 1125 IR scan\CE-C 1025.PDF
IR CE-C 1135 IR scan\CE-C 1135.PDF
IR CE-C 1143
IR CE-C 1145 IR scan\CE-C 1145.PDF
IR CE-C 1146 IR scan\CE-C 1146.PDF
IR CE-C1154 IR scan\CE-C 1154.PDF
IR CE-C 1179 IR scan\CE-C 1079.PDF
IR CE-C 1195 IR scan\CE-C 1195.PDF
IR CE-C 1203 IR scan\CE-C 1203.PDF
IR CE-C 1203/R1 IR scan\CE-C 1203-R1.PDF
IR CE-C 1253 IR scan\CE-C 1253.PDF
IR CE-C 1253/R1
IR CE-C 1253/R2
IR CE-C 1263 IR scan\CE-C 1263.PDF
IR CE-C 1268 IR scan\CE-C 1268.PDF
IR CE-C 1282 IR scan\CE-C 1282.PDF
IR CE-C 1282/R1 IR scan\CE-C 1282-R1.PDF
IR CE-C 1285 canceld
IR CE-C 1285/R IR scan\CE-C 1285-R1.PDF
IR CE-C 1287 IR scan\CE-C 1287.PDF
IR CE-C 1287/R1 IR scan\CE-C 1287-R1.PDF
IR CE-C 1288 IR scan\CE-C 1288.PDF
IR CE-C 1288/R1 IR scan\CE-C 1288-R1.PDF
IR CE-C 1312 IR scan\CE-C 1312.PDF
IR CE-C 1323 IR scan\CE-C 1323.PDF
IR CE-C 1323/R1 IR scan\CE-C 1323-R1.PDF
IR CE-C 1336 IR scan\CE-C 1336.PDF
IR CE-C 1342 IR scan\CE-C 1342.PDF
IR CE-C 1352 IR scan\CE-C 1352.PDF
IR CE-C 1355
IR CE-C 1355/R1 IR scan\CE-C 1355-R1.PDF
IR CE-C 1398 IR scan\CE-C 1392.PDF
IR CE-C 1411
IR CE-C 1430 IR scan\CE-C 1430.PDF
IR CE-C 1430/R1 IR scan\CE-C 1430-R1.PDF
IR CE-C 1440
IR CE-C 1451 IR scan\CE-C 1451.PDF
IR CE-C 1453
IR CE-C 1454 IR scan\CE-C 1454.PDF
IR CE-C 1454/R1 IR scan\CE-C 1454-R1.PDF
IR CE-C 1455 IR scan\CE-C 1455.PDF
IR CE-C 1455/R1 IR scan\CE-C 1455-R1.PDF
IR CE-C 1456 IR scan\CE-C 1456.PDF
IR CE-C 1459 IR scan\CE-C 1459.PDF
IR CE-C 1464 IR scan\CE-C 1464.PDF
IR CE-C 1470 IR scan\CE-C 1470.PDF
IR CE-C 1471
IR CE-C 1479
IR CE-C 1481 canceld
IR CE-C 1481/R1 IR scan\CE-C 1481.PDF
IR CE-C 1482 canceld
IR CE-C 1482/R1 IR scan\CE-C 1482-R1.PDF
IR CE-C 1485
IR CE-C 1485/R1
IR CE-C 1489 IR scan\CE-C 1489.PDF
IR CE-C 1497
IR CE-C 1507
IR CE-C 1509 IR scan\CE-C 1509.PDF
IR CE-C 1510 IR scan\CE-C 1510.PDF
IR CE-C 1511 IR scan\CE-C 1511.PDF
IR CE-C 1518 IR scan\CE-C 1518.PDF
IR CE-C 1519
IR CE-C 1520 IR scan\CE-C 1520.PDF
IR CE-C 1521 IR scan\CE-C 1521.PDF
IR CE-C 1522 IR scan\CE-C 1522.PDF
IR CE-C 1532 IR scan\CE-C 1532.PDF
IR CE-C 1539
IR CE-C 1546 canceld
IR CE-C 1556 IR scan\CE-C 1556.PDF
IR CE-C 1556/R1 IR scan\CE-C 1556-R1.PDF
IR CE-C 1557 IR scan\CE-C 1557.PDF
IR CE-C 1564 IR scan\CE-C 1564.PDF
IR CE-C 1565 IR scan\CE-C 1565.PDF
IR CE-C 1566
IR CE-C 1567 IR scan\CE-C 1567.PDF
IR CE-C 1576 IR scan\CE-C 1576.PDF
IR CE-C 1577 IR scan\CE-C 1577.PDF
IR CE-C 1583
IR CE-C 1590 IR scan\CE-C 1590.PDF
IR CE-C 1601 IR scan\CE-C 1601.PDF
IR CE-C 1602 IR scan\CE-C 1602.PDF
IR CE-C 1612
IR CE-C 1613 IR scan\CE-C 1613.PDF
IR CE-C 1613/R1
IR CE-C 1626 IR scan\CE-C 1626.PDF
IR CE-C 1627 IR scan\CE-C 1627.PDF
IR CE-C 1636
IR CE-C 1652
IR CE-C 1656
IR CE-C 1659
IR CE-C 1660
IR CE-C 1672
Produced Water Treatment M109

Description of work
we have completed marking tank IQD6-ABJ681050 for the purpose of excavation wor
we have completed excavation work of tank foundation in DS6 .Request for survering work (center and
We completed
Before thewe
backfilling, excavation of the
have scarified andtank foundation.we
rolled need inspaction
the top of the original layer, andand
haveapproval
coordinated with AL- FAO laboratory to take sample to test Proctor Density for
information.
Sampling the Nofirst
loose soilfor
layer on the top of the degree
compaction originaltest
layer.Request witness. witness.
in DS6. Request
We completed compaction of first layer in DS6. Request inspection the elevations for
We completed the formwork of blinding for the tank foundation in DS6. Request insp
Witness sampling of the water that will use in mix of the dry concrete.
witness sampling the water that will use in mix of the dry concrete in DS6
Inspection
We the elevations
have completed of the blinding
the formwork and theconcrete after
re-bar for thepouring in DS6. in DS6.
tank foundation
Request tofinal
Witness inspection
loading the dimensions
dry concrete C-35 for and quality.
the foundation in DS6 in AL-FAYHA
BATCH
WitnessPLANT
Witness sampling
to testing of the water
(Slump, that will beand
Temperature) used in mix
make of the dry
specimens concrete
(cube) for C35
of the
foundation concrete
foundation in DS6.
in DS6 (time
waitness 08:00).
to crush concrete cube for tank IQD6-ABJ681050 foundation (stage 1) at
7 days age.
We have completed the re-bar and the pipe sleeve for the tank foundation in DS6. Request i
final inspection of anchor bolts, formwork, embedded HDPE channel earthing plates, and th
Witness to loading dry concrete C-35 for the ring wall in DS6 in AL-FAYHA BATCH
Witness sampling of the water that will be use in mix of the dry concrete for C35 ring wall
in DS6.
Witness to testing (Slump, Temperature and cubes) of the ring wall concrete in DS6
Witness to testing concrete cubes ( compressive strength at 7 days) which took from
Inspection the concrete quality of the ring wall after removing the formwork in DS6
Excavation for PLATFORM&SHELTER foundation have been completed in DS6 need inspa
Inspection the concrete quality of the ring wall after completion all repairs and filli
I Inspection quality of the re-bars for the column of the shelters in DS7
Sampling the sub-grade layer of the platform and shelters foundations in DS6
Inspection the elevations of the sub-grade layer for the platform and shelters found
Witness to testing concrete cubes ( compressive strength at 28 days) which took from DS6 for the foundation Stage-1
Inspect the tank base surface asphalt paint corrosion IN ds6
Sampling the sub-grade layer of the plateform and shelter foundation for compactio
Inspection quality of the re-bars and formwork for the column of pump shelter( PB
Final inspection the blinding formwork for the SHELTERS, PLATFORM and SLEEPERS f
Sampling the backfilling first layer around the tank foundation for the purpose of c
Witness loading dry concrete C-15 for the blinding of PLATFORM , SHELTERS and
Witness to testing (Slump, Temperature ) for the blinding concrete of shelters, plat
Witness sampling the water to mix dry concrete C-15 for the blinding of Platform,
Sampling the backfiling first layer around tank foundation for the purpose degree
Sampleing the backfiling scond layer around the tank foundation for the purpose o
Witness conducting proctor test of samples of backfilling second layer around DS6
Final inspection of PLATFORM, SHELTERS and SLEEPERS (Formwork and re-bars) inc
Sampleing the backfiling scond layer around the tank foundation for the purpose o
Witness to loading dry concrete c-35 for the foundation of PLATFORM , SHELTER an
Witness sampling the water to mix dry concrete C-35 for the foundation of PLAT
Witness to testing (Slump, Temperature and cubes) of concrete C-35 for the fou
Sampling the backfilling third layer around the tank foundation for the purpose of
Inspection the insideproctor
Witness conducting soil and slope
test of DS6 tank
of samples to backfilling
of the start sand fourth
backfilling
layer around
DS6 tank foundation
Witness tothe
Sampling testing concrete
backfilled sandcubes
(first (compressive strength
layer) inside the at 28 days)for
tank foundation taken fromtest
proctor DS6
in DS6
Inspection the elevations of the fourth layer around the tank foundation in DS6
0227 Final inspection of SLEEPER (Formwork and re-bars) including quality and sur
Deep core test for the backifilled second and third layer around DS6 tank.
Sampling the backfilling fourth layer around the tank foundation for the purpose of
Witness to testing concrete cubes (compressive strength at 7 days) which too
Witness conducting relative density test for samples of the backfilled sand first laye
Sampling the backfiling forth layer around the tank foundation for the purpose of
Inspection the elevations of backfilled sand first layer inside the tank foundation in
Sampling the backfilled sand second layer inside DS6 tank foundation for relative de
Inspection the elevations of the backfilled sand second layer inside the tank founda
Sampling the backfilling fifth layer around DS6 tank foundation for proctor test
Inspection the elevations of the backfilling fifth layer around DS6 tank foundation
Witness conducting proctor test of samples of the backfilling fifth layer around DS6
Inspection the foundation surface of PLATFORM, SHELTERS and SLEEPERS after rep
Sampling the backfilled sand third layer inside DS6 tank foundation for compaction
Inspection the elevations of the backfilled sand third layer inside DS6 tank foundati
Sampling the backfilled sand third layer inside the tank foundation for the purpose
Sampling the backfilled sand fourth layer inside DS6 tank foundation for relative den
Witness conducting relative density test of samples of the backfilled sand fourth la
Sampling the backfilled sand fifth layer inside DS6 tank foundation for relative densi
Witness conducting the test of relative density for the samples of backfilled sand fi
Witness conducting the test of relative density for the samples the backfilled sand s
Sampling the soil of existing compacted sub-grade inside DS6 tank fro compaction t
Sampling the backfilled sand sixth layer inside DS6 tank foundation for relative densi
Witness conducting the test of relative density for the samples the backfilled sand s
Sampling the backfilled sand seventh layer inside the tank foundation for the purpose
Witness conducting relative density test of the samples of the backfilled sand seven
Sampling the structural soil above the sub-grade inside the tank foundation in DS6
Sampling the backfilled sand 8th layer inside DS6 tank foundation for relative densit
Witness conducting compaction density test of samples of the structural soil layer
Inspection the elevations of the top structural soil under HDPE layer inside DS6 t
Inspection the elevations of the 8th sand layer inside DS6 tank foundation
Witness conducting relative density test of the samples of the backfilled sand 8th
Re-sampling the final layer soil inside tank in DS6 for comaction degree test .
Final inspection of the formwork for the columns of the platform, shelters and sleep
Witness loading dry concrete C-35 for the columns of PLATFORM, SHELTERS and Sl
Witness conducting the structural soil layer above sub-grade inside DS6 tank
Witness testing (slump, temperature) and make specimens (cubes) for the Platform
Witness conducting the physical and chemical tests for raw material (gravel, sand,
Request final inspection of the anchor bolts of Platform, Shelter and Sleeper in DS6
Re-sampling the structural soil layer under HDPE and abov the sub- grade layer ins
Witness testing (slump, temperature) and make specimens (cubes) for the Platform
Witness testing (slump, temperature) for the blinding concrete (C15) in DS7.
Witness conducting compaction degree test of the samples for the structural soil la
Inspection the survey work of the backfilled 8th of the sand inside DS6 tank
Witness to testing concrete cubes (compressive strength at 28 days) which took
Inspection the survey work of the pit inside the tank in DS6
Witness the installation of the lower layer geotextile inside DS6 Tank Foundation
Witness the installation of HDPE and relative tests inside DS6 Tank Foundation IQ
Inspection the concrete of foundations for the Platform, Shelters and Sleepers after
Witness the non destructive seams testing with vacuum test/air pressure test, des
Inspect the surface coating corrosion of pump shelter and platform foundations in
Inspection repair welding with Vacuum test inside DS6 Tank Foundation IQD6-ABJ
Witness to testing concrete cubes (compressive strength at 7 days) from DS6 fo
Sampling the backfilling first layer around the foundations of pump shelter and pla
Witness ultrasonic test for Platform, Sleeper, and Shelter foundations in DS6
Witness the installation of geomembrance and relative tests inside DS6 Tank
Witness conducting the compaction degree test of sample for the backfilling first l
Sampling the backfilling first layer around the platform foundation for the purpose
Inspect the surface coating corrosion of sleeper, pump shelter and platform foundations in
Witness conducting compaction degree test of sample of the backfilling first layer
Inspection the concrete surface of the PLATFORM, SLEEPER, and SHELTER FOUNDAT
Witness the vacuum air test and destructive seam testing (peel & shear) of HDPE
Witness the welding repair of HDPE geomembrance inside DS6 Tank Foundation
Sampling the 2nd layer around the platform and shelter foundations in DS6.
Sampling the backfilled gravel 1st layer for relative density inside DS6 tank
Witness sampling the rebar for chemical and physical test in Basra University lab
Witness conducting compaction grade test of samples of the 2nd layer around the p
Witness conducting relative density test of sample of the backfilled gravel 1st layer
Inspect the surface coating corrosion of sleeper, shelter and platform foundations i
Sampling the backfilled gravel 2nd layer inside the tank for relative density test in D
Witness conducting relative density test of smaples of the backfilled gravel 2nd laye
Sampling the 3rd layer around the platform and shelter foundations in DS6.
Sampling the first layer around the sleeper foundations in DS6
Sampling the backfilled gravel 3rd layer inside the tank for relative density test in D
Witness conducting compaction degree test of samples of the 3rd layer around the p
Witness conducting relative density test of the samples of the backfilled gravel 3rd
Sampling the backfilled 1st of sand above HDPE inside DS6 tank for relative density
Witness conducting relative density test of the samples of the backfilled 1st layer
Sampling the 4th layer of backfilling around the platform and shelter foundations i
Witness conducting compaction degree test of the samples of the 4nd layer of backf
Witness doing electrical resistivity test on the 1st layer of the sand above HDPE ins
Witness doing electrical resistivity test on the 1st layer of the sand above HDPE ins
Final inspection for the blinding formwork of Pumps in DS6
Witness testing (slump, temperature) for the blinding concrete of pumps in DS6
Sampling the 5th layer around Platform foundation in DS6.
Witness conducting compaction degree test of the samples of the 5th layer around
Witness to testing concrete cubes (compressive strength at 28 days) from DS6 f
Sampling the 2nd layer of backfilled sand above the HDPE inside DS6 tank for relati
Inspection the survey work for the blinding of pumps in DS6
Sampling the 6th layer around the platform foundation in DS6
Witness conducting relative density test of the samples of the backfilled sand 2nd
Sampling the backfilled sand 3rd layer above the HDPE inside DS6 tank foundation for
Re-sampling the backfilled sand 3rd layer above the HDPE inside DS6 tank foundatio
Witness to testing stand by concrete cube (compressive strength at 28 days) wh
Witness conducting relative density test of the samples of the backfilled sand 3rd
Witness for final inspection of tank IQD6-ABJ681050 foundation including elevation,
Witness to testing concrete cubes (compressive strength at 7 days) for the blinding
Witness conducting relative density test of the samples of the backfilled sand 3rd
Sampling core of concrete for the Sleeper, SHELTER AND PLATFORM columns in DS
Witness to testing concrete cores which took from Sleeper, platform and shelters c
Final inspection for the rebar and formwork of PUMPS foundation in DS6.
Final inspection for the rebar, formwork and the pockets (including survey work) o
Witness
Loading conducting
Dry concrete compaction
for pumpsdegree test for
foundations the subgrade soil under pipe
in DS6
support foundations in DS6
Sampling water that use for mix the concrete for pumps foundations in DS6
(PS-D6PW0006, PS-D6PW0007, PS-D6PW0008, PS-D6PW0009, PS-D6PW0017,
Pouring concrete (including slump test, temperature and make specimen (cubes)) f
PS-D6PW0018,
Re-Sampling the subgrade soil under pipe support foundations in DS6
Sampling the subgrade
PS-D6PW0027,
(PS-D6PW0006, soil under
PS-D6PW0031,
PS-D6PW0007, pipe support foundations
PS-D6PW0032,
PS-D6PW0008, in DS6.
PS-D6PW0033,
PS-D6PW0009, PS-D6PW0034,
PS-D6PW0017, PS-PS-
D6PW0053).
D6PW0018, PS-D6PW0027, PS-D6PW0031, PS-D6PW0032, PS-D6PW0033, PS-
D6PW0034, PS-D6PW0053).
Witness to test concrete cubes (compressive strength at 7 days) for PUMPS foundat
Witness conducting compaction degree test for the subgrade soil under pipe suppor
Final inspection for the blinding of pipe support foundations (including survey work)
Sampling water that use for mix the concrete for the blinding of pipe support found
Pouring
Loading blinding concrete
Dry concrete (including
for pipe slump
support test, temperature)
foundations of pipe support found
in DS6.(PS-D6PW-
0006/7/8/9/17/18/27/31/32/33/34/53).
Sampling water that use for mix concrete of pipe support foundations in DS6. (P
Pouring concrete (including slump test, temperature and make specimen (cubes))
Witness to test concrete cubes (compressive strength at 28 days) of pump foundation(PAX681051A/B,PBE6810
nspection for the rebar and chipping inside the columns of pipe support(PS-D6PW
Witness to test concrete cubes (compressive strength at 7 days) of pipe support
Final inspection for the rebar, formwork and ahcol bolts of the pipe support colu
Loading Dry concrete for pipe support columns in DS6 and pipe support blanding in DS7
(zone 1,3water
Sampling between sleeper)
that used for mix concrete of for pipe support columns in DS6 and pipe
support
Pouring blanding
concrete in DS7 (zone
(including 1,3
slump at between
test, sleeper)
temperature and make specimen (cubes) of pipe
support columns in DS6
inspection the surface of pipe support columns after remove formwork in DS6 (
Witness to test concrete cubes (compressive strength at 7 days) of pipe suppor
inspection the surface of pipe support columns after coating in DS6 (PS-D6PW-
0006/7/8/9/17/18/27/28/31/32/33/34/53)
sampling of backfill soil in DS6 pump shelter area and pipe support area
sampling of backfill soil in DS6 pump shelter area and pipe support area
Witness conducting compaction degree test for pump shelter area and pipe support
sampling of backfill soil in DS7 IGF area(ZONE 1,3)
Re-sampling of backfill soil fail point PUMP area in DS6
Witness to test concrete cubes (compressive strength at 28 days) for pipe support footing
of DS6 (PS-D6PW-0006/7/8/9/17/18/27/28/31/32/33/34/53)
Witness conducting compaction degree test for pipe support area in DS6.
sampling of backfill soil for pipe support area and pump area in DS6
Witness conducting compaction degree test for pipe support area and pump area i
Sampling of backfill soil in DS6 PUMP area and pipe support area
Witness conducting compaction degree test for pipe support area and pump area i
sampling backfill soil in DS6 pump area and pipe support area。
Witness conducting compaction degree test for pipe support area and pump area in DS6.
Re-sampling of backfill soil fail point PUMP area in DS6
Witness to test concrete cubes (compressive strength at 28 days) for pipe supp
Witness conducting compaction degree test for pipe support area in DS6.
Witness conducting compaction degree test for east of pump shelter in DS6.
Witness to test concrete cubes (compressive strength at 7 days) for recover oil pum
Inspection the formwork for grout the tank foudation in DS6.
Witness the tank foundation grouting(including temperature and make specimen (c
Witness the tank foundation grouting(including temperature and make specimen (c
Final inspection for the rebar,formwork of the containment of pump in DS6
Final inspection for the rebar,formwork of the containment of pump in DS6(include survey
work)
Final inspection for the rebar,formwork of the containment of pump in DS6(include survey
work)
Witness to test concrete cubes (compressive strength at 7 days) for grout for tank
check the surface after remove of the formwork of grout the 1200m³tank foudation
Loading Dry concrete for the pipe support column in DS8 and containment of pump in
DS6.(ps-D8pw-027-037-038-039-040-041-042-043-044-045-048)
Loading Dry concrete for the pipe support column in DS8 and containment of pump in
DS6.(ps-D8pw-027-037-038-039-040-041-042-043-044-045-048)
Final inspection for the rebar,formwork of the containment of pump in DS6(include
Final inspection for the rebar,formwork of the containment of pump in DS6(include
Sampling water that used mixing concrete for the containment of pump in DS6.
Sampling water that used mixing concrete for the containment of pump in DS6.
Pouring concrete (including slump test, temperature and make specimen (cubes)) for the
containment of pump
Pouring concrete in DS6slump test, temperature and make specimen (cubes)) for the
(including
containment of pump in DS6
survey the anchor bolts's elevation/distance and the final elevation of the backfill oil for
platform(ABJ-681050) in DS6.
Mechanical completion check for platform near tank(D6-681050)in DS6.
Mechanical completion check for platform near tank(D6-681050)in DS6.
Survey the anchor bolts elevation / distance for pump shelter (PBE-681051A/B;PBE-
681052A/B) in DS6.bolts elevation for pipe support columns (ps-D7pw-083-084-085-086-
Survey the anchor
087-088-089-090-091-092-107-108-109-110-111-112-113-114-115-116-117-118-119-120-
Witness to test concrete cubes (compressive strength at 7 days) for
121-122) in DS7.
containment of of
pump
Ultrasonic test pipein DS6. columns.((PS-D6PW-0006-7-8-9-17-18-27-28-31-32-33-34-
support
53)
Ultrasonic test of pipe support columns.((PS-D6PW-0006-7-8-9-17-18-27-28-31-32-
Witness test grout cubes (compressive strength at 28 days) for the 1200m³tank foundation
Final inspection for the formwork,rebar and anchor bolts of the containment for pu
Sampling backfill soil for pipe support area(subgrade layer,elevation=2.1; 3 point)
Sampling backfill soil for pipe support area(subgrade layer,elevation=2.1; 3 point)
Witness conducting compaction degree test for pipe support area(subgrade layer,
Final inspection for the formwork of the pipe support blinding (including survey work) in DS6.
Sampling backfill soil for pipe support area(subgrade layer,elevation=2.1)in DS6 .
Loading Dry concrete for :1. Pipe support blinding(PS-D6-003-004-005-035-037-038-050-052-054-044-045-046
Loading Dry concrete for :1. Pipe support blinding(PS-D6-003-004-005-035-037-038-050-052-054-044-045-046
Sampling water that used mixing concrete for:1. Pipe support blinding(PS-D6-003-004-005-035-037-038-050-0
Sampling water that used mixing concrete for:1. Pipe support blinding(PS-D6-003-004-005-035-037-038-050-0
Pouring concrete (including slump test, temperature and make specimen (cubes)) for: 1. Pipe support blinding
Witness conducting compaction degree test for pipe support area(subgrade layer,
Witness Ultrasonic test for pipe support colums in DS6 PS-D6PW-0006-007-008-0
check the formwork of grout for platform near tank(IQD6-ABJ681050)
check the formwork of grout for pump shelter (IQD6-PBE681052A/B;PAX681051A/B
Witness test concrete cubes (compressive strength at 28 days) for the containme
Witness the platform near tank(IQD6-ABJ681050) foundation grouting (including
temperature and make
Witness the platform specimen
near (cubes) in DS6 foundation grouting (including
tank(IQD6-ABJ681050)
temperature and make
Witness the pump specimen
shelter (cubes) in DS6
(IQD6-PAX681051A/B;PBE681052A/B) foundation grouting
(including temperature and make specimen (cubes) in DS6.
Witness the pump shelter (IQD6-PAX681051A/B;PBE681052A/B) foundation grouting
(including temperature and make specimen (cubes) in DS6.
Sampling backfill soil for pipe support area east of tank (subgrade,elevation=2.1;s
Sampling backfill soil for pipe support area east of tank (subgrade,elevation=2.1;s
check surface of after remove formwork for contaiment for pumps in DS6.
Witness conducting compaction degree test for pipe support area east of tank (sub
Witness test concrete cubes (compressive strength at 7 days) for 1.pipe support columns
Final inspection for the formwork of the access platform(F1) bliding (including surv
Final inspection for the formwork of the pipe support bliding (including survey work) in
DS6.(PS-D6-001-002)
Final inspection for therebar and formwork of the pipe support footing (including survey
work) in DS6.(PS-D6-003-004-005)
Loading Dry concrete for :1. Pipe support footing(PS-D6-003-004-005);2. Access platform blinding(F1) and pi
Sampling water that used mixing concrete for:1. Pipe support footing(PS-D6-003-004-005
Pouring concrete (including slump test, temperature and make specimen (cubes)) for: 1. Pipe support footing
Check the surface of concrete for containment after repaired in DS6.
Check the surface of grout for platform and pump shelter after repaired in DS6.
Mechanical completion check for pipe support foundation in DS6.(PS-D6PW-0006-7
Witness to test grout cubes (compressive strength at 7 days) of the platform ne
Sampling backfill soil for:1 pipe support area(sixth layer,elevation=2.25;)2 pipe support 003/4/5
Final inspection for the rebar , formwork and anchor bolts(including survey work) of
Final inspection for the rebar , formwork and anchor bolts(including survey work) of
Check the surface of after coating for containment for pumps in DS6.
Loading Dry concrete for:1:pipe support columns (PS-D6-001-002-003-004-005-035-037-
038-050-052-054-040-041-042-043-044-045-046-047-048-049);2.access
Loading Dry concrete for cartridge filters skid in DS7. platform(F1) in
DS6.
Sampling water that used mixing concrete for:1:pipe support columns (PS-D6-001-002-
003-004-005-035-037-038-050-052-054-040-041-042-043-044-045-046-047-048-
Pouring concrete (including slump test, temperature and make specimen (cubes))
049);2.access
for:1:pipe platform(F1) (PS-D6-001-002-003-004-005-035-037-038-050-052-054-040-
in DS6.
Check thesupport
surfacecolumns
of concrete after remove formwork for pipe support footing in DS6.((PS-
041-042-043-044-045-046-047-048-049);2.access
D6-003-004-005) platform(F1) in DS6.
Check the surface of concrete after coating for:1 pipe support footing (PS-D6-001-002-
035-037-038-050-052-054-040-041-042-043-044-045-046-047-048-049);2.access
Witness to test
platform(F1) concrete cubes (compressive strength at 7 days) for Pipe support footing(PS-D6-003-004-005)
in DS6.
Check the surface of concrete after remove formwork for pipe support column in DS6.(PS-D6-001-002-003-004-0
Mechanical completion check for containment for pumps(include columns for this drawing)
Check
in DS6.the surface of concrete after repaired for 1:pipe support columns (PS-D6-001-002-
Mechanical completion check for sleeper foundation in DS6.
003-004-005-035-037-038-050-052-054-040-041-042-043-044-045-046-047-048-
049);2.access platform(F1)
Check the formwork of groutinfor
DS6skid foundation in DS7.(NSF SKID;WATER PUMP PIPING
SKID;EDUCTOR SKID)
Check the formwork of grout for skid foundation in DS7.(NSF SKID;WATER PUMP
Check the surface of concrete after coating for 1:pipe support columns (PS-D6-001-002-
003-004-005-035-037-038-050-052-054-040-041-042-043-044-045-046-047-048-
Mechanical completion check for pump foundation (PBE-681161A/B; PBE-681261A/B)in
049);2.access
DS8. platform(F1)in DS6
Witness to test concrete cubes (compressive strength at 7 days) for1:pipe supp
Sampling backfill soil for pipe support1. west of tank(first layer,elevation=2.4);2. east of tank
Mechanical completion check for pipe support foundation in DS6.(PS-D6-001-002
Witness conducting compaction degree test for pipe support area 1. west of tank(
Witness to test concrete cubes (compressive strength at 28 days) for:1. pipe support columns
Sampling backfill soil for pipe support (D6PW-0054,first layer,elevation=2.4)in DS6 .
Inspected Date Date Signature Report Accepted Rejected Close
2017.01.13 DS6 yes yes yes
for survering work (center and DS6 yes yes
2017.02.03 DS6 yes yes yes
2017.02.07 DS6 yes yes yes
2017.02.11 DS6 yes yes yes yes
2017.02.11 DS6 yes yes yes yes
2017.02.23 DS6 yes yes yes yes
2017.02.26 DS6 yes yes Yes
2017.02.26 DS6 yes yes yes Yes
2017.02.27 DS6 Yes yes yes yes
2017.03.05 DS6 yes yes yes
2017.03.06 DS6 yes yes yes
2017.03.07 DS6 yes yes yes yes
2017.03.07 DS6 yes yes yes
2017.03.14 DS6 yes YES yes yes
2017.03.14 DS6 yes Yes yes
2017.03.21 DS6 yes yes yes
2017.03.22 DS6 yes yes yes
2017.03.22 DS6 yes yes yes yes
2017.03.22 DS6 yes yes yes
2017.03.29 DS6 yes yes yes yes
2017.03.31 DS6 yes yes yes
2017.03.31 DS6 yes yes yes
2017.04.01 DS6 yes yes yes
2017.04.01 DS6 yes yes yes
2017.04.02 DS6 yes yes yes
2017.04.02 DS6 Yes yes yes yes
2017.04.04 DS6 yes YES yes
2017.04.04 DS6 yes yes YES
2017.04.05 DS6 yes yes yes yes
2017.04.06 DS6 yes yes yes
2017.04.09 DS6 yes yes yes
2017.04.09 DS6 YES YES YES
2017.04.10 DS6 yes YES YES
2017.04.10 DS6 yes yes yes
2017.04.10 DS6 2017.04.10 yes yes yes
2017.04.10 DS6 yes yes yes yes
2017.04.12 DS6 yes yes yes
2017.04.13 DS6 yes yes YES yes
2014.04.13 DS6 yes yes yes YES
2017.04.14 DS6 yes YES YES
2017.04.17 DS6 yes YES YES
2017.04.17 DS6 YES YES YES YES
2017.04.17 DS6 Yes YES yes
2017.04.16 DS6 YES YES YES YES
2017.04.18 DS6 yes yes yes
2017.04.18 DS6 yes yes yes yes
2017.04.19 DS6 yes yes yes YES
2017.04.20 DS6 YES YES YES
DS6 yes YES yes YES
2017.04.19 DS6 YES YES YES YES
2017.04.19 DS6 yes yes yes
2017.04.20 DS6 yes YES YES
2014.04.24 DS6 yes yes YES YES
2017.04.22 DS6 yes yes yes yes
2017.04.22 DS6 YES yes YES yes
2017.04.22 DS6 yes yes yes yes
2017.04.23 DS6 YES YES YES
2017.04.23 DS6 YES YES YES YES
2017.04.23 DS6 YES YES YES YES
2017.04.23 DS6 yes YES yes YES
2017.04.24 DS6 YES YES YES YES
2017.04.25 DS6 YES YES YES
2017.04.25 DS6 Yes yes YES
2017.04.25 DS6 YES YES YES YES
2017.04.26 DS6 YES YES YES YES
2017.04.27 DS6 yes yes yes YES
2017.04.29 DS6 YES yes YES YES
2017.05.01 DS6 YES YES YES YES
2017.05.01 DS6 YES YES YES YES
2017.05.03 DS6 yes yes yes yes
2017.05.03 DS6 yes YES YES YES
2017.05.04 DS6 YES yes YES yes
2017.05.06 DS6 yes YES YES yes
2017.05.07 DS6 yes yes yes
2017.05.08 DS6 YES YES YES YES
2017.05.08 DS6 yes YES
2017.05.09 DS6 yes yes yes
2017.05.09 DS6 yes yes YES
2017.05.09 DS6 YES yes yes
2017.05.09 DS6 YES yes YES yes
2017.05.10 DS6 yes yes YES yes
2017.05.10 DS6 YES YES YES YES
2017.05.10 DS6 YES yes yes
2017.05.10 DS6 YES yes yes
2017.05.11 DS6 YES YES YES YES
2017.05.11 DS6 YES YES YES
2017.05.11 DS6.DS7.DS8 yes YES yes YES
2017.05.11 DS6 yes YES yes
2017.05.13 DS7 YES YES yes YES
2017.05.13 DS6 yes yes yes
2017.05.13 DS6 yes YES YES
2017.05.14 DS6 yes yes yes
2017.05.14 DS6 YES yes yes yes
2017.05.15 DS6 YES YES YES YES
2017.05.15 DS6 yes yes yes
2017.05.16 DS6 yes yes yes
2017.05.16-17 DS6 yes YES YES
2017.05.17 DS6 YES YES YES
2017.05.19 DS6 yes yes YES
2017.05.18 DS6 yes yes yes
2017.05.20 DS6 yes YES YES
2017.05.20 DS6 yes yes yes yes
2017.05.21 DS6 yes YES YES
2017.05.21 DS6 YES yes yes yES
2017.05.22 DS6 YES YES yes
2017.05.22 DS6 yes yes yes
2017.05.22 DS6 yes yes yes
2017.05.22 DS6 yes yes yes yes
2017.05.23 DS6 YES YES YES YES
2017.05.23 DS6 yes yes yes
2017.05.23 DS6 yes yes yes
2017.05.24 DS6 yes yes yes
2017.05.24 DS6 yes yes yes
2017.05.24 DS6 yes yes yes yes
2017.05.24 DS6 CAMP YES YES yes
2017.05.26 DS6 yes yes yes yes
2017.05.28 DS6 yes yes yes yes
2017.05.29 DS6 yes yes yes
2017.05.29 DS6 yes yes yes
2017.05.30 DS6 yes yes yes yes
2017.05.31 DS6 yes YES YES
2017.05.31 DS6 yes yes yes yes
2017.05.31 DS6 yes YES YES
2017.06.03 DS6 yes yes YES YES
2017.05.31 DS6 yes yes YES YES
2017.06.03 DS6 YES YES YES YES
2017.06.04 DS6 yes yes yes yes
2017.06.04 DS6 yes yes yes yes
2017.05.06 DS6 yes yes yes yes
2017.06.07 DS6 YES YES YES
2017.06.07 DS6 yes yes yes yes
2017.06.06 DS6 YES YES YES
2017.06.10 DS6 yes yes yes
2017.06.07 DS6 YES YES YES YES
2017.06.08 DS6 yes yes yes YES
2017.06.10 DS6 yes yes yes YES
2017.06.11 DS6 YES YES YES YES
2017.06.09 DS6
2017.06.10 DS6 yes yes yes
2017.06.12 DS6 yes yes yes
2017.06.14 DS6 yes YES YES
2017.06.17 DS6 YES YES YES YES
2017.06.15 DS6 yes yes yes
2017.06.15 DS6 yes yes yes YES
2017.06.18 DS6
2017.16.17 DS6 yes yes yes YES
2017.16.18 DS6 YES YES YES YES
2017.06.21 DS6 YES YES YES
2017.07.06 DS6 yes yes yes YES
2017.07.22 DS6
2017.07.24 DS6
2017.07.30 DS6 YES yes yes
2017.07.30 DS6 YES yes YES yes
2017.08.30 DS6 yes YES yes
2017.08.02 DS6
2017.08.03 DS6 YES YES YES
2017.08.05 DS6
2017.08.06 DS6 yes yes yes YES
2017.08.06 DS6 YES yes YES YES
2017.08.13 DS6 YES YES YES
2017.08.14 DS6 yes yes yes yes
2017.08.14 DS6 yes yes yes
2017.08.24 DS6 yes yes YES
2017.08.24 DS6
2017.08.24 DS6 yes yes yes
2017.08.27 DS6 yes yes yes yes
2017.08.28 DS6 yes yes yes
2017.08.31 DS6 YES yes YES YES
2017.09.05 DS6 yes YES YES
2017.09.06 DS6 yes yes YES
2017.09.06 DS6 yes yes yes yes
2017.09.06 DS6 yes yes yes
2017.09.12 DS6 yes yes yes
2017.09.13 DS6 yes yes yes yes
2017.09.14 DS6 YES yes yes
2017.09.16 DS6 YES YES yes
2017.09.18 DS6 yes YES YES
2017.09.19 DS6 yes yes yes YES
2017.09.20 DS6 yes YES YES
2017.09.21 DS6
2017.09.21 DS6 YES yes YES yes
2017.09.21 DS6 yes yes yes yes
2017.09.23 DS6 yes YES YES
2017.09.24 DS6 yes yes yes
2017.09.27 DS6 yes yes yes yes
2017.09.27 DS6 yes yes yes yes
2017.09.30 DS6 yes yes yes
2017.10.02 DS6 yes yes yes
2017.10.03 DS6
2017.10.04 DS6 yes yes yes YES
2017.10.04 DS6 yes yes yes YES
2017.10.05 DS6 YES YES YES YES
2017.10.09 DS6 YES YES YES
2017.10.12 DS6 yes yes yes
2017.10.14 DS6 yes yes YES
2017.10.15 DS6 yes yes yes
2017.10.21 DS6 YES yes yes
2017.10.26 DS6
2017.10.27 DS6
2017.10.22 DS6 yes yes yes yes
2017.10.23 DS6 YES yes yes
2017.10.28 DS6 YES yes yes
2017.10.29 DS6 yes YES YES
2017.10.28 DS6 yes YES yes
2017.10.29 DS6 yes YES YES
2017.10.28 DS6 YES yes yes
2017.10.29 DS6 yes yes yes yes
2017.10.28 DS6 yes YES
2017.10.29 DS6 yes YES YES
2017.10.31 DS6 yes yes YES YES
2017.11.01 DS6 yes YES YES
2017.11.02 DS6 yes YES YES
2017.11.04 DS6 yes yes yes YES
2017.11.05 DS6 yes yes yes
2017.11.05 DS6 yes yes YES
2017.11.06 DS6
2017.11.07 DS6 yes yes yes
2017.11.12 DS6 yes yes yes yes
2017.11.14 DS6
2017.11.18 DS6 yes yes YES
2017.11.19 DS6 yes YES YES
2017.11.20 DS6
2017.11.22 DS6 yes YES YES
2017.11.22 DS6
2017.11.23 DS6 YES YES YES
2017.11.24 DS6 yes YES YES
2017.11.23 DS6 YES YES YES
2017.11.24 DS6 yes yes yes YES
2017.11.23 DS6 YES YES YES
2017.11.23 DS6 yes yes yes
2017.11.24 DS6 yes yes yes YEs
2017.11.25 DS6 yes yes yes
2017.11.25 DS6
2017.11.26 DS6
2017.11.27 DS6 yes yes YES
2017.11.28 DS6 yes YES YES
2017.11.27 DS6 yes yes YES
2017.11.28 DS6 yes YES YES
2017.11.27 DS6
2017.11.29 DS6
2017.11.29 DS6 yes YES YES
2017.11.30 DS6
2017.12.01 DS6
2017.12.02 DS6 yes yes yes
2017.12.02 DS6 yes yes yes
2017.12.02 DS6 yes yes yes
2017.12.03 DS6 yes yes yes
2017.12.03 DS6
2017.12.03 DS6 yes YES YES
2017.12.03 DS6 yes YES YES
2017.12.03 DS6 yes YES YES
2017.12.04 DS6 yes YES YES
2017.12.05 DS6
2017.12.06 DS6 yes YES YES
2017.12.08 DS6 YES YES YES
2017.12.09 DS6 yes YES YES
2017.12.09 DS6 yes YES YES
2017.12.10 DS6 yes YES YES
2017.12.10 DS6 yes YES YES
2017.12.10 DS6
2017.12.10 DS6 yes yes yes
2017.12.11 DS6 yes yes yes
2017.12.11 DS6 yes yes yes
2017.12.11 DS6
2017.12.13 DS6 yes YES YES
2017.12.14 DS6 yes YES YES
2017.12.14 DS6 yes YES YES
2017.12.15 DS6
2017.12.15 DS6 yes YES YES
2017.12.16 DS6
2017.12.17 DS6 yes YES YES
2017.12.17 DS6 yes YES YES
2017.12.17 DS6
2017.12.20 DS6
2017.12.21 DS6
2017.12.21 DS6
2017.12.23 DS6
2017.12.23 DS6
Comments

Inspaction of the elevation Should be done after compaction .

Cancel , inspaction rebar and form work together


Not appliceble at a moment.

No need
cancel
cancel

cancel by.mfco

the work is not ready , the ir was canceld


the work is not ready , the ir was canceld

the work is not ready , the ir was canceld

Third party inspactor who is profrming the testing didn’t come the ir was canceld.

As mantion in ir of loading raw material( CE-C 0580) admixture material loaded in to the silo with out witness fro
Canceld

Canceld

cancel
cancel

cancel

cancel

cancel

Cancel

canceld

canceld

canceld

canceld

canceld
cancel

cancel

cancel
Remark
ut witness from EMIL represntive.
IR No. Soft Copy Description of work Inspected Date location Signature Report Accepted Rejected
IR CE-C 0001 IR scan\CE-C 0001.pdf Subcontractor has been completed site clearing.grubbing remove excavated soil and lev 2016.12.12 DS7 yes No Yes
IR CE-C 0002 IR scan\CE-C 0002.pdf Subcontractor has digged 04 trail pits to expose subsoil. Requested EMIL to identify soi 2016.12.14 DS7 yes yes
IR CE-C 0003 IR scan\CE-C 0003.PDF Survey and mark -out are conducted for the excavation area pirior to commencement of th2016.12.28 DS7 yes yes
IR CE-C 0004 IR scan\CE-C 0004.PDF Before backfiling,we have scarified and rolled the top of the origenal layer, and have c 2016.12.31 DS7 yes yes
IR CE-C 0005 IR scan\CE-C 0005.pdf Sampling on the top of original soil layer for proctor testing has been completed under 2017.01.02 DS7 yes yes
IR CE-C 0006 IR scan\CE-C 0006.PDF Qualifed.Please start next layer compaction 2017.01.07 DS7 yes YES yes
IR CE-C 0007 IR scan\CE-C 0007.PDF Take sample soil from the borrow pit 4B to purpose chemical & physicail test (L.L, P.L, 2017.01.09 DS7 yes yes
IR CE-C 0008 IR scan\CE-C 0008.PDF Test the soil sample that took from borrow pit 4B,Physical (L.L , P.L , P.L and and mod 2017.01.09 borrow pit 4B no
IR CE-C 0011 IR scan\CE-C 0011.PDF Checking the elevations of the sub-grade layer in DS7. Request inspection 2017.01.16 DS7 yes yes yes
IR CE-C 0012 IR scan\CE-C 0012.PDF We completed compact the first layer from backfiling in DS7 Request inspaction the ele 2017.01.18 DS7 yes yes yes
IR CE-C 0013 IR scan\CE-C 0013.PDF After backfiling we have scarified and rolled the first layer .and have coordinated wit 2017.01.19 DS7 yes yes
IR CE-C 0014 IR scan\CE-C 0014.PDF Sampling the rebar for the purpose of all chemical and physical test in Basra University lab. Re 2017.01.22 DS7 yes yes yes
IR CE-C 0015 IR scan\CE-C 0015.pdf Sampling the rebar for the testing has been completed under related parties ,Witness 2017.01.23 Unversity of basra yes yes yes
IR CE-C 0016 IR scan\CE-C 0016.pdf on 22 jan 2017.request witness conducting test in basrah
We are going to take 3 samples do pgysical (LL.PL.proctor .optimum moister unversity lab. 2017.01.22 borrow pit 4B yes yes yes
IR CE-C 0017 IR scan\CE-C 0017.pdf comtent )from borrow pit4b Alfao will come at site to take samples .please
sampling 3 sample from borrow pit 4B for physcail (LL.PL proctor density,optimum moste 2017.01.24 witness borrow pit 4B yes yes yes
IR CE-C 0018 IR scan\CE-C 0018.pdf sampling.
Sampling the concrete mix(Gravel, Sand, Cement and Water) of all chemical and physical tests in AL-FAO A Cntimena batch plant yes Yes
IR CE-C 0019 IR scan\CE-C 0019.PDF witness to take samples from the first layer re-compacted (11 points) in DS7 2017.02.03 DS7 yes yes
IR CE-C 0020 IR scan\CE-C 0020.pdf Witness to take samples at 2 point failed zone 3 4 zone 4 of the first layer Ds7 to test 2017.02.03 DS7 yes yes yes
IR CE-C 0025 IR scan\CE-C 0025.PDF Sampling the concrete mix(Gravel, Sand, ) of all chemical and physical tests in AL- 2017.02.04 Antimena batch plant Yes yes yes
IR CE-C 0028 IR scan\CE-C 0028.PDF FAO Central
Sampling lab .Request
cement, gravel ,witness
sand and forwater
take samples.
as per the concrete mix to do all chemical 2017.02.06 Antimena batch plant yes yes
IR CE-C 0029 IR scan\CE-C 0029.PDF and physical
witness to taketests in AL-FAO
samples for theCentral
second lab.layer
Request
(test witness for in
11 points) taking
DS7 these samples in 2017.02.05 DS7 yes yes Yes
IR CE-C 0030 IR scan\CE-C 0030.pdf Antemina Batch Plant.
We complete the compaction of second layer in DS7. Request inspection the elevations f 2017.02.05 DS7 yes yes yes
IR CE-C 0031 IR scan\CE-C 0031.pdf Sampling raw materials (Gravel, Water and Cement ) have been completed today. 2017.02.07 Antimena batch plant yes yes Yes
IR CE-C 0033 IR scan\CE-C 0033.PDF Request conducting the testing
witness to re-take samples for the second layer (test 13 points) in DS7 2017.02.10 DS7 yes yes yes
IR CE-C 0034 IR scan\CE-C 0034.PDF We have completed re-compaction of second layer in DS7. Request inspection the elevati 2017.02.10 DS7 yes yes
IR CE-C 0039 IR scan\CE-C 0039.pdf Sampling raw material (Gravel , sand and make trial mix cubes). Request witness 2017.02.10 Antimena batch plant yes yes
IR CE-C 0040 IR scan\CE-C 0040.PDF Witness to make trial mix cubes in Antemina Batch Plant, This trial mix comes under our 2017.02.12 Antimena batch plant yes yes
IR CE-C 0041 IR scan\CE-C 0041.pdf Sampling raw material (Gravel and sand) have been completed today 11-2-2017. Request 2017.02.12 Antimena batch plant YES Yes
IR CE-C 0042 IR scan\CE-C 0042.pdf Witness to re-take samples for the second layer (test 13 points) in DS7. 2017.02.13 DS7 yes yes yes
IR CE-C 0044 IR scan\CE-C 0044.PDF witness to re-take samples for the second layer (point 2 ,11 and 13) in DS7 2017.02.14 DS7 yes yes yes
IR CE-C 0050 IR scan\CE-C 0050.pdf Witness to Sampling the cement to make Physical test . 2017.02.18 Antimena batch plant yes yes
IR CE-C 0051 IR scan\CE-C 0051.pdf Sampling raw material (Gravel , sand ) for the purpose of chemical test. Request witne 2017.02.18 Antimena batch plant yes yes
IR CE-C 0052 IR scan\CE-C 0052.PDF Witness to take sample for third layer in DS7(Test 13 point) 2017.02.19 DS7 yes yes yes
IR CE-C 0053 IR scan\CE-C 0053.pdf Survey work to check the elevations for the third layer in DS7. 2017.02.19 DS7 yes yes yes
IR CE-C 0054 IR scan\CE-C 0054.pdf Witness for trial mix design test. 2017.02.17 Antimena batch plant yes yes
IR CE-C 0055 IR scan\CE-C 0055.pdf Sampling raw material (Gravel, sand, and cement) have been completed in Antemina batch 2017.02.19 Antimena batch plant yes yes yes
plant today 18-2-2017.
IR CE-C 0056 IR scan\CE-C 0056.pdf Soil samples
Request
have been taken in the first layer DS8 today. Please witness for getting dry
witness to conducting 2017.02.18 DS7 yes yes yes
weight and the compaction test the following
result in DS8tests.
Al FAO lab.
IR CE-C 0057 IR scan\CE-C 0057.pdf SoilPhysical
1- samples and have beentests
chemical taken of today
sand and(2017-2-19).
gravel: Theseneed witness
tests for getting
will continue dry weight a
3 days. 2017.02.20 DS7 yes yes yes
IR CE-C 0058 IR scan\CE-C 0058.pdf 2-cement:
witness tothis test needs
re-take 3 days
samples for (first, third,layer
the third seventh) of sampling
(point 2 and13)day. in DS7 2017.02.20 DS7 yes yes
IR CE-C 0061 IR scan\CE-C 0061.pdf Sampling 2 points in 3rd layer in DS7 have been taken today (2017-2-21). Please witnes 2017.02.21 DS7 yes yes
IR CE-C 0064 IR scan\CE-C 0064.pdf Witness to take sample for third layer IGF system foundation in DS7 2017.02.24 DS7 yes yes yes
IR CE-C 0065 IR scan\CE-C 0065.PDF Sampling the third layer under IGF systems in DS7 have been completed in 22-2-2017. 2017.02.22 DS7 yes yes yes
IR CE-C 0066 IR scan\CE-C 0066.pdf Witness that anchor bolts conforms to IQWQ-CE1091-CLMTO-00-0003 Rev.0 MTO - 2017.02.25 DS6,7,8 yes yes
IR CE-C 0069 IR scan\CE-C 0069.pdf ANCHOR
Witness to re-take samples for the third layer (points 4, 7 and 8) under IGF systems fo 2017.02.25 DS7 yes yes
IR CE-C 0073 IR scan\CE-C 0073.pdf BOLTS:
Sampling the third layer (points 4, 7 and 8) under IGF systems foundation in DS7 have been co 2017.02.26 DS7 yes yes yes
IR CE-C 0076 IR scan\CE-C 0076.pdf 88 Nos, 42mm diameter AB x 1525mm long with 2 nuts on top and
Survey work to check the elevations for the fourth layer in DS7 for zone 1, 2, 3 and 4. 1 nut at bottom 2017.02.28 DS7 yes yes yes
IR CE-C 0077 IR scan\CE-C 0077.PDF Witness to take samples for the fourth layer in DS7 for zone 1, 2, 3 and 4. 2017.02.28 DS7 yes yes
IR CE-C 0080 IR scan\CE-C 0080.PDF Sampling the fourth layer in DS7 has been completed in 28-2-2017. 2017.03.01 DS7 YES yes YES
IR CE-C 0086 IR scan\CE-C 0086.PDF Request conducting proctor test of the samples.
Witness to re-take samples (16 points) for the fourth layer in DS7 2017.03.04 DS7 yes yes
IR CE-C 0087 IR scan\CE-C 0087.pdf Survey work to check the elevations for the fourth layer in DS7. 2017.03.04 DS7 yes YES yes
IR CE-C 0089 IR scan\CE-C 0089.PDF Sampling the 4th layer (16 points) have been completed today 4-3-2017. 2017.03.05 DS7 yes yes yes
IR CE-C 0094 IR scan\CE-C 0094.pdf Request conducting proctor test of the samples.
We completed the formwork for the tank blinding in DS7. Request inspection the 2017.03.06 DS7 yes yes
IR CE-C 0095 IR scan\CE-C 0095.pdf dimensions
Witness to and
loading quality
dry for
concrete this formwork.
C-15 for the blinding in DS7 in AL-FAYHA BATCH PLANT 2017.03.07 DS7 yes yes
IR CE-C 0096 IR scan\CE-C 0096.pdf Witness sampling of the water that will be used in mix of the dry concrete for C15 blinding in 2017.03.07 DS7 yes yes yes
DS7.
Witness to testing (Slump, Temperature ) of the blinding concrete in DS7 2017.03.07 DS7
IR CE-C 0097 IR scan\CE-C 0097.pdf yes yes
IR CE-C 0098 IR scan\CE-C 0098.PDF We completed the blinding formwork for the platform (near tank) in DS7. Request inspection 2017.03.06 DS7 yes yes yes
the coordinate, dimensions and quality for this formwork.
IR CE-C 0099 IR scan\CE-C 0099.PDF We completed the blinding formwork for the tank in DS7. Request inspection for the survey2017.03.06 work DS7 yes yes yes
IR CE-C 0100 IR scan\CE-C 0100.PDF We completed the survey work for the pump shelter in DS7. Request inspection the 2017.03.07 DS7 yes yes yes
IR CE-C 0101 IR scan\CE-C 0101.pdf coordinate
We completed and the
dimensions.
blinding formwork for the pump shelter in DS7. Request inspection th 2017.03.07 DS7 yes yes yes
IR CE-C 0102 IR scan\CE-C 0102.pdf Witness to re-take samples 1 point (zone 2, point9) for the fourth layer in DS7. 2017.03.07 DS7 yes yes
IR CE-C 0103 IR scan\CE-C 0103.pdf Re-taking samples 2 points (zone 2, point9/point10) of the 4th layer have been completed 2017.03.8 DS7 yes yes yes
today 7-3-2017. 2017.03.07 DS7
IR CE-C 0104 IR scan\CE-C 0104.pdf Check
Requestthe elevations
conducting of the
proctor tank
test foundation
of the samples. ( stage 1) after pouring concrete in DS6. yes yes yes
IR CE-C 0110 IR scan\CE-C 0110.pdf Witness to testing raw material (sand, gravel and cement) for the purpose of 2017.03.14 Al fayhaa batch pant YES YES YES
IR CE-C 0111 IR scan\CE-C 0111.pdf chemical and physical test in Al-FAO LAB. This test will
Inspection the dimensions and quality of the formwork and re-bar for two tanks continue 3 days. 2017.03.14 Al fayhaa batch pant yes yes
IR CE-C 0112 IR scan\CE-C 0112.pdf and platform
Witness foundation
to testing in DS7.
(Slump, Temperature) and make specimens (cube) of the foundation 2017.03.15 Al fayhaa batch pant yes no yes
concrete (C35) in DS8 (time 7:30).
We have completed the formwork and the re-bar for the tank foundation (IQD7-ABJ681053) 2017.03.16 DS7
IR CE-C 0113 IR scan\CE-C 0113.pdf yes yes
in DS7. Request final inspection for the dimensions, survey work and
We have completed the formwork and the re-bar for the tank foundation (IQD7-ABJ681050)quality. 2017.03.16 DS7
IR CE-C 0114 IR scan\CE-C 0113.pdf yes yes
in DS7. Request final inspection for the dimensions, survey work and
We have completed the formwork and the re-bar for platform foundation (IQD7-ABJ681053)quality. 2017.03.16 DS7
IR CE-C 0115 IR scan\CE-C 0114.pdf yes yes
in DS7. Request final inspection for the dimensions, survey work
We have completed the formwork and the re-bar for the platform foundation (IQD7- and quality. 2017.03.16 DS7
IR CE-C 0116 IR scan\CE-C 0115.pdf yes yes
ABJ681050) in DS7. Request final inspection for the dimensions, survey work and quality.
IR CE-C 0117 IR scan\CE-C 0117.pdf We have completed the formwork and the re-bar for shelter foundation (IQD7-PBE681054 2017.03.16 DS7 yes yes
IR CE-C 0118 IR scan\CE-C 0118.pdf We have completed the formwork and the re-bar for the tank foundation (IQD7- 2017.03.18 DS7 yes yes
IR CE-C 0119 IR scan\CE-C 0119.pdf ABJ681053) in DS7. Request final inspection for the dimensions,
The formwork and the re-bar for the tank foundation (IQD7-ABJ681050) in DS7 have survey work and 2017.03.18 DS7 yes yes
quality.
been completed. Request final inspection for the dimensions, survey
The formwork and the re-bar for platform foundation (IQD7-ABJ681053) in DS7 have been work and quality. 2017.03.18 DS7
IR CE-C 0120 IR scan\CE-C 0120.pdf yes yes
completed. Request final inspection for the dimensions, survey work and quality.
IR CE-C 0121 Formwork and
IR scan\CE-C
the re-bar0121.pdf
for shelters foundation (IQD7-PBE681054) in DS7 have been completed. Request final inspection for the dimensions, 2017.03.18 survey workDS7 and quality. yes yes
IR CE-C 0122 IR scan\CE-C 0122.pdf Witness loading dry concrete in Al-Fayha Batch Plant (time 10:00) to pouring concrete of the fo 2017.03.19 DS7 yes yes
IR CE-C 0123 IR scan\CE-C 0123.pdf Witness to testing (Slump, Temperature and cubes ) of the foundation concrete including two ta 2017.03.20 DS7 yes yes
IR CE-C 0124 IR scan\CE-C 0124.PDF Witness sampling of the water that will be used in mix of the dry concrete for C-35 fou 2017.03.20 DS7 yes yes yes
IR CE-C 0127 IR scan\CE-C 0127.pdf+B121B117: The additional quantities of re-bars have been supplied today 20-3-2017, each size has 2017.03.21 DS7 yes yes yes
IR CE-C 0132 IR scan\CE-C 0132.PDF Inspection quality of the re-bars for the tank ( IQD7-ABJ681050 ) in DS7 2017.03.26 DS7 yes yes
IR CE-C 0133 IR scan\CE-C 0133.PDF Inspection quality of the re-bars for the tank ( IQD7-ABJ681053 ) in DS7 2017.03.26 DS7 yes yes
IR CE-C 0134 IR scan\CE-C 0134.PDF Inspection quality of the re-bars for the foundation of platform near the tank ( IQD7- 2017.03.26 DS7 yes yes
IR CE-C 0135 IR scan\CE-C 0135.PDF Inspection quality of the re-bars for the foundation of the shelter in DS7 2017.03.26 DS7 yes yes
IR CE-C 0136 IR scan\CE-C 0136.PDF Witness to testing concrete cubes ( compressive strength at 7 days) which took from D 2017.03.27 DS7 yes yes yes
IR CE-C 0140 IR scan\CE-C 0140.pdf Witness sampling of the water that will be used in mix of the dry concrete for C-35 rin 2017.03.28 DS7 yes yes yes
IR CE-C 0146 IR scan\CE-C 0146.pdf Final inspection of the anchor bolts, formwork, embedded HDPE channel, earthling pl 2017.04.01 DS7 yes yes
IR CE-C 0147 IR scan\CE-C 0147.pdf Installation the anchor bolts, formwork, embedded HDPE channel, earthling plates and t 2017.04.01 DS7 yes yes
IR CE-C 0148 IR scan\CE-C 0148.pdf Final inspection the formwork of the columns for the shelters in DS7 2017.04.01 DS7 yes yes
IR CE-C 0149 IR scan\CE-C 0149.pdf Witness loading dry concrete in Al-Fayha Batch Plant to pouring concrete of the ring wa 2017.04.02 DS7 yes yes
IR CE-C 0150 IR scan\CE-C 0150.pdf Witness to testing (Slump, Temperature and cubes ) of the ring wall concrete for two 2017.04.02 DS7 yes yes
IR CE-C 0151 IR scan\CE-C 0151.pdf Witness sampling of the water that will be used in mix of the dry concrete for C-35 rin 2017.04.02 DS7 yes yes
IR CE-C 0152 IR scan\CE-C 0152.pdf Inspection quality of the re-bars and formwork for the column of platform near the t 2017.04.02 DS7 yes yes
IR CE-C 0153 IR scan\CE-C 0153.pdf Inspection quality of the re-bars and formwork for the column of platform near the t 2017.04.02 DS7 yes yes
IR CE-C 0157 IR scan\CE-C 0157.pdf Final inspection of the anchor bolts, formwork, embedded HDPE channel, earthling pla 2017.04.03 DS7 yes yes
IR CE-C 0158 IR scan\CE-C 0158.pdf Final inspection of the anchor bolts, formwork, embedded HDPE channel, earthling pla 2017.04.03 DS7 yes yes
IR CE-C 0159 IR scan\CE-C 0159.pdf Inspection quality of the re-bars and formwork for the column of platform near the tank ( IQD7-ABJ681050
2017.04.03 ) in DS7 DS7 no yes
IR CE-C 0160 IR scan\CE-C 0160.pdf Inspection quality of the re-bars and formwork for the column of platform near the t 2017.04.03 DS7 yes yes
IR CE-C 0161 IR scan\CE-C 0161.pdf Witness loading dry concrete in Al-Fayha Batch Plant to pouring concrete of the ring wa 2017.04.04 DS7 yes YES
IR CE-C 0164 IR scan\CE-C 0164.pdf Witness to testing concrete cubes ( compressive strength at 7 days) which took from p 2017.04.04 DS7 yes yes yes
IR CE-C 0165 IR scan\CE-C 0165.pdf Survey work of two tank foundation ’s anchor bolts, formwork, embedded HDPE channel, earthling plates and HDPE sleeves
2017.04.04 DS7 in DS7 yes Yes
IR CE-C 0167 IR scan\CE-C 0167.pdf Inspection quality of the re-bars and formwork for the column of pump shelter( PBE681054 A B2017.04.04
C) in DS7 DS7 no yes
IR CE-C 0168 IR scan\CE-C 0068.pdf Inspection quality of the re-bars and formwork for the column of pump shelter( PBE 2017.04.04 DS7 no yes yes
IR CE-C 0171 IR scan\CE-C 0171.pdf Witness sampling of the water that will be used in mix of the dry concrete for C-35 rin 2017.04.05 DS7 yes yes yes
IR CE-C 0172 IR scan\CE-C 0172.pdf Witness to testing (Slump, Temperature and cubes ) of the ring wall concrete for two 2017.04.05 DS7 yes yes
IR CE-C 0176 IR scan\CE-C 0176.pdf Inspection quality of the re-bars and formwork for the column of platform near the t 2017.04.06 DS7 yes yes
IR CE-C 0177 IR scan\CE-C 0177.pdf Inspection quality of the re-bars and formwork for the column of pump shelter(PBE6 2017.04.06 DS7 yes yes
IR CE-C 0178 IR scan\CE-C 0178.pdf Witness to testing (Slump, Temperature and cubes ) for the column of pump shelters 2017.04.06 DS7 yes yes
IR CE-C 0179 IR scan\CE-C 0179.pdf Witness sampling of the water that will be used in mix of the dry concrete for C-35 2017.06.04 DS7 yes yes yes
IR CE-C 0181/181 R1IR scan\CE-C 0181 R1.pdf Request for receiving inspection for Tank Plates batch S0004 on CPECC Ruma 2017.04.08 Rumaila camp Yes yes yes
IR CE-C 0191 IR scan\CE-C 0191.pdf Witness loading dry concrete C-35 for the column of PLATFORM , SHELTERS in DS7 2017.04.10 DS7 yes YES
IR CE-C 0192 IR scan\CE-C 0192.PDF Witness testing (Slump, Temperature and cubes) for the columns concrete of shelters, 2017.04.10 DS6 yes yes
IR CE-C 0201 IR scan\CE-C 0201.pdf Witness testing concrete cubes (compressive strength at 7days) taken from DS7 tank ri 2017.04.12 DS7 yes yes yes
IR CE-C 0203 IR scan\CE-C 0203.pdf Sampling clean dry sand for the purpose of sieving test in DS7 2017.04.13 DS7 YES YES YES
IR CE-C 0205 IR scan\CE-C 0205.pdf Inspaction the concrete of the ring wall for tow tank after reparing the surface and fili 2017.04.15 DS7 YES YES
IR CE-C 0206 IR scan\CE-C 0206.pdf Witness to test concrete cubes ( compressive strength at 7 days) which took from DS7 2017.04.13 DS7 Yes yes yes
IR CE-C 0208 IR scan\CE-C 0208.pdf Inspaction the concrete surface of the columns for the plate and shelters in DS7 2017.04.15 DS7 YES YES
IR CE-C 0213 IR scan\CE-C 0213.pdf Sampling clean dry sand for the purpose of sieving test in DS7 have been completed to 2017.04.16 DS7 YES YES YES
IR CE-C 0214 R1 IR scan\CE-C 0214 R1.pdf Inspaction the concrete surface of the columns for the plate and shelters in DS7 2017.04.16 DS7 yes YES
IR CE-C 0215 R1 IR scan\CE-C 0215 R1.pdf Inspaction the concrete surface of the columns for the plate and shelters in DS7 2017.04.16 DS7 yes YES
IR CE-C 0216 R1 IR scan\CE-C 0216 R1.pdf Sampling the backfilling fourth layer around DS6 tank foundation for proctor test 2017.04.17 DS7 yes YES YES
IR CE-C 0217 IR scan\CE-C 0217.pdf Witness to test concrete cubes (compressive strength at 7 days) taken from DS7 for th 2017.04.17 DS7 yes yes yes
IR CE-C 0218 IR scan\CE-C 0218.pdf Witness to testing concrete cubes (compressive strength at 28 days) taken from two ta 2017.04.18 DS7 YES YES YES
IR CE-C 0228 IR scan\CE-C 0228.pdf Inspection the surface of the PLATFORM & SHELTER Foundations after repair in DS7. 2017.04.19 DS7 yes yes
IR CE-C 0234 IR scan\CE-C 0234.PDF Inspect the surface coating corrosion of tank foundation IQD7-ABJ681050, tank fou 2017.04.19 DS7 yes yes
IR CE-C 0249 IR scan\CE-C 0249.pdf Sampling the backfilling first layer around the tanks foundations for proctor test in DS 2017.04.23 DS7 yes yes
IR CE-C 0250 IR scan\CE-C 0250.pdf Inspection the elevation of the backfilling first layer around the tanks foundations in D 2017.04.23 DS7 yes yes yes
IR CE-C 0254 IR scan\CE-C 0254.pdf Witness conducting proctor test of samples of the backfilling first layer around DS7 ta 2017.04.24 DS7 yes yes yes
IR CE-C 0258 IR scan\CE-C 0258.pdf Sampling the backfilling first layer around the tanks foundations for compaction degree 2017.04.25 DS7 YES YES
IR CE-C 0259 IR scan\CE-C 0259.pdf Sampling the backfilling first layer inside the small tank foundation for compaction deg 2017.04.25 DS7 YES YES
IR CE-C 0263 IR scan\CE-C 0263.pdf Sampling the backfilling first layer inside big tank foundation for compaction degree te 2017.04.25 DS7 YES YES
IR CE-C 0266 IR scan\CE-C 0266.pdf Inspection the elevations of the backfilling first layer inside small tank foundation in DS 2017.04.25 DS7 yes YES yes
IR CE-C 0267 IR scan\CE-C 0267.pdf Inspection the elevations of the backfilling first layer inside big tank foundation in DS7 2017.04.25 DS7 YES YES YES
IR CE-C 0269 IR scan\CE-C 0269.pdf Witness conducting compaction degree test of samples in zone 10 & 13 of the backfillin 2017.04.26 DS7 yes yes yes
IR CE-C 0270 IR scan\CE-C 0270.pdf Witness conducting compaction degree test of samples of the backfilling first layer ins 2017.04.25 DS7 yes yes yes
IR CE-C 0273 IR scan\CE-C 0273.pdf Witness conducting compaction degree test of samples of backfilling first layer inside 2017.04.26 DS7 yes yes yes
IR CE-C 0274 IR scan\CE-C 0274.pdf Sampling the backfilling second layer around the tank foundation for the purpose of c 2017.04.26 DS7 YES YES
IR CE-C 0278 IR scan\CE-C 0278.pdf Witness conducting compaction degree test of samples of the backfilling second layer 2017.04.27 DS7 yes yes yes
IR CE-C 0279 IR scan\CE-C 0279.pdf Sampling the crushed stone for the purpose of sieving test in DS7 2017.04.27 DS7 yes YES
IR CE-C 0280 IR scan\CE-C 0280.pdf Sampling the backfilling second layer inside small and big tank foundations for compac 2017.04.27 DS7 YES YES
IR CE-C 0285 IR scan\CE-C 0285.pdf Sampling 3 points on the backfilling second layer around the tank foundation for compa 2017.04.27 DS7 YES YES
IR CE-C 0287 IR scan\CE-C 0287.pdf Witness conducting sieving analysis test of samples of the crushed stone in DS7 2017.04.29 DS7 YES YES yes
IR CE-C 0288 IR scan\CE-C 0288.pdf Witness conducting compaction degree test of samples of backfilling second layer insid 2017.04.29 DS7 yes yes yes
IR CE-C 0289 IR scan\CE-C 0289.pdf Witness conducting compaction degree test of 3 samples of the backfilling second laye 2017.04.29 DS7 yes yes YES
IR CE-C 0293 IR scan\CE-C 0293.pdf Sampling the backfilling third layer around tanks foundations for compaction degree te 2017.04.29 DS7 YES YES
IR CE-C 0297 IR scan\CE-C 0297.pdf Witness conducting the compaction degree test of samples of backfilling third layer ar 2017.04.30 DS7 YES YES YES
IR CE-C 0299 IR scan\CE-C 0299.pdf Sampling 3 points on the backfilling third layer around the tank foundation for compact 2017.04.30 DS7 yes YES
IR CE-C 0300 IR scan\CE-C 0300.pdf Sampling the backfilling third layer inside small and big tank foundations for compacti 2017.04.30 DS7 yes yes
IR CE-C 0301 IR scan\CE-C 0301.pdf Witness conducting the test of relative density for the samples of backfilled sand fifth 2017.04.30 DS7 yes yes
IR CE-C 0303 canceld Witness conducting compaction degree test of the samples of the backfilling third layer 2017.05.01 DS7 NO NO YES
IR CE-C 0304 canceld Witness conducting compaction degree test of the samples of the backfilling third layer 2017.05.01 DS7 yes yes yes
IR CE-C 0307 IR scan\CE-C 0307.pdf Re-sampling the gravel for sieve analysis test in DS7 (according to ASTM D448 size No 2017.05.02 DS7 YES YES
IR CE-C 0308 IR scan\CE-C 0308.pdf Re-sampling of the backfilling third layer in DS7 zone (10, 11, 12, 13) for the purpose 2017.05.02 DS7 YES YES YES
IR CE-C 0311 IR scan\CE-C 0311.pdf Re-sampling of the backfilling third layer in DS7 zone (10, 11, 12, 13) for the purpose 2017.05.02 DS7 Yes YES
IR CE-C 0312 IR scan\CE-C 0312.pdf Re-sampling of the backfilling third layer inside the tanks foundations in DS7 for the 2017.05.02 DS7 YES YES
IR CE-C 0313 IR scan\CE-C 0313.pdf Witness conducting the compaction degree test of the samples of the re-compacted thir 2017.05.03 DS7 YES YES YES
IR CE-C 0314 IR scan\CE-C 0314.pdf Witness conducting the compaction degree test of the samples of the backfilling fourth 2017.05.03 DS7 yes yes yes
IR CE-C 0315 IR scan\CE-C 0315.pdf Witness conducting the compaction degree test of the samples of the backfilling third 2017.05.03 DS7 yes yes yes
IR CE-C 0316 IR scan\CE-C 0316.pdf Witness conducting sieve analysis test of gravel sample (according to ASTM D448 size 2017.05.03 DS7 yes YES yes
IR CE-C 0323 IR scan\CE-C 0323.pdf Re-sampling of the backfilling fourth layer in DS7 zone (4, 15) for the purpose of comp 2017.05.03 DS7 yes yes yes
IR CE-C 0325 IR scan\CE-C 0325.pdf Witness to testing concrete cubes (compressive strength at 28 days) taken from and ri 2017.05.02 DS7 YES yes YES
IR CE-C 0329 IR scan\CE-C 0329.PDF Sampling the fourth backfilling layer inside the big tank in DS7 2017.05.03 DS7 yes YES
IR CE-C 0330 canceld Re-Sampling the third backfilling layer inside the small tank in DS7 2017.05.04 DS7 yes yes YES
IR CE-C 0331 IR scan\CE-C 0331.pdf Re-sampling the fourth layer around the tanks foundations in DS7 zone (7, 8, 9) 2017.05.04 DS7 yes yes YES
IR CE-C 0332 IR scan\CE-C 0332.pdf Sampling the fifth layer around the tanks foundations in DS7 2017.05.06 DS7 yes yes yes
IR CE-C 0333 IR scan\CE-C 0333.pdf Re-sampling Zone (10,13) of the third backfilling layer around the tanks foundations i 2017.05.04 DS7 YES yes
IR CE-C 0335 IR scan\CE-C 0335.pdf Witness testing concrete cubes (compressive strength at 28 days) taken from founda 2017.05.04 DS7 Yes yes yes
IR CE-C 0336 IR scan\CE-C 0336.PDF Witness conducting compacting test of the sample on the backfulling fourth layer in t 2017.05.03 DS7 YES YES YES
IR CE-C 0340 IR scan\CE-C 0340.PDF Witness conducting compaction degree test of sample of the fourth backfilling layer ins 2017.05.06 DS7 yes YES YES
IR CE-C 0341 IR scan\CE-C 0341.PDF RE Sampling the backfilling layer around tank foundation in DS7 Zone (10,13) have bee 2017.05.06 DS7 yes YES
IR CE-C 0342 IR scan\CE-C 0342.pdf Re-Sampling the third backfilling layer inside the small tank in DS7 2017.05.06 DS7 yes YES YES
IR CE-C 0343 IR scan\CE-C 0343.pdf Witness conducting compaction degree test of sample of the fourth layer around the ta 2017.05.06 DS7 YES YES YES
IR CE-C 0346 IR scan\CE-C 0346.pdf Sampling the fourth layer around the tanks foundations in DS7. Zone (4) 2017.05.06 DS7 YES YES YES
IR CE-C 0347 IR scan\CE-C 0347.pdf Witness conducting compaction degree test of the samples of the fifth layer around th 2017.05.07 DS7 yes yes yes
IR CE-C 0350 IR scan\CE-C 0350.pdf Sampling the fifth backfilling layer inside the big tank in DS7. 2017.05.07 DS7 YES YES
IR CE-C 0351 IR scan\CE-C 0351.pdf Sampling the fourth backfilling layer around the tanks foundations in DS7. Zone (10, 11 2017.05.07 DS7 yes YES yes
IR CE-C 0352 IR scan\CE-C 0352.pdf Witness conducting the compaction degree test of the samples of the third backfilling l 2017.05.07 DS7 yes yes yes
IR CE-C 0357 IR scan\CE-C 0357.PDF Witness to test concrete cubes (compressive strength at 28 days) taken from DS7 for t 2017.05.08 DS7 yes yes yes
IR CE-C 0358 IR scan\CE-C 0358.pdf Sampling the final layer of the soil in side the tank in DS6 for compaction density test 2017.05.09 DS7 YES YES yes
IR CE-C 0361 IR scan\CE-C 0361.PDF Witness conducting compaction degree test of the samples of the fifth backfilling layer 2017.05.08 DS7 YES YES YES
IR CE-C 0362 IR scan\CE-C 0362.PDF Witness conducting compaction degree test of the samples of the backfilled fourth laye 2017.05.08 DS7 YES YES YES
IR CE-C 0363 IR scan\CE-C 0363.pdf Sampling the backfilled fourth layer inside the small tank in DS7. 2017.05.08 DS7 YES YES YES
IR CE-C 0364 IR scan\CE-C 0364.pdf Sampling the backfilled fifth layer around the tanks foundations in DS7(Zone 4) 2017.05.09 DS7 yes YES yes
IR CE-C 0367 IR scan\CE-C 0367.pdf Re-samples the backfilling fifth layer under SHELTERS, PLATFORM and SLEEPERS in D 2017.05.08 DS7 yes YES yes
IR CE-C 0369 IR scan\CE-C 0369.pdf Re-sampling the backfilling fifth layer inside the big tank in DS7 2017.05.09 DS7 YES YES YES
IR CE-C 0370 IR scan\CE-C 0370.pdf Re-sampling the fourth backfilling layer around the tanks foundations in DS7. Zone (10 2017.05.09 DS7 YES yes yes
IR CE-C 0371 Witness conducting compaction degree test of samples of the backfilling fourth layer in 2017.05.09 DS7
IR CE-C 0374 IR scan\CE-C 0374.pdf Sampling the gravel for the purpose of sieving test in DS7. (250 M3) 2017.05.09 DS7 YES yes
IR CE-C 0379 IR scan\CE-C 0379.pdf Witness conducting compaction degree test of the samples of the backfilling fifth layer 2017.05.10 DS7 YES YES YES
IR CE-C 0380 IR scan\CE-C 0380.pdf Witness conducting compaction degree test of the samples of the backfilled fourth lay 2017.05.10 DS7 yes YES YES
IR CE-C 0381 IR scan\CE-C 0381.pdf Sampling the backfilling fifth layer of the soil inside small tank in DS7. 2017.05.11 DS7 YES YES YES
IR CE-C 0384 IR scan\CE-C 0384.pdf Witness conducting the sieving test of the sample of the gravel in DS7. (250 M3) 2017.05.10 DS7 YES YES YES
IR CE-C 0385 IR scan\CE-C 0385.pdf Witness conducting compaction degree test of the samples of the backfilled fifth layer 2017.05.10 DS7 YES YES yes
IR CE-C 0386 IR scan\CE-C 0386.pdf Witness conducting compaction degree test of the samples of the sixth layer of the soi 2017.05.10 DS7 yes yes yes
IR CE-C 0389 IR scan\CE-C 0389.pdf Sampling raw material (sand and gravel) for chemical and physical test in Al-Fayha Bat 2017.05.10 Al fayhaa batch pant YES yes
IR CE-C 0390 IR scan\CE-C 0390.pdf Sampling the backfilled 6th layer inside the big tank in DS7 2017.05.11 DS7 YES yes
IR CE-C 0393 IR scan\CE-C 0393.pdf Sampling the backfilling sixth layer around the tank foundation in DS7 (zone4) 2017.05.11 DS7 YES YES YES
IR CE-C 0394 IR scan\CE-C 0394.pdf Sampling the backfilling for 7th layer around tanks foundations in DS7 2017.05.11 DS7 yes YES
IR CE-C 0396 IR scan\CE-C 0396.pdf Witness testing (slump, temperature) for the blinding concrete C15 in DS7 2017.05.11 DS7 YES yes
IR CE-C 0400 IR scan\CE-C 0400.pdf Witness loading dry concrete C-15 for the blinding of sleeper in DS7 2017.05.11 DS7 YES yes
IR CE-C 0404 IR scan\CE-C 0404.PDF Sampling the backfilled sixth layer inside the big tank in DS7 2017.05.13 DS7 YES YES
IR CE-C 0405 IR scan\CE-C 0405.pdf Sampling the backfilled fifth layer inside the small tank in DS7. 2017.05.13 DS7 YES YES YES
IR CE-C 0411 IR scan\CE-C 0411.pdf Sampling the backfilling fifth layer around the tank foundation in DS7 (zone 12) 2017.05.13 DS7 YES YES YES
IR CE-C 0414 IR scan\CE-C 0414.pdf Witness conducting compaction degree test of the samples for the backfilled sixth layer inside 2017.05.14 DS7 YES YES YES
IR CE-C 0415 IR scan\CE-C 0415.pdf Witness conducting compaction degree test of the samples for the backfilled fifth layer 2017.05.14 DS7 Yes YES YES
IR CE-C 0418 IR scan\CE-C 0418.pdf Witness conducting compaction degree test of the sample for the backfilling fifth layer 2017.05.14 DS7 YES YES YES
IR CE-C 0421 IR scan\CE-C 0421.pdf Sampling the backfilled 7th layer inside the big tank in DS7. 2017.05.15 DS7 YES YES YES
IR CE-C 0422 IR scan\CE-C 0422.pdf Sampling the backfilled sixth layer inside the small tank in DS7. 2017.05.15 DS7 yes YES yes
IR CE-C 0424 IR scan\CE-C 0424.pdf Sampling the backfilling sixth layer around the tank foundation in DS7 2017.05.15 DS7 yes YES yes
IR CE-C 0426 IR scan\CE-C 0426.pdf Witness conducting compaction degree test of the samples for the backfilled 7th layer 2017.05.16 DS7 yes YES yes
IR CE-C 0427 IR scan\CE-C 0427.pdf Witness conducting compaction degree test of the samples for the backfilled sixth layer inside 2017.05.16 DS7 yes yes yes
IR CE-C 0429 Witness conducting compaction degree test of the samples for the backfilling sixth lay 2017.05.16 DS7
IR CE-C 0433 IR scan\CE-C 0433.pdf Final inspection of the anchor bolts of the columns for Platform and Shelters in DS7 2017.05.17 DS7 YES yes yes
IR CE-C 0434 IR scan\CE-C 0434.pdf Sampling the backfilled 8th layer inside the big tank in DS7 2017.05.17 DS7 yes YES
IR CE-C 0435 IR scan\CE-C 0435.pdf Re-sampling the backfilled sixth layer inside the small tank in DS7 2017.05.17 DS7 yes yes yes
IR CE-C 0438 IR scan\CE-C 0438.pdf Witness loading dry concrete C-15 for the blinding of shelter and platform in DS8 2017.05.17 Al fayhaa batch pant YES yes
IR CE-C 0439 IR scan\CE-C 0439.pdf Witness loading dry concrete C-35 for the columns of the shelter and platform in DS7 2017.05.17 Al fayhaa batch pant yes yes
IR CE-C 0443 IR scan\CE-C 0443.PDF Witness testing (slump, temperature) and make specimens (cubes) for the Platform an 2017.05.18 DS7 YES YES
IR CE-C 0444 IR scan\CE-C 0444.pdf Sampling the water to mix the dry concrete for column of the Platform and Shelter in 2017.05.18 DS7 YES yes
IR CE-C 0446 IR scan\CE-C 0446.pdf Witness conducting compaction degree test of the samples of the sixth backfilling layer 2017.05.18 DS7 yes YES yes
IR CE-C 0453 IR scan\CE-C 0453.pdf Re-sampling the backfilled sixth layer inside the small tank in DS7. 2017.05.20 DS7 YES YES YES
IR CE-C 0454 IR scan\CE-C 0454.pdf Sampling the sub-grade layer under IGF foundations in DS7. 2017.05.20 DS7 YES YES YES
IR CE-C 0455 IR scan\CE-C 0455.pdf Sampling clean dry sand for the purpose of sieving analysis test in DS7 2017.05.20 DS7 YES YES
IR CE-C 0457 IR scan\CE-C 0457.pdf Witness conducting the compaction degree test of the samples for the backfilled 8th lay 2017.05.20 DS7 yes yes yes
IR CE-C 0459 IR scan\CE-C 0459.PDF Inspection the survey work of the backfilled 8th layer inside the big tank in DS7 2017.05.20 DS7 YES YES YES
IR CE-C 0460 IR scan\CE-C 0460.pdf Sampling the 6th layer around the tanks foundations.(zone 12) in DS7 2017.05.20 DS7 YES YES yes
IR CE-C 0462 IR scan\CE-C 0462.pdf Re-sampling the backfilled 8th layer inside the big tank in DS7. 2017.05.21 DS7 YES YES yes
IR CE-C 0463 IR scan\CE-C 0463.pdf Witness conducting the compaction degree test of the sample for the backfilled 6th lay 2017.05.21 DS7 YES YES yes
IR CE-C 0464 IR scan\CE-C 0464.pdf Witness conducting compaction degree test of the samples of the sixth backfilling layer 2017.05.21 DS7 YES YES yes
IR CE-C 0465 Witness conducting the sieving test of the sand sample in DS7. 2017.05.21 DS7
IR CE-C 0466 IR scan\CE-C 0466.pdf Witness conducting compaction degree test of the samples of the sub-grade layer unde 2017.05.21 DS7 YES YES yes
IR CE-C 0468 IR scan\CE-C 0468.pdf Witness loading dry concrete C-35 for the footings of the shelter and platform in DS8 2017.05.21 Al fayhaa batch pant YES YES
IR CE-C 0470 IR scan\CE-C 0470.pdf Final inspection of the formwork and rebar for SLEEPER footing in DS7 2017.05.21 DS7 YES YES
IR CE-C 0471 IR scan\CE-C 0471.pdf Final inspection the blinding formwork for INDUCED GAS FLOTATION SEPARATORS in 2017.05.21 DS7 YES YES
IR CE-C 0472 IR scan\CE-C 0472.pdf Final inspection the blinding formwork for PUMPS in DS7 2017.05.21 DS7 YES YES
IR CE-C 0473 IR scan\CE-C 0473.pdf Witness loading dry concrete C-15 for the blinding of INDUCED GAS FLOTATION S 2017.05.21 Al fayhaa batch pant YES yes
IR CE-C 0473/R1 IR scan\CE-C 0473-R1.pdf Witness loading dry concrete C-35 for the blinding PUMPS Of footing of sleepers in ds7 2017.05.22 Al fayhaa batch pant YES yes
IR CE-C 0478 IR scan\CE-C 0478.pdf sampling the backfilled 7th layer inside the small tank in DS7 2017.05.22 DS7 YES YES yes
IR CE-C 0479 IR scan\CE-C 0479.PDF Witness testing (slump, temperature) for the blinding concrete C15 of pumps in DS7 2017.05.22 DS7 YES YES
IR CE-C 0481 IR scan\CE-C 0481.pdf Sampling the water to mix the dry concrete for the blinding of the pump and the footin 2017.05.22 DS7 YES YES YES
IR CE-C 0482 IR scan\CE-C 0482.pdf Witness testing (slump, temperature) and make specimens (cubes) for Sleepers footing 2017.05.22 DS7 YES YES
IR CE-C 0484 IR scan\CE-C 0484.pdf Witness conducting the compaction degree test of the sample for the backfilled 8th laye 2017.05.22 DS7 YES YES YES
IR CE-C 0488 IR scan\CE-C 0488.pdf Witness conducting compaction degree test of sample of the backfilled 7th layer inside 2017.05.23 DS7 YES YES yes
IR CE-C 0489 IR scan\CE-C 0489.pdf Re-Sampling the sub-grade layer under IGF foundations in DS7. 2017.05.23 DS7 YES YES yes
IR CE-C 0495 IR scan\CE-C 0495.pdf Witness conducting compaction degree test of samples of the sub-grade layer in IGF a 2017.05.24 DS7 YES YES yes
IR CE-C 0498/R1 IR scan\CE-C 0498 R1.pdf Inspection the profile and the slope of excavated area inside the big tank in DS7 2017.05.28 DS7 YES yes
IR CE-C 0499 IR scan\CE-C 0499.pdf Sampling clean dry sand for the purpose of chemical in DS7 2017.05.24 DS7 YES YES
IR CE-C 0504/R1 IR scan\CE-C 0504 R1.pdf Witness conducting chemical and physical test of rebar for AWQ0109 project in Basrah u 2017.05.28 Basrah unversity YES YES yes
IR CE-C 0506/R1 IR scan\CE-C 506-R1.pdf Witness conducting the chemical test of sample of clean dry sand in DS7 2017.05.28 DS7 YES yes
IR CE-C 0507/R1 IR scan\CE-C 0507 R1.pdf Sampling the backfilled 8th layer inside the small tank in DS7. 2017.05.28 DS7 yes yes
IR CE-C 0508 IR scan\CE-C 0508.pdf Witness to testing concrete cubes (compressive strength at 7 days) from DS7 found 2017.05.25 DS7 YES YES yes
IR CE-C 0509 IR scan\CE-C 0509.PDF Witness loading dry concrete C-15 for the blinding of FOUNDATION GA AND RC DETA 2017.05.25 Al fayhaa batch pant YES yes
IR CE-C 0510/R1 IR scan\CE-C 0510 R1.pdf Final inspection the blinding formwork for FOUNDATION GA AND RC DETAILS FOR IGF SEPARA 2017.05.28 DS7 YES YES
IR CE-C 0511 IR scan\CE-C 0511.PDF Sampling the water which will use to mixing the dry concrete of the FOUNDATION GA AND RC 2017.05.25 DS7 YES yes
IR CE-C 0512 IR scan\CE-C 0512.PDF Witness testing (slump, temperature) for the blinding concrete (C15) of FOUNDAT 2017.05.25 DS7 Yes yes
IR CE-C 0513 IR scan\CE-C 0513.PDF Inspection the survey work for the sump pit inside the big tank in DS7 2017.05.29 DS7 yes
IR CE-C 0514 IR scan\CE-C 0514.pdf Inspection the survey work of the backfilled 8th layer inside the small tank in DS7 2017.05.29 DS7 YES yes
IR CE-C 0518 IR scan\CE-C 0518.PDF Inspection the concrete of SHELTER and PLATFORM columns after repairing the surfac 2017.05.28 DS7 yes yes
IR CE-C 0518/R1 IR scan\CE-C 0518-R1.PDF Inspection the concrete of SHELTER and PLATFORM columns after repairing the surfac 2017.05.29 DS7 yes yes
IR CE-C 0520 IR scan\CE-C 0520.pdf Witness to testing concrete cubes (compressive strength at 7 days) from Sleeper footi 2017.05.29 DS7 YES yes yes
IR CE-C 0522 IR scan\CE-C 0522.pdf Final inspection of the formwork and rebar for Sleepers columns and Pumps foundation 2017.05.29 DS7 yes yes
IR CE-C 0523 IR scan\CE-C 0523.pdf Witness conducting compaction degree test of samples of the 8th layer inside the small 2017.05.29 DS7 YES yes yes
IR CE-C 0531 IR scan\CE-C 0531.pdf Witness loading dry concrete C-35 for the columns of the sleeper and pump foundation 2017.05.31 DS7 no yes
IR CE-C 0532 IR scan\CE-C 0532.pdf Witness loading dry concrete C-15 for the blinding of IGF SEPARATORS in DS7. 2017.05.30 DS7 YES YES
IR CE-C 0536 IR scan\CE-C 0536.pdf Re-sampling the backfilled 8th layer inside the small tank in DS7. 2017.05.31 DS7 YES YES
IR CE-C 0539 IR scan\CE-C 0539.pdf Sampling the water to used mixing the dry concrete for the blinding of INDUCED G 2017.05.31 DS7 YES no YES
IR CE-C 0540 IR scan\CE-C 0540.pdf Witness testing (slump, temperature) for the blinding concrete of IGF SEPARATORS in 2017.05.31 DS7 YES YES
IR CE-C 0541 IR scan\CE-C 0541.pdf Re-inspection the profile and the slope of excavated area inside the big tank in DS7 2017.05.31 DS7 YES YES
IR CE-C 0543 IR scan\CE-C 0543.PDF Final inspection of the formwork and rebar for SLEEPERS columns and Pumps foundati 2017.05.31 DS7 YES yes
IR CE-C 0545 IR scan\CE-C 0545.PDF Inspection the concrete of columns of SHELTER AND PLATFORM after repairing the sur 2017.05.31 DS7 yes YES
IR CE-C 0546 IR scan\CE-C 0546.pdf visual inspaction and overlap inspaction for geotxtile installation in DS7 1200M Tank fir 2017.06.01 DS7 YES YES
IR CE-C 0547 IR scan\CE-C 0547.PDF Witness testing (slump, temperature) and make specimens (cubes) for Sleepers colum 2017.06.01 DS7 YES YES
IR CE-C 0548/R1 IR scan\CE-C 0548 R1.pdf Witness conducting compaction grade test of the samples of the backfilled 8th layer ins 2017.06.03 DS7 YES yes yes
IR CE-C 0550/R1 IR scan\CE-C 0550-R1.pdf Sampling the backfilled 3rd layer of sand inside the big tank for relative density test in 2017.06.03 DS7 YES yes
IR CE-C 0551 Inspection the survey work for the blinding top of IGF SEPORATOR foundation in DS7 2017.06.01 DS7
IR CE-C 0552 IR scan\CE-C 0522.pdf Inspection the excavation work of the slope inside the small tank in DS7 2017.06.02 DS7 YES yes
IR CE-C 0554/R1 IR scan\CE-C 0554 R1.pdf Sampling the backfilled 3rd layer of the sand inside the small tank in DS7 for relative de 2017.06.04 DS7 YES yes
IR CE-C 0556 IR scan\CE-C 0556.pdf Inspection the profile and the slope of excavated area inside the small tank in DS7 2017.06.03 DS7 YES yes
IR CE-C 0560 Witness conducting relative density test of the samples of the backfilled 3rd layer of sand insid 2017.06.04 DS7
IR CE-C 0562 IR scan\CE-C 0562.pdf Final inspection of the formwork and re-bar for Pump foundations in DS7 2017.06.04 DS7 YES yes yes
IR CE-C 0564 IR scan\CE-C 0564.pdf Re-sampling the failed point of the backfilled 8th layer inside the small tank in DS7 2017.06.04 DS7 YES yes
IR CE-C 0565 Inspection the survey work for the elevation and location of reserved holes inside Pum 2017.06.04 DS7
IR CE-C 0566 IR scan\CE-C 0566.PDF Witness conducting relative density test of the samples of the backfilled 3rd layer sand 2017.06.05 DS7 YES YES YES
IR CE-C 0567 IR scan\CE-C 0567.pdf Witness conducting relative density test of the samples of the backfilled 3rd layer sand 2017.06.05 DS7 YES yes yes
IR CE-C 0568 IR scan\CE-C 0568.PDF Inspection the painting of the columns of the SHELTER and PLATFORM in DS7 2017.06.07 DS7 YES yes
IR CE-C 0569 IR scan\CE-C 0569.pdf Witness loading dry concrete C35 for the columns of Pump foundations in DS7 2017.06.06 Al fayhaa batch pant YES YES
IR CE-C 0573 IR scan\CE-C 0573.pdf Witness sampling gravel & sand for chemical & physical tests at Al-Fayha Batch Plant 2017.06.06 Al fayhaa batch pant YES yes
IR CE-C 0575/R1 IR scan\CE-C 575 R1.pdf Inspection the concrete of the SHELTER and PLATFORM after repairing concrete surfac 2017.06.10 DS7 YES yes
IR CE-C 0576 IR scan\CE-C 0576.pdf Visual and overlap inspection for geomembrane installation in DS7 Big Tank 2017.06.06 DS7 YES yes
IR CE-C 0577 Trial welding of extrusion seam in DS7 Big Tank 2017.06.06 DS7
IR CE-C 0579 IR scan\CE-C 0579.pdf Final inspection the blinding formwork for SHELTERS FOUNDATIONS and CLARIFIER T 2017.06.07 DS7 YES yes yes
IR CE-C 0579/R2 IR scan\CE-C 0579-R2.pdf Final inspection the blinding formwork for Shelters foundations and Clarifier Tank in DS7. DS7 YES YES
IR CE-C 0580 IR scan\CE-C 0580.pdf Witness loading dry concrete C15 for the blinding of Shelter foundations and Clarifier 2017.06.06 Al fayhaa batch pant YES yes
IR CE-C 0581 IR scan\CE-C 0581.pdf Sampling the backfilled 3rd layer sand inside the small tank in DS7 for relative density 2017.06.06 DS7 YES yes
IR CE-C 0582 IR scan\CE-C 0582.pdf Sampling water to mix the dry concrete for the blinding of Shelters & Clarifier Tanks & 2017.06.10 DS7 YES yes
IR CE-C 0584 IR scan\CE-C 0584.pdf Witness testing (slump, temperature) for the blinding concrete of Shelters and Clarifie 2017.06.10 DS7 YES yes
IR CE-C 0585 IR scan\CE-C 0585.PDF Witness testing (slump, temperature) and make specimens (cubes) for Pumps foundati 2017.06.07 DS7 YES yes
IR CE-C 0586 IR scan\CE-C 0586.PDF Witness conducting relative density test of the samples of the 3rd layer of backfilled sa 2017.06.07 DS7 YES yes
IR CE-C 0588 IR scan\CE-C 0588.PDF Witness loading dry concrete C35 for IGF Separators foundations in DS7 2017.06.07 DS7 yes yes
IR CE-C 0589 IR scan\CE-C 0589.pdf Final inspection for the formwork and rebar of IGF Separators foundations in DS7 2017.06.07 DS7 YES YES
IR CE-C 0589/R1 IR scan\CE-C 0589 R1.pdf Final inspection for the formwork and rebar of IGF Separators foundations in DS7 2017.06.07 DS7 YES YES
IR CE-C 0594 IR scan\CE-C 0594.pdf Witness the chemical & physical tests of gravel & sand from Al-Fayha Batch Plant 2017.06.08 Al-fao center lab YES YES
IR CE-C 0595 IR scan\CE-C 0595.pdf Sampling the clean sand above HDPE for chemical and physical test in DS7 2017.06.08 DS7 YES yes
IR CE-C 0598/r1 IR scan\CE-C 0598-R1.pdf Visual and overlap inspection for geomembrane installation in DS7 1200 m3 Tank 2017.06.10 DS7 YES yes
IR CE-C 0600 IR scan\CE-C 0600.pdf Witness survey work for the blinding of PSV TOWER foundation in DS7 IGF area 2017.06.09 DS7 YES yes yes
IR CE-C 0601 IR scan\CE-C 0601.pdf Final inspection for formwork of PSV TOWER foundation in DS7 IGF area 2017.06.09 DS7 YES yes
IR CE-C 0603 IR scan\CE-C 0603.pdf Witness conducting physical and chemical test of samples of clean dry sand above HDPE 2017.06.10 DS7 YES yes yes
IR CE-C 0605 Trial welding of fusion seam in DS7 Big & smallTank 2017.06.10 DS7
IR CE-C 0609/R1 IR scan\CE-C 0609-R1.pdf Sampling the backfilled gravel 1st layer for relative density test inside the big tank in D 2017.06.16 DS7 YES YES
IR CE-C 0609/R2 IR scan\CE-C 0609-R2.pdf Sampling the backfilled gravel 1st layer for relative density test inside the big tank in D 2017.06.18 DS7 YES YES
IR CE-C 0611 IR scan\CE-C 0611.pdf Non-Destructive, repair welding of geomembrane in DS7 small Tank 13th June 2017.06.13 DS7 YES YES
IR CE-C 0612 IR scan\CE-C 0612.pdf Non-Destructive, Destructive test for geomembrane welding in DS7 Big Tank 13th June 2017.06.13 DS7 YES YES
IR CE-C 0617 IR scan\CE-C 0617.pdf Repair welding with Non-Destructive test for geomembrane in DS7 small Tank 14th Ju 2017.06.14 DS7 yes YES
IR CE-C 0618 IR scan\CE-C 0618.pdf Repair welding with Non-Destructive test for geomembrane in DS7 Big Tank 14th June 2017.06.14 DS7 YES YES
IR CE-C 0619 IR scan\CE-C 0619.pdf Visual and overlap inspection for geotextile installation in DS7 Big Tank 14th June 2017.06.14 DS7 yes yes
IR CE-C 0620 IR scan\CE-C 0620.pdf Visual and overlap inspection for geotextile installation in DS7 small Tank 14th June 2017.06.14 DS7 YES YES
IR CE-C 0621 IR scan\CE-C 0621.pdf Witness to testing concrete cubes (compressive strength at 28 days) from DS7 foun 2017.06.15 DS7 YES yes YES
IR CE-C 0622/R1 IR scan\CE-C 0622-R1.pdf Sampling the backfilled gravel 1st layer for relative density test inside the small tank in 2017.06.17 DS7 YES yes
IR CE-C 0623 IR scan\CE-C 0623.PDF Sampling gravel for chemical and physical test in Al-Fayhaa Batch Plant. 2017.06.15 Al fayhaa batch plant YES YES
IR CE-C 0628 IR scan\CE-C 0628.pdf Witness to test concrete cubes (compressive strength at 7 days) which took from th 2017.06.17 DS7 YES yes YES
IR CE-C 0631 IR scan\CE-C 0631.pdf Witness conducting relative density test of the samples of the backfilled gravel 1st laye 2017.06.18 DS7 YES yes YES
IR CE-C 0632 IR scan\CE-C 0632.pdf Witness conducting relative density test of the samples of the backfilled gravel 1st laye 2017.06.18 DS7 YES YES
IR CE-C 0633 IR scan\CE-C 0633.pdf Witness conducting the physical and chemical test for sample of gravel of Alfayhaa batc 2017.06.18 DS6,7,8 YES yes
IR CE-C 0635 IR scan\CE-C 0635.pdf Sampling the backfilled gravel 2nd layer for relative density test inside the small tank i 2017.06.18 DS7 YES yes
IR CE-C 0637 IR scan\CE-C 0637.pdf Witness to testing stand by concrete cube (compressive strength at 28 days) which too 2017.06.19 DS7 YES yes yes
IR CE-C 0638 canceld Sampling core of concrete for the SHELTER AND PLATFORM columns in DS7 2017.06.20 DS7 YES yes yes
IR CE-C 0639 IR scan\CE-C 0639.pdf Sampling core of concrete for the SHELTER AND PLATFORM columns in DS7 2017.06.20 DS7 YES YES
IR CE-C 0642 IR scan\CE-C 0642.pdf Witness conducting relative density test of the samples of the backfilled gravel 1st laye 2017.06.20 DS7 YES yes yes
IR CE-C 0643 IR scan\CE-C 0643.pdf Witness conducting relative density test of the samples of the backfilled gravel 2nd lay 2017.06.20 DS7 YES yes yes
IR CE-C 0644 IR scan\CE-C 0644.pdf Sampling the backfilled gravel 2nd layer for relative density test inside the big tank in 2017.06.21 DS7 YES yes
IR CE-C 0645 IR scan\CE-C 0645.pdf Sampling the backfilled gravel 3rd layer for relative density test inside the small tank i 2017.06.21 DS7 YES yes
IR CE-C 0647 IR scan\CE-C 0647.PDF Sampling dry clean sand for phiayscal and chemical test in ds7 2017.06.22 DS7 yes yes
IR CE-C 0648 IR scan\CE-C 0648.pdf Make trail mix for C15 and C35 in Alfayhaa Batch Plant. 2017.06.22 Al fayhaa batch plant YES yes
IR CE-C 0649 IR scan\CE-C 0649.pdf Witness conducting relative density test of the samples of the backfilled gravel 3rd laye 2017.06.22 DS7 YES yes YES
IR CE-C 0650 IR scan\CE-C 0650.pdf Witness conducting relative density test of the samples of the backfilled gravel 2nd laye 2017.06.22 DS7 YES yes YES
IR CE-C 0654 IR scan\CE-C 0654.pdf Witness conducting the physical and chemical test for sample of sand in DS7. 2017.06.24 DS7 YES yes YES
IR CE-C 0655 IR scan\CE-C 0655.pdf Sampling the backfilled gravel 3rd layer for relative density test inside the big tank in 2017.06.24 DS7 YES YES
IR CE-C 0655/R1 IR scan\CE-C 0655-R1.pdf Sampling the backfilled gravel 3rd layer for relative density test inside the big tank in 2017.07.02 DS7 YES YES
IR CE-C 0656 IR scan\CE-C 0656.pdf Sampling the backfilled sand 1st layer above the HDPE for relative density test inside t 2017.06.24 DS7 YES YES
IR CE-C 0658 IR scan\CE-C 0658.PDF Witness conducting relative density test of the samples of the backfilled sand 1st laye 2017.06.25 DS7 YES yes
IR CE-C 0658/R1 IR scan\CE-C 0658-R1.PDF Witness conducting relative density test of the samples of the backfilled sand 1st laye 2017.07.01 DS7 YES YES yes
IR CE-C 0659 canceld Witness conducting relative density test of the samples of the backfilled gravel 3rd laye 2017.06.25 DS7 YES yes
IR CE-C 0659/R1 IR scan\CE-C 0659-R1.PDF Witness conducting relative density test of the samples of the backfilled gravel 3rd laye 2017.07.01 DS7 YES YES yes
IR CE-C 0661 IR scan\CE-C 0661.pdf Witness conducting relative density test of the samples of the backfilled sand 1st laye 2017.06.25 DS7 YES YES YES
IR CE-C 0662 IR scan\CE-C 0662.pdf Witness conducting relative density test of the samples of the backfilled gravel 3rd laye 2017.06.25 DS7 YES YES YES
IR CE-C 0664 IR scan\CE-C 0664.pdf Final inspection for the formwork and rebar (including survey work) of PSV TOWER fou 2017.07.01 DS7 YES yes
IR CE-C 0666 IR scan\CE-C 0666.pdf Witness for electrical resistivity test on the 1st layer of the sand above HDPE inside sma 2017.07.02 DS7 YES yes YES
IR CE-C 0667 IR scan\CE-C 0667.pdf Final inspection for the formwork and rebar (including survey work) of SHELTER FOU 2017.07.02 DS7 YES yes
IR CE-C 0668 IR scan\CE-C 0668.pdf Witness loading dry concrete C-35 for the IGF SEPARATORS FOUNDATIONS in 2017.07.02 DS7 YES yes
IR CE-C 0671 Witness conducting relative density test of the samples of the backfilled gravel 3rd 2017.07.03 DS7
IR CE-C 0674 IR scan\CE-C 0674.pdf layer
Sampling the backfilled sand 1st layer above the HDPE for relative density test inside t 2017.07.04 DS7 YES yes
IR CE-C 0674/R1 IR scan\CE-C 0674-R1.pdf inside the big tank foundation in DS7.
Re-Sampling the backfilled sand 1st layer above the HDPE for relative density test (point12017.07.06 DS7 YES yes
IR CE-C 0675 IR scan\CE-C 0675.pdf Sampling the backfilled sand 2nd layer above the HDPE for relative density test inside 2017.07.04 DS7 YES yes
IR CE-C 0676 IR scan\CE-C 0676.pdf Sampling the backfilled 2nd soil layer around tank foundation (platform area) in DS8 2017.07.04 DS7 YES yes
IR CE-C 0677 IR scan\CE-C 0677.pdf Sampling the backfilled 2nd soil layer under sleeper foundation in DS8. 2017.07.04 DS7 YES yes
IR CE-C 0685 IR scan\CE-C 0685.pdf Witness to testing concrete cores which took from platform and shelters columns in DS 2017.07.06 DS7 YES yes
IR CE-C 0686 IR scan\CE-C 0686.PDF Witness to testing concrete cubes (compressive strength at 14 days) of trail mix of C1 2017.07.06 DS7 YES yes yes
IR CE-C 0687 IR scan\CE-C 0687.pdf Final inspection of the formwork and rebar for SLEEPERS columns in DS7 2017.07.06 DS7 YES yes
IR CE-C 0689 IR scan\CE-C 0689.PDF Witness conducting relative density test of the samples of the backfilled sand 1st laye 2017.07.08 DS7 YES YES
IR CE-C 0691 IR scan\CE-C 0691.pdf Witness conducting compaction degree test for the Samples of the backfilled 2nd soil l 2017.07.08 DS7 YES yes
IR CE-C 0692 IR scan\CE-C 0692.pdf Final inspection of the formwork and rebar for SLEEPERS columns in DS7. 2017.07.08 DS7 YES yes yes
IR CE-C 0692/R2 Re-Sampling the backfilled sand 2nd layer above the HDPE for relative density test insi 2017.07.12 DS7
IR CE-C 0693 canceld Final inspection for the rebar (including survey work) of Clarifier tank foundation in DS 2017.07.08 DS7 yes yes yes
IR CE-C 0693/R1 IR scan\CE-C 0693-R1.pdf Final inspection for the formwork and rebar (including survey work) of Clarifier tank fo 2017.07.12 DS7 yes YES
IR CE-C 0695 IR scan\CE-C 0695.PDF Witness to testing concrete C15 cubes (compressive strength at 28 days) for .blinding 2017.07.08 DS7 yes yes yes
IR CE-C 0696 IR scan\CE-C 0696.pdf Sampling the backfilled sand 2nd layer above the HDPE for relative density test inside 2017.07.10 DS7 YES YES
IR CE-C 0696/R1 IR scan\CE-C 0696-R1.pdf Sampling the backfilled sand 2nd layer above the HDPE for relative density test inside 2017.07.10 DS7 YES YES
IR CE-C 0696/R2 IR scan\CE-C 0696-R2.pdf Sampling the backfilled sand 2nd layer above the HDPE for relative density test inside 2017.07.11 DS7 YES YES
IR CE-C 0697 IR scan\CE-C 0697.pdf Witness conducting compaction degree test for the Samples of the backfilled 3rd soil l 2017.07.09 DS7 YES yes YES
IR CE-C 0698 IR scan\CE-C 0698.PDF Witness conducting relative density test of the samples of the backfilled sand 3rd laye 2017.07.09 DS7 YES yes YES
IR CE-C 0699 nspection of tank IQD7-ABJ681050 foundation including Concrete ring wall elevation, an 2017.07.09 DS7
IR CE-C 0700 IR scan\CE-C 0700.pdf Survey work for the backfilled 3rd layer (final layer) of sand above the HDPE and ta 2017.07.10 DS7 YES yes YES
IR CE-C 0702 IR scan\CE-C 0702.pdf Survey work for the clarifier tank foundation (D7-ABJ681260) in DS7 2017.07.10 DS7 YES yes yes
IR CE-C 0703 IR scan\CE-C 0703.PDF Inspection MC checksheet-foundation release inspection for tank(IQD7-ABJ681050)fou 2017.07.10 DS7 YES yes
IR CE-C 0705 IR scan\CE-C 0705.PDF Sampling the rebar for chemical and physical test. 2017.07.11 DS7 YES YES
IR CE-C 0706 IR scan\CE-C 0706.PDF Witness loading dry concrete C-35 for the columns of the sleeper in DS7 2017.7.11 DS7 YES YES
IR CE-C 0706/R1 IR scan\CE-C 0706-R1.pdf Witness loading dry concrete C-35 for the columns of the sleeper in DS7. 2017.07.12 DS7 YES YES
IR CE-C 0707 IR scan\CE-C 0707.PDF Witness conducting relative density test of the samples of the backfilled sand 2nd lay 2017.07.11 DS7 YES yes YES
IR CE-C 0708 Final inspection for the formwork and rebar (including survey work) of SHELTER FOUN 2017.07.12 DS7
IR CE-C 0708/R1 Final inspection for the formwork and rebar (including survey work) of SHELTER FOUN 2017.07.15 DS7
IR CE-C 0709 Final inspection of the formwork ,rebar and the pocket (including survey work) for Pu 2017.07.12 DS7
IR CE-C 0709/R1 IR scan\CE-C 0709-R1.PDF Final inspection of the formwork ,rebar and the pocket (including survey work) for Pu 2017.07.17 DS7 yes yes
IR CE-C 0710 IR scan\CE-C 0710.pdf Witness for electrical resistivity test on the 2nd layer of the sand above HDPE inside th 2017.17.13 DS7 YES YES
IR CE-C 0714 IR scan\CE-C 0714.PDF Sampling the water which will use to mixing the dry concrete for the sleeper columns i 2017.07.13 DS7 YES YES YES
IR CE-C 0715 IR scan\CE-C 0715.pdf Witness testing (slump, temperature) and make specimens (cubes) for Sleepers column 2017.07.13 DS7 YES YES
IR CE-C 0717 IR scan\CE-C 0717.PDF Witness to testing concrete cubes (compressive strength at 21 days) of trail mix of C1 2017.07.13 Al-basra lap YES yes YES
IR CE-C 0718 canceld Sampling the rebar for chemical and physical test have been completed. Please witness 2017.07.13 DS7 YES yes
IR CE-C 0718/R1 canceld Sampling the rebar for chemical and physical test have been completed. Please witness 2017.07.16 DS7 YES yes
IR CE-C 0718/R2 IR scan\CE-C 0718-R2.PDF Sampling the rebar for chemical and physical test have been completed. Please witness conducting the test Al-basra lap YES YES YES
IR CE-C 0719 IR scan\CE-C 0719.PDF Witness conducting relative density test of the samples of the backfilled sand 2nd lay 2017.07.13 DS7 YES YES yes
IR CE-C 0720 IR scan\CE-C 0720.PDF Sampling the rebar for chemical and physical test. 2017.07.15 DS7 YES yes
IR CE-C 0721 IR scan\CE-C 0721.pdf Re-Sampling the backfilled sand 3rd layer above the HDPE for relative density test insi 2017.07.17 DS7 YES YES
IR CE-C 0725 IR scan\CE-C 0725.PDF Witness for electrical resistivity test on the 3rd layer of the sand above HDPE inside th 2017.07.15 DS7 YES YES yes
IR CE-C 0729 IR scan\CE-C 0729.PDF Witness conducting relative density test of the samples of the backfilled sand 3rd laye 2017.07.16 DS7 YES YES YES
IR CE-C 0730 IR scan\CE-C 0730.pdf Witness loading dry concrete C-35 for the CLARIFIER TANK FOUNDATIONS in DS7. 2017.07.16 DS7 YES YES
IR CE-C 0731 IR scan\CE-C 0731.PDF Sampling the water which will use to mixing the dry concrete for CLARIFIER TANK F 2017.07.17 DS7 YES YES YES
IR CE-C 0732 IR scan\CE-C 0732.pdf Witness testing (slump, temperature) and make specimens (cubes) for CLARIFIER T 2017.07.17 DS7 YES YES
IR CE-C 0733 IR scan\CE-C 0733.pdf Witness loading dry concrete C-35 for the IGF SEPARATORS FOUNDATIONS in DS7. 2017.07.17 DS7 YES YES
IR CE-C 0734 IR scan\CE-C 0734.PDF Inspection the concrete of the SHELTER and PLATFORM columns after repairing the sur 2017.07.17 DS7 YES yes
IR CE-C 0734/R1 IR scan\CE-C 0834-R1.pdf Inspect the vertical surface of the shelter foundations (train 1, train 2) after 2017.08.07 DS7 YES YES
IR CE-C 0735/R1 IR scan\CE-C 0735-R1.pdf repair in DS7. for the formwork and rebar of SHELTER FOUNDATIONS (Train 2) in D
Final inspection 2017.07.19 DS7 YES yes
IR CE-C 0736/R1 IR scan\CE-C 0736-R1.pdf Final inspection for the formwork and rebar of SHELTER FOUNDATIONS (Train 1) in D 2017.07.17 DS7 YES YES
IR CE-C 0737 IR scan\CE-C 0737.PDF Sampling the water which will use to mixing the dry concrete for the IGF Separators fo 2017.07.18 DS7 YES yes yes
IR CE-C 0718/R2 IR scan\CE-C 0718-R2.PDF Sampling the rebar for chemical and physical test have been completed. Please witness 2017.07.17 DS7 YES yes
IR CE-C 0738 IR scan\CE-C 0738.PDF Pouring concrete C35 including testing (slump, temperature) and make specimen (cub 2017.07.18 DS7 YES yes
IR CE-C 0739/R1 IR scan\CE-C 0739-R1.pdf Re-sampling the backfilled 1st soil layer under sleeper foundation in DS8. 2017.07.18 DS7 YES YES
IR CE-C 0742 IR scan\CE-C 0742.PDF Witness conducting relative density test of the samples of the backfilled sand 3rd laye 2017.07.18 DS7 YES yes yes
IR CE-C 0743 IR scan\CE-C 0743.pdf Witness loading dry concrete C-35 for the IGF SEPARATOR FOUNDATION (1foundations) 2017.07.18 DS7 YES YES
IR CE-C 0744 Survey work Inspection the plate elevation of SLEEPERS columns in DS7. 2017.07.18 DS7
IR CE-C 0745 IR scan\CE-C 0745.pdf Survey work Inspection for the columns and tie beam location of SHELTER FOUNDATIO 2017.17.18 DS7 YES YES YES
IR CE-C 0746 IR scan\CE-C 0746.pdf Survey work Inspection for the columns and tie beam location of SHELTER FOUNDATIO 2017.07.18 DS7 YES yes YES
IR CE-C 0747 IR scan\CE-C 0747.PDF Sampling the water which will use to mixing the dry concrete for the IGF SEPARATOR 2017.07.19 DS7 yes yes YES
IR CE-C 0748 IR scan\CE-C 0748.pdf Pouring concrete C35 including testing (slump, temperature) and make specimen (cu 2017.07.19 DS7 YES yes
IR CE-C 0750/R1 MC of 2400m3 tank foundation(ABJ-681053) in DS7. 2017.07.20 DS7
IR CE-C 0751 IR scan\CE-C 0751.pdf Witness loading dry concrete C-35 for the shelters foundations (train1, train2) in DS7. 2017.07.19 DS7 YES YES
IR CE-C 0752 IR scan\CE-C 0752.PDF Sampling the water which will use to mixing the dry concrete for the shelters foundation 2017.07.20 DS7 yes yes YES
IR CE-C 0753 IR scan\CE-C 0753.PDF Pouring concrete C35 including testing (slump, temperature) and make specimen (cubes) 2017.07.20 DS7 YES YES
IR CE-C 0754 IR scan\CE-C 0754.PDF Witness the test of the water samples that used for mixing concrete of PSV T 2017.07.20 DS7 cancel YES
IR CE-C 0755 IR scan\CE-C 0755.PDF Witness to testing concrete cubes (compressive strength at 28 days) of trail mix of C1 2017.07.20 Basrah lab YES yes YES
IR CE-C 0756 IR scan\CE-C 0756.PDF Witness to testing concrete cubes (compressive strength at 7 days) which took from S 2017.07.20 DS7 YES yes YES
IR CE-C 0756/R1 IR scan\CE-C 0765-R1.PDF Inspection the concrete of the Sleepers columns after repairing the surface in DS7. 2017.07.27 DS7 yes yes
IR CE-C 0757 Inspection for the concrete surface after repair of Clarifier tank foundation north side i 2017.07.20 DS7
IR CE-C 0758 Survey work for the tank foundation(ABJ-681053):cross center line ;slop of the sand ;a 2017.07.21 DS7
IR CE-C 0759 IR scan\CE-C 0759.pdf Inspection the concrete of the SHELTER AND PLATFORM columns after 2017.07.22 DS7 YES YES
IR CE-C 0764 IR scan\CE-C 0764.PDF repairingtothe
Witness testsurface in DS7. cubes (compressive strength at 28 days) for C35 trail mi
spare concrete 2017.07.22 Basrah lab YES YES YES
IR CE-C 0770 IR scan\CE-C 0770.pdf Survey work for the formwork of the clarifier tank foundation and columns location in 2017.07.24 DS7 YES YES
IR CE-C 0774 IR scan\CE-C 0774.PDF Witness to test concrete cubes (compressive strength at 7 days) for clarifier tank found 2017.07.24 DS7 YES YES
IR CE-C 0775 IR scan\CE-C 0775.pdf Final inspection for the rebar and formwork for clarifier tank foundation in DS7. 2017.07.25 DS7 YES YES
IR CE-C 0775/R1 IR scan\CE-C 0775-R1.pdf Final inspection for the rebar and formwork for clarifier tank foundation in DS7. 2017.07.27 DS7 YES yes
IR CE-C 0776 IR scan\CE-C 0776.pdf Inspection the concrete of the separators foundations after removing the formwork in 2017.07.25 DS7 YES YES
IR CE-C 0776/R1 Final inspection for the blinding formwork of the jib crane foundation and pipe support 2017.07.27 DS7
IR CE-C 0777 Inspection the concrete of the separators foundations after removing the formwork in 2017.07.25 DS7
IR CE-C 0781 Witness to test concrete cubes (compressive strength at 7 days) for separators foundat 2017.07.25 DS7
IR CE-C 0782 IR scan\CE-C 0782.pdf Sampling cement for chemical and physical test 2017.07.25 Al fayhaa batch plant YES yes
IR CE-C 0783 Inspection the vertical concrete surface of the SHELTER foundation (trian 1) after rem 2017.07.26 DS7
IR CE-C 0784 IR scan\CE-C 0843.pdf Inspection the vertical concrete surface of the SHELTER foundation (trian 2) after rem 2017.07.26 DS7 YES YES
IR CE-C 0785 IR scan\CE-C 0785.pdf Survey work for the angle, location and dimension of the all colums inside the clarifier 2017.07.26 DS7 YES yes YES
IR CE-C 0786 IR scan\CE-C 0786.PDF Inspection the vertical concrete surface of the PSV TOWER after removing the formwor 2017.07.26 DS7 YES YES
IR CE-C 0787 IR scan\CE-C 0787.PDF Inspection the jibbing and the horizantail concrete surface of the separators foundation 2017.07.26 DS7 YES YES
IR CE-C 0791 IR scan\CE-C 0791.PDF Witness to test concrete cubes (compressive strength at 7 days) for separators foun 2017.07.26 DS7 YES yes
IR CE-C 0792 IR scan\CE-C 0792.pdf Final inspection for the rebar of the shelter foundations (train 1, train 2) in DS7. 2017.07.27 DS7 YES yes yes
IR CE-C 0792/R1 IR scan\CE-C 0792-R1.pdf Final inspection for the rebar and check the chipping for the shelter foundations (train 1 2017.07.29 DS7 YES yes
IR CE-C 0792/R2 IR scan\CE-C 0792-R2.pdf Final inspection for the rebar and check the chipping for the shelter foundations (train 1 2017.07.31 DS7 YES yes
IR CE-C 0800 IR scan\CE-C 0800.pdf Loading Dry concrete for pumps and clarifier tank foundations and blinding for PSV 2017.07.28 DS7 YES yes
IR CE-C 0800/R1 IR scan\CE-C 0800-R1.PDF tower
Witness(F2b) and pipeand
the physical supports (PS-D7PW-221)
chemical (PS-D7PW-286)
tests for cement samples (the(PS-D7PW-287)
tests period is 7(PS- 2017.07.30 DS7 YES YES YES
IR CE-C 0801 IR scan\CE-C 0801.pdf D7PW-265)
days) in DS7.
Witness to test concrete cubes (compressive strength at 7 days) for shelters foundation 2017.07.28 DS7 YES yes YES
IR CE-C 0802 Witness to test spare concrete cubes (compressive strength at 7 days) for clarifier tan 2017.07.27 DS7
IR CE-C 0803 IR scan\CE-C 0803.pdf Witness the physical and chemical tests for cement samples (the tests period is 7 days) 2017.07.27 DS7 YES yes
IR CE-C 0803/R1 IR scan\CE-C 0803-R1.pdf Witness the physical and chemical tests for cement samples (the tests period is 7 days 2017.08.06 DS7 YES yes
IR CE-C 0804 Loading Dry concrete for pumps and clarifier tank foundations and blinding for PSV 2017.07.28 BR Batch plant
IR CE-C 0805 Sampling water that use for mix the concrete for pumps and clarifier tank foundati 2017.07.28 DS7
IR CE-C 0806 Pouring concrete (including slump test, temperature and make specimen (cubes)) for 2017.07.28 DS7
IR CE-C 0807 IR scan\CE-C 0807.PDF Inspect the surface coating corrosion of the Sleepers footings in DS7. 2017.07.29 DS7 YES yes
IR CE-C 0808 IR scan\CE-C 0808.PDF Inspection the concrete of the Sleepers columns after repairing the surface in DS7. 2017.07.29 DS7 YES yes yes
IR CE-C 0808/R1 IR scan\CE-C 0808-R1.pdf Inspection the concrete of the Sleepers columns after repairing the surface in DS7. 2017.07.30 DS7 YES yes
IR CE-C 0818 IR scan\CE-C 0818.pdf Inspection the concrete of the Pumps(D7-PBE681051A/B;D7-PBE681052A/B) foundation 2017.07.30 DS7 YES yes
IR CE-C 0820 IR scan\CE-C 0820.pdf Inspection the vertical concrete surface of the separators foundations after repairing i 2017.07.31 DS7 YES yes
IR CE-C 0821 IR scan\CE-C 0821.pdf Inspection the vertical and horizontal concrete surface of the SHELTER foundation (tria 2017.07.31 DS7 YES yes
IR CE-C 0824 IR scan\CE-C 0824.PDF Witness to test concrete cubes (compressive strength at 14 days) for clarifier tank fou 2017.07.31 DS7 YES yes
IR CE-C 0825 IR scan\CE-C 0825.pdf Inspection the vertical concrete surface of the shelter foundation after repairing in DS7 2017.08.01 DS7 YES yes
IR CE-C 0826 IR scan\CE-C 0826.pdf Inspect the removing of spacers around all shelters (train 1, train 2) columns in DS7. 2017.08.01 DS7 YES yes
IR CE-C 0827 IR scan\CE-C 0827.pdf Inspect the chipping for all clarifier tank columns in DS7. 2017.08.01 DS7 YES yes
IR CE-C 0827/R1 Inspect the chipping for all clarifier tank columns in DS7. 2017.08.02 DS7
IR CE-C 0828 IR scan\CE-C 0828.PDF Witness conducting compaction degree test for the Samples of the backfilled soil 2nd l 2017.08.01 DS7 YES yes yes
IR CE-C 0829 IR scan\CE-C 0829.PDF Witness conducting compaction degree test for the Samples of the backfilled 2nd soil l 2017.08.01 DS7 YES yes YES
IR CE-C 0830 IR scan\CE-C 0830.pdf Inspection the vertical surface of PSV TOWER FOUNDATION after repair in DS7. 2017.08.02 DS7 YES yes
IR CE-C 0831 IR scan\CE-C 0831.PDF Inspect the vertical surface of pumps foundations (group1) after repairing in DS7 2017.08.02 DS7 yes yes
IR CE-C 0832 survey work for the blinding formwork of the jib crane foundation and pipe support fou 2017.08.02 DS7
IR CE-C 0833 Inspect the elevation for the backfilled 2nd soil layer under sleeper in DS8. 2017.08.02 DS7
IR CE-C 0834 IR scan\CE-C 0834.PDF Inspect the vertical surface of the shelter foundations (train 1, train 2)after repair in D 2017.08.02 DS7 YES YES
IR CE-C 0834/R1 IR scan\CE-C 0834-R1.pdf Inspect the vertical surface of the shelter foundations (train 1, train 2) after repair in D 2017.08.07 DS7 yes YES
IR CE-C 0838 IR scan\CE-C 0838.PDF Witness conducting compaction degree test for the Samples of the backfilled 2nd soil l 2017.08.03 DS7 YES yes YES
IR CE-C 0839 IR scan\CE-C 0839.PDF Witness conducting compaction degree test for the subgrade soil under pipe s 2017.08.03 DS7 YES yes YES
IR CE-C 0841 Witness to test concrete cubes (compressive strength at 7 days) for clarifier tank foo 2017.08.04 DS7
IR CE-C 0842 IR scan\CE-C 0842.PDF Inspect the surface of pumps foundations (PBE681054A/B/C) after remove the formwor 2017.08.05 DS7 yes yes
IR CE-C 0843 IR scan\CE-C 0843.pdf Inspect the chipping and rebar of PSV TOWER columns in DS7. 2017.08.05 DS7 YES YES
IR CE-C 0844 IR scan\CE-C 0844.PDF Inspect the concrete surface of the Clarifier Tank (northern) foundation after remove 2017.08.05 DS7 yes yes
IR CE-C 0845 IR scan\CE-C 0845.PDF Inspect the concrete of the Clarifier Tank (southern) foundation after repairing the sur 2017.08.05 DS7 YES yes
IR CE-C 0846 IR scan\CE-C 0846.PDF Witness to test concrete cubes (compressive strength at 7 days) for clarifier tank and 2017.08.05 DS7 YES YES yes
IR CE-C 0851 Witness the physical and chemical tests for cement samples (the tests period is 7 days 2017.08.06 DS7
IR CE-C 0852 IR scan\CE-C 0853-R1.pdf Final Inspection for the rebar, formwork and anchor bolt of the separators 2017.08.07 DS7 YES yes
IR CE-C 0853 canceld columns
Final (including
inspection survey
for the work)
rebar, in DS7.and anchor bolt of pipe support foundations
formwork 2017.08.07 DS7 YES yes
IR CE-C 0853/R1 IR scan\CE-C 0853-R1.pdf (including surveyfor
Final inspection work) in DS7.
the rebar, formwork and anchor bolt of pipe support foundations 2017.08.08 DS7 YES yes
IR CE-C 0853/R2 IR scan\CE-C 0853-R2.pdf PS-D7PW-221
(including survey work) in DS7.
Final inspection for the rebar, formwork and anchor bolt of pipe support foundations 2017.08.09 DS7 YES YES
PS-D7PW-286
PS-D7PW-221
(including surveyfor work) in DS7.
IR CE-C 0853/R1 IR scan\CE-C 0853-R1.pdf Final inspection the rebar, formwork and anchor bolt of pipe support foundations 2017.08.07 DS7 YES YES
PS-D7PW-286
(Inspection
(including period
survey 2 days
work) in )DS7.
IR CE-C 0854 IR scan\CE-C 0854.PDF Inspect the concrete surface of the Clarifier Tank (northern) foundation 2017.08.07 DS7 YES YES
PS-D7PW-221
after repair in DS7. coating corrosion of the Clarifier Tank (southern)
IR CE-C 0855 IR scan\CE-C 0855.PDF Inspect the surface 2017.08.07 DS7 YES YES
PS-D7PW-286
IR CE-C 0857 IR scan\CE-C 0857.PDF foundation
Inspect the in DS7. and rebar for the clarifier tank
chipping 2017.08.08 DS7 yes yes
IR CE-C 0858 IR scan\CE-C 0858.pdf (Northern) columns
Final inspection in DS7.
for the rebar, formwork, and anchor bolt of the jib crane foundation a 2017.08.08 DS7 YES yes
IR CE-C 0859 IR scan\CE-C 0859.pdf Inspect the surface of pumps foundations (group 2) after repairing in DS7. 2017.08.13 DS7 YES yes
IR CE-C 0859/R1 IR scan\CE-C 0859-R1.PDF PBE681054
Final A/B/C
inspection for the rebar, formwork, and the anchor bolt of the shelter 2017.08.09 DS7 YES yes
IR CE-C 0860 IR scan\CE-C 0860.pdf foundations
Final (train
inspection for2)the
in rebar,
DS7. formwork, and the anchor bolt of the shelter 2017.08.09 DS7 YES yes
(Inspection
foundations period
(train 2 days )
IR CE-C 0861 IR scan\CE-C 0861.PDF Final inspection for1)the
in rebar,
DS7. formwork, and the anchor bolt of the PSV TOWER 2017.08.09 DS7 yes yes
(Inspection
columns period 2 days )
IR CE-C 0863 IR scan\CE-C 0863.pdf Loading in DS7.
Dry concrete for separators and shelters (train 1) columns and pipe suppo 2017.08.10 BR Batch plant YES
IR CE-C 0864 IR scan\CE-C 0864.PDF (Inspection period
Sampling water 2 use
that daysfor) mix the concrete of separators and shelters (train 1) 2017.08.10 DS7 YES yes yes
IR CE-C 0865 IR scan\CE-C 0865.PDF Pouring concrete (including slump test, temperature and make specimen (cubes)) fo 2017.08.10 DS7 YES YES
IR CE-C 0866 IR scan\CE-C 0866.PDF Pouring concrete (including slump test, temperature and make specimen (cubes)) for se 2017.08.10 DS7 YES YES
IR CE-C 0868 IR scan\CE-C 0868.PDF Witness to testing concrete cubes (compressive strength at 28 days) which took from 2017.08.10 DS7 YES yes YES
IR CE-C 0869 Witness the physical and chemical tests for cement samples and cement compressive 2017.08.10 DS7
IR CE-C 0870 IR scan\CE-C 0870.pdf Final inspection for the rebar, formwork and anchor bolt of pipe support columns 2017.08.11 DS7 YES yes
IR CE-C 0871 IR scan\CE-C 0871.pdf (including surveyfor
Final inspection work) in DS7.(inspection
the formwork, rebar andperiod 2days)
anchor bolt of the jib crane columns 2017.08.11 DS7 YES yes
IR CE-C 0872 IR scan\CE-C 0872.pdf PS-D7PW-221
(including survey work) DS7.
Final inspection for the rebar, formwork and anchor bolt of shelter columns (train 2) (i 2017.08.11 DS7 YES yes
IR CE-C 0873 IR scan\CE-C 0873.PDF (PS-D7PW-286
inspection
Final period
inspection for 2the
days).
rebar, formwork, and the anchor bolt of the PSV TOWER column 2017.08.11 DS7 YES yes
PS-D7PW-265
PS-D7PW-287
IR CE-C 0874 IR scan\CE-C 0874.pdf Inspect the surface of the shelter foundations (train 2) after repair in DS7. 2017.08.11 DS7 YES yes
IR CE-C 0875 IR scan\CE-C 0875.pdf Inspect the concrete surface of the Clarifier Tank (northern) foundation after repair in 2017.08.11 DS7 YES yes
IR CE-C 0876 IR scan\CE-C 0876.pdf Loading Dry concrete for PSV tower columns, pipe supports (PS-D7PW-221) (PS-D7PW- 2017.08.13 DS7 YES YES
IR CE-C 0877 IR scan\CE-C 0877.PDF Sampling water that use for mix the concrete for PSV tower columns, pipe supports 2017.08.13 DS7 YES YES YES
IR CE-C 0878 IR scan\CE-C 0878.PDF Pouring concrete (including slump test, temperature and make specimen (cubes) for 2017.08.13 DS7 YES YES
IR CE-C 0880 IR scan\CE-C 0880.pdf Inspect the surface coating corrosion of the Clarifier Tank (southern and northern) fou 2017.08.13 DS7 YES yes
IR CE-C 0881 IR scan\CE-C 0881.pdf Inspect the surface coating corrosion of the shelter foundations (train 1, train 2) in DS7 2017.08.13 DS7 YES yes
IR CE-C 0881/R1 IR scan\CE-C 0881-R1.PDF Inspect the surface coating corrosion of the shelter foundations (train 1, train 2) in DS7 2017.08.17 DS7 YES yes YES
IR CE-C 0882 IR scan\CE-C 0882.pdf Inspect the surface coating corrosion of PSV TOWER FOUNDATION in DS7. 2017.08.13 DS7 YES yes
IR CE-C 0883 IR scan\CE-C 0883.pdf Inspect the surface coating corrosion of the separators foundations in DS7. 2017.08.13 DS7 YES yes
IR CE-C 0886 canceld Witness to testing spare concrete cubes (compressive strength at 28 days) of Sleepers 2017.08.13 DS7 YES yes
IR CE-C 0886/R1 IR scan\CE-C 0886-R1.PDF Witness to testing spare concrete cubes (compressive strength at 28 days) of Sleepers 2017.08.14 DS7 YES yes
IR CE-C 0887 Witness test cement cubes (the tests period is 7 days including preparing cement cub 2017.08.21 DS7 YES yes YES
IR CE-C 0890 IR scan\CE-C 0890.PDF Witness to test concrete cubes (compressive strength at 28 days) for clarifier tank fou 2017.08.14 DS7 YES YES YES
IR CE-C 0893 IR scan\CE-C 0893.PDF Final inspection for the rebar, formwork, and the anchor bolt of the Clarifier columns ( 2017.08.15 DS7 YES yes
IR CE-C 0894 IR scan\CE-C 0894.PDF Witness to test concrete cubes (compressive strength at 28 days) for separators founda 2017.08.15 DS7 yes yes yes
IR CE-C 0895 IR scan\CE-C 0895.PDF Sampling the subgrade soil beside separator foundations in DS7. (witness for 2 days) 2017.08.15 DS7 YES yes
IR CE-C 0896 IR scan\CE-C 0896.PDF Sampling the subgrade soil beside shelter foundations in DS7.(witness for 2 days) 2017.08.15 DS7 YES YES
IR CE-C 0897 IR scan\CE-C 0897.PDF Inspect the concrete surface of the separators columns after remove the 2017.08.16 DS7 YES yes
IR CE-C 0898 IR scan\CE-C 0898.PDF formwork
Witness tointest
DS7.
concrete cubes (compressive strength at 28 days) for separators fou 2017.08.16 DS7 yes yes YES
IR CE-C 0900 IR scan\CE-C 0901.PDF Final inspection for the rebar, formwork of the PSV TOWER(F2A;F2B) Foundations(inclu 2017.08.16 DS7 YES yes
IR CE-C 0901 IR scan\CE-C 0901.PDF Final inspection for the blinding of PUMP IN AREA(TRAIN-1-D7-PBE681161A/B;TRAIN-2 2017.08.16 DS7 yes yes
IR CE-C 0902 IR scan\CE-C 0902.PDF Loading Dry concrete for clarifier tank columns, psv tower foundation (F2A, F2B) and 2017.08.17 BR Batch plant yes yes
IR CE-C 0903 IR scan\CE-C 0903.PDF Sampling water that use for mix concrete of clarifier tank columns, PSV tower foundat 2017.08.17 DS7 yes YES yes
IR CE-C 0904 IR scan\CE-C 0904.PDF Pouring concrete (including slump test, temperature and make specimen (cubes)) of cl 2017.08.17 DS7 yes yes
IR CE-C 0905 IR scan\CE-C 0905.PDF Inspect the concrete surface of the shelter foundations (train 1, train 2) after remove 2017.08.17 DS7 yes yes
IR CE-C 0906 IR scan\CE-C 0906.PDF Inspect the inner surface of the shelter foundations (train 1) after repair in DS7. 2017.08.17 DS7 yes yes
IR CE-C 0907 Inspect the concrete surface of the jib crane and pipe support (PS-D7PW-221) (PS- 2017.08.17 DS7
IR CE-C 0908 IR scan\CE-C 0908.PDF Witness conducting compaction degree test for the samples of the subgrade soil beside 2017.08.17 DS7 YES yes yes
IR CE-C 0909 IR scan\CE-C 0909.PDF Witness conducting compaction degree test for the samples of the subgrade soil beside 2017.08.17 DS7 yes yes yes
IR CE-C 0910 IR scan\CE-C 0910.PDF Witness to test concrete cubes (compressive strength at 28 days) for shelters foundation 2017.08.17 DS7 YES yes yes
IR CE-C 0911 IR scan\CE-C 0911.PDF Witness to test concrete cubes (compressive strength at 7 days) for separators and 2017.08.17 DS7 yes yes yes
IR CE-C 0912 IR scan\CE-C 0912.PDF Inspect the concrete surface of the pipe support (PS-D7PW-221) (PS-D7PW-286) (PS-D 2017.08.18 DS7 yes yes
IR CE-C 0913 Inspect the inner surface of the shelter foundations (train 2) after repair in DS7. 2017.08.18 DS7
IR CE-C 0914 IR scan\CE-C 0914.PDF Inspect the surface of pipe support columns after repair in DS7. (PS-D7PW-221, PS 2017.08.19 DS7 yes yes
IR CE-C 0915 IR scan\CE-C 0915.PDF Inspect the inner surface of the shelter foundations (train 1 and 2) after coating in DS7 2017.08.19 DS7 YES YES
IR CE-C 0916 IR scan\CE-C 0916.PDF Inspect the vertical surface of pipe support foundations after coating in DS7. (PS 2017.08.19 DS7 YES YES
IR CE-C 0917 IR scan\CE-C 0917.PDF Inspect the surface of pump shelter (Train 1) columns after repair in DS7 IGF area. 2017.08.19 DS7 YES YES
IR CE-C 0918 IR scan\CE-C 0918.PDF sampling the backfiling 2th soil layer in north of bump shilter(train1) in ds7 2017.08.19 DS7 YES YES
IR CE-C 0919 IR scan\CE-C 0919.PDF Inspect the surface of separators columns after repaired in DS7. 2017.08.21 DS7 yes yes
IR CE-C 0920 IR scan\CE-C 0920.PDF Inspect the concrete surface of the shelter columns (train 1) after coating in DS7. 2017.08.20 DS7 YES YES
IR CE-C 0921 IR scan\CE-C 0921.PDF Inspect the surface of pipe support columns after coating in DS7. (PS-D7PW-221, 2017.08.20 DS7 YES YES
IR CE-C 0922 IR scan\CE-C 0922.PDF Inspect the columns of PSV TOWER foundation after remove formwork 2017.08.20 DS7 YES YES
IR CE-C 0923 IR scan\CE-C 0923.PDF in DS7.
Final inspection for the rebar and formwork and anchor bolt of PSV TOWER columns (F 2017.08.20 DS7 YES YES
IR CE-C 0924 IR scan\CE-C 0924.PDF Final inspection for the rebar and formwork of pump in IGF area (including survey 2017.08.20 DS7 YES YES
IR CE-C 0924/R1 IR scan\CE-C 0924-R1.PDF work) DS7.(PBE681161
Final inspection B)(PBE681261
for the rebar A)(PBE681261
and formwork of pump inB)IGF area 2017.08.21 DS7 yes yes
IR CE-C 0925 IR scan\CE-C 0925.PDF DS7.(PBE681161 B)(PBE681261
Witness the backfilled A)(PBE681261
1st soil layer B)separator foundations in DS7.
in the east of 2017.08.20 DS7 YES YES yes
IR CE-C 0926 IR scan\CE-C 0926.PDF Witness the backfilled 2nd soil layer in the north side of shelter foundation (train 1) in 2017.08.20 DS7 YES YES yes
IR CE-C 0927 IR scan\CE-C 0927.PDF DS7.
Witness to testing concrete cubes (compressive strength at 7 days) taken from pump 2017.08.20 DS7 YES YES yes
shelter(train 2)column,PS-D7PW-221, PS-D7PW-286, PS-D7PW-265, PS-D7PW-
287 column,jibcrane column in DS7
IR CE-C 0929 Re-Sampling the backfilled 1st soil layer(fail point) in the east of separator 2017.08.21 DS7
IR CE-C 0930 foundations
foudation.. in DS7. 2017.08.21 DS7 YES yes
IR CE-C 0931 IR scan\CE-C 0931.PDF Final inspection for the rebar and formwork (including survey work) of clarifier tank c 2017.08.21 DS7 yes yes
IR CE-C 0936 IR scan\CE-C 0936.PDF Witness conducting compaction degree test for backfilled 1st soil layer (failed point) in 2017.08.22 DS7 YES YES yes
IR CE-C 0937 IR scan\CE-C 0937.PDF Witness conducting compaction degree test for subgrade layer between Sleeper foundat 2017.08.22 DS7 YES YES yes
IR CE-C 0938 IR scan\CE-C 0938.PDF Sampling 1st layer inside of pump shelter(train1) (zone5) in DS7. 2017.08.22 DS7 yes yes
IR CE-C 0939 IR scan\CE-C 0939.PDF Inspect the surface of PSV-TOWER columns after repaired in DS7 2017.08.22 DS7 yes yes
IR CE-C 0940 IR scan\CE-C 0940.PDF Loading Dry concrete for clarifier tank columns (P1, P2, P2A, P3, P3A), PSV tower 2017.08.23 DS7 yes yes
IR CE-C 0941 IR scan\CE-C 0941.PDF Sampling water that use for mix concrete of clarifier tank columns (P1, P2, P2A, P3 2017.08.23 DS7 YES yes
IR CE-C 0942 IR scan\CE-C 0942.PDF Pouring concrete (including slump test, temperature and make specimen (cubes)) of c 2017.08.23 DS7 YES yes
IR CE-C 0943 IR scan\CE-C 0943.PDF Witness conducting compaction degree test for samples of the backfilled 1st soil layer i 2017.08.23 DS7 YES yes
IR CE-C 0944 IR scan\CE-C 0944.PDF Final inspection for the rebar and formwork of the pipe support foundations (includi 2017.08.23 DS7 yes yes
IR CE-C 0945 Sampling backfill soil (zone2,3,4,7,8,9,16) in DS7. 2017.08.23 DS7
IR CE-C 0949 IR scan\CE-C 0949.PDF Witness to test concrete cubes (compressive strength at 7 days) of clarifier tank colu 2017.08.24 DS7 YES yes yes
IR CE-C 0950 IR scan\CE-C 0950.PDF Witness conducting compaction degree test for samples of zone (2, 4, 7, 9, 16) in IGF 2017.08.24 DS7 YES YES YES
IR CE-C 0951 IR scan\CE-C 0951.PDF Witness conducting compaction degree test for samples of zone (2, 4, 7, 9, 16) in IGF 2017.08.24 DS7 yes yes
IR CE-C 0953 Final inspection for the rebar and formwork of the DS7's pipe support footing in CPE 2017.08.24 CPECC CAMP
IR CE-C 0953/R1 IR scan\CE-C 0953-R1.PDF Final inspection for the rebar and formwork of the DS7's Precast pipe support footing 2017.08.27 CPECC CAMP YES yes
IR CE-C 0954 IR scan\CE-C 0954.PDF Sampling backfill soil (zone3,8,11,12,13,14,15,) in DS7. 2017.08.24 DS7 yes yes
IR CE-C 0955 IR scan\CE-C 0955.PDF Sampling backfill soil (zone2,7) in DS7. 2017.08.24 DS7 YES YES
IR CE-C 0956 IR scan\CE-C 0956.pdf Inspect the surface of clarifier tank columns and back wash pump (PBE681161B,PBE68 2017.08.26 DS7 YES YES
IR CE-C 0957 IR scan\CE-C 0957.pdf Inspect the surface of pump shelter (train2) columns after coating in DS7. 2017.08.26 DS7 YES YES
IR CE-C 0957/R1 IR scan\CE-C 0957-R1.PDF Inspect the surface of pump shelter (train2) columns after coating in DS7. 2017.08.29 DS7 YES YES
IR CE-C 0958 IR scan\CE-C 0958.PDF Witness to test concrete cubes (compressive strength at 28 days) of clarifier tank foo 2017.08.26 DS7 yes YES yes
IR CE-C 0959 IR scan\CE-C 0959.PDF Witness conducting compaction degree test for samples of zone (zone1,2,3,7,8,11,12, 2017.08.26 DS7 yes YES yes
IR CE-C 0960 IR scan\CE-C 0960.pdf Sampling backfill soil (zone1,2,3) between two sleeper in DS7. 2017.08.26 DS7 YES YES
IR CE-C 0961 IR scan\CE-C 0961.pdf Sampling backfill soil (zone5,16) in DS7 2017.08.26 DS7 YES YES
IR CE-C 0962 IR scan\CE-C 0962.pdf Re-sampling of IR-CE-C0954 fail point in DS7 2017.08.26 DS7 YES YES
IR CE-C 0964 IR scan\CE-C 0964.PDF Witness conducting compaction degree test for samples of zone (zone1,2,5,13,15,16) in2017.08.27
IGF area in DS7. DS7 YES yes yes
IR CE-C 0965 IR scan\CE-C 0965.PDF Witness conducting compaction degree test for samples of zone (zone2,,3) between sleeper 2017.08.27
in DS7. DS7 YES yes yes
IR CE-C 0966 IR scan\CE-C 0966.pdf Final inspaction the form work of pipe support bulnding in ds7 2017.08.27 DS7 YES YES
IR CE-C 0967 IR scan\CE-C 0967.PDF Sampling backfill soil (zone1) between two sleeper in DS7. 2017.08.27 DS7 YES yes
IR CE-C 0970 Witness conducting compaction degree test for samples of zone (zone 1) between slee 2017.08.28 DS7
IR CE-C 0971 IR scan\CE-C 0971.PDF Re-sampling of fail point in DS7(include:zone2,3 between two sleeper;zone 1,2,13,16 2017.08.28 DS7 YES YES
IR CE-C 0971 IR scan\CE-C 0971.PDF Re-sampling of fail point in DS7 (include zone 3 between two sleeper 2017.08.29 DS7 yes yes
IR CE-C 0972 IR scan\CE-C 0972.PDF ;Final
zoneinspection
2,13,16 infor
IGF)
the rebar and formwork of the DS7's Precast pipe support footing 2017.08.28 DS7 YES YES
IR CE-C 0973 IR scan\CE-C 0973.PDF Loading Dry concrete for pipe support foundations in DS7. 2017.08.29 DS7 YES YES
IR CE-C 0974 IR scan\CE-C 0974.PDF Sampling water that used for mix concrete of pipe support foundations of DS7. 2017.08.29 DS7 YES YES YES
IR CE-C 0975 IR scan\CE-C 0975.PDF Pouring concrete (including slump test, temperature and make specimen (cubes)) of 2017.08.29 DS7 YES yes
IR CE-C 0976 IR scan\CE-C 0976.PDF pipe support
Witness foundations
conducting of DS7.degree test for subgrade layer between
compaction 2017.08.29 DS7 YES YES YES
IR CE-C 0977 IR scan\CE-C 0977.PDF Sleeper foundations (zone 1, 2) and (zone 1) in IGF in DS7.
Inspect the surface of back wash pump (PBE681161B,PBE681261A/B)foundation after re 2017.08.29 DS7 YES YES
IR CE-C 0978 IR scan\CE-C 0987.PDF Witness conducting compaction degree test for subgrade layer between 2017.08.30 DS7 YES YES
IR CE-C 0979 IR scan\CE-C 0979.PDF Sleeper foundations (zone 3) and (zone 2,13,16 in IGF) in DS7.
Witness to test concrete cubes (compressive strength at 7 days) of PSV column(F2A/B) and 2017.08.30 DS7
back wash pump foundation YES YES YES
IR CE-C 0981 IR scan\CE-C 0981.PDF Final inspections for the rebar and formwork of the second part of pipe support footing 2017.08.30 DS7 YES YES
IR CE-C 0981/R1 IR scan\CE-C 0981-R1.PDF Final inspections for the rebar and formwork of the second part of pipe support footing for DS7 . DS7 YES YES
IR CE-C 0982 IR scan\CE-C 0982.PDF sampling of backfill soil in DS7(include zone 2 between two 2017.08.30 DS7 YES YES
IR CE-C 0983 IR scan\CE-C 0983.PDF sleeper; zoneconcrete
Loading Dry 4,5,6,7,8,9,11
for pipeinsupport
IGF) foundations of DS7. 2017.08.31 DS7 yes YES
IR CE-C 0983/R1 IR scan\CE-C 0983-R1.PDF Loading Dry concrete for pipe support foundations of DS7. 2017.09.01 BR Batch plant YES YES
IR CE-C 0983/R2 IR scan\CE-C 0983-R2.PDF Loading Dry concrete for pipe support foundations of DS7. 2017.09.03 CPECC CAMP YES yes
IR CE-C 0984 IR scan\CE-C 0984.PDF Sampling water that used for mix concrete of pipe support foundations of DS7. 2017.08.31 DS7 YES YES
IR CE-C 0984/R1 IR scan\CE-C 0984-R1.PDF Sampling water that used for mix concrete of pipe support foundations 2017.09.01 DS7 YES YES
IR CE-C 0984/R2 IR scan\CE-C 0984-R2.PDF of DS7. water that used for mix concrete of pipe support foundations of DS7.
Sampling 2017.09.03 CPECC CAMP YES YES yes
IR CE-C 0985 IR scan\CE-C 0985.PDF Pouring concrete (including slump test, temperature and make specimen (cubes)) of 2017.08.31 DS7 yes YES
IR CE-C 0985/R1 IR scan\CE-C 0985-R1.PDF pipe support
Pouring foundations
concrete of slump
(including DS7. test, temperature and make specimen 2017.09.01 DS7 YES YES
IR CE-C 0985/R2 IR scan\CE-C 0985-R2.PDF (cubes))concrete
Pouring of pipe support foundations
(including slump test,oftemperature
DS7. and make specimen 2017.09.03 CPECC CAMP YES yes
IR CE-C 0986 IR scan\CE-C 0986.PDF (cubes)) of pipe support foundations of DS7.
Witness conducting compaction degree test for the point (include zone 2 between two sl 2017.08.31 DS7 yes yes yes
IR CE-C 0987 IR scan\CE-C 0987.PDF Inspect the surface of back wash pump (PBE681161B,PBE681261AB)foundation after co 2017.08.31 DS7 YES yes
IR CE-C 0988 IR scan\CE-C 0988.PDF Inspect the surface of PSV(F2A/B) foundation after repair in DS7. 2017.08.31 DS7 yes yes
IR CE-C 0991 check anchor bolts coordinates of clarifier tank.after pouring concrete. 2017.09.01 DS7
IR CE-C 0992 IR scan\CE-C 0992.PDF check concrete surface after remove formwork for precast pipe support footing in CPE 2017.09.03 CPECC CAMP YES yes
IR CE-C 0996 Final inspections for the formwork of the pipe support blanding in DS7 2017.09.04 DS7
IR CE-C 0997 sampling of backfill soil in DS7(include zone 2 between two sleeper; 2017.09.04 DS7
IR CE-C 0998 IR scan\CE-C 0998.PDF zone1,6,8,9,11,12,13,14,15,16 in IGF) blanding of DS7.(in IGF zone 1,2,3)
Loading Dry concrete for pipe support 2017.09.05 DS7 YES yes
IR CE-C 0999 IR scan\CE-C 0999.PDF Sampling water that used for mix concrete of pipe support blanding of DS7.(in IGF 2017.09.05 DS7 YES YES yes
IR CE-C 1000 IR scan\CE-C 1000.PDF zone 1,2,3)
Pouring concrete (including slump test, temperature) of pipe support blanding of 2017.09.05 DS7 YES YES
IR CE-C 1001 IR scan\CE-C 1001.PDF DS7. inspections
Final (in IGF zonefor
1,2,3)
the formwork of the pipe support blanding in DS7.(between 2017.09.05 DS7 YES yes
IR CE-C 1002 IR scan\CE-C 1002.PDF sleeper zone 1.3)
Witness to test concrete cubes (compressive strength at 7 days) of the first batch of 2017.09.05 DS7 YES yes yes
IR CE-C 1004 precast
samplingpipe supportsoil
of backfill footing in CPECC CAMP.
in DS7(include zone 2 between two sleeper; 2017.09.05 DS7
IR CE-C 1008 zone1,6,8,9,11,12,13,14,15,16
Pouring concrete (including slump in IGF)
test, temperature) of pipe support blanding of 2017.09.06 DS7
IR CE-C 1009 IR scan\CE-C 1009.PDF Witness
DS7. conducting
(between compaction
sleeper zone 1,3) degree test for subgrade layer between Sleeper 2017.09.06 DS7 YES YES YES
IR CE-C 1010 IR scan\CE-C 1010.PDF (zoneinspection
Final 2) and (zone
for the1,4,5,6,8,9,10,11,12,13,14,15,16) in IGF
rebar, formwork and anchor bolt of the threeincolumn
DS7. for clarifer tank in 2017.09.07 DS7 YES yes
DS7.
IR CE-C 1011 IR scan\CE-C 1011.PDF Witness to test concrete cubes (compressive strength at 28 days) of Separate column, pipe 2017.09.07 DS7 YES YES YES
support and jibe crane foundations and north shelter column in DS7.
IR CE-C 1012 IR scan\CE-C 1012.PDF nspect the surface of first batch of precast pipe support footing after repair in DS7. 2017.09.07 CPECC CAMP YES YES
IR CE-C 1008 Witness conducting compaction degree test for subgrade layer between 2017.09.06 DS7
IR CE-C 1009 IR scan\CE-C 1009.PDF Sleeper conducting
Witness (zone 2) and (zone 1,4,5,6,8,9,10,11,12,13,14,15,16)
compaction degree test for subgrade layer betweenin IGF in DS7. 2017.09.06 DS7 yes YES
IR CE-C 1010 IR scan\CE-C 1010.PDF Sleeper
Final (zone for
inspection 2) and (zone 1,4,5,6,8,9,10,11,12,13,14,15,16)
the rebar, formwork and anchor bolt of the three in IGF in DS7.for clarife
column 2017.09.07 DS7 YES YES
IR CE-C 1011 IR scan\CE-C 1011.PDF Witness to test concrete cubes (compressive strength at 28 days) of Separate column, 2017.09.07 DS7 YES YES
IR CE-C 1012 IR scan\CE-C 1012.PDF Inspect the surface of first batch of precast pipe support footing after repair in DS7. 2017.09.07 DS7 YES YES
IR CE-C 1013 IR scan\CE-C 1013.PDF Final inspection for the formwork (include survey work) of the pump blanding in DS7. ( 2017.09.09 DS7 YES YES
IR CE-C 1014 IR scan\CE-C 1014.PDF Final inspection for the rebar, formwork and pocket (include survey work)of the back wash 2017.09.09 pump in DS7. DS7 YES YES
IR CE-C 1015 IR scan\CE-C 1015.PDF Final inspection for the rebar, formwork (include survey work) of the access and crossover 2017.09.09 DS7
platforms footing in DS7. YES YES
IR CE-C 1016 IR scan\CE-C 1016.PDF Final inspection for the formwork (include survey work)of the pipe support bland 2017.09.09 DS7 YES YES
IR CE-C 1017 IR scan\CE-C 1117.PDF sampling of backfill soil in DS7. (second layer:zone 10)(third layer:zone 6,7,9 2017.09.09 DS7 YES YES
IR CE-C 1018 IR scan\CE-C 1018.PDF sampling of backfill soil in DS7. (second layer:zone 10(third layer:zone 6,7,9, 2017.09.09 DS7 YES YES
IR CE-C 1021 IR scan\CE-C 1021.PDF Loading Dry concrete for: the pipe support blinding in DS7.the pump blinding in DS7( 2017.09.10 BR batch plant YES yes
IR CE-C 1021/R1 IR scan\CE-C 1021-R1.pdf Loading Dry concrete for: the pipe support blinding in DS7.the pump blinding in 2017.09.11 BR batch plant YES YES
IR CE-C 1022 IR scan\CE-C 1022.PDF DS7(PBE-681153A/B/C).the back wash pump in DS7(PBE-681161A).the access
Sampling water that used for mix concrete of the pipe support blinding in DS7. the pump blinding and 2017.09.10
in DS7 DS7 YES yes
IR CE-C 1022/R1 IR scan\CE-C 1022-R1.PDF crossover platforms
Sampling water that footing
used forinmix
DS7concrete
(train-1:F3,F4,F5,F6;
of the pipe supporttrain-2:F3,F4A,F5,F6). 2017.09.11
blinding in DS7. the pump blinding in DS7 DS7 YES YES
IR CE-C 1023 IR scan\CE-C 1023.PDF Pouring concrete (including slump test, temperature and make specimen (cubes)) of the pipe 2017.09.10 DS7
support blinding in DS7.the YES in DS7(PBE-681153A/B/C).the
pump blinding yes back wa
IR CE-C 1023/R1 Pouring concrete (including slump test, temperature and make specimen (cubes)) of 2017.09.11 DS7
IR CE-C 1024 IR scan\CE-C 1024.PDF the pipe support blinding in DS7.the pump blinding in
Witness conducting compaction degree test for the IGF area (zone DS7(PBE-681153A/B/C).the 2017.09.10 DS7 YES yes yes
IR CE-C 1025 IR scan\CE-C 1025.PDF back wash pump in DS7(PBE-681161A).the
6,7,8,9,10,11,12,13,14,15,16) in DS7. access and crossover platforms
Witness to test concrete cubes (compressive strength at 7 days) of the second batch footing 2017.09.10 DS7 YES YES YES
in
of DS7 (train-1:F3,F4,F5,F6;
precast pipe support train-2:F3,F4A,F5,F6).
foundations in CPECC CAMP.
IR CE-C 1026 IR scan\CE-C 1026.PDF Witness to test concrete cubes (compressive strength at 28 days) for PSV tower 2017.09.10 DS7 YES yes yes
IR CE-C 1029 IR scan\CE-C 1029.PDF columns, pipe supports (PS-D7PW-221) (PS-D7PW-286) (PS-D7PW-287)
Final inspection for the pipe support footing formwork and rebar (including survey (PS-D7PW- 2017.09.11 DS7 yes YES
IR CE-C 1034 IR scan\CE-C 1034.PDF 265) columns, shelter columns (train 2), and jib crane columns
Inspection the formwork of pump blinding in DS7 IGF area.(PBE-681253A/B/C) in DS7. 2017.09.13 DS7 YES yes yes
IR CE-C 1035 IR scan\CE-C 1035.PDF Inspection the formwork of pipe support blinding in DS7 IGF area. 2017.09.13 DS7 YES YES
IR CE-C 1036 IR scan\CE-C 1036.PDF Inspection the surface of pipe support columns after repaired in DS6. (PS-D6PW-000 2017.09.13 DS7 YES YES
IR CE-C 1038 IR scan\CE-C 1038.PDF sampling of backfill soil in DS7 IGF area.(forth layer:zone 6,7,8, 9,11,12,13,14 2017.09.13 DS7 YES YES
IR CE-C 1039 IR scan\CE-C 1039.PDF Loading Dry concrete for: the pipe support blinding and pump blinding in DS7. 2017.09.14 DS7 YES yes
IR CE-C 1039/R1 IR scan\CE-C 1039-R1.PDF Loading Dry concrete for: 1.the pipe support and pump blinding in DS7. 2.pipe support 2017.09.15 DS7 yes yes
foundation footing in used
DS7 for
3.pipe
mix support
concretecolumns in DS7
IR CE-C 1040 IR scan\CE-C 1040.PDF Sampling water that of the pipe support blinding and pump blinding in 2017.09.14 DS7 YES yes
DS7.
IR CE-C 1040/R1 IR scan\CE-C 1040.PDF Sampling water that used for mix concrete ofthe blinding and foundation in DS7 2017.09.15 DS7 YES YES yes
IR CE-C 1041 IR scan\CE-C 1040.PDF Pouring concrete (including slump test, temperature ofthe pipe support blinding and pump blinding in 2017.09.14 DS7 yes yes
DS7.
IR CE-C 1041 IR scan\CE-C 1041.PDF Pouring concrete (including slump test, temperature and make specimen(cubes) for 1.the pipe support 2017.09.15 DS7 YES YES
and pump blinding in DS7.2.pipe support foundation footing in DS7.3.pipe support columns in DS7
IR CE-C 1042 IR scan\CE-C 1042.PDF Final inspection for the rebar, formwork and ahcol bolts of the pipe support columns (including survey 2017.09.14 DS7 YES yes
work) in DS6. (PS-D7PW-0109/110/111/112/113/124/115/116/117/118/119/120/121/122/285)
IR CE-C 1043 IR scan\CE-C 1043.PDF Witness to test concrete cubes (compressive strength at 28 days) of CLARIFER tank columns PSV 2017.09.14 DS7 YES YES YES
foundation F2A/B of DS7
IR CE-C 1044 IR scan\CE-C 1044.PDF Witness conducting compaction degree test for the IGF area (zone 6,7,8,9,10,11,12,,14,15,16) in DS7. 2017.09.14 DS7 YES YES YES
IR CE-C 1046 IR scan\CE-C 1046.PDF Re-sampling fail point (CE-C1035) and ZONE 13 in DS7 IGF area +G8:G15 2017.09.14 DS7 YES YES
IR CE-C 1047 IR scan\CE-C 1047.PDF Check the anchor bolt for clarifier tank for close the (CAR) 2017.09.13 DS7 YES yes
IR CE-C 1048 IR scan\CE-C 1048.PDF Final inspection for the rebar, formwork and pocket of the pump foundatin (including survey work) in 2017.09.16 DS7 YES yes
DS7.(PBE-681153A/B/C)
IR CE-C 1049 IR scan\CE-C 1049.PDF Final inspection for the rebar, formwork of the foundatin (including survey work) in DS7. 2017.09.16 DS7 YES yes
1.crossover foundation type F7. 2.pipe support foundation (PS-D7PW-235/236/253/254)
IR CE-C 1050 IR scan\CE-C 1050.PDF Witness conducting compaction degree test for the IGF area (zone 6,11,13,14) in DS7. 2017.09.16 DS7 YES YES YES
IR CE-C 1053 IR scan\CE-C 1053.PDF Inspection the surface of 3 columns of clarifier tank and back wash pump after repaired 2017.09.17 DS7 YES yes
IR CE-C 1056 IR scan\CE-C 1056.PDF Loading Dry concrete for: 1.pipe support foundation footing in DS8. 2017.09.18 DS7 yes yes
IR CE-C 1059 IR scan\CE-C 1059.PDF Inspection the surface of pipe support foundation after repaired . 2017.09.18 DS7 YES YES
IR CE-C 1060 IR scan\CE-C 1060-R1.PDF Witness to test concrete cubes (compressive strength at 7 days) of 3 CLARIFER ta 2017.09.19 DS7 YES YES YES
IR CE-C 1061 IR scan\CE-C 1061.PDF sampling of backfill soil in DS7 IGF area (ZONE:4,6,7,8,9,11,12,13,14,15) 2017.09.18 DS7 YES yes
IR CE-C 1063 IR scan\CE-C 1063.PDF Witness conducting compaction degree test for in DS7 IGF area (ZONE:4,6,7,8,9,11,1 2017.09.19 DS7 YES YES YES
IR CE-C 1064 IR scan\CE-C 1164.PDF Re-sampling of backfill soil fail point (CE-C1063) in DS7 IGF area 2017.09.19 DS7 YES yes
IR CE-C 1065 IR scan\CE-C 1065.PDF Final inspection for the rebar, formwork of the pipe support foundatin (including survey work) 2017.09.20 DS7 YES YES YES
in DS7.(CTS-05;CTS-06)
IR CE-C 1066 IR scan\CE-C 1066.PDF Final inspection for the rebar, formwork of the foundatin (including survey work) crossover 2017.09.20 DS7 YES yes
columns in DS7.
IR CE-C 1067 IR scan\CE-C 1067.PDF Witness to test concrete cubes (compressive strength at 28 days) 1.CLARIFER tank and
(TRAIN1:F3,F4,F5,F6; TRAIN2:F3,F4A,F5,F6;) 2017.09.20 DS7 YES YES YES
PSV foundation F2A/Bsoilcolumns
in DS7 of DS7 2.back
1,3) wash pump foundation(PBE-
IR CE-C 1069 IR scan\CE-C 1069.PDF sampling of backfill IGF area(ZONE 2017.09.20 DS7 YES YES
681161B,PBE-681261A/B)
IR CE-C 1071 IR scan\CE-C 1071.PDF Final inspaction the form work of the skid blinding (including suervey work )in ds7(D7- 2017.09.20 DS7 YES YES
V681157;D7-V681157;681152).
IR CE-C 1072 IR scan\CE-C 1072.PDF Loading Dry concrete for: 1.the SKID blinding in DS7. 2.PUMP FOUNDATON in 2017.09.21 DS7 YES YES
DS7.3.CROSSOVER columns in DS7.4.PIPE SUPPORT FOOTING IN DS7
IR CE-C 1073 IR scan\CE-C 1073.PDF Sampling water that used for mix concrete ofthe blinding and foundation in DS7 2017.09.21 DS7 YES yes YES
IR CE-C 1074 IR scan\CE-C 1074.PDF Pouring concrete (including slump test, temperature and make specimen(cubes) for 1.the 2017.09.21 DS7 YES YES
SKID blinding inforDS7. 2.PUMP FOUNDATON in DS7.3.CROSSOVER columns in survey
IR CE-C 1075 IR scan\CE-C 1075.PDF Final inspection the rebar, formwork and ahcol bolts of the pipe support (including 2017.09.21 DS7 YES yes
DS7.4.PIPE
work) SUPPORT FOOTING IN DS7
in DS7) for the formwork of the skid1.pipe support footingsurvey
(PS-D7PW-
IR CE-C 1076 IR scan\CE-C 1076.PDF Final inspection blinding (including work) in DS7.(D7- 2017.09.21 DS7 YES YES yes
0131/130/129/134/1135/141/144/143/140/139/258/294/293)
V681154;D7-681254;D7-681252 ) 2.pipe support columns (
IR CE-C 1080 IR scan\CE-C 1080.PDF Witness conducting compaction degree test for in DS7 IGF area (ZONE:1,3)
PS-D7PW-238/239/295/296) 2017.09.21 DS7 YES yes YES
IR CE-C 1081 IR scan\CE-C 1081.PDF Loading Dry concrete for: 1.the SKID blinding in DS7.2.PIPE SUPPORT FOOTING A 2017.09.22 DS7 YES YES
IR CE-C 1082 IR scan\CE-C 1082.PDF Sampling water that used for mix concrete ofthe blinding and foundation in DS7. 2017.09.22 DS7 YES yes YES
IR CE-C 1083 IR scan\CE-C 1083.PDF Pouring concrete (including slump test, temperature and make specimen(cubes) for 2017.09.22 DS7 YES YES
IR CE-C 1084
IR CE-C 1085 IR scan\CE-C 1085.PDF Inspect the surface of the pipe support foundation after repaired in DS7. 2017.09.23 DS7 YES YES
IR CE-C 1086 IR scan\CE-C 1086.PDF 2017.09.23
Final inspection for the rebar, formwork and ahcol bolts of the pipe support columns (including DS7
survey work) in DS7) YES YES
(PS-D7PW-107-108-201-20
IR CE-C 1087 IR scan\CE-C 1087.PDF Witness to test concrete cubes (compressive strength at 7 days) for pipe support. 2017.09.23 DS7 YES yes YES
IR CE-C 1089 IR scan\CE-C 1089.PDF sampling of backfill soil in DS7 IGF area(ZONE 1,3) 2017.09.23 DS7 YES YES
IR CE-C 1090 IR scan\CE-C 1090.PDF Inspect the surface of the pipe support foundation after coating in DS7 2017.09.24 DS7 YES YES
IR CE-C 1091 IR scan\CE-C 1091.PDF 2017.09.24 DS7
Final inspection for the rebar, formwork and ahcol bolts of the pipe support columns (including survey work) in DS7) YES YES
(PS-D7PW-116-056-114-12
IR CE-C 1092 IR scan\CE-C 1092.PDF Final inspection for the rebar, formwork and pocket of the pump foundation (includin 2017.09.24 DS7 YES YES
IR CE-C 1094 IR scan\CE-C 1094.PDF Witness conducting compaction degree test for IGF area in DS7.(ZONE:1,3) 2017.09.24 DS7 YES YES
IR CE-C 1095 IR scan\CE-C 1095.PDF Sampling of backfill soil in DS7 CLAFIRIER TANK area. 2017.09.24 DS7 YES
IR CE-C 1096 IR scan\CE-C 1096.PDF Loading Dry concrete for: 1.the SKID blinding in DS7.2.PIPE SUPPORT FOOTING 2017.09.24 DS7 YES YES
IR CE-C 1097 IR scan\CE-C 1097.PDF Sampling water that used for mix concrete of the blinding and foundation in DS7. 2017.09.25 DS7 YES yes yes
IR CE-C 1098 IR scan\CE-C 1098.PDF Pouring concrete (including slump test, temperature and make specimen(cubes) fo 2017.09.25 DS7 YES YES
IR CE-C 1099 IR scan\CE-C 1099.PDF Final inspection for the formwork of the flocculant injection skid blinding (including su 2017.09.25 DS7 YES YES
IR CE-C 1100 IR scan\CE-C 1100.PDF Witness conducting compaction degree test for clarifier tank area in DS7. 2017.09.25 DS7 YES YES YES
IR CE-C 1101 IR scan\CE-C 1101.PDF Witness to test concrete cubes (compressive strength at 7 days) for sleeper column 2017.09.25 DS7 yes YES YES
IR CE-C 1102 IR scan\CE-C 1102.PDF check the concrete surface of the pump foundation(PBE-681153ABC)after remove formwork. 2017.09.26 DS7 YES YES
IR CE-C 1103 Witness to test concrete cubes (compressive strength at 28 days) for the second batch 2017.09.26 DS7
IR CE-C 1104 IR scan\CE-C 1104.PDF Sampling of backfill soil in DS7 IGF area(ZONE 3) 2017.09.26 DS7 YES yes
IR CE-C 1106 IR scan\CE-C 1006.PDF Final inspection for the rebar, formwork and ahcol bolts of the NSF skid (including survey 2017.09.27
work) in DS7(D7-V681157DS7 YES yes
IR CE-C 1107 IR scan\CE-C 1107.PDF 2017.09.27
Final inspection for the rebar, formwork and ahcol bolts of the recovered pump skid (including DS7 YES
survey work) in DS7(D7-V681154) yes
IR CE-C 1108 IR scan\CE-C 1108.PDF 2017.09.27
Final inspection for the rebar, formwork and ahcol bolts of the water pump piping skid (including DS7) (D7-V681152)
survey work) in DS7 YES yes
IR CE-C 1109 IR scan\CE-C 1109.PDF check the concrete surface of the pump foundation(PBE-681153ABC)after repaired 2017.09.27 DS7 YES yes
IR CE-C 1111 IR scan\CE-C 1111.PDF Witness conducting compaction degree test for IGF area in DS7.(ZONE:3) 2017.09.27 DS7 YES YES yes
IR CE-C 1112 IR scan\CE-C 1112.PDF Inspect the pipe support columns after chipping in DS7. 2017.09.28 DS7 YES YES
IR CE-C 1113 IR scan\CE-C 1113.PDF check the concrete surface of the pump foundation(PBE-681153ABC)after coating 2017.09.28 DS7 YES YES
IR CE-C 1114 IR scan\CE-C 1114.PDF Witness to test concrete cubes (compressive strength at 7 days) for pump foundation( 2017.09.28 DS7 YES yes
IR CE-C 1114/R1 IR scan\CE-C 1114-R1.PDF Witness to test concrete cubes (compressive strength at 7 days) for pump foundation( 2017.09.30 DS7 YES YES yes
IR CE-C 1114/R2 IR scan\CE-C 1114-R2.PDF Witness to test concrete cubes (compressive strength at 7 days) for pump foundation( 2017.09.30 DS7 YES YES
IR CE-C 1115 IR scan\CE-C 1115.PDF Loading Dry concrete for the SKID FOUNDATION in DS7.(DS7-V681152;DS7-V681154;DS7-V681157) 2017.09.29 DS7 YES YES
IR CE-C 1116 IR scan\CE-C 1116.PDF 2017.09.29
Sampling water that used for mix concrete of the SKID FOUNDATION in DS7.(DS7-V681152;DS7-V681154;DS7-V681157) DS7 YES YES yes
IR CE-C 1117 IR scan\CE-C 1117.PDF Pouring concrete (including slump test, temperature and make specimen(cubes) for the SKID 2017.09.29
FOUNDATION in DS7. DS7 YES YES
IR CE-C 1104 canceld Final inspection for the rebar, formwork and ahcol bolts of the recovered pump skid (including 2017.09.29
survey work) in DS7DS7 YES yes
IR CE-C 1118/R1 Final inspection for the rebar, formwork and ahcol bolts of the recovered pump skid (including 2017.09.30
survey work) in DS7DS7
IR CE-C 1119 canceld Final inspection for the rebar, formwork and ahcol bolts of the water pump piping skid (including survey work) in DS7
2017.09.29 DS7) YES yes
IR CE-C 1119/R1 Final inspection for the rebar, formwork and ahcol bolts of the water pump piping skid (including2017.09.30
survey work) in DS7
DS7)
IR CE-C 1120 Witness to test concrete cubes (compressive strength at 7 days) for pump foundation( 2017.09.29 DS7
IR CE-C 1120/R1 IR scan\CE-C 1120-R1.PDF Witness to test concrete cubes (compressive strength at 7 days) for 1.pipe support footing2017.09.29 DS7 YES YES YES
(PS-D7PW-0131/130/129/134/1135/141/144/143/140/139/258/294/293) 2.pip
IR CE-C 1121 canceld Witness to test concrete cubes (compressive strength at 7 days) for 1.pipe support footing2017.09.29 DS7 YES yes
(PS-D7PW-0131/130/129/134/1135/141/144/143/140/139/258/294/293) 2.pip
IR CE-C 1121/R1 Final inspection for the rebar, formwork and ahcol bolts of the PIPE SUPPORT COLU 2017.09.29 DS7
IR CE-C 1122 IR scan\CE-C 1122.PDF Check the surface of concrete after repaired of sleeper columns and pipe support footing vertical2017.09.29
surface DS7 YES YES
IR CE-C 1123 IR scan\CE-C 1123.PDF Check the surface of concrete after repaired of crossover platform columns。 2017.09.30 DS7 YES YES
IR CE-C 1124 IR scan\CE-C 1124.PDF sampling backfill soil in DS7 CLARIFER TANK area。 2017.09.30 DS7 YES YES
IR CE-C 1126 canceld Final inspection for the rebar, formwork and ahcol bolts of the NSF skid (including survey 2017.10.02
work) in DS7) DS7 YES yes
IR CE-C 1126/R1 Final inspection for the rebar, formwork and anchor bolts of the NSF skid (including survey 2017.10.02 DS7
IR CE-C 1127 IR scan\CE-C 1127.PDF work)
Loadingin DS7 (D7-V681257)
Dry concrete for recover oil pump skid and water pump piping skid foundations in 2017.10.02 DS7 YES yes
DS7.
IR CE-C 1128 IR scan\CE-C 1128.PDF Sampling water that used for mix concrete of recover oil pump skid and water pump piping 2017.10.02 DS7 YES YES yes
skid foundations
concretein(including
DS7.
IR CE-C 1129 IR scan\CE-C 1129.PDF Pouring slump test, temperature and make specimen (cubes)) of recover 2017.10.02 DS7 YES YES
oil pump skid and water pump piping skid foundations in DS7.
IR CE-C 1130 IR scan\CE-C 1130.PDF Check the surface of concrete after remove formwork of pump foundation(PBE- 2017.10.02 DS7 YES yes
IR CE-C 1131 681253A/B/C)。
Final inspection for the rebar, formwork and anchor bolts of the FLOCCULANT INJECTION 2017.10.02 DS7
IR CE-C 1132 IR scan\CE-C 1132.PDF skid
Witness(including survey work)
to test concrete cubes DS7 (D7-V681170/681270)
in (compressive strength at 28 days) for the second batch of 2017.10.02 DS7 YES YES yes
precast pipe support footing in CPECC camp.strength at 7 days) for 1.PIPE SUPPORT
IR CE-C 1134 Witness to test concrete cubes (compressive 2017.10.02 DS7
IR CE-C 1136 IR scan\CE-C 1136.PDF FOOTING
Witness AND COLUMNS
conducting compactionIN DS7.2.PUMP FOUNDATION(PBE-681253A/B/C)
degree test for CLARIFIER tank area and IGF area(ZONE:3) 2017.10.02 DS7 YES YES yes
in DS7. conducting compaction degree test for CLARIFIER tank area and IGF area(ZONE:3)
IR CE-C 1136/R1 IR scan\CE-C 1136-R1.PDF Witness 2017.10.03 DS7 YES YES yes
in DS7.
Loading Dry concrete for NSF skid and FLOCCULANT INJECTION skid foundations in DS7.
IR CE-C 1137 IR scan\CE-C 1137.PDF 2017.10.03 DS7 YES yes
IR CE-C 1138 IR scan\CE-C 1138.PDF Sampling water that used for mix concrete of NSF skid and FLOCCULANT INJECTION skid 2017.10.03 DS7 YES yes
foundations in DS7.
IR CE-C 1139 IR scan\CE-C 1139.PDF Pouring concrete (including slump test, temperature and make specimen (cubes)) of NSF skid 2017.10.03 DS7 YES YES
and FLOCCULANT INJECTION skid foundations in DS7.
IR CE-C 1140 IR scan\CE-C 1140.PDF Final inspection for the rebar, formwork and anchor bolts of the pipe support columns 2017.10.03 DS7 YES YES
(including
Check the survey
surfacework) in DS7 (PS-D7PW-
IR CE-C 1141 IR scan\CE-C 1141.PDF of concrete after coating of crossover platform (train 2:F3,F4,F5.F6) 2017.10.03 DS7 YES yes
0131/130/129/134/1135/141/144/143/140/139/258/294/293)
columns.
IR CE-C 1142 IR scan\CE-C 1142.PDF Check the surface of concrete after repaired of pipe support foundation. 2017.10.03 DS7 yes
IR CE-C 1142/R1 IR scan\CE-C 1142-R1.PDF Check the surface of concrete after repaired of pipe support foundation. 2017.10.04 DS7 YES yes
IR CE-C 1144 IR scan\CE-C 1144.PDF Check the surface of concrete after remove formwork of NSF skid (train1) and recover 2017.10.04 DS7 YES yes
IR CE-C 1151 sampling backfill soil in DS7 zone 5 and zone 3 fail point。 2017.10.04 DS7
IR CE-C 1152 IR scan\CE-C 1152.PDF Check the surface of concrete after coating of pipe support foundation. 2017.10.05 DS7 YES yes
IR CE-C 1153 IR scan\CE-C 1153.PDF Check the surface of concrete after repaired of pump foundation.(PBE-681253A/B/C) 2017.10.05 DS7 YES yes
IR CE-C 1155 IR scan\CE-C 1155.PDF Witness conducting compaction degree test for IGF area in DS7.(ZONE 3;5) 2017.10.05 DS7 YES yes
IR CE-C 1156 IR scan\CE-C 1156.PDF Sampling the backfilling soil for PSV TOWER area in DS7. 2017.10.05 DS7 yes YES
IR CE-C 1157 IR scan\CE-C 1157.pdf Witness sampling gravel & sand for chemical & physical tests at BR Batch Plant 2017.10.05 BR batch plant yes YES
IR CE-C 1158 IR scan\CE-C 1158.pdf Witness sampling cement for chemical & physical tests at BR Batch Plant 2017.10.05 BR batch plant yes YES
IR CE-C 1159 IR scan\CE-C 1159.PDF Check the surface of concrete after coating of pump foundation.(PBE-681253A/B/C) 2017.10.05 DS7 YES YES
IR CE-C 1164 IR scan\CE-C 1164.PDF Witness conducting compaction degree test for PSV TOWER area in DS7. 2017.10.07 DS7 YES YES yes
IR CE-C 1165 IR scan\CE-C 1165.PDF Witness to test concrete cubes (compressive strength at 7 days) for NSF skid (train1) and 2017.10.07 DS7 YES yes
recover oil surface
pump skid (train1) and water pumpof piping
NSF skid(train1)
skid (train1)foundation.
IR CE-C 1166 IR scan\CE-C 1166.PDF Check the of concrete after repaired and recover oil pump skid 2017.10.07 DS7 YES YES
(train1) andsurface
water pump piping skid(train1)
after removefoundation.
IR CE-C 1167 IR scan\CE-C 1167.PDF Check the of concrete forwork of NSF skid (train2) and recover oil pump 2017.10.07 DS7 YES YES
skid (train2) and water pump piping skid(train2) foundation.
IR CE-C 1168 Final inspection for the rebar, formwork and anchor bolts of the pipe support columns 2017.10.07 DS7
(including survey work) in DS7. (PS-D7PW-15-18-19-20-33-35-39-40-41-55-56-60-61-62-63-
IR CE-C 1169 IR scan\CE-C 1169.PDF check the materil of Non-shrink cementitious grout in DS7.
64-68-76-77-78-83-84-85-86-87-88-89-90-91-92-156-159-160) 2017.10.07 DS7 YES yes
IR CE-C 1170 IR scan\CE-C 1170.PDF sampling backfill soil in clafirier tank area (elevation=1.95) and zone 1,2,(elevation=1.35) in 2017.10.07 DS7 YES yes
Loading
DS7 Dry concrete for pipe support columns in DS7. (PS-D7PW-15-18-19-20-33-35-39-
IR CE-C 1171 IR scan\CE-C 1171.PDF Witness test for material (sand ,gravel ,cement) in ALFO CENTER LAB.
40-41-55-56-60-61-62-63-64-68-76-77-78-83-84-85-86-87-88-89-90-91-92-156-159-160-131- 2017.10.07 DS7 YES yes
IR CE-C 1172 IR scan\CE-C 1172.PDF Pouring concrete (including slump test,
130-129-134-135-141-144-143-140-139-258-294-293) temperature and make specimen (cubes)) of pipe 2017.10.08 DS7 YES yes
support columns in DS7. (PS-D7PW-15-18-19-20-33-35-39-40-41-55-56-60-61-62-63-64-68-
IR CE-C 1173 IR scan\CE-C 1173.PDF Sampling water that used for mix concrete of pipe support columns in DS7.
76-77-78-83-84-85-86-87-88-89-90-91-92-156-159-160-131-130-129-134-135-141-144-143- 2017.10.08 DS7 YES YES yes
IR CE-C 1174 IR scan\CE-C 1174.PDF 140-139-258-294-293)
Check the surface of concrete after coating of NSF skid (train1) and recover oil pump skid 2017.10.08 DS7 YES yes
IR CE-C 1175 (train1)
Check the andsurface
water pump piping skid(train1)
of concrete after coatingfoundation.
of NSF skid (train1) and recover oil pump skid 2017.10.08 DS7
IR CE-C 1175/R1 IR scan\CE-C 1175-R1.PDF (train1) and water pump piping skid(train1) foundation. 2017.10.09 DS7 YES YES
IR CE-C 1176 IR scan\CE-C 1176.PDF Witness the mixing grouting process 2017.10.08 DS7 YES yes
IR CE-C 1176/R1 IR scan\CE-C 1176-R1.PDF Witness the mixing grouting process
Witness conducting compaction degree test for clafirier tank area (sixth layer ,elevation=1.95) 2017.10.10 DS7 YES YES
IR CE-C 1177 and zone 3,(third layer,elevation=1.35) in DS7 2017.10.08 DS7
IR CE-C 1178 sampling backfill soil in zone 1,2,(third layer,elevation=1.35) in DS7 2017.10.08 DS7
IR CE-C 1180 IR scan\CE-C 1180.PDF Check the surface of concrete after repaired of NSF skid (train2) and recover oil pum 2017.10.09 DS7 YES YES
IR CE-C 1181 IR scan\CE-C 1181.PDF sampling backfill soil in zone 1,2,(third layer,elevation=1.35) and zone 16(fifth layer 2017.10.09 DS7 YES YES
IR CE-C 1182 IR scan\CE-C 1182.PDF Check the surface of concrete after coating of NSF skid (train2) and recover oil pump 2017.10.10 DS7 YES YES
IR CE-C 1183 IR scan\CE-C 1183.PDF Check the surface of concrete after repaired of flocculant injection skid 2017.10.10 DS7 YES YES
IR CE-C 1184 IR scan\CE-C 1184.PDF Witness to test concrete cubes (compressive strength at 7 days) for NSF skid (train2) an 2017.10.10 DS7 YES yes
IR CE-C 1185 Witness conducting compaction degree test for zone 1,2,(third layer,elevation=1.35) and 2017.10.10
zone 16 DS7
IR CE-C 1186 Final inspection for the rebar,formwork of the third batch of precast pipe suppo 2017.10.11 DS7
IR CE-C 1187 IR scan\CE-C 1187.PDF Re-sampling backfill soil in zone 2 fail point,(third layer,elevation=1.35) and zone 16 fail point 2017.10.11 DS7 YES YES
IR CE-C 1188 IR scan\CE-C 1088.PDF 2017.10.11 DS7 YES YES
sampling backfill soil under pipe support foundation,(second layer,elevation=1.15)(PS-D7-003/0004/005/105/106/006/007/009/010/038/070/065/157/072/066/067/069/073/
IR CE-C 1189 IR scan\CE-C 1189.PDF sampling backfill soil under ROMOTE I/O SHELTER foundation,(fifth layer,elevation=1.75) 2017.10.11 DS7 YES YES
IR CE-C 1190 IR scan\CE-C 1190.PDF Check the surface of concrete after remove formwork of pipe support foundatio 2017.10.11 DS7 YES YES
IR CE-C 1191 IR scan\CE-C 1191.PDF Loading Dry concrete for the third batch of precast pipe support footing in CPECC camp. 2017.10.12 DS7 YES YES
IR CE-C 1192 IR scan\CE-C 1192.PDF Sampling water that used for the third batch of precast pipe support footing in CPECC camp. 2017.10.12 DS7 YES YES yes
IR CE-C 1193 IR scan\CE-C 1193.PDF Pouring concrete (including slump test, temperature and make specimen (cubes)) of the third 2017.10.12 DS7 YES yes
batch of precast pipe support footing in CPECC camp.
IR CE-C 1194 IR scan\CE-C 1194.PDF Witness conducting compaction degree test for IR-CE-1187/88/89 in DS7 2017.10.12 DS7 YES yes
IR CE-C 1196 IR scan\CE-C 1196.PDF Re-sampling backfill soil for IR-CE-1187/88/89 fail points in DS7 2017.10.12 DS7 YES yes
IR CE-C 1197 IR scan\CE-C 1197.PDF sampling backfill soil for ZONE 3(fifth layer,elevation=1.75),ZONE 8 ,13(third 2017.10.12 DS7 YES yes
IR CE-C 1198 IR scan\CE-C 1198.PDF layer,elevation=1.35)
sampling in DS7
backfill soil under pipe support foundation,(second layer,elevation=1.15)(PS-D7- 2017.10.12 DS7 YES yes
222-223-224-225-226-266-267-268-269-270;CTS-07/08)
IR CE-C 1199 IR scan\CE-C 1199.PDF Check the surface of concrete aftercoating of flocculant injection skid 2017.10.12 DS7 YES yes
IR CE-C 1200 IR scan\CE-C 1200.PDF Check the surface of concrete after repaired for pipe support columns. 2017.10.13 DS7 YES yes
IR CE-C 1201 Inspection the formwork of the blinding for REMOTE I/O shelter and eyes washed 2017.10.13 DS7
IR CE-C 1202 IR scan\CE-C 1202.PDF foundation。
Inspection the formwork of the blinding for pipe support foundation。 2017.10.13 DS7 YES YES
IR CE-C 1204 Final inspection for the formwork of the pipe support blinding (including survey work) in DS7. 2017.10.14 DS7
(PS-D7-003-004-005-006-007-008-009-010-012-014-038-065-066-067-069-070-071-072-073-
IR CE-C 1205 IR scan\CE-C 1205.PDF Check the surface of concrete after repaired for pipe support columns.
157-093-080-079-158-094-095) 2017.10.14 DS7 YES YES
IR CE-C 1206 IR scan\CE-C 1206.PDF Check the surface of concrete after coating for pipe support columns. 2017.10.14 DS7 yES YES
IR CE-C 1207 IR scan\CE-C 1207.PDF Witness conducting compaction degree test for IR-CE-1196/97/98 in DS7 2017.10.14 DS7 YES yes
IR CE-C 1210 IR scan\CE-C 1210.PDF Re-sampling backfill soil for IR-CE-1187/88/89 fail points in DS7 2017.10.14 DS7 YES yes
IR CE-C 1211 IR scan\CE-C 1211.PDF sampling backfill soil for ZONE 1,2(fifth layer,elevation=1.75) 2017.10.14 DS7 YES yes
IR CE-C 1212 IR scan\CE-C 1212.PDF Witness to test concrete cubes (compressive strength at 28 days) for pipe support and pipe 2017.10.15 DS7 YES YES YES
support column.
IR CE-C 1213 IR scan\CE-C 1213.PDF Loading Dry concrete for the pipe support and remote shelter blinding in DS7. 2017.10.15 DS7 YES YES
IR CE-C 1214 IR scan\CE-C 1214.PDF Sampling water that used the pipe support and remote shelter blinding in DS7. 2017.10.15 DS7 yes YES
IR CE-C 1215 IR scan\CE-C 1215.PDF Pouring concrete (including slump test, temperature and make specimen (cubes)) of the pipe 2017.10.15
support and remoteDS7
shelter blindingyes YES
in DS7.(PS-D7-003-004-005-006-007-008-009
IR CE-C 1216 IR scan\CE-C 1216.PDF Witness conducting compaction degree test for backfill soil of ZONE 1,2(fifth layer,elevation=1.75) 2017.10.15 and the point
DS7under CTS-07YES YES
foundation. YES
IR CE-C 1217 IR scan\CE-C 1217.PDF Witness to test concrete cubes (compressive strength at 28 days) for 2017.10.15 DS7 YES YES yes
IR CE-C 1218 the backto
Witness wash
test pump
concrete in DS7(PBE-681161A).
cubes (compressive strength at 7 days) for pipe support 2017.10.15 DS7
IR CE-C 1219 IR scan\CE-C 1219.PDF the
Finalaccess and crossover
inspection platforms footing
for the rebar,formwork of the in DS7
fourth(train-1:F3,F4,F5,F6;
batch of precast pipe suppo train-2: 2017.10.15 DS7 YES yes
IR CE-C 1220 IR scan\CE-C 1220.PDF F3,F4A,F5,F6).
Check the surface of concrete after repaired of pipe support footing in CPECC 2017.10.16 DS7 YES YES
IR CE-C 1220/R1 IR scan\CE-C 1220-R1.PDF Check the surface of concrete after repaired of pipe support footing in CPECC 2017.10.18 YES YES yes
IR CE-C 1228 IR scan\CE-C 1228.PDF check the surface after coating of pipe support foundation. 2017.10.16 DS7 yes yes
IR CE-C 1229 IR scan\CE-C 1229.PDF Re-sampling backfill soil for ZONE 1,2(fifth layer,elevation=1.75) 2017.10.16 DS7 YES yes
IR CE-C 1230 IR scan\CE-C 1230.PDF Loading Dry concrete for the fourth batch of precast pipe support footing in CPECC camp. 2017.10.17 DS7 YES YES
(PS-D8PW-001-002-046-050-051-052-055-056-057-058-059) (PS-D6PW-001-002-035-037-
IR CE-C 1230/R1 IR scan\CE-C 1230-R1.PDF Loading Dry concrete for the fourth batch of precast pipe support
038-039-040-041-042-043-044-045-046-047-048-049-050-051-054)
footing in CPECC camp. 2017.10.18 DS7 YES yes
(PS-D8PW-001-002-046-050-051-052-055-056-057-058-059) (PS-D6PW-001-002-035-037-
IR CE-C 1231 IR scan\CE-C 1231.PDF Sampling water that used for the fourth batch of precast pipe support
038-039-040-041-042-043-044-045-046-047-048-049-050-051-054)
footing in CPECC camp. 2017.10.17 DS7 YES YES
IR CE-C 1231/R1 IR scan\CE-C 1231-R1.PDF Sampling water that used for the fourth batch of precast pipe support footing in CPECC camp. 2017.10.18 DS7 YES yes yes
IR CE-C 1232 IR scan\CE-C 1232.PDF Pouring concrete (including slump test, temperature and make specimen (cubes)) of the 2017.10.17 DS7 YES YES
fourth batch of precast pipe slump
supporttest,
footing in CPECC andcamp.
make(PS-D8PW-001-002-046-050-
IR CE-C 1232/R1 Pouring concrete (including temperature specimen (cubes)) of the 2017.10.18 DS7
051-052-055-056-057-058-059)
fourth batch of precast pipe support (PS-D6PW-001-002-035-037-038-039-040-041-042-043-
footing in CPECC camp. (PS-D8PW-001-002-046-050-
IR CE-C 1233 IR scan\CE-C 1233.PDF Witness conducting compaction
044-045-046-047-048-049-050-051-054) degree test for backfill soil resampling of ZONE 1,2(fifth 2017.10.17 DS7 YES YES YES
051-052-055-056-057-058-059) (PS-D6PW-001-002-035-037-038-039-040-041-042-043-
IR CE-C 1234 IR scan\CE-C 1234.PDF layer,elevation=1.75)
re-sampling backfill soil for IR-CE-C1233
044-045-046-047-048-049-050-051-054) fail point。 2017.10.17 DS7 YES yes YES
IR CE-C 1235 IR scan\CE-C 1235.PDF sampling backfill soil for between two tanks area(third layer,elevation=1.35) 2017.10.17 DS7 YES YES
IR CE-C 1238 IR scan\CE-C 1238.PDF Witness conducting compaction degree test for backfill soil resampling of ZONE 1,2(fifth layer 2017.10.18 DS7 YES YES
IR CE-C 1239 IR scan\CE-C 1239.PDF Witness conducting compaction degree test for backfill soil of between two tanks area 2017.10.18 DS7 YES YES YES
IR CE-C 1240 IR scan\CE-C 1240.PDF Re-sampling backfill soil for IR-CE-C1238/1239 fail point。 2017.10.18 DS7 YES yes
IR CE-C 1241 IR scan\CE-C 1241.PDF Check the surface of concrete after remove the formwork of pipe support columns 2017.10.19 DS7 YES yes
IR CE-C 1242 IR scan\CE-C 1242.PDF Witness
Witness toto test
test concrete
concrete cubes
cubes (compressive
(compressive strength
strength at
at 28 days)for
7 days) for 1.pump foundation 2017.10.19 DS7 YES YES
2.crossover columns 3.pipe support footing in DS7.
IR CE-C 1243 the third batch of precast pipe support footing in CPECC camp. 2017.10.19 DS7
IR CE-C 1244 IR scan\CE-C 1246.PDF Check the surface of concrete after coating for pipe support foundation in DS8. 2017.10.19 DS7 YES yes
IR CE-C 1245 IR scan\CE-C 1245.PDF sampling backfill soil for zone 3(sixth layer,elevation=1.95),zone 8,13(fourth layer, 2017.10.19 DS7 yes YES
IR CE-C 1246 IR scan\CE-C 1246.PDF Check the surface of concrete after repaired of pipe support columns (PS-D7PW-018-035- 2017.10.19 DS7 YES yes
39-40)
IR CE-C 1247 IR scan\CE-C 1247.PDF Final inspection for the rebar,formwork of the pipe support footing in DS7. (PS-D7PW-094- 2017.10.21 DS7 YES YES
095-105-150)
IR CE-C 1248 Final inspection for the rebar,formwork,anchor bolts of the pipe support columns in DS7. (PS- 2017.10.21 DS7
D7-106-209-210-211-212-213-214-222-223-224-225-226-266-267-268-269-270-273-274-275-
IR CE-C 1249 IR scan\CE-C 1249.PDF Final inspection for the formwork of the blinding for EDUCTOR skid and CROSSOVER
276-277-278;CTS-07-08) 2017.10.21 DS7 YES YES
PLATFORM (F1,F2) in DS7.
IR CE-C 1250 Final inspection for the rebar,formwork of the REMOTE I-O SHELTER and EYES WASH 2017.10.21 DS7
foundation.
IR CE-C 1251 IR scan\CE-C 1251.PDF Witness conducting compaction degree test for backfill soil of zone 3(sixth 2017.10.21 DS7 YES YES yes
IR CE-C 1254 IR scan\CE-C 1254.PDF layer,elevation=1.95),zone 8,13(fourth layer,elevation=1.55)
Re-sampling backfill soil for IR-CE-C1251 fail point。 2017.10.21 DS7 YES yes
IR CE-C 1255 IR scan\CE-C 1255.PDF sampling backfill soil for zone 16(fifth layer,elevation=1.95) 2017.10.21 DS7 YES yes
IR CE-C 1256 IR scan\CE-C 1256.PDF Witness to test concrete cubes (compressive strength at 28 days) for the 1.pipe support 2017.10.21 DS7 YES YES yes
footing (PS-D7PW-0131-130-129-134-1135-141-144-143-140-139-258-294-293)2.pipe
IR CE-C 1257 IR scan\CE-C 1257.PDF Witness to test concrete spare cubes (compressive strength at 28 days) for 1.pump foundation 2017.10.21 DS7 YES yES yes
support columns
2.crossover (PS-D7PW-238-239-295-296)
columns 3.pipe support footing in DS7.
IR CE-C 1258 IR scan\CE-C 1258.PDF Loading Dry concrete for the pipe support foundation and remote shelter/eye wash 2017.10.22 DS7 YES YES
IR CE-C 1259 IR scan\CE-C 1259.PDF Sampling water that used mixing concrete for the pipe support foundation and rem 2017.10.22 DS7 YES YES yes
IR CE-C 1260 IR scan\CE-C 1260.PDF Pouring concrete (including slump test, temperature and make specimen (cubes)) of 2017.10.22 DS7 YES yes
IR CE-C 1261 IR scan\CE-C 1261.PDF Check the material of epoxy grout in DS7. 2017.10.22 DS7 YES YES
IR CE-C 1262 IR scan\CE-C 1262.PDF Witness to test concrete cubes (compressive strength at 7 days) for pipe support c 2017.10.22 DS7 YES YES YES
IR CE-C 1264 IR scan\CE-C 1264.PDF Witness conducting compaction degree test for backfill soil of zone 1,2,16 and above PSV area 2017.10.22 DS7 YES YES YES
IR CE-C 1265 IR scan\CE-C 1265.PDF check the surface after remove formwork of the fourth batch of precast pipe support 2017.10.23 DS7 YES YES
IR CE-C 1266 IR scan\CE-C 1266.PDF Check the surface of concrete after coating of pipe support columns (PS-D7PW-018-0 2017.10.23 DS7 YES YES
IR CE-C 1267 IR scan\CE-C 1267.PDF Inspection the formwork for grout the 1200m³tank foudation in DS7 2017.10.23 DS7 YES YES
IR CE-C 1269 IR scan\CE-C 1269.PDF Witness to test concrete cubes (compressive strength at 7 days) for pipe support footing in 2017.10.23 DS7 YES yes yes
DS8.(ps-D8pw-027-037-038-039-040-041-042-043-044-045-048)
IR CE-C 1270 IR scan\CE-C 1270.PDF Witness to test concrete cubes (compressive strength at 28 days) for 1.PIPE SUPPORT 2017.10.23 DS7 YES YES YES
FOOTING AND COLUMNS IN DS7.2.PUMP FOUNDATION
IR CE-C 1271 IR scan\CE-C 1271.PDF Re-sampling backfill soil for zone 1,2(sixth layer,elevation=1.95) fail point。 2017.10.23 DS7 YES YES
IR CE-C 1272 IR scan\CE-C 1272.PDF sampling backfill soil for pump area(fifth layer,elevation=1.75) and pipe support area(fourth 2017.10.23 DS7 YES YES
IR CE-C 1273 IR scan\CE-C 1273.PDF layer,elevation=1.55)between two tanks
Witness the 1200m³ tank foundation grouting(including temperature and make speci 2017.10.24 DS7 YES YES
IR CE-C 1274 IR scan\CE-C 1274.PDF Witness conducting compaction degree test for pump area(fifth layer,elevation=1.75) and 2017.10.24 DS7 layer elevation=1.55)between
pipe support area(fourth YES yes YES
two tanks and zone 1,2
IR CE-C 1275 IR scan\CE-C 1275.PDF Re-sampling backfill soil for IR-CE-C1274 fail point。 2017.10.24 DS7 yes yes
IR CE-C 1276 IR scan\CE-C 1276.PDF Witness to test concrete cubes (compressive strength at 7 days) for the fourth b 2017.10.25 DS7 YES yes YES
IR CE-C 1277 IR scan\CE-C 1277.PDF Witness to test grout cubes (compressive strength at 7 days) for tank foundation (I 2017.10.25 DS7 YES yes yes
IR CE-C 1278 IR scan\CE-C 1278.PDF Final inspection for the rebar,formwork,anchor bolts of the pipe support columns i 2017.10.25 DS7 YES yes
IR CE-C 1279 IR scan\CE-C 1279.PDF Final inspection for the rebar,formwork anchor bolts and plate of the pipe support co 2017.10.26 DS7 YES yes
IR CE-C 1286 IR scan\CE-C 1286.PDF Witness to test 2 sets concrete cubes (compressive strength at 28 days) for skid foundation in ds7. 2017.10.28 DS7 YES YES YES
IR CE-C 1289 IR scan\CE-C 1289.PDF check the surface
Final inspection forofthe
concrete after repaired
rebar, formwork of pipe bolts
and anchor support column
of the and REMOTE
EDUCTOR skid in I/O 2017.10.28 DS7 YES YES
IR CE-C 1290 IR scan\CE-C 1290.PDF shelter and
DS7(include
Final eyes
survey
inspection wash foundation。
work)
for the rebar, formwork and anchor bolts(include survey work) of the 2017.10.28 DS7 YES YES
IR CE-C 1291 IR scan\CE-C 1291.PDF ACCESS AND CROSSOVER PLATFORM foundation (F1,F2) in DS7 2017.10.28 DS7 YES YES
IR CE-C 1292 IR scan\CE-C 1292.PDF 2017.10.28 DS7 YES YES
IR CE-C 1293 IR scan\CE-C 1293.PDF Witness conducting compaction degree test for ZONE 6 (sixth layer,elevation=1.95) in IGF 2017.10.29
area. DS7 YES YES
IR CE-C 1294 check the surface of concrete after coating of pipe support column and REMOTE I/O s 2017.10.29 DS7
IR CE-C 1295 IR scan\CE-C 1295.PDF sampling backfill soil for pipe support area(fifth layer,elevation=1.75) and pump shelter area 2017.10.29 DS7 YES yes
IR CE-C 1296 IR scan\CE-C 1296.PDF Witness to test concrete cubes (compressive strength at 7 days) for pipe support co 2017.10.29 DS7 YES YES yes
IR CE-C 1297 IR scan\CE-C 1297.PDF Loading Dry concrete for the pipe support column and EDUCTOR skid and ACCESS AND 2017.10.30 DS7 YES yes
CROSSOVER
Sampling waterPLATFORM foundation
that used mixing (F1,F2)
concrete for theinpipe
DS7support column and EDUCTOR skid 2017.10.30 DS7 YES YES YES
IR CE-C 1298 IR scan\CE-C 1298.PDF
and ACCESS AND CROSSOVER PLATFORM foundation (F1,F2) in DS7
IR CE-C 1299 Pouring concrete (including slump test, temperature and make specimen (cubes)) for the pipe 2017.10.30 DS7
support column and EDUCTOR skid and ACCESS AND CROSSOVER PLATFORM
IR CE-C 1300 IR scan\CE-C 1300.PDF Final inspection for the rebar, formwork and anchor bolts (include survey work)of the pipe 2017.10.30 DS7 YES yes
foundation
support (F1,F2)
columns in DS7.(ps-D7pw-003-004-005-006-007-008-009-012-038-065-066-067-
in DS7(ps-D7pw-079-080-081--093-094-095-105-150-158)
IR CE-C 1301 IR scan\CE-C 1301.PDF Inspection the formwork for grout the 2400m³tank foudation
069-070-071-072-073-079-080-081--093-094-095-105-150-157-158) in DS7 2017.10.30 DS7 YES yes
IR CE-C 1302 Witness conducting compaction degree test for pipe support area(fifth layer,elevation=1.75) 2017.10.30 DS7
IR CE-C 1303 IR scan\CE-C 1303.PDF and pump shelter area (sixth layer,elevation=1.95)between two tanks.
sampling backfill soil for 1200m³tank platform area (sixth layer,elevation=1.95). 2017.10.30 DS7 YES yes
IR CE-C 1305 Final inspection for the rebar, formwork of the precast ACCESS PLATFORM footing and 2017.10.30 DS7
CROSS OVER foundation in CPECC camp. strength at 28 days) for recovered oil pump skid
IR CE-C 1306 IR scan\CE-C 1306.PDF Witness to test concrete cubes (compressive 2017.10.30 DS7 YES YES yes
(train2) and water pump piping skid (train2)
IR CE-C 1307 IR scan\CE-C 1307.PDF Loading Dry concrete for the precast ACCESS PLATFORM footing and CROSS OVER fo 2017.10.31 DS7 YES yes
IR CE-C 1308 IR scan\CE-C 1308.PDF Sampling water that used mixing concrete for the precast ACCESS PLATFORM footing and 2017.10.31 DS7 yes YES yes
CROSS OVER foundation(F1) in CPECC camp
IR CE-C 1309 IR scan\CE-C 1309.PDF Pouring concrete (including slump test, temperature and make specimen (cubes)) for the 2017.10.31 DS7 YES yes
precast ACCESS PLATFORM footing and CROSS OVER foundation(F1) in CPECC camp
IR CE-C 1310 IR scan\CE-C 1310.PDF survey the anchor bolts's elevation/distance and the final elevation of the backfill oil for 2017.10.31 DS7 YES yes yes
platform(ABJ-681050) in DS7.
IR CE-C 1311 IR scan\CE-C 1311.PDF survey the anchor bolts's elevation/distance and the final elevation of the backfill oil for 2017.10.31 DS7 YES yes yes
platform(ABJ-681053) in DS7.
IR CE-C 1314 IR scan\CE-C 1314.PDF Witness conducting compaction degree test for 1200m³tank platform area (sixth 2017.10.31 DS7 YES yes
IR CE-C 1315 IR scan\CE-C 1315.PDF layer,elevation=1.95).
sampling backfill soil for zone 4 (sixth layer,elevation=1.95)in IGF area ; 2017.10.31 DS7 YES yes
IR CE-C 1316 IR scan\CE-C 1316.PDF Re-sampling backfill soil 1 fail points for pipe support area(fifth layer,elevation=1.75) and 2 2017.10.31 DS7 YES yes
IR CE-C 1317 IR scan\CE-C 1317.PDF fail pointstopump
Witness shelter
test spare area (sixth
concrete cubeslayer,elevation=1.95)
(compressive strengthbetween twofor
at 28 days) tanks.
recovered oil 2017.10.31 DS7 YES YES yes
pump skid (train2) and water pump piping skid (train2)
IR CE-C 1318 IR scan\CE-C 1318.PDF Witness to test concrete cubes (compressive strength at 28 days) for NSF skid (train2) and 2017.10.31 DS7 YES YES YES
FLOCCULANT INJECTION skid
IR CE-C 1319 IR scan\CE-C 1319.PDF Witness to test grout cubes (compressive strength at 7 days) for tank foundation of (ABJ- 2017.10.31 DS7 YES YES yes
681050) in DS7
IR CE-C 1320 IR scan\CE-C 1320.PDF Witness the 2400m³ tank foundation(D7-681053) grouting(including temperature and make 2017.11.01 DS7 YES yes
specimen (cubes) in DS7
IR CE-C 1321 IR scan\CE-C 1321-R1.PDF Mechanical completion check for platform near tank(D7-681050;D7-681053) in DS7. 2017.11.01 DS7 YES yes
IR CE-C 1321/R1 IR scan\CE-C 1321-R1.PDF Mechanical completion check for platform near tank(D7-681050;D7-681053) in DS7. 2017.11.02 DS7 YES yes
IR CE-C 1324 IR scan\CE-C 1324.PDF Witness conducting compaction degree test for zone 4 ,5(sixth layer,elevation=1.95)in IGF 2017.11.01 DS7
area and 1 fail points YESarea
for pipe support YES YES
IR CE-C 1325 IR scan\CE-C 1325.PDF Check the surface of grout after remove the formwork of 1200m³tank foundation(D7-681050) 2017.11.02
in DS7. DS7 YES YES
IR CE-C 1326 IR scan\CE-C 1326.PDF Final inspection for the rebar,formwork of the precast stair foundation for DS6,DS7,D 2017.11.02 DS7 YES YES
IR CE-C 1328 IR scan\CE-C 1328.PDF Resampling backfill soil for zone 5 ,6(sixth layer,elevation=1.95)in IGF area and 1 fail points2017.11.02 DS7
for pipe support area YES YES
IR CE-C 1329 IR scan\CE-C 1329.PDF Loading Dry concrete for the precast stair doundation and CROSS OVER foundation(F2) in 2017.11.03 DS7 YES YES
CPECC
Samplingcamp.
water that used mixing concrete for the precast stair doundation and CROSS
IR CE-C 1330 IR scan\CE-C 1330.PDF 2017.11.03 DS7 YES YES
OVER
Pouringfoundation(F2) in CPECC
concrete (including slumpcamp.
test, temperature and make specimen (cubes)) for the stair
IR CE-C 1331 IR scan\CE-C 1331.PDF 2017.11.03 DS7 YES YES
doundation and CROSS
survey the concrete OVER foundation
and anchor (F2) in CPECCand
bolts's elevation/distance camp.the elevation of the backfill oil
IR CE-C 1332 2017.11.03 DS7
IR CE-C 1333 IR scan\CE-C 1333.PDF around foundation
Check the surface ofin DS7. (incloud:1)
concrete after repaired4 pump shed foundation;
of EDUCTOR 2)17 pump
skid and ACCESS AND 2017.11.04 DS7 YES yes
foundation; 3)14
CROSSOVER equipment
PLATFORM foundation;4)some
foundation (F1,F2) pipe support column
in DS7。
IR CE-C 1334 IR scan\CE-C 1334.PDF Check the surface of sixth backfill soil inside the CLARIFIER tank. 2017.11.04 DS7 YES yes
IR CE-C 1335 IR scan\CE-C 1335.PDF Witness conducting compaction degree test for zone 5 ,6(sixth layer,elevation=1.95)in IGF 2017.11.04 DS7
area and 1 fail points YESarea
for pipe support yes
IR CE-C 1338 IR scan\CE-C 1338.PDF Witness conducting compaction degree test for zone 5 ,6(sixth layer,elevation=1.95)in IGF 2017.11.04 DS7
area and 1 fail points YESarea
for pipe support YES YES
IR CE-C 1339 IR scan\CE-C 1339.PDF Loading Dry concrete for the precast overall stair foundation and overall ladder foundation in 2017.11.05 DS7 YES yes
CPECC camp.
IR CE-C 1340 IR scan\CE-C 1340.PDF Sampling water that used mixing concrete for the precast overall stair foundation and overall 2017.11.05 DS7 YES YES YES
ladder foundation in CPECC camp.
IR CE-C 1341 IR scan\CE-C 1341.PDF Pouring concrete (including slump test, temperature and make specimen (cubes)) for the 2017.11.05 DS7 yes yes
precast overall stair foundation and overall ladder foundation in CPECC camp.
IR CE-C 1343 IR scan\CE-C 1343.PDF Mechanical completion check for pump shelter (D6-PBE681052A/B;D6-PAX681051A/B)in 2017.11.05 DS7 YES yes
DS6.
IR CE-C 1344 IR scan\CE-C 1344.PDF Mechanical completion check for pump shelter (D7-PBE681051A/B;D7-PBE681052A/B)in 2017.11.05 DS7 YES yes
DS7.
IR CE-C 1345 IR scan\CE-C 1345.PDF Mechanical completion check for pump shelter (D7-PBE681054A/B/C)in DS7. 2017.11.05 DS7 YES yes
IR CE-C 1346 IR scan\CE-C 1346.PDF Mechanical completion check for pump shelter (D7-PBE681153A/B/C;D7-V-681154)in DS7. 2017.11.05 DS7 YES yes
IR CE-C 1347 IR scan\CE-C 1347.PDF Check the surface of concrete after repaired of pipe support columns in DS7.(ps-D7pw-003- 2017.11.05 DS7 YES yes
004-005-006-007-008-009-012-038-065-066-067-069-070-071-072-073-079-080-081--093-
IR CE-C 1348 IR scan\CE-C 1348.PDF Check the surface of concrete after repaired of pipe support columns in DS7.(ps-D7pw-003-
094-095-105-150-157-158) 2017.11.05 DS7 YES yes
004-005-006-007-008-009-012-038-065-066-067-069-070-071-072-073-079-080-081--093-
IR CE-C 1349 IR scan\CE-C 1349.PDF sampling backfill soil for zone 8,13(fifth layer,elevation=1.75); zone 9,12(sixth
094-095-105-150-157-158) 2017.11.05 DS7 YES yes
IR CE-C 1350 IR scan\CE-C 1350.PDF layer,elevation=1.95)in DS7 IGF area.
Resampling backfill soil for zone 6(sixth layer,elevation=1.95)in IGF area 2017.11.05 DS7 YES YES
IR CE-C 1351 IR scan\CE-C 1351.PDF Witness to test concrete cubes (compressive strength at 28 days) for pipe support column in 2017.11.05 DS7 YES YES
ds7.(PS-D7PW-15-18-19-20-33-35-39-40-41-55-56-60-61-62-63-64-68-76-77-78-83-84-85-86-
IR CE-C 1353 IR scan\CE-C 1353.PDF Survey the anchor bolts elevation for pipe support columns (ps-D7pw-083-084-085-086-087-
87-88-89-90-91-92-156-159-160-131-130-129-134-135-141-144-143-140-139-258-294-293) 2017.11.05 DS7 YES YES YES
088-089-090-091-092-107-108-109-110-111-112-113-114-115-116-117-118-119-120-121-122)
IR CE-C 1353/R1 IR scan\CE-C 1353.PDF Survey the anchor bolts elevation for pipe support columns (ps-D7pw-083-084-085-086-087-
in DS7. 2017.11.07 DS7 YES yes
088-089-090-091-092-107-108-109-110-111-112-113-114-115-116-117-118-119-120-121-122)
IR CE-C 1354 IR scan\CE-C 1354.PDF Check the surface of concrete after coating of EDUCTOR skid and ACCESS AND
in DS7. 2017.11.06 DS7 YES yes
CROSSOVER PLATFORM foundation (F1,F2) in DS7。
IR CE-C 1356 IR scan\CE-C 1356.PDF sampling backfill soil for pipe support area(third layer,elevation=1.35)( 2400m³tank 2017.11.06 DS7 YES yes
IR CE-C 1357 IR scan\CE-C 1357.PDF southeast
Witness corner
test and northwest
concrete corner) strength at 7 days) for EDUCTOR skid and
cubes (compressive 2017.11.06 DS7 YES YES yes
IR CE-C 1359 IR scan\CE-C 1359.PDF ACCESS AND CROSSOVER PLATFORM foundation (F1,F2) in DS7。
Witness conducting compaction degree test for zone 6(sixth layer,elevation=1.95)in IGF 2017.11.06 DS7 YES yes
IR CE-C 1360 IR scan\CE-C 1360.PDF area
Witness conducting compaction degree test for zone 8,13(fifth layer,elevation=1.75); zone 2017.11.06 DS7 YES YES yes
IR CE-C 1361 IR scan\CE-C 1361.PDF 9,12(sixth layer,elevation=1.95)in DS7 IGF area.
Check the surface of concrete after coating of pipe support columns (ps-D7pw-083-084-085- 2017.11.07 DS7 YES yes
086-087-088-089-090-091-092-107-108-109-110-111-112-113-114-115-116-117-118-119-120-
IR CE-C 1362 IR scan\CE-C 1362.PDF Mechanical completion check for pipe support columns (ps-D7pw-083-084-085-086-087-088-
121-122) in DS7. 2017.11.07 DS7 YES yes
089-090-091-092-107-108-109-110-111-112-113-114-115-116-117-118-119-120-121-122) in
IR CE-C 1362/R1 IR scan\CE-C 1362-R1.PDF Mechanical completion check for pipe support columns (ps-D7pw-083-084-085-086-087-088-
DS7. 2017.11.11 DS7 YES yes
089-090-091-092-107-108-109-110-111-112-113-114-115-116-117-118-119-120-121-122) in
IR CE-C 1363 IR scan\CE-C 1363.PDF Mechanical completion check for pipe support columns (ps-D7pw-083-084-085-086-
DS7. 2017.11.07 DS7 YES yes
IR CE-C 1366 IR scan\CE-C 1366.PDF sampling backfill soil for pipe support area(third layer,elevation=1.35)( 1200m³tank south- 2017.11.07 DS7 YES yes
IR CE-C 1366/R1 west corner
sampling ) soil for pipe support area(third layer,elevation=1.35)( 1200m³tank south-
backfill 2017.11.08 DS7
Check the surface of concrete after repaired of the precast ACCESS PLATFORM footing and
west corner and 2400m³tank north-east
IR CE-C 1367 IR scan\CE-C 1376.PDF CROSS OVER foundation(F1) in CPECCcorner
camp. 2017.11.07 DS7 YES yes
IR CE-C 1368 IR scan\CE-C 1368.PDF Witness test concrete cubes (compressive strength at 7 days) for precast ACCESS 2017.11.07 DS7 yes YES yes
IR CE-C 1370 2017.11.08 southeast corner
Re-sampling fail pointof backfill soil for pipe support area(third layer,elevation=1.35)( 2400m³tank DS7 and northwest corner
IR CE-C 1371 IR scan\CE-C 1371.PDF Witness test grout cubes (compressive strength at 7 days) for 2400m³tank(D7-ABJ68 2017.11.08 DS7 YES YES yes
IR CE-C 1372 IR scan\CE-C 1372.PDF Witness test concrete cubes (compressive strength at 28 days) for the third batch of 2017.11.09 DS7 YES YES yes
IR CE-C 1373 IR scan\CE-C 1373.PDF Witness conducting compaction degree test for pipe support area(second layer,elevation=1.85) and pump areaDS7
2017.11.09 YES YES YES
IR CE-C 1374 IR scan\CE-C 1374.PDF Witness conducting compaction degree test for pipe support area(third 2017.11.09 DS7 YES yes
IR CE-C 1375 IR scan\CE-C 1375.PDF layer,elevation=1.35)( 1200m³tank south-west corner and 2400m³tank
Witness conducting compaction degree test for pipe support area(third east side ) 2017.11.09 DS7 YES YES yes
IR CE-C 1376 IR scan\CE-C 1376.PDF layer,elevation=1.35)(
Final 2400m³tank
inspection for the formwork southeast
of the cornerblinding
pipe support and northwest corner)and
(including zone
survey work) in DS7. 2017.11.11 DS7 YES yes
(PS-D7-096-097-098-099-100-101-102-103-014)
12(fifth layer,elevation=1.75)
IR CE-C 1377 IR scan\CE-C 1377.PDF Final inspection for the formwork,rebar and anchor bolts of the pipe support column (including 2017.11.11 DS7 YES yes
IR CE-C 1378 IR scan\CE-C 1378.PDF survey work) in DS7. (PS-D7-010-014;CS-D7PW-1001)
Check surface of grout after repaired for 2400m³ tank foundation(D7-ABJ681053) 2017.11.11 DS7 YES yes
IR CE-C 1379 IR scan\CE-C 1379.PDF Mechanical completion check for PUMP foundation(PBE-681051A/B,PBE-681052A/B) in DS7. 2017.11.11 DS7 YES yes
IR CE-C 1380 IR scan\CE-C 1380.PDF Mechanical completion check for WATER PUMP PIPING skid(train1) in DS7. 2017.11.11 DS7 YES yes
IR CE-C 1381 IR scan\CE-C 1381.PDF Mechanical completion check for RECOVERED OIL PUMP skid(train1) in DS7. 2017.11.11 DS7 YES yes
IR CE-C 1382 IR scan\CE-C 1382.PDF Mechanical completion check for NSF skid(train1,train2) in DS7. 2017.11.11 DS7 YES yes
IR CE-C 1383 IR scan\CE-C 1383.PDF Mechanical completion check for EDUCTOR skid(train1) in DS7. 2017.11.11 DS7 YES yes
IR CE-C 1384 IR scan\CE-C 1384.PDF Mechanical completion check for FLOCCULANT INJECTION skid in DS7. 2017.11.11 DS7 YES yes
IR CE-C 1385 Mechanical completion check for JIB CRANE in DS7. 2017.11.11 DS7
IR CE-C 1386 IR scan\CE-C 1386.PDF Final inspection for the formwork,rebar of the precast overall sample station foundation 2017.11.11 DS7 YES yes
;miscellaneous electrical and instrument support and cothodic protection foundation in CPECC
IR CE-C 1387 IR scan\CE-C 1387.PDF sampling backfill soil for pipe support area(second layer,elevation=1.15)(ps-D7-001-016-
camp 2017.11.11 DS7 YES yes
IR CE-C 1388 IR scan\CE-C 1388.PDF 017-075-082
sampling ) soil for pipe support area(sixth layer,elevation=1.95) between two tanks.
backfill 2017.11.11 DS7 YES yes
IR CE-C 1389 IR scan\CE-C 1389.PDF sampling backfill soil for zone 7,8,9,10,12,13,14,15(sixth layer,elevation=1.95) in IGF area. 2017.11.11 DS7 YES yes
IR CE-C 1391 IR scan\CE-C 1391.PDF Check surface of grout after repaired for 1200m³ tank foundation(D7-ABJ681050) 2017.11.12 DS7 YES yes
IR CE-C 1392 IR scan\CE-C 1392.PDF Witness conducting compaction degree test for for pipe support area(second 2017.11.12 DS7 YES YES yes
IR CE-C 1393 IR scan\CE-C 1393.PDF layer,elevation=1.15)(ps-D7-001-016-017-075-082
Witness conducting compaction degree test for pipe support) area(sixth 2017.11.12 DS7 YES YES
IR CE-C 1394 IR scan\CE-C 1394.PDF layer,elevation=1.95)
Witness between degree
conducting compaction two tanks.
test for zone 7,8,9,10,12,13,14(sixth 2017.11.12 DS7 YES YES YES
IR CE-C 1395 IR scan\CE-C 1395.PDF layer,elevation=1.95) in IGF area.
Re-sampling backfill soil for pipe support area(third layer,elevation=1.35)(2400m³tank 2017.11.12 DS7 YES yes
IR CE-C 1396 IR scan\CE-C 1396.PDF south-east Corner)
Re-sampling backfill soil fail points for IR-CE1392,IR-CE1393,IR-CE1394 2017.11.12 DS7 YES yes
IR CE-C 1397 IR scan\CE-C 1397.PDF Witness test concrete cubes (compressive strength at 28 days) for pipe support column (PS- 2017.11.12 DS7 YES YES yes
D7-003-004-005-006-007-008-009-010-012-014-038-065-066-067-069-070-071-072-073-157-
IR CE-C 1399 IR scan\CE-C 1399.PDF Witness test concrete cubes (compressive strength at 7 days) for the precast overall s
093-080-079-158-094-095).(PS-D7-209-210-211-212-213-214-222-223-224-225-226-266- 2017.11.12 DS7 YES YES yes
IR CE-C 1402 IR scan\CE-C 1402.PDF Witness conducting compaction degree test
267-268-269-270-273-274-275-276-277-278;CTS-07/08) for pipe support area of 1200m³tank east 2017.11.13 DS7 YES YES yes
side(second layer,elevation=1.15)
IR CE-C 1403 IR scan\CE-C 1403.PDF Witness conducting compaction degree test for pipe support area(sixth 2017.11.13 DS7 YES YES yes
IR CE-C 1404 IR scan\CE-C 1404.PDF layer,elevation=1.95)
Final inspection for the between
formworktwo tanks.
of the pipe support blinding (including survey work) in DS7. 2017.11.13 DS7 YES yes
(PS-D7-001-016-017-075-082-151A-152A)
IR CE-C 1405 Re-sampling backfill soil for pipe support area(third layer,elevation=1.35)(2400m³tank 2017.11.13 DS7
IR CE-C 1406 south-east
Check Corner)
surface of concrete after repaired for for the precast overall stair foundation and overall 2017.11.13 DS7
ladder foundation in CPECC camp.
IR CE-C 1408 canceld 2017.11.14 DS7 YES
Loading Dry concrete for the pipe support in DS7.(blinding:PS-D7-001-016-017-075-082-096-097-098-099-100-101-102-103-104;column yes
IR CE-C 1408/R1 canceld 2017.11.15 DS7 YES
Loading Dry concrete for the pipe support in DS7.(blinding:PS-D7-001-016-017-075-082-096-097-098-099-100-101-102-103-104;column yes
IR CE-C 1408/R2 canceld 2017.11.16 DS7 YES
Loading Dry concrete for the pipe support in DS7.(blinding:PS-D7-001-016-017-075-082-096-097-098-099-100-101-102-103-104;column yes
IR CE-C 1408/R3 2017.11.17 DS7
Loading Dry concrete for the pipe support in DS7.(blinding:PS-D7-001-016-017-075-082-096-097-098-099-100-101-102-103-104-151A-152A; EYE WASH ;column
IR CE-C 1409 canceld Sampling water that used mixing concrete for the pipe support in DS7.(blinding:PS-D7-001- 2017.11.14 DS7 YES yes
IR CE-C 1409/R1 canceld 016-017-075-082-096-097-098-099-100-101-102-103-104;column:PS-D7-010-014,CTS-
Sampling water that used mixing concrete for the pipe support in DS7.(blinding:PS-D7-001- 2017.11.15 DS7 YES yes
1001).
016-017-075-082-096-097-098-099-100-101-102-103-104;column:PS-D7-010-014,CTS-
IR CE-C 1409/R2 canceld Sampling water that used mixing concrete for the pipe support in DS7.(blinding:PS-D7-001- 2017.11.16 DS7 YES yes
1001).
016-017-075-082-096-097-098-099-100-101-102-103-104;column:PS-D7-010-014,CTS-
IR CE-C 1409/R3 IR scan\CE-C 1409-R3.PDF Sampling water that used mixing concrete for the pipe support in DS7.(blinding:PS-D7-001- 2017.11.17 DS7 YES YES YES
1001).
016-017-075-082-096-097-098-099-100-101-102-103-104-151A-152A; EYE WASH ;column:
IR CE-C 1410 canceld Pouring concrete (including slump test, temperature and make specimen (cubes)) for the pipe 2017.11.14 DS7 YES yes
PS-D7-010-014,CTS-1001)
support in DS7.(blinding:PS-D7-001-016-017-075-082-096-097-098-099-100-101-102-103-
IR CE-C 1410/R1 canceld Pouring concrete (including slump test, temperature and make specimen (cubes)) for the pipe 2017.11.15 DS7 YES yes
104;column:PS-D7-010-014,CTS-1001).
support in DS7.(blinding:PS-D7-001-016-017-075-082-096-097-098-099-100-101-102-103-
IR CE-C 1410/R2 canceld Pouring concrete (including slump test, temperature and make specimen (cubes)) for the pipe 2017.11.16 DS7 YES yes
104;column:PS-D7-010-014,CTS-1001).
support in DS7.(blinding:PS-D7-001-016-017-075-082-096-097-098-099-100-101-102-103-
IR CE-C 1410/R3 IR scan\CE-C 1408-R3.PDF Pouring concrete (including slump test, temperature and make specimen (cubes)) for the pipe 2017.11.17 DS7 YES YES
104;column:PS-D7-010-014,CTS-1001)
support in DS7.(blinding:PS-D7-001-016-017-075-082-096-097-098-099-100-101-102-103-
IR CE-C 1411 Witness conducting compaction degree test for pipe support area(third 2017.11.14 DS7
104-151A-152A; EYE WASH ;column:PS-D7-010-014,CTS-1001)
layer,elevation=1.35)(2400m³tank south-east Corner)
IR CE-C 1412 IR scan\CE-C 1412.PDF Re-sampling backfill soil for pipe support area(sixth layer,elevation=1.95) between two 2017.11.14 DS7 YES yes
IR CE-C 1413 IR scan\CE-C 1413.PDF tanks.
Re-sampling backfill soil for pipe support area(sixth layer,elevation=1.95) between two 2017.11.14 tanks. DS7 YES YES
IR CE-C 1414 IR scan\CE-C 1414.PDF Mechanical completion check for WATER PUMP PIPING skid(train 2) in DS7. 2017.11.15 DS7 YES YES
IR CE-C 1415 IR scan\CE-C 1415.PDF Mechanical completion check for RECOVERED OIL PUMP skid(train 2) in DS7. 2017.11.15 DS7 YES YES
IR CE-C 1416 IR scan\CE-C 1416.PDF Witness conducting compaction degree test for pipe support area(sixth layer,elevation=1.95) 2017.11.16 DS7
between two tanks YES YES yes
IR CE-C 1418 IR scan\CE-C 1418.PDF Sampling backfill soil for pipe support area(fourth layer,elevation=1.55) (1200m³tank west- 2017.11.15 DS7 YES YES
IR CE-C 1419 IR scan\CE-C 1419.PDF south and backfill
Sampling 2400m³west-north
soil pipe in
forformwork DS7. area(second layer,elevation=1.15) (1200m³ tank east
support 2017.11.15 DS7 YES YES
Final inspection for the of the EYE WASH blinding and pipe support blinding
IR CE-C 1422 IR scan\CE-C 1422.PDF side)in DS7.
(including survey work) in DS7.(PS-D7-151A-152A) 2017.11.16 DS7 YES YES
IR CE-C 1423 IR scan\CE-C 1423.PDF Mechanical completion check for EDUCTOR skid(train 2) in DS7. 2017.11.16 DS7 YES YES
IR CE-C 1425 IR scan\CE-C 1425.PDF Witness conducting compaction degree test for pipe support area(fourth 2017.11.16 DS7 YES YES YES
IR CE-C 1426 IR scan\CE-C 1426.PDF layer,elevation=1.55)
Witness conducting (1200m³tank
compaction west-south and support
2400m³west-north in DS7. 2017.11.16 DS7 YES YES yes
Final inspection for the formworkdegree test for platform
of the access pipe area(second
blinding and pipe support blinding
IR CE-C 1427 IR scan\CE-C 1427.PDF layer,elevation=1.15)
(including survey work) (1200m³tank west side)in DS7.
in DS7.(PS-D7-002-0021) 2017.11.18 DS7 YES YES
IR CE-C 1428 IR scan\CE-C 1428.PDF Mechanical completion check for separators foundation(train1, 2) in DS7. 2017.11.18 DS7 YES YES
IR CE-C 1431 IR scan\CE-C 1431.PDF Final inspection for the rebar and formwork of the precast miscellaneous electrical a 2017.11.18 CPECC CAMP YES YES
IR CE-C 1432 IR scan\CE-C 1432.PDF Re-sampling backfill soil fail point for:1. pipe support area(sixth layer,elevation=1.95) 2017.11.18 DS7 YES YES
IR CE-C 1432/R1 IR scan\CE-C 1432-R1.PDF between two backfill
Re-sampling tanks P3;2. pipe
soil fail support
point for:1.area(fourth
pipe supportlayer,elevation=1.55) south-west of
area(sixth layer,elevation=1.95) 2017.11.19 DS7 YES YES
1200m³
betweentanks .
IR CE-C 1433 canceld Samplingtwo tanks
backfill P3;2.
soil pipe support
for zone area(fourth
15 area(sixth layer,elevation=1.55)
layer,elevation=1.95) in IGFsouth-west
area . of 2017.11.18 DS7 YES YES
1200m³ tanks
IR CE-C 1433/R1 IR scan\CE-C 1433-R1.PDF Sampling backfill soil for zone 15 area(sixth layer,elevation=1.95) in IGF area . 2017.11.19 DS7 YES YES
IR CE-C 1434 IR scan\CE-C 1434.PDF Loading Dry concrete for the the precast miscellaneous electrical and instrument supports 2017.11.19 DS7 YES YES
foundation in CPECC camp.
IR CE-C 1435 Sampling water that used mixing concrete for the precast miscellaneous electrical and 2017.11.19 DS7
instrument supports foundation in CPECC camp.
IR CE-C 1436 IR scan\CE-C 1436.PDF Pouring concrete (including slump test, temperature and make specimen (cubes)) for the 2017.11.19 DS7 YES YES
precast miscellaneous electrical and instrument supports foundation in CPECC camp.
IR CE-C 1437 Witness test concrete cubes (compressive strength at 28 days) for for the pipe sup 2017.11.19 DS7 YES YES
IR CE-C 1438 IR scan\CE-C 1438.PDF Witness mix grout to repair the location of shim plate for NSF SKID and CLARIFIER TA 2017.11.20 DS7 YES YES
IR CE-C 1441 IR scan\CE-C 1441.PDF Witness conducting compaction degree test for 1. pipe support area(sixth 2017.11.20 DS7 YES YES YES
IR CE-C 1442 IR scan\CE-C 1442.PDF layer,elevation=1.95) between degree
Witness conducting compaction two tankstestP3;2. pipe 15
for zone support area(fourth
area(sixth 2017.11.20
layer,elevation=1.95) in IGF area . DS7 YES YES yes
IR CE-C 1443 IR scan\CE-C 1443.PDF layer,elevation=1.55)
Final south-west
inspection for the rebar of 1200m³
and formwork tanks
of the pipe .
support footing (including survey work) 2017.11.20 DS7 YES YES
IR CE-C 1444 in DS7.(PS-D7-096-099-100-101-103-104)
Sampling backfill soil for pipe support area east-north of 2400m³tank(third 2017.11.20 DS7
IR CE-C 1444/R1 IR scan\CE-C 1444-R1.PDF layer,elevation=1.35) and east-south of 2400m³tank(fourth layer,elevation=1.55)in DS7
Sampling backfill soil for pipe support area east-north of 2400m³tank(third layer,elevation=1.35) . 2017.11.21and east-south
DS7 YES
of 2400m³tank yes
IR CE-C 1445 IR scan\CE-C 1445.PDF Loading Dry concrete for :1. Pipe support footing(PS-D7-096-099-100-101-103-104);2. 2017.11.21 DS7 YES YES
IR CE-C 1446 IR scan\CE-C 1446.PDF Access platform blinding and pipe support blinding in DS7.(PS-D7-002-021)
Sampling water that used mixing concrete for:1. Pipe support footing(PS-D7-096-099-100- 2017.11.21 DS7 YES YES yes
IR CE-C 1447 101-103-104);2.
Pouring Access platform
concrete (including blinding
slump test, and pipe and
temperature support
make blinding
specimenin DS7.(PS-D7-002-
(cubes)) for: 1. Pipe 2017.11.21 DS7
021)
support footing(PS-D7-096-099-100-101-103-104);2. Access platform blinding and pipe
IR CE-C 1448 IR scan\CE-C 1448.PDF check the surface of concrete of pipe support columns after remove forwork in DS7.(PS-D7- 2017.11.21 DS7 YES YES
support blinding in DS7.(PS-D7-002-021)
010-014;CS-1001)
IR CE-C 1449 Witness test grout cubes (compressive strength at 28 days) for the 1200m³tank foundation 2017.11.21 DS7
IR CE-C 1450 IR scan\CE-C 1450.PDF Mechanical completion check for separators foundation(train1, 2) in DS7. 2017.11.22 DS7 YES YES
IR CE-C 1452 IR scan\CE-C 1452.PDF Witness conducting compaction degree test for pipe support area east-north of 2400m³tank 2017.11.22 DS7 YES YES yes
IR CE-C 1457 IR scan\CE-C 1457.PDF check the surface of concrete of pipe support columns after repaired in DS7.(PS-D7-010- 2017.11.23 DS7 YES YES
014;CS-1001)
IR CE-C 1458 check the elevation of the embedded plate for separator foundation 2017.11.23 DS7
IR CE-C 1460 IR scan\CE-C 1460.PDF Check the material of epoxy grout in DS7. 2017.11.23 DS7 YES YES
IR CE-C 1461 canceld Check the material of polysulphide sealant in DS7. 2017.11.23 DS7 YES YES
IR CE-C 1461/R Check the material of polysulphide sealant in DS7. 2017.11.24 DS7 YES YES
IR CE-C 1462 Check the formwork of grout for separator column(P2) in DS7. 2017.11.23 DS7
IR CE-C 1463 Witness mixing of grout for separator column(P2) in DS7. 2017.11.23 DS7
IR CE-C 1465 IR scan\CE-C 1465.PDF check the surface of concrete of pipe support columns after coating in DS7.(PS-D7-01 2017.11.24 DS7 YES YES
IR CE-C 1466 IR scan\CE-C 1466.PDF check the chipping inside of pipe support columns in DS7.(PS-D7-096-097-098-099-1 2017.11.24 DS7 YES YES
IR CE-C 1467
IR CE-C 1468 IR scan\CE-C 1468.PDF check the formwork of grout for two platform near tank(IQD7-ABJ681050 and IQD7-A 2017.11.24 DS7 YES YES
IR CE-C 1469 IR scan\CE-C 1469.PDF check the formwork of grout for two pump shelter (IQD7-PBE681051A/B;PBE681052A 2017.11.24 DS7 YES yes
IR CE-C 1472 IR scan\CE-C 1472.PDF Witness test concrete cubes (compressive strength at 7 days) for the pipe support c 2017.11.24 DS7 YES YES yes
IR CE-C 1473 IR scan\CE-C 1473.PDF 2017.11.24in DS7.
Sampling backfill soil for pipe support area east-north of 2400m³tank(fourth layer,elevation=1.55) DS7 YES YES
IR CE-C 1474 IR scan\CE-C 1474.PDF Witness the platform near tank(IQD7-ABJ681050 and IQD7-ABJ681053) foundation grou 2017.11.25 DS7 YES yes
IR CE-C 1475 IR scan\CE-C 1475.PDF Witness two pump shelter (IQD7-PBE681051A/B;PBE681052A/B and PBE681052A/B/C) fo 2017.11.25 DS7 YES yes
IR CE-C 1476 IR scan\CE-C 1476.PDF Witness conducting compaction degree test forpipe support area east-north of 2400m³tank 2017.11.25 DS7 YES YES YES
IR CE-C 1480 Witness test concrete cubes (compressive strength at 7 days) for the precast miscel 2017.11.26 DS7
IR CE-C 1484 canceld Witness test concrete cubes (compressive strength at 28 days) for the pipe support column2017.11.27
and EDUCTOR skid and DS7ACCESS ANDYES YES (F1
CROSSOVER PLATFORM foundation
IR CE-C 1484/R1 Witness test concrete cubes (compressive strength at 28 days) for the pipe support column2017.11.28
and EDUCTOR skid and DS7ACCESS AND CROSSOVER PLATFORM foundation (F1
IR CE-C 1486 2017.11.27
Sampling backfill soil for pipe support area east-south of big tank(fifth layer,elevation=1.75)and DS7east-north of big tank(fourth layer
pipe support area
IR CE-C 1487 Witness test concrete cubes (compressive strength at 28 days) for the precast ACCESS 2017.11.28 DS7
PLATFORM footing and CROSS OVER foundation(F1) in CPECC camp
IR CE-C 1488 IR scan\CE-C 1488.PDF Witness test concrete cubes (compressive strength at 28 days) for Pipe support footing(PS- 2017.11.28 DS7 YES YES yes
IR CE-C 1490 D7-096-099-100-101-103-104)
Witness test grout cubes (compressive strength at 28 days) for the 2400m³tank(D7- 2017.11.29 DS7
ABJ681053) in DS7.
Final inspection for the rebar and formwork of the pipe support columns (including survey
IR CE-C 1491 IR scan\CE-C 1491.PDF 2017.11.29 DS7 YES yes
work)inspection
Final in DS7.(PS-D7-096-097-098-099-100-101-102-103-104-151A-152A)
for the rebar and formwork of the eye wash foundation part 2 (including
IR CE-C 1492 IR scan\CE-C 1492.PDF 2017.11.29 DS7 YES yes
survey work)completion
in DS7. check for PSV-TOWER in DS7.
IR CE-C 1494 IR scan\CE-C 1494.PDF Mechanical 2017.11.29 DS7 YES yes
IR CE-C 1495 IR scan\CE-C 1395.PDF Mechanical completion check for ACCESS AND CROSSOVER PLATFORM (TRAIN 1,2) in 2017.11.29 DS7 YES yes
DS7.
IR CE-C 1496 IR scan\CE-C 1496.PDF Mechanical completion check for CLARIFIER TANK Subsidiary foundation (TRAIN 1,2) in 2017.11.29 DS7 YES yes
DS7.
IR CE-C 1499 IR scan\CE-C 1499.PDF Final inspection for the rebar and formwork of the access platform foundation columns 2017.11.30 DS7 YES yes
(including surveyfor work) in DS7.
IR CE-C 1500 IR scan\CE-C 1500.PDF Final inspection the rebar and formwork of the pipe support columns (including survey 2017.11.30 DS7 YES yes
IR CE-C 1501 work) in DS7.(PS-D7-001-002-016-017-021-075-082)
Sampling backfill soil for pipe support area east-south 2400m³tank (fifth layer, elevat 2017.11.30 DS7 YES yes
IR scan\CE-C 1508.PDF
IR CE-C 1503 IR scan\CE-C 1503.PDF witness mixing grout for repaired location of shim plate. 2017.11.30 DS7 YES YES
IR CE-C 1504 IR scan\CE-C 1504.PDF Loading Dry concrete for:1.access platform near tank columns for DS7;2.pipe support 2017.12.01 DS7 YES YES
columns (PS-D7-001-002-012-016-017-075-082-096-097-0098-099-100-101-102-103-104-
IR CE-C 1505 Sampling water that used mixing concrete for:1.access platform near tank columns for 2017.12.01 DS7
151A-152A)3.EYE
DS7;2.pipe support WASH
columns foundation (slope) in DS7.
(PS-D7-001-002-012-016-017-075-082-096-097-0098-099-100-
IR CE-C 1506 IR scan\CE-C 1506.PDF Pouring concrete (including slump test, temperature and make specimen (cubes)) for:1.access 2017.12.01 DS7 YES yes
101-102-103-104-151A-152A)3.EYE
platform near tank columns for DS7;2.pipe WASHsupport
foundation (slope)
columns in DS7.
(PS-D7-001-002-012-016-017-
IR CE-C 1508 IR scan\CE-C 1508.PDF Final inspection for the formwork of the CARTRIDGE FILTERS SKID bliding (including s 2017.12.02 DS7 YES yes
075-082-096-097-0098-099-100-101-102-103-104-151A-152A)3.EYE WASH foundation
IR CE-C 1512 IR scan\CE-C 1512.PDF Witness the PIPE RACK foundation between two tanks grouting (including temperature and
(slope) in DS7. 2017.12.02 DS7 YES yes
make specimen (cubes) in DS7
IR CE-C 1513 Witness conducting compaction degree test for pipe support area east-south 2400m³tank (fifth 2017.12.02 DS7
layer, elevation=1.75) and pipe support area west-south 1200m³tank (fifth layer,
IR CE-C 1515 IR scan\CE-C 1515.PDF Sampling backfill
elevation=1.75) soil for pipe support area west-north of 2400m³ tank (sixth layer, el
in DS7. 2017.12.02 DS7 YES yes
IR CE-C 1517 IR scan\CE-C 1517.PDF check formwork of grout for pipe rack foundation between two tanks. (PS-D7-083-08 2017.12.03 DS7 YES yes
IR CE-C 1523 IR scan\CE-C 1523.PDF Check the joint of NSF SKID(train:1,2)clean and repair. 2017.12.03 DS7 YES yes
IR CE-C 1526 Witness conducting compaction degree test for pipe support area west-north of 2400m³ 2017.12.03 DS7
IR CE-C 1528 Witness test grout cubes (compressive strength at 7 days) for 1.the platform nea 2017.12.03 DS7
IR CE-C 1529 IR scan\CE-C 1229.PDF Loading Dry concrete for CARTRIDGE FILTERS skid blinding(train:1,2) in DS7. 2017.12.04 DS7 YES YES
IR CE-C 1530 Sampling water that used mixing concrete for CARTRIDGE FILTERS skid blinding(train:1,2) in 2017.12.04 DS7
DS7.
IR CE-C 1531 IR scan\CE-C 1531.PDF Pouring concrete (including slump test, temperature) for CARTRIDGE FILTERS skid 2017.12.04 DS7 YES YES
blinding(train:1,2) in DS7.
IR CE-C 1533 IR scan\CE-C 1533.PDF Check the surface of NSF SKID(train:1,2)joints after repaired by polysulphide sealant in DS7. 2017.12.04 DS7 YES YES
IR CE-C 1534 Witness to test concrete cubes (compressive strength at 28 days) of the precast overal 2017.12.04 DS7
IR CE-C 1535 IR scan\CE-C 1535.PDF Check the surface of columns after remove formwork in DS7.(1.access platform near tank columns 2017.12.05
for DS7;2.pipe DS7 YES
support columns YES
IR CE-C 1543 IR scan\CE-C 1543.PDF check the formwork of grout for the pipe support columns in DS7.(PS-D7PW-106-107-108- 2017.12.06 DS7 YES YES
109-110-111-112-113-118-119-120-121-122)
IR CE-C 1544 IR scan\CE-C 1544.PDF Witness the pipe support columns grouting (including temperature and make specimen 2017.12.06 DS7 YES YES
(cubes) in DS7.(PS-D7PW-106-107-108-109-110-111-112-113-118-119-120-121-122)
IR CE-C 1545 Sampling backfill soil for pipe support area (sixth layer,elevation=1.95)west-south the 2017.12.06 DS7
IR CE-C 1547 IR scan\CE-C 1547.PDF 1200m³tank in DS7 .of grout for the CLARIFIER TANK foundation (P3) in DS7.
check the formwork 2017.12.07 DS7 YES YES
IR CE-C 1548 IR scan\CE-C 1548.PDF Witness the the CLARIFIER TANK foundation (P3) grouting (including temperature and make 2017.12.07 DS7 YES YES
specimen (cubes) in DS7.
IR CE-C 1549 survey the concrete and anchor bolts's elevation/distance for pipe support foundation in DS7. 2017.12.07 DS7
IR CE-C 1550 IR scan\CE-C 1550.PDF Mechanical completioncompaction
Witness conducting check for pipe support
degree foundation
test DS7. area (sixth
for pipeinsupport 2017.12.07 DS7 YES YES
IR CE-C 1551 layer,elevation=1.95)west-south the 1200m³tank in DS7 . 2017.12.07 DS7
IR CE-C 1553 Sampling backfill soil for pipe support area (sixth layer,elevation=1.95)EAST-NORTH the2017.12.07 2400m³tank in DS7 DS7
IR CE-C 1554 IR scan\CE-C 1554.PDF Check the surface of after repaired for 1.access platform near tank columns for DS7;2.pipe 2017.12.07 support columns DS7 YES YES
IR CE-C 1555 Check the surface of after COATING for 1.access platform near tank columns for DS7;2.pipe 2017.12.08
support columns DS7
IR CE-C 1555/R1 IR scan\CE-C 1555-R1.PDF Check the surface of after coating for 1.access platform near tank columns for DS7;2.pipe support 2017.12.09
columns DS7 YES YES
IR CE-C 1558 Witness conducting compaction degree test for pipe support area (sixth 2017.12.09 DS7
IR CE-C 1559 layer,elevation=1.95)
Witness to test concreteEAST-NORTH the 2400m³tank
cubes (compressive strength at in 7DS7 . of 1.access platform near
days) 2017.12.09 DS7
tank columns for DS7;2.pipe support columns (PS-D7-001-002-012-016-017-075-082-096-
IR CE-C 1562 IR scan\CE-C 1562.PDF Final inspection for the rebar , formwork and anchor bolts(including survey work) of cartridge 2017.12.09 DS7 YES YES
097-0098-099-100-101-102-103-104-151A-152A)3.EYE
filters skid in DS7. WASH foundation (slope) in DS7.
IR CE-C 1563 IR scan\CE-C 1563.PDF Sampling backfill soil for 1.pipe support area east of 1200m³tank(first 2017.12.09 DS7 YES YES
IR CE-C 1568 layer,elevation=1.35);2. pipe support area west of 2400m³tanktank(first
Sampling water that used mixing concrete for cartridge filters skid in DS7.. 2017.12.10 DS7
layer,elevation=1.35);3.
Pouring concrete (including pipe slump support area east-south
test, temperature of 2400m³tank
and make specimen(sixth
(cubes)) for cartridge
IR CE-C 1569 IR scan\CE-C 1569.PDF Check the formwork of grout for:1.SEPRATORS foundation (train1;2);2. 2017.12.10 DS7 YES yes
Witness conducting
DS7. compaction
layer,elevation=1.95)
filters skid in in DS7. degree test for1.pipe support area east CLARIFIER TANK
of 1200m³tank(first
IR CE-C 1570 IR scan\CE-C 1570.PDF foundation (train1;2);3.pipe pipe
layer,elevation=1.35);2. support (D7PW-105-106)
support area west of 2400m³tanktank(first 2017.12.10 DS7 YES yes
IR CE-C 1571 IR scan\CE-C 1571.PDF Witness grouting (including temperature and make specimen
layer,elevation=1.35);3. pipe support area east-south of 2400m³tank (sixth (cubes) for 1.SEPRATORS 2017.12.10 DS7 YES yes
foundation (train1;2);2. CLARIFIER TANK foundation (train1;2);3.pipe support (D7PW-105-
IR CE-C 1572 layer,elevation=1.95)
106) in DS7. in DS7. 2017.12.10 DS7
IR CE-C 1573 IR scan\CE-C 1573.PDF Sampling backfill soil for 1.pipe support area west of 1200m³tank(first
Witness to test concrete cubes (compressive strength at 28 days) for NSF skid (train2) and 2017.12.10 DS7 YES yes
IR CE-C 1575 layer,elevation=1.35);2.
FLOCCULANT INJECTION skid pipe support area south of 1200m³tank(first layer,elevation=1.35) 2017.12.10 DS7
in DS7 to test concrete cubes (compressive strength at 28 days) for NSF skid (train2) and
IR CE-C 1575/R1 Witness 2017.12.11 DS7
FLOCCULANT INJECTION skid
IR CE-C 1578 IR scan\CE-C 1578.PDF Witness to test concrete cubes (compressive strength at 28 days) for NSF skid (trai 2017.12.10 DS7 YES yes
IR CE-C 1579 IR scan\CE-C 1579.PDF Witness grouting (including temperature and make specimen (cubes) for pipe support columns 2017.12.11 DS7 YES yes
in DS7.
IR CE-C 1580 IR scan\CE-C 1580.PDF Witness conducting compaction degree test for:1.pipe support area west of 1200m³tank(first 2017.12.11 DS7 YES yes
IR CE-C 1584 layer,elevation=1.35);2.
Witness to test grout cubes pipe(compressive
support area south of 1200m³tank(first
strength at 7 days) for layer,elevation=1.35)
the PIPE RACK found 2017.12.11 DS7
in DS7
IR CE-C 1588 IR scan\CE-C 1588.PDF Sampling backfill soil for pipe support east of 2400m³tank(first layer,elevation=1.35) in DS7 2017.12.12 DS7 YES YES
IR CE-C 1591 IR scan\CE-C 1591.PDF . 2017.12.13 DS7 YES YES
Check the surface
Mechanical of concrete
completion check for after remove
pump formwork
foundation for cartridge filters skid
(D7-PBE681153A/B/C; D7-in DS7.
IR CE-C 1592 IR scan\CE-C 1592.PDF PBE681253A/B/C) in DS7. 2017.12.13 DS7 YES YES
IR CE-C 1593 Mechanical completion check for JIB crane in DS7. 2017.12.13 DS7
IR CE-C 1594 IR scan\CE-C 1494.PDF Mechanical completion
Final inspection check for pipe
for the formwork of thesupport in DS7
crossover andIGF area. details near tanks blinding
foundation
2017.12.13 DS7 YES yes
IR CE-C 1595 IR scan\CE-C 1595.PDF F1(including survey work) in DS7. 2017.12.13 DS7 YES yes
IR CE-C 1598 Witness conducting compaction degree test for pipe support east of 2400m³tank(first layer, 2017.12.13 DS7
IR CE-C 1599 IR scan\CE-C 1599.PDF elevation=1.35) in DS7 .
Sampling backfill soil for pipe support west of 2400m³tank(second layer,elevation=1.55) in 2017.12.13 DS7 YES YES
IR CE-C 1603 IR scan\CE-C 1603.PDF DS7 .
Check the surface of concrete after repaired for cartridge filters skid in DS7. 2017.12.14 DS7 YES YES
IR CE-C 1605 Witness conducting compaction degree test for pipe support east of 2400m³tank(first layer 2017.12.14 DS7
IR CE-C 1606 Witness to test grout cubes (compressive strength at 7 days) for the pipe support columns in 2017.12.14 DS7
DS7.(PS-D7PW-106-107-108-109-110-111-112-113-118-119-120-121-122)
IR CE-C 1607 Witness to test grout cubes (compressive strength at 7 days) for the CLARIFIER TANK 2017.12.14 DS7
foundation (P3)in DS7.
IR CE-C 1608 Sampling backfill soil for pipe support west of 1200m³tank(second layer,elevation=1.55) in 2017.12.14 DS7
IR CE-C 1614 DS7 .
Final inspection for the rebar, formwork of precast miscellaneous electrical and instr 2017.12.15 DS7
IR CE-C 1614/R1 Final inspection for the rebar, formwork of precast miscellaneous electrical and instr 2017.12.16 DS7
IR CE-C 1615 IR scan\CE-C 1615.PDF Loading Dry concrete for precast miscellaneous electrical and instrument supports fou 2017.12.16 DS7 YES YES
IR CE-C 1615/R1 Loading Dry concrete for precast miscellaneous electrical and instrument supports fou 2017.12.17 DS7
IR CE-C 1616 IR scan\CE-C 1616.PDF Mechanical completion check for ACCESS PLATFORM NEAR TANK in DS7. 2017.12.16 DS7 YES yes
IR CE-C 1617 Mechanical completion check for pump foundation (PBE-681161A/B; PBE-681261A/B) in 2017.12.16 DS7
DS7.
IR CE-C 1618 Mechanical completion check for pump foundation(PBE-681054A/B/C) in DS7. 2017.12.16 DS7
IR CE-C 1620 IR scan\CE-C 1620.PDF Witness grouting (including temperature and make specimen (cubes) for skid fou 2017.12.16 DS7 YES yes
IR CE-C 1621 Witness conducting compaction degree test for pipe support west of 1200m³tank(second 2017.12.16 layer DS7
IR CE-C 1622 Sampling water that used mixing concrete for precast miscellaneous electrical and instrument 2017.12.16 DS7
supports
Samplingfoundation
water that in CPECC camp.
IR CE-C 1622/R1 used mixing concrete for precast miscellaneous electrical and instrument 2017.12.17 DS7
supports foundation in CPECC camp.
IR CE-C 1623 Pouring concrete (including slump test, temperature and make specimen (cubes)) for precast 2017.12.16 DS7
miscellaneous electrical and instrument supports foundation in CPECC camp.
IR CE-C 1623/R1 Pouring concrete (including slump test, temperature and make specimen (cubes)) for precast 2017.12.17 DS7
miscellaneous electrical and instrument supports foundation in CPECC camp.
IR CE-C 1624 Sampling backfill soil for pipe support1. west of 2400m³tank(third layer,elevation=1.75);2. 2017.12.16 DS7
IR CE-C 1625 east of 2400m³tank(third layer,elevation=1.75) in DS7 .
Witness to test concrete cubes (compressive strength at 7 days) for the pipe support in DS7. 2017.12.16 DS7
(blinding:PS-D7-001-016-017-075-082-096-097-098-099-100-101-102-103-104-151A-152A;
IR CE-C 1628 IR scan\CE-C 1628.PDF Check the surface of concrete after coating for cartridge filters skid in DS7. 2017.12.17 DS7 YES YES
EYE WASH ;column:PS-D7-010-014,CTS-1001)
IR CE-C 1629 IR scan\CE-C 1629.PDF Check the formwork of grout for 1.PSV-TOWER foundation;2,pipe support foundation in DS7. 2017.12.17 DS7 YES YES
IR CE-C 1630 IR scan\CE-C 1630.PDF Witness grouting (including temperature and make specimen (cubes) for 1.PSV-TOWER 2017.12.17 DS7 YES YES
foundation;2,pipe support foundation in DS7.
IR CE-C 1633 Witness conducting compaction degree test for pipe support area 1. west of 2017.12.17 DS7
IR CE-C 1634 2400m³tank(third layer,elevation=1.75);2.east of
Sampling backfill soil for pipe support1. west of 1200m³tank(second 2400m³tank(third layer,elevation=1.75) 2017.12.17 DS7
in DS7 .
IR CE-C 1635 layer,elevation=1.55);2.east
Witness to test concrete cubesof(compressive
1200m³tank(third strength layer,elevation
at 28 days) for=1.75) in DS7 .
the precast 2017.12.17 DS7
miscellaneous electrical and instrument supports foundation in CPECC
Witness to test concrete cubes (compressive strength at 7 days) for cartridge filters skid incamp.
IR CE-C 1637 Witness to test grout cubes (compressive strength at 7 days) for 1.SEPRATORS foundation 2017.12.17 DS7
DS7.
IR CE-C 1638 (train1;2);2. CLARIFIER TANK foundation (train1;2);3.pipe support (D7PW-105-106) in DS7. 2017.12.17 DS7
IR CE-C 1639 IR scan\CE-C 1639.PDF Loading Dry concrete for:1.pipe columns (PS-D8PW-001-002-046-050-051-052-055-056-057- 2017.12.18 DS7 YES YES
058-059)
Sampling and access platform(F1).2.pipe
mixing concretesupport footing(PS-D8PW-003-004-005)in DS8.
IR CE-C 1640 water that used for: 1.pipe columns (PS-D8PW-001-002-046-050- 2017.12.18 DS7
051-052-055-056-057-058-059) and access platform(F1).2.pipe support footing(PS-D8PW-
IR CE-C 1641 Pouring concrete (including slump
003-004-005)in DS8.
test, temperature and make specimen (cubes)) for1.pipe 2017.12.18 DS7
columns (PS-D8PW-001-002-046-050-051-052-055-056-057-058-059) and ofaccess
IR CE-C 1643 Witness conducting compaction degree test for pipe support area 1. south
platform(F1).2.pipe support footing(PS-D8PW-003-004-005)in DS8. 2017.12.18 DS7
IR CE-C 1644 1200m³tank(second
Witness to test grout cubes layer,elevation=1.55);2.east
(compressive strength atof7 1200m³tank(third
days) for pipe supportlayer,elevation
columns in DS7. 2017.12.18 DS7
=1.75) in DS7 .
IR CE-C 1645 IR scan\CE-C 1645.PDF Mechanical
Final inspectioncompletion
for the rebarcheck andfor CARTRIDGE
formwork FILTERS skid
of the contaiment in DS7.
of pump paving and cofferdam 2017.12.18 DS7 YES YES
IR CE-C 1646 IR scan\CE-C 1646.PDF (including survey work) in DS7. ( PBE681052A/B, PBE681051A/B; PBE681054A/B/C
Final inspection for the rebar and formwork of the contaiment of pump paving and cofferdam ) 2017.12.19 DS7 YES YES
IR CE-C 1646/R1 IR scan\CE-C 1646-R1.PDF (including survey work) in DS7. ( PBE681052A/B, PBE681051A/B; PBE681054A/B/C ) 2017.12.20 DS7 YES YES
Witness to test grout cubes (compressive strength at 28 days) for Pipe support footing(PS-
IR CE-C 1647 D7-096-099-100-101-103-104)in DS7. 2017.12.19 DS7
IR CE-C 1648 IR scan\CE-C 1648.PDF Loading Dry concrete for the contaiment of pump paving and cofferdam in DS7. ( 2017.12.20 DS7 YES YES
IR CE-C 1650 Sampling water that used mixing concrete forthe contaiment of pump paving and cofferdam in 2017.12.20 DS7
DS7. ( PBE681052A/B, PBE681051A/B; PBE681054A/B/C )
IR CE-C 1651 Pouring concrete (including slump test, temperature and make specimen (cubes)) for the 2017.12.20 DS7
contaiment of pump paving and cofferdam in DS7. ( PBE681052A/B, PBE681051A/B;
IR CE-C 1654 Check the grout surface
PBE681054A/B/C ) after remove formwork for skid foundation in DS7.(NSF 2017.12.21 DS7
IR CE-C 1655 SKID;WATER PUMP PIPING
Check the formwork of groutSKID;EDUCTOR
for pipe supportSKID)
columns in DS7. 2017.12.21 DS7
IR CE-C 1657 Witness grouting (including temperature and make specimen (cubes) for pipe support 2017.12.21 DS7
IR CE-C 1658 2017.12.21
Sampling backfill soil for pipe support area east of 2400m³tank(fourth layer,elevation=1.95) in DS7 DS7
IR CE-C 1666 check the formwork of grout for pipe support in DS7. 2017.12.23 DS7
IR CE-C 1667 Witness grouting (including temperature and make specimen (cubes) for pipe support 2017.12.23 DS7
columns in DS7.
IR CE-C 1668 Witness conducting compaction degree test for pipe support area 1. east of 2017.12.23 DS7
IR CE-C 1669 2400m³tank(fourth layer,elevation=1.95);2. east of 1200m³tank(subgrade 2017.12.23
Sampling backfill soil for pipe support area1. south of 1200m³tank(third layer,elevation=1.75);2. DS7
west of 1200m³tank
IR CE-C 1671 layer,elevation=1.15) in DS7 .
Witness to test grout cubes (compressive strength at 7 days) for pipe skid founda 2017.12.23 DS7
Close Comments Remark
yes All the full with organic matreal need to the engineering about this issare
yes
yes The soil now is on pit
yes
yes
YES This comment writen by contractor , we need the lab resalit strat with next layer
YES Theres some places have gravel on the top surface this need scraping or cleanins

yes
yes
yes
yes
yes
yes
yes
YES
yes
yes
yes
no Just wtness the samples.
yes All point failed
yes
yes Most the resuilt not pass
yes
yes
yes the trail mix c15 is rejcted,because is to high water quantity.
yes the water quantity to high ,so we cant take sample
Yes The maxied concrete shown that the quntity of gravel is to high and we cant prosses the sllump.
no
yes
yes
yes
yes
yes
yes W/C high
yes Change the batch plant and the rae material not used
yes No report test
yes
yes
YES
yes
yes
yes
yes witness for result
Yes 25-Feb-16
yes
yes
YES
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes Some rebar need tie,deep clean of concrete block used as cover need to be removed
YES
yes
yes
yes The work is not ready
yes
yes the work is not ready
YES
yes the work is not ready
YES
yes Modify the cover of the top for plate form foundtion just for some locations.
YES
yes modify the form work of one foundation from the foundation of the shliter.
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes After the inchor boilt location at the center of the ring wall .the earthing plate are not installed on the ring wall. Arrenge with cpecc QC/ commant (the anchor boilt not the center of center of wall of the earthing plate not in
yes after the inchor boilt location at the center of the ring wall .the earthing plate are not installed on the ring wall.
yes Colums concrete cover are not enagh and more sipcer increase on each side the cover
YES
yes Cancel , the finail incpaction rejected fo a lot of commants.
yes Cancel , the finail incpaction rejected fo a lot of commants.
yes Colums concrete are not enough ,and more spacer on each side .
yes colums concrete are not enough ,and more spacer on each side /aggreed with cpecc commets.
YES
YES
yes not required.
YES
yes
yes
no not reqired , the water is no good. And size change
yes not reqired , the water is no good.
yes
yes
yes
yes
yes Not required
yes
yes
YES
YES
yes
YES
yes Some bubble on surface .some where not flate need repair .joint not smoth ,a lot os crack need be repair
Yes
YES Sone nail remove. Some corner need repair .need to cheek again after finsh the repier
YES
YES Nail need removed ,corner need repair.
yes Just pale form (ABJ681053) and pump sholter (PBE681054) Is ok
YES
YES
YES
yes Juset clean the repiring material from the surface for the plate form and &shelter
yes
yes
yes
YES
YES
YES
YES
YES
YES
yes
YES
yes
yes
yes
YES
YES
YES
YES the sample is filed by siev analysis
YES
YES
YES Zone 10,11,12,13 not ready
YES
YES
yES
yES
YES Official holiday

YES
YES
YES
YES
YES
YES
yes
yes the sample is filed by siev analysis
yes
yes
YES
Not ready
yes
yes
yes
yes
Yes
y
yes
yes
yes
YES
yes
YES
YES
yes
YES
yes
yes
yes
YES
YES
YES
YES
YES

yes The supplies sample not crash stone ,its rounded gravel cpecc need to comform to engneering about that ,and chemical test .
yes
yes
YES
yes
yes
yes
yes
yes
yes
YES Cancel
yes Sleeper bulding formwork cheek by exxon mobile not pass
yes
YED
YES
YES
YES
YES
YES
YES
YES
YES
YES
yes All point failed

YES
YES
yes
yes
yes
YES
yes
yes
YES
YES
YES
yes the point is failed
YES
YES
YES
YES

yES
YES
yes NCR :109 QAPC .NCR 0001 Need be closed form cpecc side now they under their resbonsibilty
YES Compaction test is failed
yes
yes batch plant not ready .
yes
Yes
YES
YES
YES
YES
YES
YES
yes
yes The work is not ready for inspaction .
YES The subcontractor changed the lab from al fao to basrah lab
yes Rebar with heat NO.245477 and size 25mm get on result of uts not matching with ASTM requriment
yes
yes
yes
yes cancel
YES Point for re-compaction need to modify (little bit compaction ).
yes cancel
yes cancel
yES cancel
yes
yes Cancel.
YES
yes
YES Seevral command are noticed and to be modfided issu new IR for inspaction .
yes Tow point are tested on got on filed values (87*88)%.
yes Canceld.
YES
YES
YES
YES
YES
yes Cancel
YES Cancel
yes
yES
YES One point failed and need for recompact and re test.
yes

yes Seevral command are noticed and to be modfided issu new IR for inspaction .
yes
yes

yes 1-survey report not attached


yes 2-some cleaning with chamfer fixedfor some area
3-some hole at the face of formwork need to be closed
Yes 4-some boxes of foundations need for cleaning from pieces of chamfer and nails
yes 5-all pockets need to be oiled to remove it easily without any defects may
yes caused
becausetoPUMPS
concrete.
FOUNDATIONS in DS7 have not past the formwork IR with signature of EMIL
yes
yes the quntities take from gravel :300m3*** sand :200m3
yes 1-concrete repired need for curing as per ACI code and surface to be homegenous with regular material for both foundation ..2- noticed surface cracked need to be opend and then propaly with approval material.
yes

yes
YES
yes Raw meterial all readry uploded in the silo anf cant recognize id coming for pw-109 project meaterial.
yes
yes
yes As mantion in ir of loading raw material( CE-C 0580) admixture material loaded in to the silo with out witness from EMIL represntive.
yes because PUMPS FOUNDATIONS in DS7 have not past the formwork IR with signature of EMIL
Yes
yes cancel
YES Rejected by cpecc
YES Additional alogwt broeing are needed at some poitions: removing the nailes for forme work and virticallty of some poition need adjasted …palstic pecicy need to be removed and form work need to oiled .
YES raw material gravel is not pass
yes
yes
yes
yes
yes

YES
YES
YES
YES
YES
YES
yes
YES
YES All cube faild in the test .
yes
YES
YES
YES
YES
YES
yes
yes one valeu cube is faled in test.
yes cancel
YES Scanner divice required to avoid tovel steel renforcement by wong way during the driling
YES
YES
yes
yes
yes
yes
yes
YES
YES
YES
YES
YES
yes cancel
YES
yes
Yes One point failed.
YES
YES
yes
YES
YES The work is not ready
YES

yes Elvation of layer need be leveing .


yes
yes
yes
yes
yes cancel
Yes
yes
yES
yes
yes

yes cancel
YES
yes
YES
YES
YES
yES
YES

YES
YES
Yes
YES
YES cancel
YES
YES

yes
YES Cancel
YES
YES
yES
YES
yES
yes
yes
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES All corner damge need to be repierd
Yes All aeeoundthe
Cleanliness foundation need
form work to beisclean
in side required
YES some rebar need be tighted
YES
Yes
yes
YES
YES
YES

YES
yes
yes
yes

YES
YES
YES thrmoumeater device to cheek the conacrte temprture Qlibrated is broken and CPECC we used inerintive one but without calbration
YES cancel
yes values of c15 ok and values of c35 is faild .
yES
yes the footing and columm need be repiring well

YES
YES Values of cube are faild and cpecc adviced to waiting for 28days result for concrete cubs crushing fore verifying the values.
YES Cancel because is work .
YES values are faild and cpecc to wait still to 28 days
YES Cancel because is work not ready.
yes columm location and angle cheeck almadar survay mohammad and cpecc survey magang .
yES concrete surface need be clean for dust well than procced repeir.

yes

yes Small hony combs the chipp the work pants and the repaire surface approved
yes material
yes Cleanliness all around the foundation required.
yes
yes
yes the work is not ready.
yes some parts need to be chipping properly in both trains.
yes all exposed pecies of plastic spacer need to be removed .
yes
YES
yes

yes
yes

yES
yes
yes
yes nocied small craceks at top surface need be repried.
yes
yes
yes
yes cancel .the work is not ready.
yes
yes little pit chipping need for some columm with removed .

yes

YES The test is done one point pass one point is fiald
yes All chemfer need be modifided

yES
YES
YES
YES The test is done one point is pass #tow point feaild

yes all chemfer need be modfided prpberly .


yes
yes All area around foundation need be clean.
yes Vertical surface need be smooth , wash and dry .
yes

yes cancel .the work is not ready.


yes
YES Cancel because is work not ready.
YES
yes
yes
yes All around the botton of footing need to be clean anf coating by bitumen
yes properly
some hols need to be required and coated.
yes Cancel because is work not ready.
yes Cancel because is work not ready.
yes
yes
yes Cancel because is work not ready.
YES
Yes
YES
Yes
Yes

yes some nails need be cuter and removeld


yes
Yes
yes Data sheet aprovel for aprovel coating meaterial foe in plate reqiured.
yes
yes
YES
yes
YES
yes Bracing of form work need be removed.
yes
yes
yes
yes
yes
YES
YES Spare cubs and test failed wating cpecc acive to cheek whith engernning and send feed back.
YES
yes
yes
yes
YES
yes
YES
yes
YES
yes
yes
yes
yes
yes

yes tow point is failed one point is pass


yes the test point is faled.
yes
yes
yes

YES
YES Clear marking to show every (200mm)to each layer .
YES
YES
YES
yes smooth ,cleaned required for concrete surface .
YES
YES
YES
YES
YES
yes
yes
yes
yes
yes
yes chamfer picise need be adjected dnd fixed preperly .
yes
yes
yes
yes
yes
yes
yes
yes
yes

yes
yes Two point is faild need be recomaction.
yes

yes
yes
YES
YES
YES
YES
yes
yes three point is faild need be repering test .
YES
YES
YES
yes 2point is faild
yes
YES
yes

YES
YES
YES
YES
YES
yes
YES only one point is faild
YES
YES small part need be clean.
YES
YES
YES
YES
YES
yes cancel
yes cancel
yes cancel
yes cancel
YES
yes cancel
yes cancel
yes
yes
yes some prat need to be clean and coted with bitument coating.
yes

yes

yes
yes
yes
yes
yes

yes
yes
yes
yes

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
yes cancel
YES
yes cancel
YES
yes cancel

yes
yes
yes 1-survay report shoud be attched for verfying.
YES 2- steel reinforcement shall be leveling in side the form work.
yes
yes cleanliess requires inside the form work befor pouring concrete.
YES
YES
yes cancel
yes
yes
YES cancel
yes cancel
Yes Cancel
yes 1- seurvay report done by cpecc team only .
yes 2- All anchor boiit need to be restricted agein to movment during the pouring or
yes all need to cheecked immediately of the completed the pouring.
YES
Yes
yes 1- loss in rebar cordnation need to be fixed and reber all rebar .
yes 2-cleaness
1- cleanessrequired inside the
requird inside the form
formwork.
work.
yes 3- drawing
2- survay report cheek by cpecc survyer only.Revison change dimeusion need to
no. (IQWQ-CDFND-D7-009-005)
yes controled by DCC enginering to incloded into the revised master list of drowing.
yes
yes
yes
yes survay report for final layer the elevation and drawing is required.
yes
yes
YES 1-cleaness required inside the formwork.
YES 2- survay report cheek by cpecc survyer only.
YES
YES Backfill layer need be leveling
YES 1- Survay report made by CPECC Team only.
YES
YES
YES
yes 1-cleaness required inside the formwork.
yes 2- survay report cheek by cpecc survyer only.
yes 3- two foundation (f7&f7a)are shefted toword south(38cm) of got apprved from
YES engireeing and reviced need to be add in built drwing and update revison and
dwaing.
YES
YES

YES
YES 1- Cleanliness required in dide form work.
YES 2- seurvay report done by cpecc team only .
YES 3- All anchor boiit need to be restricted agein to movment during the pouring or
YES all need to cheecked immediately of the completed the pouring.
YES 1- Cleanliness reqiurd in side the form work of foundtion befor concrete pouring
YES . Cleanliness reqiurd in side the form work of foundtion befor concrete pouring
1-
2- survay works done by cpecc only .
.Ponit
YES faled be recompacted test.
3-
2- all anchor boltdone
needby
becpecc
restacted agein is any movemet during pouring. Or
YES All survay works
foundations are need only
be mark to .br verify from the evevation od backfulling layer each (200mm)
dabble cheek immedietely ofter concrete pouring to montertion elevation and
YES cordnation.
YES
YES
YES
YES
YES
YES Cleanliness required all around the foundation
all weak point need be removed and reiper aproved material
yes all pokets need be clean and need for modifieded .
yes Cleaniness requriment inside the form work before procceding with concrete
yes pouring
Cleaniness requriment inside the form work before procceding with concrete
yes top anchor requriment
pouring
Cleaniness boilts need inside
to be coverd
the form aginest
work the rushprocceding
before of cocrete.with concrete
ALL
top anchor bolit need to be cheeked immediately after completed concrete
yes Conrete surface need to be wash and dry to proceed of
anchor
pouring boilts need to be coverd aginest the rush cocrete.
witj coating bitumen
pouring
ALL anchor
top to maintian
anchor boilts
bolit needthe
needto verticlity
tobebecheekedof anchor boilt.
immediately
coverd aginest after
the rush of completed
cocrete. concrete
yes
RFI requires
pouring
ALL anchor to be
to maintian
bolit attched
need betocheeked
show
thetoverticlity of engineering
anchor boilt.approvied
immediately the
after completed concrete
YES 1- Cleanliness requrieds all around foundation and rebar pedstals
additiondpipesadded.
RFI requires to be attched to show engineering
pouring to maintian the verticlity of anchor boilt. approvied the
YES 2-some
small stirps
parts needneed
to to
be be adjusted.
coated after remove
Approperiatd repair
additiondpipesadded.
RFI requires to procedms
be attched requried
to show offerthe
engineering
formwork.
completed
approvied thethe
concrete pouring to
Yes 3- some
Cancel rebar need be clean rush of eanente.
repair hte toprepair
Approperiatd of pipes
additiondpipesadded. are added.
procedms requried offer completed the concrete pouring to
yes repair hte top of pipes are added.
Approperiatd repair procedms requried offer completed the concrete pouring to
Yes repair hte top of pipes are added.
YES
YES
Yes
yes

yes

yes
yES

YES
YES Concrete surface need be cleaned and dry tp proceed bitumen caoting .
YES Concrete repieried need be dry to proceed with coating.
YES

yes

yes
yes Cleanliness required and washing the surface befoe proceeding with caoting
Pepeair hole with approvel material aften weak point.
yes

yes
yes
yes
yes
yes
yES
yes
yes
yes
yes all notied need to regeir aproved material
small crack k at the top surface need to be treat.
yes some part need be toch up with bituemin coat.
yes cocrete chamfer to be modified properly.
yes
YES
YES
YES
YES
YES
yes
YES
YES Cleanliness required all around the foundation

yes
yes
yes
yes
yes
yes

YES
yes Cancel
YES

YES Cleanliness required all around the foundation .


YES
YES
YES
yes

YES
YES
YES
YES
YES
YES
YES
yes
yes
yes
yes
yes
yes

YES

YES
YES
yes ONE point
yes
yes
YES
YES
YES
YES
YES
YES

yes cleanliness inside the form work befor concrete pouring.


yes Canceld
yes
yes
yes
yes Canceld
yes
YES Canceld
yes
YES Canceld

YES Tow point is filed in the test and need recompact again.
YES
yes
YES
YES
yes Cancel
yes
YES

yes cleanliness reqired for concrete surface.


YES All concrete surface neeed be clean
yes
YES

YES

Yes
yes Cancel
yes concrete surface need be smooth ,washd ,clean ,caoted br bitumen coat.
yes
yes
YES
Yes
Yes
yES
YES
YES
YES
YES
YES
yes
YES
YES
YES
YES
YES
yes cancel
yes
yes
YES
YES
YES
YES
YES cleanliness inside the form work befor concrete pouring.
YES
YES
yes

yes
yes
yes
yes

yes
yes

yes

yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
YES
Yes
yes
yes
yes
YES
yES
YES RFI need be issed to get in Emil aprovel to used post frill anchor bolts.
YES
YES Cancel
YES Cancel
YES Cancel

yes
yes
yes
YES
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes
Yes
yes
yes
yes
yes cancel
yes
yes
yes cancel

yes
yes

YES
YES
YES
YES
yes
yes
yes
yes
yes
yes
yes
yes
yes
yes

yes
yes
yes
yes
yes
yes
YES
YES
yes
yes
yes
yes
YES
YES
yes

yes
yes
yes

yes
yes
yes
YES
YES
YES
YES
YES

yes
YES
YES
YES
Yes
YES
YES
YES
YES
YES
Yes
YES
YES
YES
YES Cancel
YES
YES
YES
YES

YES
YES
YES
YES
YES
YES

YES
YES
YES

YES

YES
YES
YES

YES
YES Cancel
YES

YES
YES

YES
YES
YES
YES
YES
YES
YES

YES Canel

YES

yes
yes
yes
yes
yes
yes
yes
yes
YES
YES

yes
yes
yes

yes
yes
yes

YES

YES
YES

YES
YES
YES

YES
YES

YES

YES

YES

YES
YES

yes
yes
yes

yes

yes
yes
yes

YES
YES
YES

yes
yes

YES
YES

YES

yes

yes

YES
YES
YES

YES

YES
YES
YES
YES
of the earthing plate not installed layer delcrtion not in the corect position.
pproval material.
IR No. Soft Copy
IR CE-C 0009 IR scan\CE-C 0009.PDF
IR CE-C 0021 IR scan\CE-C 0021.PDF
IR CE-C 0024 IR scan\CE-C 0024.PDF
IR CE-C 0026 IR scan\CE-C 0026.PDF
IR CE-C 0032 IR scan\CE-C 0032.pdf
IR CE-C 0035 IR scan\CE-C 0035.PDF
IR CE-C 0037 IR scan\CE-C 0037.pdf
IR CE-C 0046 IR scan\CE-C 0046.pdf
IR CE-C 0047 IR scan\CE-C 0155.pdf
IR CE-C 0048 IR scan\CE-C 0048.pdf
IR CE-C 0049 IR scan\CE-C 0049.pdf
IR CE-C 0059 IR scan\CE-C 0059.pdf
IR CE-C 0060 IR scan\CE-C 0060.pdf
IR CE-C 0062 IR scan\CE-C 0062.pdf
IR CE-C 0066 IR scan\CE-C 0066.pdf
IR CE-C 0068 IR scan\CE-C 0068.pdf
IR CE-C 0070 IR scan\CE-C 0070.pdf
IR CE-C 0074 IR scan\CE-C 0074.pdf
IR CE-C 0078 IR scan\CE-C 0078.pdf
IR CE-C 0079 IR scan\CE-C 0079.pdf
IR CE-C 0081 IR scan\CE-C 0081.pdf
IR CE-C 0082 IR scan\CE-C 0082.pdf
IR CE-C 0083 IR scan\CE-C 0083.pdf
IR CE-C 0084 IR scan\CE-C 0084.pdf
IR CE-C 0085 IR scan\CE-C 0085.pdf
IR CE-C 0106 IR scan\CE-C 0106.pdf
IR CE-C 0107 IR scan\CE-C 0107.pdf
IR CE-C 0108 IR scan\CE-C 0108.PDF
IR CE-C 0125 IR scan\CE-C 0125.pdf
IR CE-C 0128 IR scan\CE-C 0128.pdf
IR CE-C 0137 IR scan\CE-C 0137.PDF
IR CE-C 0138 IR scan\CE-C 0138.pdf
IR CE-C 0139 IR scan\CE-C 0139.pdf
IR CE-C 0155 IR scan\CE-C 0155.pdf
IR CE-C 0163 IR scan\CE-C 0163.pdf
IR CE-C 0173 IR scan\CE-C 0173.pdf
IR CE-C 0174 IR scan\CE-C 0174.pdf
IR CE-C 0180 IR scan\CE-C 0180.pdf
IR CE-C 0182 IR scan\CE-C 0182.pdf
IR CE-C 0183 IR scan\CE-C 0183.pdf
IR CE-C 0184 IR scan\CE-C 0184.pdf
IR CE-C 0185 IR scan\CE-C 0185.pdf
IR CE-C 0188 IR scan\CE-C 0188.pdf
IR CE-C 0194 IR scan\CE-C 0194.pdf
IR CE-C 0195 IR scan\CE-C 0195.pdf
IR CE-C 0197 IR scan\CE-C 0197.pdf
IR CE-C 0197/R1 IR scan\CE-C 0197-R1.pdf
IR CE-C 0198 IR scan\CE-C 0198.pdf
IR CE-C 0198/R1 IR scan\CE-C 0198-R1.pdf
IR CE-C 0200 IR scan\CE-C 0200.pdf
IR CE-C 0200 R/1 IR scan\CE-C 0200 R1.pdf
IR CE-C 0219 IR scan\CE-C 0219.pdf
IR CE-C 0219/R1 IR scan\CE-C 0219 R1.pdf
IR CE-C 0220 IR scan\CE-C 0220.pdf
R CE-C 0224 IR scan\CE-C 0224.pdf
IR CE-C 0224/R1 IR scan\CE-C 0224 R1.pdf
IR CE-C 0229 IR scan\CE-C 0229.pdf
IR CE-C 0230 IR scan\CE-C 0230.pdf
IR CE-C 0237 IR scan\CE-C 0237.pdf
IR CE-C 0238 IR scan\CE-C 0238.pdf
IR CE-C 0239 IR scan\CE-C 0239.pdf
IR CE-C 0240 R1 IR scan\CE-C 0240 R1.pdf
IR CE-C 0242 IR scan\CE-C 0242.pdf
IR CE-C 0243 IR scan\CE-C 0243.pdf
IR CE-C 0244 IR scan\CE-C 0244.pdf
IR CE-C 0251 IR scan\CE-C 0251.pdf
IR CE-C 0260 IR scan\CE-C 0260.pdf
IR CE-C 0261 IR scan\CE-C 0261.pdf
IR CE-C 0262 IR scan\CE-C 0262.pdf
IR CE-C 0264 IR scan\CE-C 0264.pdf
IR CE-C 0265 IR scan\CE-C 0265.PDF
IR CE-C 0271 IR scan\CE-C 0271.pdf
IR CE-C 0272 IR scan\CE-C 0272.pdf
IR CE-C 0275 IR scan\CE-C 0275.pdf
IR CE-C 0276 IR scan\CE-C 0276.pdf
IR CE-C 0281 IR scan\CE-C 0281.pdf
IR CE-C 0282 IR scan\CE-C 0282.pdf+A70K11A71:B79A69A71:B79
IR CE-C 0283 IR scan\CE-C 0283.pdf
IR CE-C 0290 IR scan\CE-C 0290.pdf
IR CE-C 0291 IR scan\CE-C 0291.pdf
IR CE-C 0292 IR scan\CE-C 0292.pdf
IR CE-C 0294 IR scan\CE-C 0294.pdf
IR CE-C 0295 IR scan\CE-C 0295.pdf
IR CE-C 0296 IR scan\CE-C 0296.pdf
IR CE-C 0305 IR scan\CE-C 0305.pdf
IR CE-C 0306 IR scan\CE-C 0306.pdf
IR CE-C 0309 IR scan\CE-C 0309.pdf
IR CE-C 0310 IR scan\CE-C 0310.pdf
IR CE-C 0317 IR scan\CE-C 0317.pdf
IR CE-C 0318 IR scan\CE-C 0318.pdf
IR CE-C 0320 IR scan\CE-C 0320.pdf
IR CE-C 0321 IR scan\CE-C 0321.pdf
IR CE-C 0326 IR scan\CE-C 0326.pdf
IR CE-C 0327 IR scan\CE-C 0327.pdf
IR CE-C 0328 IR scan\CE-C 0328.pdf
IR CE-C 0334 IR scan\CE-C 0334.PDF
IR CE-C 0337
IR CE-C 0338 IR scan\CE-C 0338.PDF
IR CE-C 0344 IR scan\CE-C 0344.pdf
IR CE-C 0345 IR scan\CE-C 0345.pdf
IR CE-C 0348 IR scan\CE-C 0348.pdf
IR CE-C 0353 IR scan\CE-C 0323.pdf
IR CE-C 0354 IR scan\CE-C 0354.pdf
IR CE-C 0355 IR scan\CE-C 0355.pdf
IR CE-C 0356 IR scan\CE-C 0356.pdf
IR CE-C 0359 IR scan\CE-C 0359.PDF
IR CE-C 0365 IR scan\CE-C 0365.PDF
IR CE-C 0372 IR scan\CE-C 0372.pdf
IR CE-C 0377 IR scan\CE-C 0377.pdf
IR CE-C 0382 IR scan\CE-C 0382.pdf
IR CE-C 0391 IR scan\CE-C 0391.pdf
IR CE-C 0397 IR scan\CE-C 0397.pdf
IR CE-C 0398 IR scan\CE-C 0398.pdf
IR CE-C 0399 IR scan\CE-C 0399.pdf
IR CE-C 0408 IR scan\CE-C 0408.pdf
IR CE-C 0409 IR scan\CE-C 0409.pdf
IR CE-C 0410 IR scan\CE-C 0410.pdf
IR CE-C 0412 IR scan\CE-C 0412.pdf
IR CE-C 0416 IR scan\CE-C 0416.pdf
IR CE-C 0417 IR scan\CE-C 0417.pdf
IR CE-C 0423 IR scan\CE-C 0423.pdf
IR CE-C 0428 IR scan\CE-C 0428.pdf
IR CE-C 0436 IR scan\CE-C 0436.pdf
IR CE-C 0437 IR scan\CE-C 0437.pdf
IR CE-C 0440 IR scan\CE-C 0440.pdf
IR CE-C 0441 IR scan\CE-C 0441.pdf
IR CE-C 0445 IR scan\CE-C 0445.pdf
IR CE-C 0447 IR scan\CE-C 0447.pdf
IR CE-C 0449 IR scan\CE-C 0449.pdf
IR CE-C 0456 IR scan\CE-C 0456.pdf
IR CE-C 0458 IR scan\CE-C 0458.pdf
IR CE-C 0458/R1 IR scan\CE-C 0458-R1.pdf
IR CE-C 0461 IR scan\CE-C 0461.pdf
IR CE-C 0469 IR scan\CE-C 0469.pdf
IR CE-C 0476 IR scan\CE-C 0476.pdf
IR CE-C 0480 IR scan\CE-C 0480.pdf
IR CE-C 0483 IR scan\CE-C 0483.pdf
IR CE-C 0490 IR scan\CE-C 0490.pdf
IR CE-C 0491 IR scan\CE-C 0491.pdf
IR CE-C 0500 IR scan\CE-C 0500.PDF
IR CE-C 0500/R1 IR scan\CE-C 0500-R1.PDF
IR CE-C 0501 IR scan\CE-C 0501.PDF
IR CE-C 0501/R1 IR scan\CE-C 0501 R1.pdf
IR CE-C 0502 IR scan\CE-C 0502-R1.pdf
IR CE-C 0516 IR scan\CE-C 0516.pdf
IR CE-C 0517 IR scan\CE-C 0517.pdf
IR CE-C 0519 IR scan\CE-C 0519.pdf
IR CE-C 0521 IR scan\CE-C 0521.pdf
IR CE-C 0525 IR scan\CE-C 0525.pdf
IR CE-C 0526 IR scan\CE-C 0526.pdf
IR CE-C 0527 IR scan\CE-C 0527.pdf
IR CE-C 0527/R1 IR scan\CE-C 0527-R1.pdf
IR CE-C 0528 IR scan\CE-C 0528.pdf
IR CE-C 0529 IR scan\CE-C 0529.pdf
IR CE-C 0530 IR scan\CE-C 0530.pdf
IR CE-C 0534 IR scan\CE-C 0534.pdf
IR CE-C 0535 IR scan\CE-C 0535.pdf
IR CE-C 0555 IR scan\CE-C 0555.pdf
IR CE-C 0561 IR scan\CE-C 0561.pdf
IR CE-C 0570 IR scan\CE-C 0570.pdf
IR CE-C 0572 IR scan\CE-C 0572.pdf
IR CE-C 0574
IR CE-C 0576/R1
IR CE-C 0587 canceld
IR CE-C 0587/R1 IR scan\CE-C 0587-R1.pdf
IR CE-C 0590 IR scan\CE-C 0590.PDF
IR CE-C 0591 IR scan\CE-C 0591.pdf
IR CE-C 0604 IR scan\CE-C 0604.pdf
IR CE-C 0604/R1 IR scan\CE-C 0604 R1.pdf
IR CE-C 0607 IR scan\CE-C 0607.pdf
IR CE-C 0607/R1 IR scan\CE-C 0607-R1.pdf
IR CE-C 0610
IR CE-C 0616
IR CE-C 0625 IR scan\CE-C 0625.pdf
IR CE-C 0627 IR scan\CE-C 0627.pdf
IR CE-C 0634 IR scan\CE-C 0634.pdf
IR CE-C 0634/R1 IR scan\CE-C 0634-R1.pdf
IR CE-C 0636 IR scan\CE-C 0636.pdf
IR CE-C 0638
IR CE-C 0641 IR scan\CE-C 0641.pdf
IR CE-C 0646/R1 IR scan\CE-C 0646-R1.pdf
IR CE-C 0649 IR scan\CE-C 0649.pdf
IR CE-C 0651/R1 IR scan\CE-C 0651-R1.pdf
IR CE-C 0653
IR CE-C 0657 IR scan\CE-C 0657.pdf
IR CE-C 0660 IR scan\CE-C 0660.PDF
IR CE-C 0663 IR scan\CE-C 0663.pdf
IR CE-C 0665
IR CE-C 0682 IR scan\CE-C 0682.PDF
IR CE-C 0688 IR scan\CE-C 0668.pdf
IR CE-C 0669 IR scan\CE-C 0669.pdf
IR CE-C 0670 IR scan\CE-C 0670.pdf
IR CE-C 0672 IR scan\CE-C 0672.pdf
IR CE-C 0673 IR scan\CE-C 0673.pdf
IR CE-C 0678 IR scan\CE-C 0678.pdf
IR CE-C 0679 IR scan\CE-C 0679.pdf
IR CE-C 0680 IR scan\CE-C 0680.PDF
IR CE-C 0681 IR scan\CE-C 0681.PDF
IR CE-C 0682 IR scan\CE-C 0682.PDF
IR CE-C 0684 IR scan\CE-C 0684.pdf
IR CE-C 0690 IR scan\CE-C 0690.PDF
IR CE-C 0694 IR scan\CE-C 0694.pdf
IR CE-C 0701 IR scan\CE-C 0701.pdf
IR CE-C 0704 IR scan\CE-C 0704.pdf
IR CE-C 0711 IR scan\CE-C 0711.pdf
IR CE-C 0712 IR scan\CE-C 0712.pdf
IR CE-C 0713 IR scan\CE-C 0713.pdf
IR CE-C 0716 IR scan\CE-C 0617.pdf
IR CE-C 0722 IR scan\CE-C 0722.pdf
IR CE-C 0723 IR scan\CE-C 0723.pdf
IR CE-C 0724 IR scan\CE-C 0724.pdf
IR CE-C 0725 IR scan\CE-C 0725.pdf
IR CE-C 0726 IR scan\CE-C 0726.pdf
IR CE-C 0727 IR scan\CE-C 0727.pdf
IR CE-C 0728 IR scan\CE-C 0728.pdf
IR CE-C 0739/R1 IR scan\CE-C 0739-R1.pdf
IR CE-C 0740 IR scan\CE-C 0740.PDF
IR CE-C 0740/R1 IR scan\CE-C 0740-R1.pdf
IR CE-C 0741 IR scan\CE-C 0741.PDF
IR CE-C 0741/R1 IR scan\CE-C 0741-R1.pdf
IR CE-C 0760 IR scan\CE-C 0760.PDF
IR CE-C 0761 IR scan\CE-C 0761.PDF
IR CE-C 0762
IR CE-C 0765 IR scan\CE-C 0765.PDF
IR CE-C 0765/R1 IR scan\CE-C 0765-R1.PDF
IR CE-C 0766
IR CE-C 0767 IR scan\CE-C 0767.pdf
IR CE-C 0768
IR CE-C 0769 IR scan\CE-C 0769.PDF
IR CE-C 0771 IR scan\CE-C 0771.pdf
IR CE-C 0772 IR scan\CE-C 0772.pdf
IR CE-C 0776 IR scan\CE-C 0776.pdf
IR CE-C 0778 IR scan\CE-C 0778.pdf
IR CE-C 0779 IR scan\CE-C 0779.pdf
IR CE-C 0780 IR scan\CE-C 0780.pdf
IR CE-C 0788
IR CE-C 0789
IR CE-C 0790
IR CE-C 0793
IR CE-C 0794 IR scan\CE-C 0794.pdf
IR CE-C 0795 IR scan\CE-C 0795.pdf
IR CE-C 0796 IR scan\CE-C 0796.pdf
IR CE-C 0797 IR scan\CE-C 0797.pdf
IR CE-C 0798 IR scan\CE-C 0798.pdf
IR CE-C 0799 IR scan\CE-C 0799.pdf
IR CE-C 0809 IR scan\CE-C 0809.PDF
IR CE-C 0810 IR scan\CE-C 0810.pdf
IR CE-C 0811 IR scan\CE-C 0811.pdf
IR CE-C 0815 IR scan\CE-C 0815.PDF
IR CE-C 0816
IR CE-C 0817 IR scan\CE-C 0817.PDF
IR CE-C 0819
IR CE-C 0822 IR scan\CE-C 0822.pdf
IR CE-C 0823 IR scan\CE-C 0823.pdf
IR CE-C 0823/R1 IR scan\CE-C 0823-R1.PDF
IR CE-C 0828 IR scan\CE-C 0828.PDF
IR CE-C 0829 IR scan\CE-C 0829.PDF
IR CE-C 0836 IR scan\CE-C 0836.pdf
IR CE-C 0837 IR scan\CE-C 0837.pdf
IR CE-C 0838 IR scan\CE-C 0838.PDF
IR CE-C 0839 IR scan\CE-C 0839.PDF
IR CE-C 0847 IR scan\CE-C 0847.PDF
IR CE-C 0856 IR scan\CE-C 0856.pdf
IR CE-C 0860 IR scan\CE-C 0860.pdf
IR CE-C 0862
IR CE-C 0867 IR scan\CE-C 0867.PDF
IR CE-C 0885 IR scan\CE-C 0885.PDF
IR CE-C 0891
IR CE-C 0891/R1 IR scan\CE-C 0891-R1.PDF
IR CE-C 0892
IR CE-C 0928 IR scan\CE-C 0928.PDF
IR CE-C 0932 IR scan\CE-C 0932.PDF
IR CE-C 0933 IR scan\CE-C 0933.PDF
IR CE-C 0934
IR CE-C 0935 IR scan\CE-C 0935.PDF
IR CE-C 0952
IR CE-C 0980 IR scan\CE-C 0980.PDF
IR CE-C 0989 IR scan\CE-C 0989.PDF
IR CE-C 0993 IR scan\CE-C 0993.PDF
IR CE-C 0994 IR scan\CE-C 0994.PDF
IR CE-C 0995 IR scan\CE-C 0995.PDF
IR CE-C 1019 IR scan\CE-C 1019.PDF
IR CE-C 1020 IR scan\CE-C 1020.PDF
IR CE-C 1027
IR CE-C 1027/R1 IR scan\CE-C 1027-R1.PDF
IR CE-C 1028
IR CE-C 1030 IR scan\CE-C 1030.PDF
IR CE-C 1031 IR scan\CE-C 1031.PDF
IR CE-C 1032
IR CE-C 1051
IR CE-C 1051/R1 IR scan\CE-C 1051-R1.PDF
IR CE-C 1052 IR scan\CE-C 1052-R1.PDF
IR CE-C 1052/R1 IR scan\CE-C 1052-R1.PDF
IR CE-C 1054 IR scan\CE-C 1054.PDF
IR CE-C 1056 IR scan\CE-C 1056.PDF
IR CE-C 1057 IR scan\CE-C 1057.PDF
IR CE-C 1058 IR scan\CE-C 1058.PDF
IR CE-C 1070
IR CE-C 1122
IR CE-C 1133 IR scan\CE-C 1133.PDF
IR CE-C 1147 IR scan\CE-C 1147.PDF
IR CE-C 1148 IR scan\CE-C 1148.PDF
IR CE-C 1149 IR scan\CE-C 1149.PDF
IR CE-C 1149/R1 IR scan\CE-C 1149-R1.PDF
IR CE-C 1150
IR CE-C 1159 IR scan\CE-C 1159.PDF
IR CE-C 1160 IR scan\CE-C 1160.PDF
IR CE-C 1161 IR scan\CE-C 1161.PDF
IR CE-C 1161/R1 IR scan\CE-C 1161-R1.PDF
IR CE-C 1162 IR scan\CE-C 1162.PDF
IR CE-C 1162/R1 IR scan\CE-C 1162-R1.PDF
IR CE-C 1163 IR scan\CE-C 1163.PDF
IR CE-C 1163/R1
IR CE-C 1208 IR scan\CE-C 1208.PDF
IR CE-C 1209
IR CE-C 1221 IR scan\CE-C 1221.PDF
IR CE-C 1222 IR scan\CE-C 1222.PDF
IR CE-C 1223 IR scan\CE-C 1223.PDF
IR CE-C 1224 IR scan\CE-C 1224.PDF
IR CE-C 1225
IR CE-C 1226 IR scan\CE-C 1226.PDF
IR CE-C 1227 IR scan\CE-C 1227.PDF
IR CE-C 1236 IR scan\CE-C 1236.PDF
IR CE-C 1237
IR CE-C 1252 IR scan\CE-C 1252.PDF
IR CE-C 1278 IR scan\CE-C 1278.PDF
IR CE-C 1280 IR scan\CE-C 1280.PDF
IR CE-C 1281
IR CE-C 1283 IR scan\CE-C 1283.PDF
IR CE-C 1283/R IR scan\CE-C 1283-R1.PDF
IR CE-C 1284 IR scan\CE-C 1284.PDF
IR CE-C 1284/R IR scan\CE-C 1284-R1.PDF
IR CE-C 1292 IR scan\CE-C 1292.PDF
IR CE-C 1313 IR scan\CE-C 1313.PDF
IR CE-C 1322 canceld
IR CE-C 1322/R1 IR scan\CE-C 1322-R1.PDF
IR CE-C 1327
IR CE-C 1335 IR scan\CE-C 1335.PDF
IR CE-C 1337 IR scan\CE-C 1337.PDF
IR CE-C 1352
IR CE-C 1358
IR CE-C 1364 IR scan\CE-C 1364.PDF
IR CE-C 1365 IR scan\CE-C 1365.PDF
IR CE-C 1365/R1
IR CE-C 1369 IR scan\CE-C 1369.PDF
IR CE-C 1390 IR scan\CE-C 1390.PDF
IR CE-C 1400 IR scan\CE-C 1400.PDF
IR CE-C 1401 IR scan\CE-C 1401.PDF
IR CE-C 1407 IR scan\CE-C 1407.PDF
IR CE-C 1417 IR scan\CE-C 1417.PDF
IR CE-C 1421
IR CE-C 1424
IR CE-C 1429 IR scan\CE-C 1429.PDF
IR CE-C 1429/R1 IR scan\CE-C 1429-R1.PDF
IR CE-C 1439
IR CE-C 1477 IR scan\CE-C 1477.PDF
IR CE-C 1478 IR scan\CE-C 1478.PDF
IR CE-C 1483 canceld
IR CE-C 1483/R1
IR CE-C 1493 IR scan\CE-C 1493.PDF
IR CE-C 1498
IR CE-C 1502 IR scan\CE-C 1502.PDF
IR CE-C 1514
IR CE-C 1516 IR scan\CE-C 1516.PDF
IR CE-C 1524 IR scan\CE-C 1524.PDF
IR CE-C 1525 IR scan\CE-C 1525.PDF
IR CE-C 1527
IR CE-C 1536 IR scan\CE-C 1533.PDF
IR CE-C 1537
IR CE-C 1538 IR scan\CE-C 1538.PDF
IR CE-C 1540
IR CE-C 1540/R1 IR scan\CE-C 1540.PDF
IR CE-C 1541
IR CE-C 1541/R1
IR CE-C 1542
IR CE-C 1542/R1 IR scan\CE-C 1542-R1.PDF
IR CE-C 1552
IR CE-C 1560 IR scan\CE-C 1560.PDF
IR CE-C 1561 IR scan\CE-C 1561.PDF
IR CE-C 1574 IR scan\CE-C 1574.PDF
IR CE-C 1580
IR CE-C 1582
IR CE-C 1585 IR scan\CE-C 1585.PDF
IR CE-C 1585/R1 IR scan\CE-C 1585.PDF
IR CE-C 1585/R2 IR scan\CE-C 1585-R2.PDF
IR CE-C 1586 IR scan\CE-C 1586.PDF
IR CE-C 1586/R1 IR scan\CE-C 1586-R1.PDF
IR CE-C 1586/R2
IR CE-C 1587 canceld
IR CE-C 1587/R1 IR scan\CE-C 1587-R1.PDF
IR CE-C 1587/R2
IR CE-C 1589 IR scan\CE-C 1589.PDF
IR CE-C 1596 IR scan\CE-C 1596.PDF
IR CE-C 1597 IR scan\CE-C 1587.PDF
IR CE-C 1600 IR scan\CE-C 1600.PDF
IR CE-C 1604 IR scan\CE-C 1604.PDF
IR CE-C 1609 canceld
IR CE-C 1609/R1 canceld
IR CE-C 1610 canceld
IR CE-C 1610/R1 IR scan\CE-C 1610-R1.PDF
IR CE-C 1611 canceld
IR CE-C 1611/R1 IR scan\CE-C 1611-R1.PDF
IR CE-C 1619 IR scan\CE-C 1619.PDF
IR CE-C 1627
IR CE-C 1631 IR scan\CE-C 1631.PDF
IR CE-C 1632 IR scan\CE-C 1628.PDF
IR CE-C 1642 IR scan\CE-C 1642.PDF
IR CE-C 1649
IR CE-C 1653
IR CE-C 1660
IR CE-C 1661
IR CE-C 1662
IR CE-C 1663
IR CE-C 1664
IR CE-C 1665
Produced Water Treatment M109

Description of work
We have completed marking tank IQD8-ABJ681050 for the purpose of excavation work . Reguest inspection .
We
We complete
have
Before the excavation
completed
backfilling, wethe
have of the tank
excavation
scarified and foundation,
work of tankthe
rolled Weofneed
foundation
top inspection
theinoriginal andand
DS8. Request
layer, approval
for the work
survering
have profile(center
coordinated of theAL-
with soil t
and
dimensions
FAO of the
laboratory tank sample
to take area ) to test Proctor Density for information. No loose soil on the top of theoriginal
layer.Request witness.
Take 2 point for comaction drgree testing from sub-grade layer under tank foundation in DS8
Sampling the sub-grade layer for compaction degree test in DS8. Request witness.
We have completed the re-compaction of sub-grade layer in DS8. Request inspection the elevations for this l
take Samples for the first layer in DS8
survey work to check the elevation for the first layer of tank foundation in DS8.
Sampling cement for cube retest in Antemina Batch Plant. Please specify the time of the witness for getting r
Sampling cement for cube retest in Antemina Batch Plant. Please specify the time of the witness for getting r
Survey work to check the elevations for the second layer in DS8.
Witness
Witness to take
that samples
anchor boltsfor the second
conforms layer ( 2 points ) for the purpose
to IQWQ-CE1091-CLMTO-00-0003 of compaction
Rev.0 MTO - ANCHORdegree test in DS8
Sampling the second layer in DS8 has been completed in 21-2-2017. Request witness proctor test of the sam
BOLTS:
88 Nos, 42mm diameter AB x 1525mm long with 2 nuts on top and 1 nut at bottom
Survey to check the elvations for the thired layer under foundation in DS8
Witness sampling of third layer under tank foundation for compaction degree in DS8
Sampling the third layer in DS8 have been completed in 25-2-2017. Request conducting take dry weight.
Survey work to check the elevations for the fourth layer in DS8
Witness tothe
Sampling takefourth
samples for in
layer theDS8
fourth
haslayer
been( 2completed
points ) in DS8
in 28-2-2017.
Request conducting proctor test of the samples.
We completed the formwork of blinding for the tank foundation in DS8. Request inspection the dimensions and quality fo
Witness loading dry concrete in Al-Fayha Batch Plant
Witness to testing (Slump, Temperature) of the blinding concrete in DS8
Witness sampling of the water that will be used in mix of the dry concrete for C15 blinding in DS8 (time 10:3
please witness loading dry concrete ( C-35 ) for the foundation tank in DS8
Witness sampling of the water that will be used in mix of the dry concrete for C-35 Foundation in DS8 (time 10:30).
Witness to testing (Slump, Temperature) and make specimens (cube) of the foundation concrete(C35) in DS8 (time
11:00).
We have completed the re-bar work for the wall of the tank in DS8. Request inspection the type, dimensions
Witness to testing concrete cubes ( compressive strength at 7 days) which took from DS8 for the foundation
Final inspection of anchor bolts formwork, embedded HDPE channel, and the HDPE sleeves for the wall of th
Witness loading dry concrete(C-35 ) in Al-Fayha Batch Plant for the ring wall tank in DS8, Platform and shelt
Witness to testing (Slump, Temperature and cubes) of the ring wall concrete ( C-35) in DS8, Platform and she
Inspection the profile of the soil after excavation in DS8
Witness to testing concrete cubes ( compressive strength at 7 days) which took from DS8 for the ring wall St
inspection concrete surface of ring wall after remove formwork at DS8
R1 Witness to re-take samples under shelters and platform for the purpose of compaction degree test in DS6
Excavation for PLATFORM&SHELTER foundation have been completed in DS8 inspaction the profile of the soil
Inspection the elevations of the sub-grade layer for shelters, platform and sleepers in DS8
Sampling the sub-grade layer for SHELTERS, PLATFORM AND SLEEPERS foundations for compaction degree t
Inspection the surface of the ring wall concrete of the tank in DS8.
Sampling dry clean sand and crushed stone for the purpose of chemical and sieving test in Zubair in Basrah.
Sampling the sub-grade layer for SHELTERS, PLATFORM AND SLEEPERS foundations for compaction degree te
Inspection the concrete surface of the tank after painting by bitumen material in DS8
Witness conducting proctor test for subgrade samples of shelter, platform and sleepers foundations of DS8
Sampling the sub-grade layer for SHELTERS, AND SLEEPERS foundations for compaction degree test in DS8
Sampling the sub-grade layer for SHELTERS, AND SLEEPERS foundations for compaction degree test in DS8
Sampling the backfilling first layer around DS8 tank foundation for degree test.
Sampling the backfilling first layer around DS8 tank foundation for degree test.
Witness testing concrete cubes (compressive strength at 7days) taken from DS7 tank Foundation (stage-1).
Witness testing concrete cubes (compressive strength at 7days) taken from DS7 tank ring wall (stage-2).
Sampling the backfilling first layer around DS8 tank foundation for Drgree test
Sampling the backfilling first layer around DS8 tank foundation for Drgree test
Inspect the tank foundation surface coating corrosion in DS8
Sampling the sub grade layer under shelter and sleeper foundations for proctor test in DS8
Sampling the sub grade layer under shelter and sleeper foundations for proctor test in DS8
Witness conducting proctor test of samples of the backfilling first layer around DS8 tank foundation
Witness conducting proctor test of samples of the subgrade layer DS8 sleeper and shelter foundations
Sampling sub-grade layer under sleeper foundation for proctor test in DS8 (for the failed point)
Sampling the backfilling second layer around DS8 tank foundation for proctor test
Inspection the elevations of the second backfilling layer around DS8 tank
Sampling the sub-grade layer inside the tank for the compaction test in DS8
Sampling the backfiling sacond layer around tank foundation for the purpose compaction degree test in DS8
Witness conducting proctor test of samples of sub-grade layer under sleeper foundation in DS8 (for the failed
sampling the sub-grade layer inside tank for purpose of compaction degree test in DS8 have been is complete
Witness to testing concrete cubes (compressive strength at 28 days) taken from tank ring-wall in DS8 and pl
Witness conducting compaction degree test of samples of the sub-grade layer inside DS8 tank
Sampling the backfilling third layer around DS8 tank foundation for compaction degree test
Sampling the backfilling first layer under the PLATFORM, SHELTERS AND SLEEPERS for compaction degree te
Inspection the elevations of backfilling third layer around DS8 tank foundation
Inspection the elevations of the backfilling first layer under the PLATFORM, SHELTERS AND SLEEPERS in DS8
Witness conducting compaction degree test of samples of the backfilling third layer around DS8 tank foundat
Witness conducting compaction degree test of samples of the backfilling first layer under SLEEPERS of DS8
Sampling the sub-grade layer inside DS8 tank for the purpose of compaction degree test
Sampling the backfilling first layer under SHELTERS and PLATFORM in DS8 for compaction degree
0281 Witness conducting compaction degree test of samples of backfilling first layer under SHELTERS and
Sampling the backfilling fourth layer around DS8 tank foundation for compaction degree test
Witness conducting compaction degree test of samples of sub-grade inside DS8 tank
Witness conducting compaction degree test of samples of backfilling fourth layer around the tank foundation
Sampling the backfilling second layer under SHELTERS, PLATFORM and SLEEPERS for compaction degree tes
Sampling the backfilled sand (first layer) inside the tank foundation for relative density test in DS8
Witness conducting the test of relative density for samples of the backfilled sand first layer inside DS8 tank f
Witness conducting compaction degree test of samples of the backfilling second layer under SHELTERS, P
Sampling of backfilling fifth layer around DS8 tank foundation for compaction degree test
Sampling the backfilling third layer under SHELTERS, PLATFORM and SLEEPERS for compaction degree test i
Witness conducting compaction degree test of samples of backfilling fifth layer around DS8 tank foundation
sampling the backfilling sand second layer insid eDS8 tanks foundations in DS7 for realitive density test
Re-sampling of the backfilling fifth layer around the tank foundation in DS8
Witness conducting the compaction degree test of the samples of the backfilling third layer under SHELT
Witness conducting compaction degree test of samples of backfilling fifth layer around DS8 tank foundation
Witness conducting the test of relative density for the samples the backfilled sand second layer inside DS8 t
Sampling the backfilled sand third layer inside DS8 tank foundation for relative density test
Sampling the backfilled sand fourth layer inside DS8 tank foundation for relative density test
Witness conducting the test of relative density for the samples the backfilled sand third layer inside DS8 tank
Sampling the backfilling fourth layer under SHELTERS, PLATFORM and SLEEPERS for the purpose of compacti
Witness conducting compaction degree test of samples of the backfilling fourth layer under SHELTERS, PL
witness the compaction degree test of sample of central existing compacted sub-grade inside DS6
Sampling the back filling fourth layer under SHELTER ,PLATFORM .SLEEPERS for the puropse os compaction d
Sampling the backfilled sand fourth layer inside DS8 tank foundation for relative density test
Sampling the backfilling sixth layer around the tank foundation for the purpose of compaction degree test in
Sampling the backfilling fifth layer under SHELTERS, PLATFORM and SLEEPERS for the purpose of compaction
Witness conducting the compaction degree test of the samples of the backfilling sixth layer around the tank
Witness testing (slump, temperature) and make specimens (cubes) for the Platform and Shelters columns. Co
Witness conducting relative density test of the samples of the backfilled sand fourth layer inside DS8 tank fo
Witness conducting relative density test of the samples of the backfilled sand second layer inside DS8 tank f
Witness conducting compaction degree test of the samples of the backfilling fifth layer under SHELTERS,
Sampling the backfilled sand fifth layer inside DS8 tank foundation for the purpose of relative density test.
Witness conducting relative density test of samples of the backfilled sand fifth layer inside DS8 tank foundati
Witness conducting the compaction degree test of the samples of the backfilling fifth layer under SHELTE
Sampling the backfilled sand sixth layer inside the tank foundation for the purpose of relative density test in
Witness conducting relative density test for sixth sand layer inside DS8 tank
Witness testing (slump, temperature) for blinding concrete C15 in DS8
Witness testing (slump, temperature) for blinding concrete C15 in DS8
Final inspection for the blinding formwork of Platform and Shelter in DS8
Final inspection the blinding formwork for Sleepers in DS7
Sampling the central sub-grade layer inside DS8 tank.
Sampling the backfilled 7th layer of the sand inside the tank for relative density test in DS8.
Final inspection the blinding formwork for Shelter and Platform in DS8
Witness conducting compaction degree test of the samples for the central sub-grade layer inside DS8 tank.
Witness conducting relative density test of the samples for the backfilled 7th layer of sand inside the tank in
Re-sampling for the sub-grade layer inside the tank in DS8.
Witness conducting compaction degree test of the samples for the central sub-grade layer inside DS8
Sampling the structural soil layer above central sub-grade layer inside DS8 tank
Sampling the backfilled 8th layer of the sand inside DS8 tank for relative density test
Witness testing (slump, temperature) for the blinding concrete (C15) of Platform and Shelters in
Sampling the water to mix the dry concrete for the blinding of Platform and Shelters in DS8
Witness conducting relative density test of the samples of the backfilled sand 8th layer inside DS8 tank found
Witness conducting compaction degree test of the samples of the structural soil layer above central sub-grad
Re-Sampling the structural soil layer above central sub-grade layer inside DS8 tank
Witness conducting compaction degree test of the samples for the structural soil layer above central sub-gra
Inspection the survey work for the backfilled 8th layer of the sand and the sump pit inside the tank in DS8
Inspection the survey work for the backfilled 8th layer of the sand and the sump pit inside the tank in DS8
Re-Sampling the structural soil layer above central subgrade layer inside the tank in DS8.
Final inspection of formwork and rebar for the footings of Platform and Shelters in DS8
Sampling the structural soil layer above central subgrade layer inside DS8 tank
Sampling the water to mix the dry concrete of the Platform and Shelters footings in DS8
Witness testing (slump, temperature) and make specimens (cubes) for the Platform, Shelters and Sleepers c
Witness conducting compaction degree test of samples of the structural soil layer above central sub-grade la
Inspection the survey work for the backfilled 8th layer of the sand the inside DS8 tank
Witness the installation of the lower layer geotextile inside DS8 Tank
Witness the installation of the lower layer geotextile inside DS8 Tank
Witness trial welding of geomembrance inside DS8 Tank
Witness trial welding of geomembrance inside DS8 Tank
Witness the installation of geomembrance inside DS8 Tank
Final inspection of the formwork and rebar for pump shelter and platform columns in DS8
Witness the installation of geomembrance on ring-slope inside DS8 Tank
Witness to testing concrete cubes (compressive strength at 7 days) which took from the C35 footings of Platf
Inspection for installation and welding(overlap and appearance) in DS8 Tank IQD8-ABJ681050
Request final inspection for the anchor bolts of Platform and Shelter columns in DS8
Witness loading dry concrete C-35 for the columns of Shelter and Platform in DS8
Witness repair welding and vacuum test for geomembrane inside DS8 Tank
Witness repair welding and vacuum test for geomembrane inside DS8 Tank
Witness Destructive test for geomembrane inside DS8 Tank
Inspection installation and welding inside DS8 Tank
Witness Non-destructive test for geomembrane inside DS8 Tank
Witness testing (slump, temperature) and make specimens (cubes) for the Platform and Shelters columns. Co
Sampling the water to mix the dry concrete C35 of Platform and Shelters columns in DS8
Sampling the 1st layer of backfilled gravel inside DS8 tank for relative density test
Inspection the concrete of the SHELTER and PLATFORM after repairing the surface in DS8
Witness conducting relative density test of the samples of the backfilled gravel 1st layer inside DS8 tank
Witness conducting relative density test of the samples of the backfilled gravel 1st layer inside DS8 tank
Sampling the backfilled gravel 2st layer inside DS8 tank for relative density test
Inspection the concrete of the SHELTER and PLATFORM after repairing concrete surface in DS8
Witness conducting relative density test of the samples of the backfilled gravel 2nd layer inside DS8 tank
Witness conducting relative density test of the samples of the backfilled gravel 2nd layer inside DS8 tank
Inspect the surface coating corrosion of shelters and platform foundations in DS8
Sampling the backfilled gravel 2nd layer for relative density test inside DS8 tank
Sampling the backfilled gravel 3rd layer for relative density test inside DS8 tank
Sampling the backfilled gravel 3rd layer(Fail point) for relative density test inside DS8 tank
Witness conducting relative density test of the samples of the backfilled gravel 3rd layer inside the tank foun
Witness conducting relative density test of the samples of the backfilled gravel 3rd layer inside the tank foun
Sampling the backfilled sand 1st layer above the HDPE inside DS8 tank foundation for relative density test.
Witness to testing stand by concrete cube (compressive strength at 28 days) which took from the column
Witness conducting relative density test of the samples of the backfilled sand 1st layer above the HDPE in DS
Witness doing electrical resistivity test on the 1st layer of the sand above HDPE inside DS8 tank.
Sampling the backfilled 2nd layerof the sand above the HDPE inside the tank in DS8.
Sampling the backfilled 2nd layerof the sand above the HDPE inside the tank in DS8.
Inspection the concrete of PLATFORM after repairing concrete surface in DS8
Witness to testing concrete cubes (compressive strength at 28 days) from the C35 footings of Platform and S
Witness conducting relative density test of the samples of the backfilled sand 2nd layer above the HDPE insi
Sampling the backfilled sand 3rd layer above the HDPE inside DS8 tank foundation for relative density test
Sampling the backfilled 3rd soil layer around tank foundation (platform area) in DS8.
Sampling core of concrete for the SHELTER AND PLATFORM footings in DS8.
Witness conducting relative density test of the samples of the backfilled sand 3rd layer above the HDPE insid
Witness for final inspection of tank IQD8-ABJ681050 foundation including elevation, slope, protection etc. in
Witness for final inspection Elevation of the tank foundation top, Coordinates and elevation of anchor bolt in
Inspect the surface coating corrosion of the platform in DS8.
Witness to testing speare concrete cubes (compressive strength at 28 days) from the C35 footings of Platfor
Check the concrete cores length which took from the columns of PLATFORM, SHELTERS and SLEEPERS in
Re-sampling the backfilled 2nd soil layer under sleeper foundation in DS8.
Sampling the backfilled 1st soil layer under sleeper foundation in DS8.
Sampling the backfilled
Witness conducting 1st soil layer
compaction around
degree thethe
test for tank foundation
Samples in backfilled
of the DS8. 1st soil
layer under sleeper foundation in DS8.
Witness conducting compaction degree test for the Samples of the backfilled 1st soil layer around tank foundatio
Witness conducting compaction degree test for the Samples of the backfilled 2nd soil layer around tank found
Witness conducting compaction degree test for the Samples of the backfilled 2nd soil layer under sleeper fou
Witness conducting relative density test of the samples of the backfilled sand 2nd layer above the HDPE insi
Witness conducting relative density test of the samples of the backfilled sand 1st layer above the HDPE insid
Check the concrete cores length which took from the columns of PLATFORM, SHELTERS and SLEEPERS in
Witness to testing concrete cores which took from platform and shelters footings in DS8.
Witness conducting compaction degree test for the Samples of the backfilled 2nd soil layer under sleeper fou
Sampling the backfilled 3rd soil layer around tank foundation (platform area) in DS8.
Re-sampling the backfilled 2nd soil layer under sleeper foundation in DS8.
Witness conducting
Sampling compaction
the backfilled degree
4th soil layer test for
around thefoundation
tank Samples of the backfilled 2nd soil layerunder sleeper foun
(platform area) in DS8.
Re-sampling the backfilled 2nd soil layer under sleeper foundation in DS8
Inspect the surface coating corrosion of shelters and platform foundations in DS8.
Witness conducting compaction degree test for the Samples of the backfilled 4th soil layer around tank found
Sampling the backfilled soil first layer around the foundations of pump shelters.
Re-sampling the backfilled 2nd soil layer under sleeper foundation in DS8
Re-sampling the backfilled 2nd soil layer under sleeper foundation in DS8.
Re-Sampling the backfilled 4th soil layer around tank foundation (platform area) in DS8.
Witness conducting compaction degree test for the Samples of the backfilled 4th soil layer around tank found
Witness conducting compaction degree test for the Samples of the backfilled 2nd soil layer under sleeper fo
Witness conducting compaction degree test for the Samples of the backfilled 1st soil layer around shelter fo
Re-sampling the backfilled 1st soil layer under sleeper foundation in DS8.
Sampling the backfilled 5th soil layer around tank foundation (platform area) in DS8.
Sampling the backfilled 5th soil layer around tank foundation (platform area) in DS8.
Re-Sampling the backfilled soil first layer around the foundations of pump shelters in DS8.
Re-Sampling the backfilled soil first layer around the foundations of pump shelters in DS8.
Witness conducting compaction degree test for the Samples of the backfilled 5th soil layer around tank found
Witness conducting compaction degree test for the Samples of the backfilled 2nd soil layer under sleeper in
Re-Sampling the backfilled soil first layer around the foundations of pump shelters in DS8.
Witness conducting compaction degree test for the Samples of the backfilled soil 1st layer around the founda
Witness conducting compaction degree test for the Samples of the backfilled soil 1st layer around the founda
Re-sampling the backfilled 5th soil layer around tank foundation (platform area) in DS8.
Re-sampling the backfilled 1st soil layer under sleeper in DS8
Re-sampling the backfilled 5th soil layer around tank foundation (platform area) in DS8.
Re-sampling the backfilled 1st soil layer under sleeper in DS8
Witness conducting compaction degree test for the Samples of the backfilled 1st soil layer under sleeper in D
Witness conducting compaction degree test for the Samples of the backfilled 5th soil layer around tank found
Inspection the elevation of the backfilling second layer under the sleeper foundations in DS8
Sampling the backfilled soil 2nd layer around the foundations of pump shelters in DS8.
sampling the backfilled 6th soil layer around tank foundation (platform area) in DS8.
sampling the backfilled 2nd soil layer under sleeper in DS8.
Sampling the backfilled soil 2nd layer around the foundations of pump shelters in DS8.
sampling the backfilled 6th soil layer around tank foundation (platform area) in DS8.
sampling the backfilled 2nd (final layer) soil layer under sleeper (including survey report) in DS8
Witness conducting compaction degree test for the Samples of the backfilled soil 2nd layer around the found
Witness conducting compaction degree test for the Samples of the backfilled 6th soil layer around tank found
Witness conducting compaction degree test for the Samples of the backfilled 2nd soil layer under sleeper in
Witness conducting compaction degree test for the Samples of the backfilled soil 2nd layer around the found
Witness conducting compaction degree test for the Samples of the backfilled 6th soil layer around tank found
Witness conducting compaction degree test for the Samples of the backfilled 2nd soil layer under sleeper in
Survey work for the final soil layer under sleeper in DS8.
Re-Sampling the backfilled soil 2nd layer around the foundations of pump shelters in DS8.
Re-sampling the backfilled 6th soil layer around tank foundation (platform area) in DS8.
Re-sampling the backfilled 2nd soil layer under sleeper in DS8.
Witness conducting compaction degree test for the Samples of the backfilled 2nd soil layer under sleeper in
Witness conducting compaction degree test for the Samples of the backfilled 6th soil layer around tank found
Witness conducting compaction degree test for the Samples of the backfilled soil 2nd layer around the found
Survey work for the elevation of the concrete pumps and packet in DS8
Re-Sampling the backfilled soil 2nd layer around the foundations of pump shelters in DS8.
Re-sampling the backfilled 2nd soil layer under sleeper in DS8.
Re-sampling the backfilled
Witness conducting 2nd soil
compaction layertest
degree under sleeper
for the in DS8_
Samples of the backfilled soil 2nd layer around the
foundations of pump shelters in DS8 (point 1)
Witness conducting compaction degree test for the Samples of the backfilled 2nd soil layer under sleeper in
Sampling the backfilled soil 3rd layer around the foundations of pump shelters in DS8.
Witness conducting compaction degree test for the Samples of the backfilled 2nd soil layer under sleeper in
Witness conducting compaction degree test for the Samples of the backfilled 2nd soil layer under sleeper in
Witness conducting compaction degree test for the Samples of the backfilled soil 3rd layer around the founda
Re-Sampling the backfilled soil 3rd layer around the foundations of pump shelters in DS8
Re-Sampling the backfilled soil 3rd layer around the foundations of pump shelters in DS8.
Witness conducting compaction degree test for the Samples of the backfilled soil 3rd layer around the founda
Re-Sampling the backfilled soil 3rd layer around the foundations of pump shelters in DS8.
Witness conducting compaction degree test for the Samples of the backfilled soil 3rd layer around the founda
Sampling the backfilled soil 4th layer around the foundations of pump shelters in DS8.
Witness conducting compaction degree test for the Samples of the backfilled soil 4th layer around the founda
Witness conducting compaction degree test for the Samples of the backfilled soil 4th layer around the founda
Survey work for the final soil layer under pump shelter and sleeper foundations in DS8. ( survey work for 2 d
Final inspection for the formwork of blinding of the pump shelter and under sleeper (including survey work)
DS7.
Final inspection for the pump and sleeper blinding formwork (including survey work) DS8.
Loading Dry C15 concrete for the blinding of pumps and sleeper in DS8.
Sampling water that Use for mix the concrete for the blinding of pumps and sleeper foundations in DS8.
Pouring concrete (including the temperature and slump test) for the blinding of pumps and sleeper in DS8.
checkinspections
Final the elevation
for of
theblanding
rebar andforformwork
sleeper and pumps
of the sleeper
footing for DS8. (survey work).
Final inspection for the rebar, formwork and pockets of the pump foundations (including survey work) in
Loading Dry concrete for sleeper footing and pump foundations of DS8.
Sampling water that
Pouring concrete used forslump
(including mix concrete of sleeperand
test, temperature footing
makeand pump foundations of DS8.
specimen
(cubes) of sleeper footing and pump foundations of DS8..
Inspect the sleeper columns after chipping in DS8.
Inspect the surface of pump foundation after remove formwork in DS8.
Witness to test concrete cubes (compressive strength at 7 days) of sleeper footing and pump foundations o
Witness to test concrete cubes (compressive strength at 7 days) of sleeper footing and pump foundations o
Final inspection for the pipe support blinding formwork (including survey work) in DS8.
Loading Dry concrete for: the pipe support blinding in DS8.
Sampling water that used for mix concrete of the pipe support blinding in DS8
Pouring concrete (including slump test, temperature of the pipe support blinding in DS8.
Final inspection for the rebar, formwork of the sleeper foundatin (including survey work) in DS8.(CS-D8PW-0001/2/3)
Final inspection for the rebar, formwork of the sleeper foundatin (including survey work) in DS8.(CS-D8PW-0001/2/3)
Final inspection for the rebar, formwork of the pipe support foundatin (including survey work) in DS8. (PS-D8PW-
006/007/008/009/017/018/031/032/033/034/036/047/049/053/054)
Final inspection for the rebar, formwork of the pipe support foundatin (including survey work) in DS8.(ps-D8pw-
006/007/008/009/017/018/031/032/033/034/036/047/049/053/054)
Inspection the surface of pump foundation after repaired .
Loading Dry concrete for: 1.pipe support foundation footing in DS8. 2.sleeper columns in DS8
Sampling water that used for mix concrete of the sleeper columns and pipe support foundation in DS8.
Pouring concrete (including slump test, temperature and make specimen(cubes) for: 1.pipe support foundation
Inspect the chipping and rebar for the pipe support columns in DS8.
Final inspection for the rebar, formwork and ahcol bolts of the PIPE SUPPORT COLUMNS (including sur
Witness to test concrete cubes (compressive strength at 28 days) for pump foundation(PAX 681251A/B;PAX
681252A/B)and
Check the surfacesleeper footing in after
of concrete DS8. coating of pump foundaton(D8-PAX681051A/B;PAX681052A/B)
Final inspection for the rebar, formwork and ahcol bolts of the PIPE SUPPORT COLUMNS (including surv
Check the surface of concrete after repaired of sleeper columns and pipe support footing vertical surface。
Check the surface of concrete after repaired of sleeper columns 。
sampling backfill soil in DS8 east of the pump shehter area 。
Final inspection for the formwork s of the pipe support blinding (including survey work) in DS8(ps-D8pw-
037/038/039/040/041/042/043/044/045/048)
Final inspection for the rebar, formwork and ahcol bolts of the PIPE SUPPORT COLUMNS (including survey work) in
DS8(ps-D8pw-006/007/008/009/017/018/031/032/033/034/036/047/049/053/054)
Loading Dry concrete for pipe support blinding and columns in DS8. 1:blinding(ps-D8pw-
037/038/039/040/041/042/043/044/045/048);2:columns(ps-D8pw-
Loading Dry concrete for pipe support blinding and columns in DS8. 1:blinding(ps-D8pw-
006/007/008/009/017/018/031/032/033/034/036/047/049/053/054)
037/038/039/040/041/042/043/044/045/048);2:columns(ps-D8pw-
Sampling water that used for mix concrete of pipe support blinding and columns in DS8.
006/007/008/009/017/018/031/032/033/034/036/047/049/053/054)
Sampling water that used for mix concrete of pipe support blinding and columns in DS8.
Pouring concrete (including slump test, temperature and make specimen (cubes)) of pipe support blinding and
columns in DS8. (including slump test, temperature and make specimen (cubes)) of pipe support blinding and
Pouring concrete
columns in DS8.for the rebar, formwork of the pipe support footing (including survey work) in DS8. (ps-D8pw-037-038-
Final inspection
039-040-041-042-043-044-045-048)
Check the surface of concrete after repaired for pipe support footing in DS8.(ps-D8pw-
006/007/008/009/017/018/031/032/033/034/036/047/049/053/054)
Loading Dry concrete for the pipe support footing in DS8.(ps-D8pw-037-038-039-040-041-042-043-044-045
Sampling water that used the pipe support footing in DS8.
Pouring concrete (including slump test, temperature and make specimen (cubes)) of the pipe support fo
Inspection the formwork for grout the tank foudation in DS8
check the surface after repaired of pipe support foundation.
Witness to test concrete cubes (compressive strength at 28 days) for pipe support footing and sleeper colum
Witness to test concrete cubes (compressive strength at 7 days) for
pipe support
Witness column
the tank in DS8 grouting(including temperature and make specimen (cubes) in DS8
foundation
Check the surface of concrete after repaired for pipe support foundation in DS8.
Check the chipping inside of pipe support columns in DS8 . (ps-D8pw-027-037-038-039-040-041-042-043-044-045-
048)
Final inspection for the rebar,formwork,anchor bolts of the pipe support columns in DS8. (ps-D8pw-027-
Check the surface of grout after remove the formwork of tank foundation in DS8.
sampling backfill soil for pipe support area (third layer,elevation=1.65)
Sampling water that used mixing concrete for the pipe support column in DS8.
Sampling water that used mixing concrete for the pipe support column in DS8.
Pouring concrete (including slump test, temperature and make specimen (cubes)) for the pipe support co
Pouring concrete (including slump test, temperature and make specimen (cubes)) for the pipe support co
sampling backfill soil for zone 6(sixth layer,elevation=1.95) in IGF area.
survey the anchor bolts's elevation/distance and the final elevation of the backfill oil for platform(ABJ-681050
Mechanical completion check for platform near tank(D8-681050)in DS8.
Mechanical completion check for platform near tank(D8-681050)in DS8.
sampling backfill soil for around pipe support(first layer,elevation=1.65) in DS8.
Check the surface of concrete after remove formwork of pipe support columns in DS8。(ps-D8pw-037-038-039-040-
041-042-043-044-045-048)
Witness conducting compaction degree test for around pipe support(first layer,elevation=1.65) in DS8.
Witness to test concrete cubes (compressive strength at 7 days) for
pipe support
Witness column
to test in DS8
concrete .(ps-D8pw-027-037-038-039-040-041-042-043-044-045-048)
cubes (compressive strength at 28 days) for pipe support column in DS8.(ps-D8pw-006-007-
008-009-017-018-031-032-033-034-036-047-049-053-054)
Check the surface of concrete after repaired of pipe support columns in DS8。(ps-D8pw-037-038-039-040-041-042-
043-044-045-048)
sampling backfill soil for around pipe support(second layer,elevation=1.85) in DS8.
Check the surface of concrete after coating of pipe support columns in DS8。(ps-D8pw-037-038-039-040-041-04
survey the concrete and anchor bolts's elevation/distance in DS8. (incloud:1)pump shelter foundation;
Mechanical completion check for PUMP shelter foundation(D8-PBE681051A/B,PAX681051A/B) in DS8.
Check surface of grout after repaired for 1200m³ tank foundation(D8-ABJ681050)
Witness test concrete cubes (compressive strength at 28 days) for pipe support footing (ps-D8pw-037-038
Sampling backfill soil for pipe support area(fifth layer,elevation=2.05)in DS8 .
Witness test concrete cubes (compressive strength at 28 days) for the fourth batch of precast pipe su
Witness conducting compaction degree test for pipe support area(third layer,elevation=1.65)in DS8 .
Sampling backfill soil for pipe support area(fifth layer,elevation=2.05)in DS8
Sampling backfill soil for pipe support area(fifth layer,elevation=2.05)in DS8
Witness conducting compaction degree test for pipe support area(fourth layer,elevation=1.85)and pump shel
Sampling backfill soil for pipe support area (fifth layer,elevation=2.05)and pipe support area east of tank(sub
Witness test concrete cubes (compressive strength at 28 days) for the pipe support column in DS8.(ps-D
Witness conducting compaction degree test for pipe support area (fifth layer,elevation=2.05)and pipe suppor
Witness conducting compaction degree test for pipe support area (fifth layer,elevation=2.05)and pipe suppor
Sampling backfill soil for pump shelter area (sixth layer, elevation=2.25) in DS8.
Witness conducting compaction degree test for pump shelter area (sixth layer, elevation=2.25) and pipe suppo
Sampling backfill soil for pipe support area west of tank (subgrade layer, elevation=0.95; subgrade layer, el
Witness conducting compaction degree test for pipe support area west of tank and south of tank(subgrade la
Sampling backfill soil for pump shelter area fail point (sixth layer, elevation=2.25) in DS8.
Final inspection for the formwork of the remote shelter bliding (including survey work) in DS8
Final inspection for the formwork of the pipe support bliding (including survey work) in DS8.
Witness conducting compaction degree test for pump shelter area and subgrade fail point (sixth layer, elevat
Mechanical completion check for pipe support foundation in DS8.(PS-D8PW-006-007-008-009-017-018-031-032-033-
034-036-047-049-053-054-027-037-038-039-040-041-042-043-044-045-048)
Final inspection for the formwork of the access platform blinding(F1) (including survey work) in DS8.
Final inspection for the formwork of the pipe support blinding (including survey work) in DS8.(PS-D8PW-001-002-046-
050-051-052-055-056-057-058-059)
Loading Dry concrete for 1.access platform near tank blinding(F1); 2.remote I/O blinding;3.pipe support
Loading Dry concrete for 1.access platform near tank blinding(F1); 2.remote I/O blinding;3.pipe support
Sampling water that used mixing concrete for1.access platform near tank blinding(F1); 2.remote I/O blinding;3.pipe
support
Samplingblinding(PS-D8PW-001-002-046-050-051-052-055-056-057-058-059)
water that used mixing concrete for1.access platform near tank blinding(F1); 2.remote I/O blinding;3.pipe
support
Pouring blinding(PS-D8PW-001-002-046-050-051-052-055-056-057-058-059)
concrete (including slump test, temperature) for 1.access platform near tank blinding(F1); 2.remote I/O
blinding;3.pipe support blinding(PS-D8PW-001-002-046-050-051-052-055-056-057-058-059)
Pouring concrete (including slump test, temperature) for 1.access platform near tank blinding(F1); 2.remo
Witness conducting compaction degree test for:1 pipe support area(sixth layer,elevation=2.25;)2 pipe supp
Check the formwork of grout for pump shelter (IQD8-PBE681052A/B;PAX681051A/B) and platform near the tank in
DS8
Witness pump shelter (IQD8-PBE681052A/B;PAX681051A/B) and platform near the tank grouting (including
temperature and make
Sampling backfill soil specimen (cubes) 003/4/5(second
for pipe support in DS8. layer,elevation=1.5) in DS8 .
Final inspection for the rebar , formwork (including survey work) of remote I/O shelter foundation in DS8.
Witness conducting compaction degree test for pipe support 003/4/5(second layer,elevation=1.5) in DS8 .
Loading Dry concrete for remote I/O shelter foundation and pipe support blinding(PS-D8-003-004-005) in DS8.
Loading Dry concrete for remote I/O shelter foundation and pipe support blinding(PS-D8-003-004-005) in DS8.
Loading Dry concrete for remote I/O shelter foundation and pipe support blinding(PS-D8-003-004-005) in DS8.
Sampling water that used mixing concrete for remote I/O shelter foundation and pipe support blinding(PS-D8-003-004-
005) in DS8.
Sampling water that used mixing concrete for remote I/O shelter foundation and pipe support blinding(PS-D8-003-004-
005) in DS8.
Sampling water that used mixing concrete for remote I/O shelter foundation and pipe support blinding(PS-D8-003-004-
005) in DS8.
Pouring concrete (including slump test, temperature and make specimen (cubes)) for remote I/O shelter foundation
and pipeconcrete
Pouring support blinding(PS-D8-003-004-005) in DS8.
(including slump test, temperature and make specimen (cubes)) for remote I/O shelter foundation
and pipe support blinding(PS-D8-003-004-005) in DS8.
Pouring concrete (including slump test, temperature and make specimen (cubes)) for remote I/O shelter foundation
and pipe support blinding(PS-D8-003-004-005) in DS8.
Final inspaction for the formwork(incloding survery )of pipe support blinding (PS-D8-003-004-005)IN DS8
Check the formwork of grout for pipe support (D8PW-017-018-033-034-038-039-040-041-042-043-044-045)
Check the surface of grout after remove formwork for platform and pump shelter.
Witness grouting (including temperature and make specimen (cubs)for pipe supports coulmns in DS8 (D8PW-017-018-
033-034-038-39-40-45)
Final inspection for the rebar, formwork and anchor bolt of:1.the pipe support column(D8PW-001-046-50-51-
Loading Dry concrete for pipe columns (PS-D8PW-001-002-046-050-051-052-055-056-057-058-059) and access
platform(F1) in DS8. for pipe columns (PS-D8PW-001-002-046-050-051-052-055-056-057-058-059) and access
Loading Dry concrete
platform(F1) in DS8.
Sampling water that used mixing concrete for pipe columns (PS-D8PW-001-002-046-050-051-052-055-056-057-058-
059) and access platform(F1)
Sampling water that in DS8.in
used mixing DS8.
concrete for pipe columns (PS-D8PW-001-002-046-050-051-052-055-056-057-058-
059) andconcrete
Pouring access platform(F1) in DS8.in
(including slump DS8.
test, temperature and make specimen (cubes)) for pipe columns (PS-D8PW-001-
002-046-050-051-052-055-056-057-058-059) and access platform(F1)
Pouring concrete (including slump test, temperature and make in (cubes))
specimen DS8. for pipe columns (PS-D8PW-001-
002-046-050-051-052-055-056-057-058-059) and access platform(F1)
Mechanical completion check for pump foundation(PBE-681051A/B; in DS8.
PBE-681052A/B) in DS8.
Mechanical completion check for pump foundation(PBE-681051A/B; PBE-681052A/B) in DS8.
Check the surface of concrete after remove formwork for remote I/0 shelter foundation in DS8.
Final inspection for the rebar, formwork of pipe support footing in DS8.(PS-D8-003-004-005)
Check the surface of concrete after repaired for remote I/0 shelter foundation in DS8.
Check the surface of concrete after coating for ROMOTE I/O SHELTER in DS8
Witness to test GROUT cubes (compressive strength at 7 days) forpipe support columns in DS8. (D8PW-017
Witnessthe
Check to surface
test concrete cubes (compressive
after remove formwork for strength at 7 days)
pipe support for and
columns remote I/O shelter foundation in DS8
access platform(F1)in DS8.(PS-D8PW-001-002-046-050-051-052-055-056-057-058-059)
Check the surface after repaired for pipe support columns and
access platform(F1)in
Final inspection for theDS8.(PS-D8PW-001-002-046-050-051-052-055-056-057-058-059)
rebar and formwork of the contaiment of pump paving and cofferdam (including
survey work) in DS8. (PBE681052A/B,PAX681051A/B)
Final inspection for the rebar ,formwork and anchor bolt of the pipe support columns (including survey work)
in DS8.(PS-D8PW-003-004-005)
check the formwork of grout for pipe support in DS8.(PS-D8PW-042-043-044-045)
Inspected Date location Signature Report Accepted Rejected Close
2017.01.11 DS8 yes yes yes
2017.02.03 DS8 yes yes yes
2017.02.04 DS8 yes YES yes YES
2017.02.07 DS8 yes yes yes yes
2017.02.09 DS8 yes yes yes
2017.02.10 DS8 yes yes yes yes
2017.02.10 DS8 yes yes yes yes
2017.02.15 DS8 yes yes yes
2017.02.15 DS8 yes yes yes
2017.02.15 DS8 yes yes yes
2017.02.18 DS8 yes yes yes
2017.02.20 DS8 yes YES yes yes
2017.02.20 DS8 yes yes yes yes
2017.02.22 DS8 yes yes yes yes
2017.02.25 DS6,7,8 yes yes yes
2017.02.24 DS8 yes yes yes Yes
2017.02.24 DS8 yes yes Yes
2017.02.26 DS8 yes yes yes Yes
2017.02.28 DS8 yes yes yes yes
2017.02.28 DS8 yes yes yes
2017.03.01 DS8 yes yes yes yes
2017.03.02 DS8 yes yes yes yes
2017.03.05 DS8 yes yes yes
2017.03.05 DS8 yes yes yes
2017.03.05 DS8 yes yes yes yes
2017.03.14 DS8 yes yes yes
2017.03.14 DS8 yes yes yes no
2017.03.14 DS8 yes yes yes yes
2017.03.20 DS8 yes yes yes
2017.03.21 DS8 yes yes yes no
2017.03.27 DS8 yes yes yes
2017.03.28 DS8 yes yes
2017.03.28 DS8 yes yes yes
2017.04.02 DS8 yes yes yes
2017.04.04 DS8 yes yes yes yes
2017.04.05 DS8 yes yes yes
2017.04.05 DS8 yes yes yes yes
2017.06.04 DS8 yes yes yes
2017.04.08 ds8 yes YES yes yes
2017.04.08 DS8 yes yes yes YES
2017.04.08 DS8 yes YES YES
2017.04.09 DS8 yes YES YES
2017.04.09 DS8 yes yes yes
2017.04.10 DS8 yes yes yes
2017.04.10 DS8 yes yes yes yes
2017.04.10 DS8 yes yes yes
2017.04.11 DS8 yes yes yes
2017.04.12 DS8 yes yes yes
2017.04.12 DS8 yes yes yes
2017.04.10 DS8 yes yes yes
2017.04.12 DS8 YES YES YES YES
2017.04.18 DS8 yes yes yes
2017.04.18 DS8 yes Yes yes
2017.04.18 DS8 yes yes yes
2017.04.18 DS8 yes yes yes
2017.04.19 DS8 YES YES YES
2017.04.20 DS8 yes yes yes yes
2017.04.20 DS8 yes yes yes yes
2017.04.22 DS8 YES YES yes YES
2017.04.22 DS8 yes yes yes YES
2017.04.22 DS8 yes yes YES yes
2017.04.23 DS8 yes yes yes
2017.04.23 DS8 yes NO yes yes
2017.04.23 DS8 YES YES YES YES
2017.04.23 DS8 yes yes yes
2017.04.25 DS8 yes yes yes YES
2017.04.25 DS8 yes yes yes
2017.04.25 DS8 Yes YES YES
2017.04.25 DS8 YES YES YES
2017.04.25 DS8 yes yes yes yes
2017.04.25 DS8 yes yes yes yes
2017.04.26 DS8 yes yes yes yes
2017.04.26 DS8 yes yes yes YES
2017.04.26 DS8 YES YES yes
2017.04.26 DS8 YES YES YES
2017.04.27 DS8 yes yes YES YES
2017.04.27 DS8 yes yes yes
2017.04.27 DS8 yes yes YES YES
2017.04.29 DS8 yes yes yes yes
2017.04.29 DS8 yes YES yes
2017.04.29 DS8 yes YES yes
2017.04.30 DS8 YES YES YES yes
2017.04.30 DS8 YES YES YES yes
2017.04.30 DS8 YES YES YES
2017.05.01 DS8 YES YES YES
2017.05.01 DS8 yes yes yes
2017.05.02 DS8 YES YES YES
2017.05.02 DS8 Yes YES YES
2017.05.03 DS8 yes YES yes yes
2017.05.03 DS8 YES YES YES yes
2017.05.03 DS8 yes yes yes yes
2017.05.03 DS8 yes yes yes YES
2017.04.05 DS8 yes yes yes
2017.04.05 DS8 yes yes yes yes
2017.05.4 DS8 yes yes yes
2017.05.04 DS8 yes yes yes
2017.05.04 DS8
2017.05.06 DS8 yes YES YES yes
2017.05.06 DS8 yes YES YES YES
2017.05.06 DS8 YES YES YES YES
2017.05.07 DS8 yes yes yes
2017.05.07 DS8 yes Yes yes
2017.05.07 DS8 YES yes YES YES
2017.05.07 DS8 yes yes YES YES
2017.05.07 DS8 YES yes YES YES
2017.05.08 DS8 yes yes yes YES
2017.05.08 DS8 yes yes yes yes
2017.05.09 DS8 YES YES yes YES
2017.05.10 DS8 yes yes yes YES
2017.05.10 DS8 yes yes YES YES
2017.05.11 DS8 yes YES yes yes
2017.05.11 DS8 yes YES yes
2017.05.11 DS8 yes YES yes
2017.05.11 DS8 yes YES yes
2017.05.13 DS8 yes yes YES
2017.05.13 DS8 yes yes yes YES
2017.05.13 DS8 Yes yes YES YES
2017.05.14 DS8 YES yes yes
2017.05.14 DS8 yes yes yes yes
2017.05.14 DS8 yes yes yes YES
2017.05.15 DS8 yes yes yes YES
2017.05.16 DS8 yes yes yes YES
2017.05.17 DS8 YES yes YES yes
2017.05.17 DS8 YES yes yes yes
2017.05.17 DS8 yes YES yes
2017.05.17 DS8 yes YES YES
2017.05.18 DS8 yes yes YES YES
2017.05.18 DS8 yes yes yes yes
2017.05.18 DS8 yes YES YES yes
2017.05.20 DS8 yes YES yes yes
2017.05.20 DS8 yes YES YES
2017.05.21 DS8 yes YES YES
2017.05.21 DS8 yes yes YES
2017.05.21 DS8 YES YES YES
2017.05.22 DS8 yes YES YES yes
2017.05.22 DS8 YES YES YES YES
2017.05.22 DS8 Yes yes yes
2017.05.23 DS8 yes YES yes yes
2017.05.23 DS8 YES yes yes
2017.05.24 DS8 YES yes yes
2017.05.26 DS8 yes yes yes
2017.05.26 DS8 yes yes YES
2017.05.24 DS8 yes YES YES
2017.05.24 DS8 yes YES YES
2017.05.28 DS8 yes yes yes
2017.05.28 DS8 YES YES YES
2017.05.29 DS8 yes yes yes
2017.05.28 DS8 yes YES YES
2017.05.29 DS8 yes yes yes
2017.05.29 DS8 yes yes yes
2017.05.30 DS8 yes YES YES
2017.06.03 DS8 yes YES YES
2017.05.30 DS8 yes YES YES
2017.05.30 DS8 yes YES YES
2017.05.30 DS8 yes YES YES
2017.05.30 DS8 YES YES YES
2017.05.30 DS8 YES YES YES
2017.06.04 DS8 yes yes yes
2017.06.04 DS8 yes YES YES
2017.06.05 DS8 yes yes yes yes
2017.06.05 DS8 yes YES yes yes
2017.06.06 DS8
2017.06.10 DS8
2017.06.08 DS8 yes YES yes
2017.06.09 DS6 yes yes yes yes
2017.06.07 DS8 yes YES yes
2017.06.07 DS8 yes yes yes
2017.06.10 DS8 yes yes yes
2017.06.11 DS8 YES yes yes
2017.06.13 DS8 yes YES YES yes
2017.06.13 DS8 yes YES YES yes
2017.06.14 DS8
2017.06.15 DS8
2017.06.15 DS8 yes YES yes
2017.06.17 DS8 yes YES yes
2017.06.18 DS8 yes YES YES
2017.06.19 DS8 yes YES yes
2017.06.19 DS8 yes YES yes
2017.06.19 DS8
2017.06.20 DS8 yes yes yes yes
2017.06.22 DS8 yes yes yes
2017.07.08 DS8 yes yes yes
2017.06.24 DS8 YES yes yes
2017.06.23 DS8
2017.06.24 DS8 yes YES YES
2017.06.25 DS8 YES YES YES
2017.06.28 DS8 YES YES YES
2017.06.30 DS8
2017.7.06 ds8-7-6 YES YES YES
2017.7.06 DS8 YES yes yes
2017.07.02 DS8 YES YES YES
2017.07.02 DS8 YES YES YES
2017.07.03 DS8 yes YES yes YES
2017.07.03 DS8 YES yes yes YES
2017.07.05 DS8 yes yes YES YES
2017.07.05 DS8 yes yes YES YES
2017.07.05 DS8 yes yes yes yes
2017.07.05 DS8 YES yes yes YES
2017.07.06 DS8 yes yes yes
2017.07.06 DS8 yes yes yes yes
2017.07.08 DS8 yes yes yes
2017.07.08 DS8 yes YES YES
2017.07.10 DS8 yes YES YES
2017.07.11 DS8 yes yes YES YES
2017.07.11 DS8 yes YES YES
2017.07.12 DS8 yes YES YES
2017.07.12 DS8 yes YES YES
2017.07.13 DS8 yes YES YES
2017.07.15 DS8 yes YES YES
2017.07.14 DS8 yes YES YES
2017.07.15 DS8 yes YES YES
2017.07.15 DS8 yes YES YES
2017.07.16 DS8 yes yes YES YES
2017.07.16 DS8 yes yes YES YES
2017.07.16 DS8 yes yes YES YES
2017.07.20 DS8 yes yes yes
2017.07.18 DS8 yes YES YES
2017.07.20 DS8 yes YES YES
2017.07.18 DS8 YES YES YES
2017.07.20 DS8 yes YES YES
2017.07.22 DS8 yes YES YES YES
2017.07.22 DS8 yes YES YES YES
2017.07.22 DS8
2017.07.23 DS8 yes yes yes
2017.07.24 DS8 yes YES YES
2017.07.23 DS8
2017.07.23 DS8 yes yes YES yes
2017.07.23 DS8
2017.07.23 DS8 yes YES yes
2017.07.24 DS8 yes yes YES yes
2017.07.24 DS8 yes yes YES yes
2017.07.25 DS8 yes yes yes
2017.07.25 DS8 yes YES YES
2017.07.25 DS8 yes YES YES
2017.07.25 DS8 yes YES YES
2017.07.26 DS8
2017.07.26 DS8
2017.07.26 DS8
2017.07.27 DS8
2017.07.27 DS8 YES yes yes
2017.07.27 DS8 YES yes YES yes
2017.07.27 DS8 yes yes YES yes
2017.07.27 DS8 yes yes YES yes
2017.07.27 DS8 yes yes YES yes
2017.07.27 DS8 YES YES YES
2017.07.29 DS8 yes YES YES
2017.07.29 DS8 YES yes yes
2017.07.29 DS8 yes yes yes
2017.07.30 DS8 yes YES YES yes
2017.07.30 DS8
2017.07.30 DS8 yes YES YES yes
2017.07.31 DS8 yes yes yes
2017.07.31 DS8 yes yes YES yes
2017.07.31 DS8 yes yes YES yes
2017.08.02 DS8 yes YES yes
2017.08.01 DS8 yes yes YES
2017.08.01 DS8 yes yes YES YES
2017.08.02 DS8 yes YES YES
2017.08.02 DS8 yes YES YES
2017.08.03 DS8 yes yes YES YES
2017.08.03 DS8 yes yes YES YES
2017.08.05 DS8 yes YES YES
2017.08.07 DS8 yes YES YES
2017.08.08 DS8 yes yes YES YES
2017.08.09 DS8
2017.08.10 DS8 yes YES YES
2017.08.11 DS8 yes YES YES
2017.08.14 DS8
2017.08.15 DS8 yes yes YES YES
2017.08.15 DS8
2017.08.20 DS8 yes yes yes
2017.08.21 DS8 yes yes yes
2017.08.22 Br.batch plant yes yes yes
2017.08.22 DS8
2017.08.22 DS8 yes yes yes
2017.08.24 DS8
2017.08.30 DS8 yes YES YES YES
2017.08.31 DS8 yes YES YES
2017.09.04 DS8 yes yes yes
2017.09.04 DS8 yes yes YES YES
2017.09.04 DS8 yes YES YES
2017.09.09 DS8 yes YES YES
2017.09.09 DS8 yes YES YES
2017.09.11 DS8
2017.09.11 DS8 yes YES YES
2017.09.11 DS8
2017.09.12 DS8 yes YES YES
2017.09.12 DS8 yes yes YES YES
2017.09.12 DS8
2017.09.16 DS8
2017.09.16 DS8 yes yes yes
2017.09.16 DS8 yes yes yes
2017.09.16 DS8 yes yes yes
2017.09.16 DS8 yes YES YES
2017.08.18 DS8 yes YES YES
2017.08.18 DS8 yes yes yes
ort foundation footing in DS8. 2.sleeper columns in DS8
yes yes yes
2017.09.20 DS8
2017.09.29 DS8
2017.10.02 DS8 yes yes yes
2017.10.04 DS8 yes yes yes
2017.10.06 DS8 yes yes yes
2017.10.04 DS8 YES YES YES
2017.10.06 DS8 yes yes yes
2017.10.04 DS8
2017.10.06 DS8 yes yes yes
2017.10.06 DS8 yes yes YES YES
2017.10.07 DS8 yes yes yes
2017.10.09 DS8 yes YES YES
2017.10.07 DS8 yes yes yes
2017.10.08 DS8 YES yes YES Yes
2017.10.07 DS8 yes yes yes
2017.10.09 DS8
2017.10.14 DS8 yes YES YES
2017.10.14 DS8
2017.10.16 DS8 yes yes yes
2017.10.16 DS8 yes yes YES yes
2017.10.16 DS8 yes YES yes
2017.10.16 DS8 yes yes yes
2017.10.16 DS8
2017.10.16 DS8 yes yes yes
2017.10.16 DS8 yes yes yes
2017.10.18 DS8 yes yes yes
2017.10.18 DS8
2017.10.21 DS8 yes YES YES
2017.10.25 DS8 yes yes yes
2017.10.26 DS8 yes yes yes
2017.10.26 DS8
2017.10.28 DS8 yes yes yes
2017.10.29 DS8 yes YES YES yes
2017.10.28 DS8 yes yes yes
2017.10.28 DS8 yes YES YES
2017.10.28 DS8 yes yes YES YES
2017.10.31 DS8 yes YES YES YES
2017.11.01 DS8 yes YES YES
2017.11.02 DS8 yes yes YES yes
2017.11.02 DS8 yes YES yes
2017.11.04 DS8 yes YES YES
2017.11.04 DS8 yes YES YES YES
2017.11.05 DS8
2017.11.06 DS8
2017.11.07 DS8 yes YES YES
2017.11.07 DS8 yes YES YES
2017.11.08 DS8
2017.11.08 DS8 yes YES YES
2017.11.12 DS8 yes YES YES
2017.11.14 DS8 yes YES YES
2017.11.14 DS8 yes yes yes
2017.11.14 DS8 yes yes YES YES
2017.11.15 DS8 yes YES YES
2017.11.15 DS8 yes YES YES
2017.11.16 DS8
2017.11.18 DS8 yes YES YES
2017.11.19 DS8 yes YES YES
2017.11.20 DS8
2017.11.25 DS8 yes yes yes
2017.11.26 DS8 yes yes YES yes
2017.11.27 DS8 yes yes yes
2017.11.28 DS8
2017.11.29 DS8 yes yes yes
2017.11.30 DS8
2017.11.30 DS8 yes yes yes
2017.12.02 DS8
2017.12.02 DS8 yes yes yes
2017.12.03 DS8 yes yes yes
2017.12.03 DS8 yes yes yes
2017.12.03 DS8
2017.12.05 DS8 yes YES YES
2017.12.05 DS8
2017.12.05 DS8 yes YES YES
2017.12.06 DS8
2017.12.07 DS8 yes YES YES
2017.12.06 DS8
2017.12.07 DS8
2017.12.06 DS8
2017.12.07 DS8 yes YES YES
2017.12.07 DS8
2017.12.09 DS8 yes YES YES
2017.12.09 DS8 yes YES YES
2017.12.10 DS8 yes YES YES
2017.12.11 DS8
2017.12.12 DS8
2017.12.12 DS8 yes yes yes
2017.12.13 DS8 yes yes yes
2017.12.14 DS8 yes yes yes
2017.12.12 DS8 yes yes yes
2017.12.13 DS8 yes yes yes
2017.12.14 DS8
2017.12.12 DS8 yes yes YES
2017.12.13 DS8 yes YES YES
2017.12.14 DS8
2017.12.12 DS8 yes YES YES
2017.12.13 DS8 Yes YES YES
2017.12.13 DS8 yes YES yes
2017.12.13 DS8 yes yes yes
2017.12.14 DS8 yes yes yes
2017.12.15 DS8 yes YES YES
2017.12.16 DS8 yes YES YES
2017.12.15 DS8 yes YES YES
2017.12.16 DS8 yes yes yes
2017.12.15 DS8 yes YES YES
2017.12.16 DS8 yes YES YES
2017.12.16 DS8 yes YES YES
2017.12.17 DS8 yes YES YES
2017.12.17 DS8 yes YES YES
2017.12.17 DS8 yes YES YES
2017.12.18 DS8 yes YES YES
2017.12.20 DS8
2017.12.20 DS8
2017.12.21 DS8
2017.12.22 DS8
2017.12.23 DS8
2017.12.23 DS8
2017.12.23 DS8
2017.12.23 DS8
Comments

We there just samples for proctor .the compaction reject because is not ready
Need to removed the sand layer under grade .

Cleaniness required inside form work

The sub contractor no show up the time.

the work is not copleted

surface repair and then check

This inspaction removal of from and markout of defects.


Not required

Some area in the foundation need to paint &chamfor need to fixed.


2 point failed
the work is not copmpleted

the work is not copmpleted


the work is not copmpleted
Curing time less them 28 days

the work is not copmpleted

Cotaing is ok ,but chamfer need repair.


The must be issued 14 hours advace

the work not completed .


the work not completed .

Sponge soil plate form ,not ready shalter

the work is not completed .

Waiting more than one hour of the inspaction time

the work is not completed .


Cancel

the work is not completed.


not required
the work is not completed.
the work is not completed.

not reqired

the point is falled

The work not completd


The work not complted
The work not completd

cancel
cancel
cancel
Trial welding for inspactor not done yet.
the work is not competed

The work is not ready


one counte cube get on failed value 19.17.mpa at 7days age.
The work is not ready
ALL exposed all anchor boilt to need be coverd by cap to avoid the trash os concrete during of pouring.

The work is not ready

Tow cubs failed valuse (21.52*15.551)MPA at 7 day age .

Cancel

because Shelters footing are failed on 7 days of cube strength.

The work is not ready

The work is not completed

Required mc cheecklist need be attched with IR decument .

The work is not ready.


Tow point is pass toe point is faild.

point is faild need be recompacted test.

the work is not competed.


the work is not competed

The test is done.and point test failed .


the test is done.and two point test failed nrrd recompact test.

Cancel

some Places in shelter need be coating again.

test done and tow point is feaid need retest.


test doneand point is feaid need retest.
test done and tow point is feaid need retest.
cancel because is layer need be compaction.

cancel because work is not ready .


elevation of final layerunder the lean concrete need be cheek .

find layer under lean concrete level wating for survay rebort to confirm elevation

lose partion in side in the form work need be combleted properly .


Crack notcied at concrete surface need be repierd properly.
Vertical surface need repier agniset the hole.

Vertial rebar need be adjusted vertical with retraction


cleanliness required inside the formwork befor pouring
plastic spercers need be add for 1 st foundations .
Survay rebort need be signture br Email survear.
cleaning in side the form work befor concrete pouring .

Steel renforcement need to be clean from the concrete .


Steel renforcement need to be clean from the rush concrete .

cleanliness required inside the form work


insert plate
cleaninf need in
required to the
be chaked
formwork
plastic
all rebar at padstal orbe
chamfer need leveled
need to be vertical
survay work id done by mfco &
Concrete surface need be smoth .washed and than caoted.
All pokets are need modifided and clean
some part need be coated proberly.

Thw work is not completed.


Concrete surface need be smoth .clean dry coating by bitumen
All chamfer are need be modifided properly.

cancel

cancel

cancel

Cleanliness
All weak edge requires of be
need to then chipping.
reomved
All rebar
cleanliness
silica need be
inside
need to free
the form workrush
from
be removed the of concrete
befor cocrete. pouring.
All anchor
concrete boits need
chamfer and be distracted
all hols or be
need to be repeir
chakedbediractly
apperdafter complite concrete pouring to wait the vertical
material.
and coordnations.
cancel

cancel

cancel

Concrete surface need be smooth, washing ,dry and thean coating by bitumen material.
cancel

Cancel

Cancel

cancel
cancel
cancel
cancel
cancel
cancel

cancel
Remark
Cancel
IR No. Soft Copy
CE-MAT 0002
CE-MAT 0003
CE-MAT 0004
CE-MAT 0005
CE-MAT 0006
CE-MAT 0007
CE-MAT-0009
CE-MAT-0010
CE-MAT 0051
CE-MAT 0052
CE-MAT-0011
CE-MAT-0012 IR scan\CE-MAT 0012.pdf
CE-MAT-0013/A IR scan\CE-MAT 0013 A.pdf
CE- MAT 0014
CE-MAT-0015
CE-MAT-0016 IR scan\CE-MAT 0016.PDF
CE-MAT-0017 IR scan\CE-MAT 0017.PDF
CE-MAT-0018 IR scan\CE-MAT 0018.PDF
CE-MAT-0019 IR scan\CE-MAT 0019.PDF
CE-MAT-0020 IR scan\CE-MAT 0020.PDF
CE-MAT-0021 IR scan\CE-MAT-0021.PDF
CE-MAT-0022 IR scan\CE-MAT-0022.PDF
CE-MAT-0023 IR scan\CE-MAT-0023.PDF
CE-MAT-0024 IR scan\CE-MAT-0024.PDF
CE-MAT-0025 IR scan\CE-MAT-0025.PDF
CE-MAT-0026 IR scan\CE-MAT-0026.PDF
CE-MAT-0027 IR scan\CE-MAT-0027.PDF
CE-MAT-0028 IR scan\CE-MAT-0028.PDF
CE-MAT-0029 IR scan\CE-MAT-0029.PDF
CE-MAT-0030 IR scan\CE-MAT-0030.PDF
CE-MAT-0031 IR scan\CE-MAT 0031.PDF
CE-MAT-0032 IR scan\CE-MAT-0032.PDF
CE-MAT-0033 IR scan\CE-MAT-0033.PDF
CE-MAT-0034 IR scan\CE-MAT-0034.PDF
CE-MAT-0035 IR scan\CE-MAT-0035.PDF
CE-MAT-0036 IR scan\CE-MAT-0036.PDF
CE-MAT-0037 IR scan\CE-MAT-0037.PDF
CE-MAT-0038 IR scan\CE-MAT-0038.PDF
CE-MAT-0039 IR scan\CE-MAT-0039.PDF
CE-MAT-0040 IR scan\CE-MAT-0040.PDF
CE-MAT-0041 IR scan\CE-MAT-0041.PDF
CE-MAT-0042 IR scan\CE-MAT-0042.PDF
CE-MAT-0043 IR scan\CE-MAT-0043.PDF
Produced Water Treatment M109

Description of work Inspected Date


Inspection for receiving of Tank Plates batch S0005 2017.04.05
Inspection for receiving of CP Materaial 1st Shipment 2017.05.08
Inspection for receiving of Anchor Bolts 1 st Shipment 2017.05.08
Inspection for receiving of 26 pieces Tank Plates remained 2017.06.14
Inspection for receiving of coating 2017.05.12
Inspection for receiving of thinner 2017.05.18
For Piping Bulk 1 st Shipment Recieving Inspection 2017.08.05
For Piping Bulk 2 st Shipment Recieving Inspection
Inspection for
Inspection for the
the receiving
receiving of
of first
Cleanbatch
Out Door (COD) of
accessories of four
four tanks
tanks (Except the 2017.07.10
COD) 2017.07.10

Receiving inspection for Cathodic Protection Material 2nd shipment


Receiving inspection for Earthing Material
Receiving inspection for ICSS system cancel
Inspaction requst for recveving inspaction of coterol valves
Inspection request for quantity and physical conditions of weld rod
1-pacing list
Inspaction
2-coo requst for recveving inspaction of anchor bolts 2017.09.23
Inspaction requst for
1-pacing
Inspaction
3-material listrequst
test for recveving
recveving inspaction
certficate. inspaction of
of coterol
coterol valves
valves 2017.10.05
1-pacing
2-coo list
1-pacing
4-material listtest inspaction realse note. 2017.10.12
2-coo
3-material test certficate.
2-coo
Inspaction requst for recveving inspaction of INCOR BOITLS 2017.10.24
3-material test certficate.
3-material
1-pacing list test certficate.
2017.10.29
4-material
2-coo test inspaction realse note.
Inspaction requst for recveving inspaction of INTEGATED CONTEROL SAFETY 2017.10.31
3-material
SYSTEM test certficate.
(ICSS)
Inspaction requst for recveving inspaction of TANK ACCESSORIES. 2017.10.31
4-material
1-pacing test inspaction realse note.
1-pacing list
Inspaction requst for recveving inspaction of ITT CETRIFUGAL PUMP.
list 2017.10.31
1-pacing
2-coo list
2-coo
Inspaction
2-coo requst for recveving inspaction of Fabricated steel structure with 2017.10.31
3-material
3-material test
test certficate.
certficate.
Fasteners.
3-material test
Inspaction requstcertficate.
for recveving inspaction of PIPING BULK. 2017.10.31
4-material
4-material
4-material test
test
test inspaction
inspaction
inspaction realse
realse
realse note.
note.
note.
1-pacing
1-pacing
Inspaction list
list
requst for recveving inspaction of ELECTRICAL POWER CABLE. 2017.11.06
2-coo
2-coo
1-coo
Inspaction
3-material test requst for recveving inspaction of TANK ACCSSORIES
certficate. 2017.11.08
3-material
2-pacing
4-material listtest
test
certficate.
inspaction realse note.
1-coo
Inspaction
4-material requst
test for recveving
inspaction realseinspaction
note. of FIRE&GAS DEDECTORS 2017.11.11
3-material
2-pacing listtest certficate.
1-coo
Inspaction requst for recveving inspaction of API PUMPS 2017.11.13
4-material
3-material test
test inspaction
certficate. realse note.
2-pacing
1-coo list
Inspaction requst for recveving inspaction of (PRESSURE) local gauges 2017.11.23
4-material
2-pacing
3-material
1-coo test certficate.
listtest inspaction realse note.
Inspaction
3-material requst
test for recveving inspaction of IGF EQUMPENTS 1st SHIPMENT.
certficate. 2017.11.28--24
2-pacing
4-material list test inspaction realse note.
1-coo
4-material test inspaction realse note.
3-IRN
Inspaction requst for recveving inspaction of SELF ACTUATED PRESSURE 2017.12.02
2-pacing
5- Testing list
results.
4-MTC
VALVES.
Inspaction
3-IRN
5- TPI inspaction requst for recveving inspaction of ELECRONIC TRANSMITTER/DP
reports 2017.12.02
1-coo
4- TPI inspaction
TRANSMITTER.
Inspaction
6-Testing reports
requst for recveving inspaction of GGC VALVES
results. 2017.12.02
5-Punch
2-pacing
1-coo results.
list
1-coo
Inspaction requst for recveving inspaction of Electrical bluk material (cable tray 2017.12.02
3-IRN
2-pacing
2-pacing list
listrequst) for recveving inspaction of PSV tower and crossover steel
and accessories
Inspaction 2017.12.02
4-Test
3-IRN
3-IRN certifcates
1-coo
structure
Inspaction . requst reports
for recveving inspaction of Piping specail Items -Strainers 2017.12.02
5-
4- TPI
4-TPI
TPI inspaction
Inspaction
inspaction reports.
reports
2-pacing
1-coo
1-coo list
Inspaction
5- Calibration requst for recveving
certifcates . inspaction of Acsecc fittings-flare welds covers 2017.12.09
3-IRN
2-pacing
2-pacing list
list
1-coo
Inspaction requst reports
for recveving inspaction of Acsecc Tank acessories ladders, 2017.12.09
4- TPI inspaction
3-IRN
3-IRN
2-pacing
e.t.c
Inspaction listrequst reports
for recveving inspaction of steel structure 2017.12.09
4- TPI inspaction
4-M.T.C
3-IRN
1-coo
1-coo
Inspaction requst for recveving inspaction of pipeing bulks. 2017.12.09
5-
5-
4- Fabrecation
TPI
Testinspaction
reports. QCreports
reports
2-pacing
2-pacing
1-coo list
list
Inspaction
5- TPI inspaction requst reports
for recveving inspaction of instrument cables 2017.12.09
3-IRN
2-pacing
3-IRN list
1-coo
Inspaction requst reports
for recveving inspaction of Elecitrical bulk. 2017.12.09
4- TPI
TPI inspaction
3-IRN
4- inspaction reports.
2-pacing
1-coo list
4- TPI inspaction reports.
5- Test reborts.
3-IRN
2-pacing list
5- Test reborts.
4- TPI inspaction reports.
3-IRN
5-
4- Test reborts. reports.
TPI inspaction
5- Certifcates
location Signature Report Accepted Rejected Close
CPECC Rumaila Camp yes yes yes yes
DS6 Accomdation camp yes yes yes
DS7 CPECC OFFICE STORE yes yes yes
CPECC Rumaila Camp yes yes yes yes
CPECC Rumaila Camp yes yes yes YES
CPECC Rumaila Camp yes yes yes YES
CPECC Rumaila Camp yes yes yes
CPECC Rumaila Camp
CPECC Rumaila Camp yes yes yes YES
CPECC Rumaila Camp yes yes yes YES
DS7 yes yes YES
CPECC Camp Yard near DS6
CPECC Camp Yard near DS6 yes YES YES
CPECC Camp Yard near DS6
CPECC Rumaila Camp yes yes YES
DS7 yes yes YES
CPECC Camp/DS6 yes yes YES
CPECC Camp near /DS6 yes yes YES
CPECC Camp near /DS6 yes yes YES
DS7 Store yes yes YES
CPECC Camp near /DS6 yes yes YES
CPECC Camp near /DS6 yes yes YES
CPECC Camp near /DS6 yes yes YES
CPECC Camp near /DS6 yes yes YES
CPECC Camp near /DS6 yes yes YES
CPECC Camp near /DS6 yes yes YES
DS7 Store yes yes YES
CPECC Camp near /DS6 yes yes YES
CPECC Camp near /DS7 yes yes YES
CPECC Camp near /DS6 yes yes YES
DS7 PTW Station entrance yes yes YES
CPECC Camp near /DS6 yes yes yes
CPECC Camp near /DS6 yes yes YES
CPECC Camp near /DS6 yes yes yes
CPECC Camp near /DS6 yes YES YES
CPECC Camp near /DS6 yes YES YES
CPECC Camp near /DS6 yes YES yes
CPECC Camp near /DS7 yes yes yes
CPECC Camp near /DS6 yes yes yes
CPECC Camp near /DS6 yes yes yes
CPECC Camp near /DS6 yes yes yes
CPECC Camp near /DS6 yes yes yes
CPECC Camp near /DS6 yes yes yes
Comments
Remark
IR No. Soft Copy
CE-M 0015
CE-M 0016
CE-M 0022
CE-M 0025
CE-M 0026
CE-M 0029
CE-M 0030
CE-M 0032
CE-M 0033
CE-M 0037
CE-M 0039
CE-M 0041
CE-M 0043

CE-M 0044

CE-M 0047
CE-M 0048

CE-M 0055

CE-M 0056
CE-M 0057
CE-M 0058
CE-M 0059
CE-M 0061
CE-M 0063
CE-M 0064
CE-M 0065

CE-M 0068

CE-M 0069
CE-M 0070
CE-M 0071

CE-M 0072
CE-M 0073
CE-M 0074
CE-M 0075
CE-M 0076

CE-M 0077

CE-M 0080
CE-M 0081/81R

CE-M 0082

CE-M 0086

CE-M 0087

CE-M 0088

CE-M 0091

CE-M 0093

CE-M 0094

CE-M 0098

CE-M 0102

CE-M 0104
CE-M 0106
CE-M 0107

CE-M 0107

CE-M 0108

CE-M 0109

CE-M 0110

CE-M 0112

CE-M 0115
CE-M 0116
CE-M 0117
CE-M 0119
CE-M 0120

CE-M 0121

CE-M 0124

CE-M 0125

CE-M 0126

CE-M 0127

CE-M 0128

CE-M 0130

CE-M 0130R1

CE-M 0131

CE-M 0132
CE-M 0133
CE-M 0134
CE-M 0135

CE-M 0136

CE-M 0137

CE-M 0138

CE-M 0139

CE-M 0142

CE-M 0143

CE-M 0144

CE-M 0146
CE-M 0147
CE-M 0148
CE-M 0149
CE-M 0150

CE-M 0151
CE-M 0152

CE-M 0153

CE-M 0154

CE-M 0155
CE-M 0156
CE-M 0157
CE-M 0159
CE-M 0160
CE-M 0161
CE-M 0162
CE-M 0163
CE-M 0166
CE-M 0167
CE-M 0168
CE-M 0172
CE-M 0173
CE-M 0174
CE-M 0175
CE-M 0178
CE-M 0179

CE-M 0180

CE-M 0183

CE-M 0184

CE-M 0185

CE-M 0186

CE-M 0187

CE-M 0188

CE-M 0189
CE-M 0190
CE-M 0191
CE-M 0192
CE-M 0193
CE-M 0194
CE-M 0195
CE-M 0196
CE-M 0197
CE-M 0198
CE-M 0199
CE-M 0200

CE-M 0201
CE-M 0202
CE-M 0203
CE-M 0204

CE-M 0205

CE-M 0206

CE-M 0207
CE-M 0208
CE-M 0209
CE-M 0210
CE-M 0211
CE-M 0212
CE-M 0213

CE-M 0214

CE-M 0215

CE-M 0216
CE-M 0217

CE-M 0218

CE-M 0219
CE-M 0220

CE-M 0221

CE-M 0222

CE-M 0223
CE-M 0224
CE-M 0225
CE-M 0226
CE-M 0227
CE-M 0228
CE-M 0229

CE-M 0230

CE-M 0231

CE-M 0232
CE-M 0233

CE-M 0234

CE-M 0235
CE-M 0236

CE-M 0237

CE-M 0238

CE-M 0239

CE-M 0242
CE-M 0243
CE-M 0244
CE-M 0245
CE-M 0246
CE-M 0247
CE-M 0248
CE-M 0249
CE-M 0250
CE-M 0251

CE-M 0252

CE-M 0253

CE-M 0254
CE-M 0255
CE-M 0256
CE-M 0257

CE-M 0258

CE-M 0259
CE-M 0260
CE-M 0261
CE-M 0262
CE-M 0263

CE-M 0264

CE-M 0265

CE-M 0266

CE-M 0267

CE-M 0268

CE-M 0269
CE-M 0270
CE-M 0271
CE-M 0272
CE-M 0273
CE-M 0274
CE-M 0275
CE-M 0276

CE-M 0277
CE-M 0278
CE-M 0279

CE-M 0280

CE-M 0281

CE-M 0282

CE-M 0283

CE-M 0284
CE-M 0285

CE-M 0286

CE-M 0287
CE-M 0288
CE-M 0289
CE-M 0290

CE-M 0291

CE-M 0292

CE-M 0293

CE-M 0294

CE-M 0295

CE-M 0296

CE-M 0297
CE-M 0298
CE-M 0299
CE-M 0300
CE-M 0301
CE-M 0302
CE-M 0303
CE-M 0304
CE-M 0305
CE-M 0306
CE-M 0307
CE-M 0308

CE-M 0309

CE-M 0310

CE-M 0311

CE-M 0312

CE-M 0313
CE-M 0314
CE-M 0315

CE-M 0316

CE-M 0317
CE-M 0318
CE-M 0319
CE-M 0320
CE-M 0322
CE-M 0323
CE-M 0324
CE-M 0325
CE-M 0326
CE-M 0327

CE-M 0328
CE-M 0329
CE-M 0330
CE-M 0331
CE-M 0332
CE-M 0333
CE-M 0334
CE-M 0335
CE-M 0336
CE-M 0337
CE-M 0338
CE-M 0339
CE-M 0340
CE-M 0341

CE-M 0342

CE-M 0343
CE-M 0344
CE-M 0345
CE-M 0346
CE-M 0347
CE-M 0348
CE-M 0349
CE-M 0350
CE-M 0351

CE-M 0352

CE-M 0353
CE-M 0354
CE-M 0355

CE-M 0357

CE-M 0358
CE-M 0359
CE-M 0360

CE-M 0361

CE-M 0362
CE-M 0363
CE-M 0364
CE-M 0365
CE-M 0366
CE-M 0367
CE-M 0368
CE-M 0369

CE-M 0370
CE-M 0371
CE-M 0372
CE-M 0373
CE-M 0374
CE-M 0375
CE-M 0376

CE-M 0377

CE-M 0378

CE-M 0379
CE-M 0380
CE-M 0381
CE-M 0382
CE-M 0383
CE-M 0384
CE-M 0385

CE-M 0386

CE-M 0387
CE-M 0388
CE-M 0389

CE-M 0390
CE-M 0391
CE-M 0392

CE-M 0393

CE-M 0394
CE-M 0395
CE-M 0396

CE-M 0397

CE-M 0398

CE-M 0399
CE-M 0400
CE-M 0401
CE-M 0402
CE-M 0403
CE-M 0404
CE-M 0405
CE-M 0406
CE-M 0407

CE-M 0408
CE-M 0409
CE-M 0410

CE-M 0411
CE-M 0412
CE-M 0413
CE-M 0414
CE-M 0415

CE-M 0416

CE-M 0417

CE-M 0418
CE-M 0419
CE-M 0420
CE-M 0421
CE-M 0422
CE-M 0423
CE-M 0424
CE-M 0425
CE-M 0426
CE-M 0427
CE-M 0428
CE-M 0429
CE-M 0430

CE-M 0431

CE-M 0432

CE-M 0433

CE-M 0434
CE-M 0435
CE-M 0436
CE-M 0437
CE-M 0438
CE-M 0439

CE-M 0440

CE-M 0441

CE-M 0442

CE-M 0443

CE-M 0444
CE-M 0445
CE-M 0446
CE-M 0447
CE-M 0448
CE-M 0449
CE-M 0450
CE-M 0451

CE-M 0452

CE-M 0453

CE-M 0454

CE-M 0455
CE-M 0456
CE-M 0457
CE-M 0458

CE-M 0459

CE-M 0460
CE-M 0461
CE-M 0462
CE-M 0463
CE-M 0464
CE-M 0465

CE-M 0466
CE-M 0467
CE-M 0468
CE-M 0469
CE-M 0470

CE-M 0471
CE-M 0472
CE-M 0473
CE-M 0474
CE-M 0475
CE-M 0476
CE-M 0477
CE-M 0478
CE-M 0479
CE-M 0480
CE-M 0481
CE-M 0482

CE-M 0483
CE-M 0484
CE-M 0485
CE-M 0486
CE-M 0487
CE-M 0488
CE-M 0489
CE-M 0490
CE-M 0491
CE-M 0492
CE-M 0493
CE-M 0494
CE-M 0495

CE-M 0496

CE-M 0497

CE-M 0498

CE-M 0499
CE-M 0500
CE-M 0501
CE-M 0502
CE-M 0503

CE-M 0504
CE-M 0505
CE-M 0506

CE-M 0507

CE-M 0508
CE-M 0509

CE-M 0510

CE-M 0511

CE-M 0512

CE-M 0513
CE-M 0514
CE-M 0515
CE-M 0516
CE-M 0517

CE-M 0518
CE-M 0519
CE-M 0520
CE-M 0521
CE-M 0521
CE-M 0522
CE-M 0522
CE-M 0523
CE-M 0524
CE-M 0525
CE-M 0526
CE-M 0527
CE-M 0528
CE-M 0529
CE-M 0530
CE-M 0531
CE-M 0532
CE-M 0533

CE-M 0534

CE-M 0535
CE-M 0536
CE-M 0537

CE-M 0538

CE-M 0539
CE-M 0540
CE-M 0541
CE-M 0542

CE-M 0543

CE-M 0544
CE-M 0545
CE-M 0546
CE-M 0547
CE-M 0548
CE-M 0549
CE-M 0550
CE-M 0551
CE-M 0552
CE-M 0553
CE-M 0554
CE-M 0555
CE-M 0556
CE-M 0557
CE-M 0558
CE-M 0559

CE-M 0560
CE-M 0561
CE-M 0562

CE-M 0563
CE-M 0564
CE-M 0565
CE-M 0566
CE-M 0567
CE-M 0568
CE-M 0569

CE-M 0570

CE-M 0571
CE-M 0572
CE-M 0573
CE-M 0574
CE-M 0575
CE-M 0576
CE-M 0577
CE-M 0578
CE-M 0579
CE-M 0580
CE-M 0581
CE-M 0582
CE-M 0583
CE-M 0584
CE-M 0585
CE-M 0586
CE-M 0587
CE-M 0588

CE-M 0589

CE-M 0590

CE-M 0591
CE-M 0592
CE-M 0593
CE-M 0594
CE-M 0595
CE-M 0596
CE-M 0597

CE-M 0598

CE-M 0599

CE-M 0600
CE-M 0601
CE-M 0602
CE-M 0603
CE-M 0604
CE-M 0605
CE-M 0606
CE-M 0607
CE-M 0608
CE-M 0609
CE-M 0610
CE-M 0611
CE-M 0612
CE-M 0613
CE-M 0614
CE-M 0615
CE-M 0616

CE-M 0617

CE-M 0618

CE-M 0619

CE-M 0620

CE-M 0621

CE-M 0622

CE-M 0623
CE-M 0624
CE-M 0625
CE-M 0626
CE-M 0627
CE-M 0628

CE-M 0629

CE-M 0630
CE-M 0631

CE-M 0632

CE-M 0633
CE-M 0634
CE-M 0635
CE-M 0636
CE-M 0637
CE-M 0638
CE-M 0639
CE-M 0640
CE-M 0641

CE-M 0642
CE-M 0643
CE-M 0644
CE-M 0645
CE-M 0646
CE-M 0647
CE-M 0648
CE-M 0649
CE-M 0650
CE-M 0651

CE-M 0652

CE-M 0653
CE-M 0654
CE-M 0655
CE-M 0656
CE-M 0657
CE-M 0658
Produced Water Treatment M109
Description of work
Inspection Request for welders qualification test
Inspection Request for welders qualification test
Inspection Request for welders qualification test
Inspection Request for welders qualification test
Inspection Request for the overlap between the annular plate and the subplate of the 1200m3 in ds6
Inspection request for the orientation,location and sequence of the bottom plate before welding in DS6 site
Inspection request for the overlap distances of bottom plate before welding in DS6 site
Inspection for the quality and dimensions of shell plates after rolling of D8-Pre-separator
Inspection request for checking the bottom plate welds of tank D6-ABJ681050 before welding
Inspection request for checking the bottom plate welds of tank D8-ABJ681050 before welding
Inspection request for checking the bottom plate fit up of tank D6-ABJ681050 before welding
Inspection Request for welders qualification test
Inspection Request for welders qualification test
Inspection request for the Radiographic Testing Proceeding for the plates of the 3rd batch welding qualification t

Inspection request for the Radiographic Testing Proceeding for the plates of the 3rd batch welding qualification t

Inspection request for checking the bottom plate welds of tank D8-ABJ681050 before welding
Inspection request for checking the bottom plate welds of tank D7-ABJ681050 before welding.(The weld number
8,L-9,L-10,L-11,L-12,L-13,L-14,L-15).
The details refer to attached drawings.
Inspection request for checking the bottom plate welds of tank D8-ABJ681050 before welding.The weld number
1,L-2,L-3,L-4,L-5,L-6,L-7.
Inspection request for checking the bottom plate fit up of tank D6-ABJ681050 before welding
Inspection request for checking the bottom plate fit up of tank D7-ABJ681050 before welding
Inspection request for checking the annular plates fit up of tank D8-ABJ681050 before welding
Inspection request for checking the annular plate fit up of tank D6-ABJ681050 before welding
Inspection request for checking the annular plate fit up of tank D7-ABJ681050 before welding
Inspection request for checking the bottom plate fit up of tank D6-ABJ681050 before welding
Inspection request for Visual Inspection and Witness of Penetrant testing of Bevel repaired areas for COD plate a
DS7
Inspection request for checking Orientation, Location, and slope control of bottom plates tank D7-ABJ681050 b
welding
Inspection request for checking Orientation, Location, and slope control of bottom plates tank D8-ABJ681050 b
welding
Inspection request for checking the bottom plate fit up of tank D7-ABJ681050 before welding
Inspection request for visual inspection and Radiographic Testing Proceeding for the annular welds of D7-ABJ68
Inspection request for visual inspection and Radiographic Testing Proceeding for the annular welds of D8-ABJ68

Inspection request for checking the bottom plate fit up of tank D8-ABJ681050 before welding
Inspection request for level and elevation of the annular plates of D8-ABJ681050
Inspection request for checking the annular plate fit up and visual inspection of tank D7-ABJ681050
Inspection request for Marking line of Tank 1st course shell plate. Review for pre erection shell plate check

Inspection request for checking the rectification and witnessing the penetrant test of the excess gaps in annular
plate joints of Tank D6-ABJ681050
Inspection request for the visual inspection and Radiographic Testing Proceeding for the annular plate joints
(approx.300mm) of tank D6-ABJ681050 after welding
1) Check the bottom annular elevation and leveling of PRE-SEPARATOR at DS7
2) Check the marking line for first course shell plates of PRE-SEPARATOR at DS7
Inspection request for checking the levelness and elevation of annular plate and the marking line of first course
plate and drain sewage pit of tank D6-ABJ681050
1) Marking line for the center point of at DS7
2) Checking orientation, location, slope for COD and annular plates and bottom plates.
1) Checking the fitting up for annular plates butt weld before welding. Weld N.O:Weld N.O: A-4,A-5,A-6,A-8,A-9
10,A-12,A-13,A-14,A-16,A-1,A-2;
2) RT test for the butt welds of annular plate;
3) surveillance for bottom plates lay out and fit up.
Checking the roundness, plumbness and level of 1st course shell plate of Tank D8-ABJ681050 and Checking the
up of 1st course shell plate of Tank before welding
Inspection request for PRE-SEPRATOR(D7-ABJ681050)
1. Checking the roundness, plumbness and level of 1st course shell plates.
2. Checking the fit-up of 1st course shell plate of Tank before welding.
Inspection requests for annlar plate fitting up tomorrow (25 th July 2017 ) at DS7 location for the ongoing Tank
fabrication
Inspection request for Checking the roundness、plumbness and level and Checking the fit-up of 1st course sh
plate of Tank D6-ABJ681050 before welding
Inspection Request for PRDUCED WATER TANK(D7-ABJ681053)
1.Visual inspection for 300mm full pass of annular plates welds ;
2. RT test for 300mm full pass of annular plates butt welds.
Inspection request for PRE-SEPRATOR(D7-ABJ681050)

1. Visual inspection for outside vertical welds of 1st course shell plate

2) Check the inside weld back gouging of 1st course shell plate before welding

Visual inspection request for the welds of DS6 Pre-separator roof plate stiffener (Welding Completed)
Visual inspection for 1st course shell plate outside vertical welds and check the surface after back gouging
Inspection request for Visual inspection for 1st course shell plate internal vertical welds of Tank D8-ABJ681050

Inspection request for PRE-SEPRATOR(D7-ABJ681050)


1. Visual inspection for vertical welds of 1st course shell plate after welding;
2) Dimension inspection for plumpness, leveling, roundness of 1st shell plates after welding.
Inspection request for PRDUCED WATER TANK(D7-ABJ681053)
1. Inspection for marking line of the 1st course shell plates before erection;
2. Surveillance for erecting of 1st course shell plate
Inspection request for Visual inspection for 1st course shell plate outside vertical joints and checking the surface
back gouging of Tank D6-ABJ681050
Visual inspection and Radiographic Testing proceeding for 1st course shell plate vertical welds-DS8 Pre-separato

Inspection request for Visual inspection and Radiographic Testing proceeding for 1st course shell plate vertical jo
of Tank D6-ABJ681050
Inspection request for Checking the roundness,plumbness,levelness and elevation of 1st course shell plate of Ta
D8-ABJ681050 after welding
Inspection for the elevation,orientation and location of DS7 Pre-separator MW3 before fire cut
Inspection request for Checking the roundness, plumbness , levelness of 1st course shell plate of Tank D6-
ABJ681050 after welding
Inspection for the fit-up of vertical welds for the 2nd course shell plate of DS7 Pre-separator
Visual inspection for the overlap welds of bottom plates of DS7 Produced Water Tank (Welding Completed )
Inspection for the annular plates' elevation and level and the mark line on bottom plate for 1st course shell plat
DS7 Pre-separator (Before 1st course erection)
Inspection request for Checking the vertical joints fit-up of 2nd course shell plate of Tank D8-ABJ681050 before
welding
Inspection request for Checking the elevation ,orientation and location of shell manway MW3 of Tank D8-ABJ681
before cutting
Inspection request for Checking the elevation ,orientation and location of shell manway of Tank D6-ABJ681050
before cutting
Inspection for the fit-up of vertical joints for the 1st course shell plates of DS7 Produced Water Tank (Before We
)
Inspection request for Checking the roundness, plumbness , levelness of 1st course shell plate of DS7 Produced
Water Tank
Inspection request for Checking the roundness, plumbness and bending of 2nd course shell plate of DS7 Pre-
separator
Inspection request for Checking the roundness, plumbness and Peaking&Bending of 2nd course shell plate of DS
Pre-separator
Inspection for the fit-up of vertical(V2-1) for the 2nd course shell plate and 1st horizontal welds (SH-1)of DS7 P
separator
Inspection for back gouging for the vertical welds of 2nd course shell plate and 1st ring horizontal weld of DS7 P
separator
Inspection for the roundness, plumbness and level of 1st course shell plates of DS7 Produced Water Tank
Inspection for the fit-up of vertical welds for the 1st course shell plate of DS7 Produced Water Tank
IR CE-M 0135 Inspection request for Visual inspection for 2nd course shell plate outside vertical joints and check
the surface after back gouging of Tank D8-ABJ681050
Checking the Plumbness of 1st course shell plates after welding;Checking the welds’ Peaking of 1st course sh
plates after welding.
Inspection request for Checking the fit up of shell plates vertical welds before welding. Welds N.O: V2-1,V2-2, V2
V2-4, V2-5
Inspection request for Visual inspection for 2nd course shell plate internal vertical joints and checking the fit-up o
V2-1 and 1st horizontal joint of Tank D8-ABJ681050
Inspection request for Checking the back gouging of 2nd course shell plates vertical welds . Welds N.O: V2-1,V2
V2-3, V2-4, V2-5.D6-ABJ681050
Inspection request for visual inspection of vertical welds of the 2nd course shell plate and 1st ring horizontal wel
DS7 Pre-separator
Inspection request for checking the back gouging of V2-1 and the 1st horizontal joint of Tank D8-ABJ681050

Visual Inspection for 2nd course shell plates vertical welds after welding. Welds N.O: V2-1,V2-2, V2-3, V2-4, V2-
5;Visual Inspection for fit up for 2nd course shell plates horizontal weld before welding.DS6-Pre-separator
Inspection for back gouging for the vertical welds of 1s course shell plate of DS7 Produced Water Tank
Inspection for radiographic test proceeding of 1st horizontal welds of DS7 Pre-separator shell plate
Inspection Request for Visual inspection and Radiographic Testing proceeding for 2nd course vertical joints and 1
horizontal joint of Tank D8-ABJ681050
Inspection for elevation of the Annular plates before fixing shim plates by tack welding.
Inspection request for Checking the back gouging of 2nd course shell plates horizontal welds . Welds N.O: SH-1
Inspection request for visual inspection and RT proceeding for 1st course shell plate vertical welds of DS7 Produ
Water Tank
Inspection forInspection for plumpness, leveling, roundness of 1st shell plates of DS7 Produced Water Tank (We
Completed)
Visual inspection for 1st Horizontal Welds (welds N.O:SH-1).;RT proceeding for 2st course shell plate vertical we
and 1st Horizontal Welds DS6- Pre-separator
Dimension Inspection for 2nd course of shell plates after welding.Surveillance for erecting the 3rd course of shel
plates.DS6 Pre-separator
Inspection Request for Checking the roundness, plumbnes of 2nd course shell plate of Tank D8-ABJ681050 after
welding
Inspection for the fit-up of the 3rd course shell plate vertical welds of DS7 Pre-separator
Inspection request for Checking the vertical joints fit-up of 3rd course shell plate of Tank D8-ABJ681050 before
welding
Inspection for fit up of the 3rd course shell plates before welding-DS6 Pre-separator
Inspection for back gouging for the vertical welds of 3rd course shell plate of DS7 Pre-separator
Inspection for the fit-up of vertical joint (V3-1) and the 2nd ring horizontal joint of DS7 Pre-separator
Inspection for back gouging of the 3rd course shell plates vertical welds.DS6 Pre-separator
Inspection Request for Checking the fit-up of the joint V3-1 and the 2nd horizontal joint of Tank D8-ABJ681050
before welding
Inspection for the fit-up of 2st course shell plates vertical joint of DS7 Produced Water Tank
Inspection for elevation of the Annular plates before fixing shim plates by tack welding of DS7 Pre-separator
Inspection for horizontal weld fit up of the 3rd course shell plates before welding.DS6 Pre-separator
Inspection for back gouging for the vertical welds of 2nd course shell plate of DS7 Produced Water Tank
Inspection for back gouging for the vertical welds (V3-1 ) of 3rd course shell plate and 2st ring horizontal weld o
DS7 Pre-separator
Inspection request for checking the back gouging of the 3rd vertical joints of Tank D8-ABJ681050
Inspection for back gouging of the 3rd course shell plates horizontal weld.DS6 Pre-separator
Inspection for fit-up for the 1st ring horizontal joint of DS7 Produced Water Tank
Inspection request for visual inspection and RT proceeding for vertical welds of 3rd course shell plate and 2nd
horizontal welds of DS7 Pre-separator
Inspection for the roundness, plumbness and peaking& bending of 3rd course shell plate of DS7 Pre-separator
(Vertical and horizontal welds completed)
Inspection Request for Inspection request for Visual Inspection of the 3rd course vertical joints and checking th
back gouging of the 2nd horizontal joint of Tank D8-ABJ681050
Inspection Request for checking the elevation of the Annular plates before fixing shim plates by tack welding of
D8-ABJ681050
1. Dimension Inspection for 3rd course of shell plates after welding.DS6 Pre-separator
2. Surveillance for erecting the 4th course of shell plates.
1. Visual inspection for vertical and horizontal welds of 3rd course shell plate after welding DS6 Pre-separator
2. RT proceeding for 3rd course shell plate vertical welds and Horizontal Weld after welding.
Inspection request for Visual Inspection of the 2nd horizontal joint and Checking the roundness, plumbnes of 3rd
course shell plate of Tank D8-ABJ681050 after welding
Inspection for the elevation, orientation and location of DS7 Produced Water Tank shell manway MW3&MW4 bef
cutting
Inspection for elevation of the Annular plates before fixing shim plates by tack welding of DS7 Produced Water T
Inspection for back gouging for 1st ring horizontal weld of DS7 Produced Water Tank
Inspection request for Checking the fit-up of the 4th vertical joints of Tank D8-ABJ681050 before welding
Inspection request for visual inspection and RT proceeding for vertical welds of 2nd course shell plates and 1st r
horizontal weld of DS7 Produced Water Tank
Inspection for fit-up of the fourth course vertical joints of DS7 Pre-separator
Inspection request for Checking the fit-up of the 3rd horizontal joint of Tank D8-ABJ681050 before welding
Inspection for vertical welds fit up of the 4th course shell plates before welding.;
Inspection for back gouging of the 4rd course shell plates vertical welds.
Inspection for back gouging for the vertical welds of 4th course shell plate of DS7 Pre-separator
Inspection for fit-up of the vertical weld (V4-1) and the 3rd ring horizontal weld (SH-3) of DS7 Pre-separator
Inspection for horizontal weld fit up of the 4th course shell plates before welding
Inspection request for Checking the back-gouging of the 4th course vertical joints and the 3rd horizontal joint of
Tank D8-ABJ681050 before welding
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for back gouging of the 4rd course shell plates horizontal weld.
Inspection for back gouging for 3rd ring horizontal weld of DS7 Pre-separator
Inspection for fit-up of the vertical joints of DS7 Produced Water Tank 3rd course plates
Inspection for the roundness, plumbness and peaking & bending of 2nd course shell plate of DS7 Produced Wate
Tank (Vertical and horizontal welds completed)
Inspection request for Visual Inspection of the 3rd horizontal joint and the 4th vertical joints of Tank D8-ABJ6810
after welding
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual inspection for vertical and horizontal welds of 4th course shell plate after welding.
2. RT proceeding for 4th course shell plate vertical welds and Horizontal Weld after welding.
1. Dimension Inspection for 4th course of shell plates after welding
2. Surveillance for erecting the 5th course of shell plates.
Inspection for the elevation and mark line of the mid wind girder of DS7 Pre-separator
Inspection request for visual inspection and RT proceeding for vertical welds of 4th course shell plates and 3rd ri
horizontal weld of DS7 Pre-separator
Inspection for back gouging for the vertical welds of 3rd course shell plate of DS7 Produced Water Tank
Inspection for the roundness, plumbness and peaking& bending of 4th course shell plate of DS7 Pre-separator
(Vertical and horizontal welds completed)
Inspection request for checking the marking line of the wind girder of Tank D8-ABJ681050 before installation
Inspection Request for PRE-SEPRATOR(D6-ABJ681050) Inspection for vertical welds fit up of the 5th course shel
plates before welding.
Inspection for fit-up of the vertical weld (V3-4) and the 2nd ring horizontal weld (SH-2) of DS7 Produced Water T

Inspection request for Checking the fit-up of the 5th course vertical joints of Tank D8-ABJ681050 before welding
Inspection for back gouging of the vertical weld (V3-4) and the 2nd ring horizontal weld (SH-2) of DS7 Produced
Water Tank
Inspection for fit-up of the vertical joint of DS7 Pre-separator 5th course shell plate
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for back gouging of the 5th course shell plates vertical welds. Welding N.O:V5-1, V5-2, V5-3, V5-4,
5.
Inspection for back gouging of the vertical weld of DS7 Pre-separator 5th course shell plate
Inspection request for visual inspection and RT proceeding for vertical welds of 3rd course shell plates and 2nd r
horizontal weld of DS7 Produced Water Tank
Inspection for the roundness, plumbness and peaking & bending of 3rd course shell plate of DS7 Produced Wate
Tank (Vertical and horizontal welds completed)
Inspection request for Checking the back-gouging of the 5th course vertical joints and the fit-up of the 4th horiz
joint of Tank D8-ABJ681050
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for horizontal welds fit up of the 5th course shell plates before welding.
Inspection for fit-up of the vertical weld (V5-1) and the 4th ring horizontal weld (SH-4) of DS7 Pre-separator
Inspection request for Checking the fit-up of the wind girder of Tank D8-ABJ681050 before welding
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for back gouging of the 5th course shell plates horizontal welds. Welding N.O:SH-4.
Inspection for fit-up of the vertical joints of DS7 Produced Water Tank 4th course shell plate
Inspection for back gouging of the 4th horizontal weld of DS7 Pre-separator
Inspection request for Checking the back-gouging of the 4th horizontal joint of Tank D8-ABJ681050 before weld

Inspection Request for PRE-SEPRATOR(D6-ABJ681050)


1. Visual inspection for vertical and horizontal welds of 5th course shell plate after welding.
2. RT proceeding for 5th course shell plate vertical welds and Horizontal Weld after welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Dimension Inspection for 5th course of shell plates after welding.
2. Surveillance for erecting the 6th course of shell plates.
Inspection for back gouging of the vertical welds of DS7 Produced Water Tank 4th course shell plates
Inspection request for Visual Inspection of the 4th horizontal joint and the 5th vertical joints of Tank D8-ABJ6810
after welding
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for vertical welds fit up of the 6th course shell plates before welding. Welds NO. :V6-1, V6-2, V6-
V6-4, V6-5
Inspection for fit-up of the vertical joints (V4-4) and 3rd ring horizontal joint of DS7 Produced Water Tank
Inspection request for visual inspection and RT proceeding for vertical welds of 5th course shell plates and 4th ri
horizontal weld of DS7 Pre-separator
Inspection request for Checking the banding and peaking of the 1st to 5th course joints of Tank D8-ABJ681050 a
welding
Inspection request for Checking the fit-up of the 6th course vertical joints of Tank D8-ABJ681050 before weldin

Inspection Request for PRE-SEPRATOR(D6-ABJ681050)


1. Inspection for back gouging of the 6th course shell plates vertical welds. Welding NO.:V6-1, V6-2, V6-3, V6-4,
5.

Inspection for back gouging of the vertical joint (V4-4)) and 3rd ring horizontal joint of DS7 Produced Water Tan
Inspection for fit-up of the vertical joints of DS7 Pre-separator 6th course shell plates
Inspection request for Checking the fit-up of the 5th horizontal joint of Tank D8-ABJ681050 before welding
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for horizontal welds fit up of the 6th course shell plates. Welding N.O:SH-5
Inspection for the location and mark line of Drain Sewage Pit of DS7 Pre-separator before cutting
Inspection for the location and mark line of Center Pipe of DS7 Pre-separator before Erection
Inspection for the back gouging of the vertical welds of DS7 Pre-separator 6th course shell plates
Visual inspeaction and RT proceeding for vertical welds of 4th course shell plates and 3th ring horizontal welds o
DS7 Produced Water Tank
Inspection for fit-up of the vertical joint (V6-1) and the 5th horizontal joint (SH-5) of DS7 Pre-separator
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for back gouging of the 6th course shell plates horizontal welds.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for intermediate stiffener location and fit up before welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for elevation、orientation and location of Nozzles on shell plates.
Inspection request for Checking the back-gouging of 5th horizontal joint and the 6th course vertical joints of Tan
D8-ABJ681050
Inspection for fit-up of the vertical joint of DS7 Produced Water Tank 5th course shell plates
Inspection for back gouging of the vertical joint (V6-1) and 5th ring horizontal (SH-5)weld of DS7 Pre-separator
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual inspection for vertical and horizontal welds of 6th course shell plate after welding.
2. RT proceeding for 6th course shell plate vertical welds and Horizontal Weld after welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Dimension Inspection for 6th course of shell plates after welding.
2.Checking the total plumbness of shell plates
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fillet welds fit up of shell plates to annular plates before welding.
Inspection for back gouging of the vertical joint of DS7 Produced Water Tank 5th course shell plates
Inspection for fit-up of the mid wind girder of DS7 Pre-separator
Inspection for elevation and mark line for the top angle and top wind girder of DS7 Pre-separator
Visual inspection and RT proceeding for vertical welds of 6th course shell plates and 5th ring horizontal welds of
Pre-separator
Inspection for the roundness,plumbness and peaking &bending of 5th course shell plates of DS7 Pre-
separator(Vertical and horizontal welds completed)
Inspection request for Checking the elevation and the marking line of top angle of Tank D8-ABJ681050 before fit

Inspection request for Visual inspection and RT proceeding for the 5th horizontal joint and the 6th vertical joints
Tank D8-ABJ681050 after welding
Inspection request for Checking the roundness and plumbness of the 6th course shell plate of Tank D8-ABJ6810
after welding
Inspection request for Visual inspection and Witness conducting PT examination for the initial weld pass inside t
shell to bottom weld of Tank D8-ABJ681050 after welding
1. Inspection for leak test for inner fillet welds root pass of shell plates to annular plates .
2. Surveillance for welding of external fillet welds shell plates to annular plates.
Inspection for fit-up of the 4th ring horizontal joint of DS7 Produced Water Tank
Inspection for back gouging of the 4th ring horizontal welds of DS7 Produced Water Tank
Inspection for fit-up of the top wind girder of DS7 Pre-separator
Inspection for fit-up of the shell to bottom joint of DS7 Pre-separator
Inspection request for Visual inspection and Witness conducting MT examination for the root pass of the annula
annular joints of Tank D8-ABJ681050 after welding
Inspection for elevation and mark line of DS7 Produced Water Tank mid wind girder
Visual inspection and RT proceeding for the vertical welds of 5th course shell plate and 4th ring horizontal welds
DS7 Produced Water Tank (Welding Completed)
Visual inspection and leak test for inner fillet welds root pass of shell plates to annular plates of DS7 Pre-separat
Inspection for MT for root pass of annular to annular welds of DS7 Pre-seaprator
Inspection request for Checking the elevation and orientation of the shell nozzles of Tank D8-ABJ681050 before
cutting
Inspection request for Checking the elevation and orientation of the oil collection base plates of Tank D8-ABJ681
before installation
Inspection request for Visual inspection and Witness conducting MT examination for the cap pass of the annular
annular joints of Tank D8-ABJ681050 after welding
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual inspection for inner and external fillet welds of shell plates to annular plates after welding.
2. Surveillance MT test for inner and external fillet welds of shell plates to annular plates after welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for butt welds fit up of annular plates before welding (exclude 300 full pass).
2. Surveillance for MT test for butt welds root pass of annular plates.
Inspection request for Visual inspection and Witness conducting PT test for the inside weld of the shell-to-botto
joint of Tank D8-ABJ681050 after welding
Inspection fo MT proceeding for annular to annular welds of DS7 Pre-separator(Welding Completed)
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for overlap distance of bottom plate to annular plate.
2. Inspection for fit up of bottom plate to annular plate.
Inspection for the overlap and fit-up of the bottom plates to annular plates of DS7 Pre-separator
Inspection for fit-up of vertical joints of DS7 Produced Water Tank 6th course shell plates
Inspection for fit-up of mid wind girder of DS7 Produced Water Tank
Visual inspection and PT proceeding for the shell to bottom inner welds of DS7 Pre-separator (Inner Welding
Completed)
Inspection request for Checking the overlap distance of bottom plate to annular plate of Tank D8-ABJ681050 bef
fit-up
Inspection request for Checking the fit-up of the top angle and top wind girder of Tank D8-ABJ681050 before
welding
Visual inspection and PT proceeding for the mid wind girder to shell plates welds of DS7 Pre-separator (Welding
Completed)
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual inspection for butt welds of annular plates after welding (exclude 300 full pass).
2. Witness for MT test for butt welds of annular plates after welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of top angle and stiffener before welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual inspection for fillet welds of intermediate stiffener after welding.
2. Witness for PT test for fillet welds of intermediate stiffener after welding.
Inspection for the roundness,plumbness and peaking &bending of 6th course shell plates of DS7 Pre-
separator(Vertical and horizontal welds completed)
Inspection for the total plumbness of DS7 Pre-separator after shell plate erection and welding completed
Inspection for the elevation and orientation of DS7 Pre-separator shell nozzles before cutting
Inspection for elevation, orientation and mark line of DS7 Pre-separator Oil Collector support pad
Inspection for back gouging for vertical joints of DS7 Produced Water Tank 6th course shell plates
Inpsection for fit-up for the 5th horizontal joint of DS7 Produced Water Tank
Checking the fit-up of bottom plate to annular plate joints of Tank D8-ABJ681050 before welding
Inpsection for the drain sewage pit after excavation and before installation of DS7 Pre-separator
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for MT for temp welds removed area of 5th and 6th course shell plates.
Inspection for fit-up of DS7 Pre-separator drain sewage pit
Inspection for back gouging of DS7 Produced Water Tank 5th horizontal welds
Visual inspection and Witness conducting MT test for butt joint root pass of top angle and top wind girder of Ta
D8-ABJ681050 after welding
Visual inspection and Witness conducting PT test for the outside weld of the shell-to-bottom joint of Tank D8-
ABJ681050 after welding
Inspection request for Checking the elevation and orientation of the shell nozzles of Tank D8-ABJ681050 before
cutting
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for elevation of top angle and stiffener.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for MT for temp welds removed area of 3th and 4th course shell plates.

Visual inspection and RT proceeding for vertical welds of 6th course shell plates and 5th ring horizontal welds of
Produced Water Tank
Inspection for the center pipe location and mark line of DS7 Pre-separator
Inspection for the roundness, plumbness, peaking & bending of DS7 Prodcued Water Tank 4th course s
plates
Inspection for the roundness, plumbness, peaking & bending of DS7 Prodcued Water Tank 5th course s
plates
Inspection for fit-up of DS7 Produced Water Tank shell to bottom joint
Checking the location and marking line of sewage pit of Tank D8-ABJ681050 before cutting
Checking the location and marking line of central pipe of Tank D8-ABJ681050 before cutting
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for making line of center pipe before installing.
Inspection for fit-up of DS7 Pre-separator top angle
Visual inspection and leak test for the inner welds root pass of DS7 Produced Water Tank shell plates to annular
plates
Checking the total plumbness of Tank D8-ABJ681050 after shell plate erection and welding completed
Checking the fit-up of the oil collection base plate of Tank D8-ABJ681050 before welding
Inspection for the overlap and fit-up of the bottom plates to annular plates of DS7 Produced Water Tank
Inspection for the MT proceeding for annular to annular welds of DS7 Produced Water Tank (Root Pass Welding
Completed)
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual inspection for fillet welds of bottom plates after welding.
Checking the fit-up of the drain swage pit of Tank D8-ABJ681050 before welding
Checking the fit-up of the shell nozzles of Tank D8-ABJ681050 before welding
Inspection for the MT proceeding for annular to annular welds of DS7 Produced Water Tank ( Welding Complete
Inspection for the fit-up of shall nozzles of DS7 Pre-separator
Inspection for the location and mark line of DS7 Produced Water Tank drain sewage pit
Checking the fit-up of the oil collection of Tank D8-ABJ681050 before welding
Inspection for the fit-up of DS7 Produced Water Tank bottom to annular plate
Inspection for the fit-up of DS7 Pre-separator manway MW4
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for supports P103 to P101 fit up of water distributor before welding.
Inspection for the fit-up of DS7 Pre-separator oil collection (before welding)
Inspection for the elevation and mark line of DS7 Produced Water Tank top angle(inside) and top mid girder
(outside)
Checking the fit-up of the 24” shell manway of Tank D8-ABJ681050 before welding
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for nozzles fit up before welding. Nozzles N.O: N17, N30, MW3.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual Inspection for top stiffener fillet welds after welding.
2. Witness PT test for top stiffener fillet welds after welding.
Inspection for the drain sewage pit after excavation and before installation of DS7 Produced Water Tank
Visual inspection and PT for the shell to bottom inner welds of DS7 Produced Water Tank (welding completed)
Visual inspection and PT for the Mid Wind Girder welds of DS7 Produced Water Tank (welding completed)
Inpsection for the plumbness of DS7 Pre-separator center pipe
Checking the fit-up of the water distributer of Tank D8-ABJ681050 before welding
Checking the plumbness of center pipe and the fit-up of center pipe to bottom joint of Tank D8-ABJ681050 befo
welding
Checking the fit-up of 30” shell manway of Tank D8-ABJ681050 before welding
Inpsection for the mark line of DS7 Produced Water Tank oil collection
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual Inspection for fillet welds of sump to bottom plate after welding.
2. Witness PT test for fillet welds of sump to bottom plate after welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of center pipe to bottom plate.
2.Inspection for plumbness of center pipe installation.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of 24” SHELL MANWAY NW4 before welding.
Inspection for fit-up of DS7 Produced Water Tank drain sewage pit
Inspection for fit-up of DS7 Produced Water Tank water distributor before welding
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of shell NOZZLES before welding. Nozzles N.O: N2,N15.
2. Inspection for butt welds fit up of shell nozzle’s pipes before welding. Nozzles N.O: N3, N10, N14.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for butt welds back gouging of oil collector PART II and PART III.
Inspection for fit-up of DS7 Pre-separator shell manway MW3
Inspection for roundness, plumbness, peaking & bending of DS7 Produced Water Tank 6th shell plates(vertical a
horizontal weld completed)
Inspection for total plumbness of DS7 Produced Water Tank after shell plate erection and welding completed

Inspection for the elevation, orientation and mark line of DS7 Produced Water Tank shell nozzles before cutting
Inspection for MT for DS7 Pre-separator manway MW4 welds root pass
Inspection for fit-up of DS7 Produced Water Tank top angle (Inside)
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Witness for PT test for root pass of shell plate manway welds.
Inspection for fit-up of DS7 Produced Water Tank shell manway MW3 and MW4
Inspection for PT for DS7 Pre-separator manway MW3 welds root pass
Witness the PT test for the inside root pass of shell nozzles and shell manways of Tank D8-ABJ681050
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of tank distribution PART-101 before welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of NOZZLE to shell plate before welding. Nozzles N.O: N3, N10, N14.
Inspection for MT for the welds of oli collector to shell plate of DS7 Pre-seaprator
Inspection for PT for DS7 Pre-separator shell to bottom welds (welding completed)
Inspection for the fit up of DS7 Pre-separator water distributor inside tank before welding
Checking the fit-up of the central pipe to bottom plate joint of Tank D8-ABJ681050 before welding
Checking the plumbness of central pipe of Tank D8-ABJ681050 before welding
Checking the fit-up of water distributer item P-101 of Tank D8-ABJ681050 before welding
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual Inspection for shell manway welds after welding . N.O: MW3,MW4.
2.witness PT test for shell manway welds after welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual Inspection for oil collection fillet welds after welding . N.O: MW3,MW4.
2. Witness PT test for baseplate welds of oil collection after welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual Inspection for oil collection fillet welds after welding . N.O: MW3,MW4.
2. Witness PT test for baseplate welds of oil collection after welding.
Inspection for fit-up of DS7 Pre-separator anchor chairs
Inspection for fit-up of DS7 Produced Water Tank shell nozzles
Visual inspection and PT for the weld of DS7 Produced Water Tank drain sewage pit to bottom plate
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual Inspection for pipes butt welds of shell nozzles after welding. Nozzles N.O: N3, N10, N14.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of NOZZLE to shell plate before welding. Nozzles N.O:N13, N16.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Witness MT for three-plate lap of bottom plate after welding.
Inpsection for NDE for DS7 Pre-separator shell manway MW3 and MW4 after welding completed
Visual inspection and MT test for shell manway reinforcing plate to shell weld of Tank D8-ABJ681050 after weldin

Visual inspection and PT test for nozzle neck to shell and reinforcing plate weld of Tank D8-ABJ681050 after wel
Checking the fit-up of anchor chair of Tank D8-ABJ681050 before welding
Visual inspection and PT for the welds of DS7 Produced Water Tank top angle and top wind girder to shell plates
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of roof plates before welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual Inspection for water distribution pipes and supports after welding.
Inspection for fit-up of DS7 Pre-separator roof plates before welding
Visual inspection and witness the PT test for the top angle and top wind girder of Tank D8-ABJ681050 after weld

Inspection Request for PRE-SEPRATOR(D6-ABJ681050)


1. Visual Inspection for shell nozzles welds after welding.
2. Witness for PT test for nozzles welds after welding.
Nozzles N.O: N2, N3, N10,N13, N14,N15,N17,N30, N16.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for elevation update of shell nozzles for RFI.
Nozzles N.O: N21,N22,N23.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of NOZZLE to shell plate before welding. Nozzles N.O:N18~N23, N11.
Inspection for the anchor chairs' installation on DS7 Pre-separator bottom before welding
Inspection for fit-up of DS7 Produced Water Tank water distributor
Inspection for fit-up of DS7 Produced Water Tank nozzle N2 & N3 pipe spools
Visual inspection and PT for DS7 Produced Water Tank shell to bottom external welds(Welding Completed)
Inspection for PT for root pass weld of DS7 Produced Water Tank shell Manway MW4
Inspection for fit-up of DS7 Produced Water Tank anchor chairs
Visual inspection and witness the NDT test for shell nozzles of Tank-D8-ABJ681050 after welding
Visual inspection and witness the NDT test for base plates of water distributer, level transmitter support and pipe
supports of Tank D8-ABJ681050 after welding
Witness the PT test for the places where the temporary welds and attachments are removed of the 1st course sh
plate of Tank D8-ABJ681050
Inspection for fit-up of DS7 Produced Water Tank oil collector
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for radius and orientation of Roof Nozzles' markline.
Inspection for the location, orientation and mark line of DS7 Pre-separator roof nozzles and manways before cut
Inspection for the plumbness of DS7 Produced Water Tank center pipe
Checking the fit-up of the roof plates of Tank D8-ABJ681050 before welding
Witness the NDT test for the places where the temporary welds and attachments are removed of the 2nd ,3rd an
4th course shell plate of Tank D8-ABJ681050
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of roof NOZZLES before welding.
2. Witness for PT test for roof welds covered by reinforce plate
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of NOZZLE to shell plate before welding. Nozzles N.O:N1,N28.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Witness for PT test for temp welds removed area of shell plates 1st and 2nd course.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of bolt chairs to shell plate before welding.
Visual inspection and MT for the roof welds covered by reinforce plates
Checking the orientation and marking line of roof nozzles of Tank D8-ABJ681050 before cutting
Inpseciton for fit-up of DS7 Produced Water Tank water distributor pipes and supports inside tank
Inspection for fit-up of DS7 Pre-separator roof Nozzles and Manway.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of pipe supports before welding.
Inspection for the elevation, orentation and fit-up of DS7 Pre-separator external pipe supports
Inspection for waviness and flatness of DS7 Pre-separator roof plates (welding completed)
Visual inspection and MT for the welds of oli collector to shell plate of DS7 Produced Water Tank
Witness the PT test for roof manways root pass weld of Tank D8-ABJ681050
Checking the fit-up of roof nozzles of Tank D8-ABJ681050 before welding
Inspection for fit-up of DS7 Produced Water Tank roof plates before welding
Inspection for waviness and flatness of DS7 Produced Water Tank roof plates before welding
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for roof plate waveness, orientation after welding.
2. Visual inspection for roof plate welds after welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual Inspection for top angle welds after welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual Inspection for anchor chair welds after welding.
2.Witness PT test for fillet welds of anchor chair baseplate to shell plates.
Inspection for PT for DS7 Pre-separator roof nozzles root pass welds
Checking the fit-up of roof manways of Tank D8-ABJ681050 before welding
Witness the NDT test for the places where the temporary welds and attachments are removed of the 4th ,5th an
6th course outside shell plate of Tank D8-ABJ681050
Inspection for fit-up of DS7 Pre-separator roof center plate before welding
Visual inspection and PT for the weld of DS7 Produced Water Tank drain sewage pit to bottom plate
Checking the fit-up of roof central plate of Tank D8-ABJ681050 before welding
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual Inspection for welds of shell nozzles after welding. N.O:N1,N28,N10,N14,N18~23
2. Witness PT test for welds of nozzles to shell plates and MT for baseplate to shell plates.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual Inspection for welds of all the roof nozzles and manway after welding.
2. Witness PT test for welds of nozzles to roof plates and MT for baseplate to shell plates.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of roof center plate before welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Witness MT for roof plate welds cover by baseplates of roof structure.
2. Inspection for fit up of roof structure before welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of pipe supports inside of the tank before welding.
Visual inspection and PT for the welds of DS7 Pre-separator top angle and top wind girder to shell plates
Visual inspection and PT for the welds of DS7 Pre-separator piping supports pad to shell plates external surface
Visual inspection and PT for the welds of DS7 Pre-separator roof nozzles (welding completed)
Witness the NDT test for the places where the temporary welds and attachments are removed of the 1st ,2nd an
3rd course outside shell plate of Tank D8-ABJ681050
Witness the NDT test for roof nozzles and roof manways of Tank D8-ABJ681050 after welding
Checking the orientation and fit-up of roof supports of Tank D8-ABJ681050 before welding
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual Inspection for roof center plate welds after welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of water distribution angle supports before welding.
2. Inspection for fit up of water distribution supports P103 to shell before welding.

Visual inspection for the welds of DS7 Pre-separator anchor chairs and MT for the welds of pads to shell plates

Visual inspection and MT for the welds of DS7 Pre-separator supports pads on the roof plates external surface
Visual inspection and MT for the temporary attachments welds area on DS7 Pre-separator shell plates inside surf
after removed
Inspection for the fit-up of DS7 Pre-separator nameplate support
Visual inspection and PT for welds of DS7 Pre-separator nameplate support to shell plate
Visual inspection and NDE for welds root pass and final pass of DS7 Pre-separator shell nozzle N1
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of nameplate support to shell plate before welding.
2. Inspection for fit up of rod bar to roof plate before welding

Inspection for the location, orientation and mark line of DS7 Produced Water Tank roof nozzles before cutting
Inspection for fit-up of DS7 Pre-separator roof rod bar
Inspection for MT for the welds of DS7 Pre-separator roof nozzles reinforcement pad to roof plates
Inspection for MT for the welds of the temporary attachments welds area on DS7 Pre-separator shell external su
Checking the fit-up of roof rod bar of Tank D8-ABJ681050 before welding
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of shell manway davits before welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for vacuum test for bottom welds.
Inspection for NDE proceeding for the welds of DS7 Pre-separator shell nozzles after welding completed
Witness the MT test for the roof pipe support base plates of Tank D8-ABJ681050 after welding
Witness the PT test for top angle to shell plate lower weld of Tank D8-ABJ681050 after welding
Witness the MT test for reinforcing plate to roof plate joints of roof nozzles and manways of Tank D8-ABJ681050
after welding
Witness the MT test for the places where the temporary welds and attachments are removed and three-plates-la
bottom plate of Tank D8-ABJ681050
Witness the vacuum test for bottom plate fillet welds of Tank D8-ABJ681050
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of cable clips to roof and shell plate.
Inspection for the fit up of DS7 Pre-separator cable clips before welding
Inspection for the fit up of DS7 Produced Water Tank anchor chair pad to shell plate
Inspection for the fit up of DS7 Produced Water Tank roof nozzles and manway
Inspection for NDE for the welds of DS7 Produced Water Tank roof plates coverd by reinforement plates
Visual insepction for the welds of DS7 Pre-separator bottom plates and MT for the three layers overlap area
Inspection for the vacuum box test for the welds of DS7 Pre-separator bottom plates
Visual inspection and MT for the welds of DS7 Pre-separator drain sewage pit to bottom plate
Visual inspection for the welds of DS7 Pre-separator rod bar on roof external surface
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for MT for temp welds removed area of 6th, 5th and 4th course shell plates external surface.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for annular plates and shim plates before grouting.
Inspection for fit-up of DS7 Produced Water Tank roof center plate before welding
Visual inspection for welds of DS7 Pre-separator internal piping supports and MT for welds of the pads to shell
Visual inspection and MT for welds of DS7 Pre-separator center pipe to bottom plate
Visual inspection and NDE for welds of DS7 Produced Water Tank manway MW3
Witness the NDT test for the places where the temporary welds and attachments are removed of the 5th and 6th
course inside shell plate of Tank D8-ABJ681050
Visual inspection and witness PT test to name plate of Tank D8-ABJ681050 after welding
Inspectionf for the pneumatic test for the welds of DS7 Pre-separator shell and roof nozzle
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of cable clip to bottom plate before welding.
Checking the installation of bolts and gaskets inside the tank of DS8
Visual inspection for the welds of DS7 Produced Water Tank anchor chairs and MT for the welds of pads to shel
plates
Visual inspection for the welds of DS7 Pre-separator roof plates
Visual inspection and MT for the temporary attachments welds area on DS7 Produced Water Tank shell plates in
surface
Inspection for the location, orientation and fit-up of DS7 Produced Water Tank accessories on roof external surfa

Inspection Request for PRE-SEPRATOR(D6-ABJ681050)


1. Visual Inspection for pipe support inside of the tank after welding.
2. Inspection MT test for support baseplate to shell plate.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for water distribution angle supports and supports P103 to shell after welding.
2. Inspection for center pipe to bottom after welding.
3. Inspection MT for baseplate of supports P103 to shell after welding.
Visual inspection for the annular to bottom welds and MT for three layers overlap welds of DS7 Produced Water
bottom plates
Inspection for the vacuum test for the welds of DS7 Produced Water Tank bottom plates
Visual inpsection and NDE for the welds of DS7 Produced Water roof nozzles after welding completed
Visual inspection and MT for the welds of DS7 Pre-separator anode pads on bottom plates
Inspection for location, orientation and fit-up of DS7 Produced Water Tank piping supports on shell external surf
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for leak test of shell NOZZLES reinforcement plate to shell plates after welding.
Visual inpsection and NDE for the welds of DS7 Produced Water Tank shell nozzles after welding completed
Inspection for location, orientation and fit-up of DS7 Produced Water Tank Water distributor Assembly Supports

Visual inspection for the welds of DS7 Produced Water Tank piping supports and MT for welds of the pads to ro

Inspection Request for PRE-SEPRATOR(D6-ABJ681050)


1. Visual Inspection for pipe support outside of the tank after welding (oil remove pipe and overflow pipe)
2. Inspection for MT test for support baseplate to shell.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual Inspection for nameplate and manway davit after welding.
2. Inspection for PT test for nameplate fillet welds to shellplate.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for MT for temp welds removed area of 1st, 2nd and 3rd course shell plates external surface.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for vacuum test for bottom welds.
Visual inspection and MT for the temporary attachments welds area on DS7 Produced Water Tank shell plates ou
surface
Visual inspection and MT for welds of DS7 Produced Water Tank internal piping supports pad to shell and bottom
Visual inspection and MT for welds of DS7 Produced Water Tank external piping supports pad to shell
Visual inspection and MT for welds of DS7 Produced Water Tank distributor Assembly Supports pad to shell
Visual inspection and MT for weld of DS7 Produced Water Tank center pipe base plate to bottom plate
inspection for the location and mark line of DS7 Produced Water Tank spiral stairways support pad and handrails
support pad
inspection for the location and mark line of DS7 Pre-separator spiral stairways support pad and handrails suppor
Inspection for PT for welds of top angle to shell plate
Witness the pneumatic test for the shell and roof reinforcing plate welds of Tank D8-ABJ681050
Inspection for the pneumatic test for the welds of DS7 Produced Water Tank shell and roof nozzle
Checking the orientation and elevation of pipe support on bottom and shell of Tank D8-ABJ681050
Checking the fit-up of pipe support on bottom and shell of Tank D8-ABJ681050
Inspection for MT test for temp welds removed area of bottom plate and annular plate
Visual Inspection for pipe support welds outside of the tank
Checking the orientation and marking line of base plates of the stairway, ladders and platform of Tank D8-ABJ68
Witness the MT test to the repaired places of the 1st course shell plate external surface of Tank D7-ABJ681053
Visual Inspection for pipe support welds inside of the tank
Inspection for leak test of roof NOZZLES reinforcement plate
Dimension Inspection for 4th course shell plates
Inspection for MT test for shell MANWAY reinforcement plate to shell plate
Checking the base plate fit-up of spiral stairway, ladder, roof platform, roof handrail and roof walkway of Tank D
ABJ681050 before welding
Inspection for marking line of the roof platform and handrail
Visual inspection for the welds of DS7 Produced Water Tank roof plates (erection and welding completed)
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of the platform and handrail to roof before welding.
Inspection for the mark line and fit-up of DS7 Pre-separator roof paltform and handrail support pads before wel
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of support baseplate of the platform, stair and ladder to shell plate before welding.
Visual inspection and witness MT test to the spiral stairway and ladder base plates of Tank D8-ABJ681050 after
welding
Inspection for the mark line and fit-tp of DS7 Pre-separator ladders and platform support pads before welding
Inspection for the mark line and fit-tp of DS7 Pre-separator spiral stairway and platform support pads before
welding
Visual inspection and MT for the joint covered by roof platform and handrail support pads of DS7 Pre-separator
plates
Visual inspection and PT for the nameplate of DS7 Produced Water Tank (welding completed)
Inspection for MT for the roof plate welds covered by platform support baseplate
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of the personal protection supports to shellplate before welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of earth plate to shellplate before welding.
2. Inspection for fit up for stainless cable clip plate to baseplate on tank bottom.
Inspection for the location and fit-up of DS7 Pre-separator earthing plate to shell plate before welding
Inspection for the location and fit-up of DS7 Produced Water Tank earthing plate to shell plate before welding
Inspection for fit-up of DS7 Pre-separator anode stainless clips on the base plate inside tank
Inspection for fit-up of DS7 Produced Water Tank anode stainless clips on the base plate inside tank
Visual inspection and MT for the welds of DS7 Pre-separator ladders, spiral stair ways and platform support base
paltes to shell plate (welding completed)
Inpsection for the fit-up and visual inspection for the personnel protection mesh supports to shell plate
Checking the location and fit-up of shell earthing plate and bottom anode stainless clips of Tank D8-ABJ681050
before welding
Witness UT test for the vertical joints covered by the shell base plate of Tank D8-ABJ681050
Inpsection for UT for the shell joint covered by support pads of DS7 Pre-separator
Inspection for UT for the shell joint covered by support pads and the joint close to the vertical joint of DS7 Produ
Water Tank
Visual inspection and PT for the welds of DS7 Pre-separator earthing plate to shell plate
Visual inspection and PT for the welds of DS7 Produced Water Tank earthing plate to shell plate
Visual Inspection for welds of platform and handril support baseplate to roof and roof structure after welding
Visual Inspection for welds of stair,ladder and platform support baseplate to shell and MT after welding
Visual Inspection for welds of cable clip on bottom and erath plate to shell and PT after welding
Inspection for MT for the welds of DS7 Produced Water Tank roof plate covered by roof platform and handrail
support pads
Inspection for location mark line and fit up of roof platform and handrail support pads of DS7 Produced Water Ta
before welding
Witness taking the water sample for hydrostatic test of Tank D8-ABJ681050
Inspection for UT for the butt welds covered by roof platform and handrail support pads of DS7 Produced Water
Tank
Inspection for the mark line and fit up of DS7 Produced Water Tank ladders and platform supports pads before
welding
Witness PT test for shell earthing plate of Tank D8-ABJ681050 after welding
Inspection for the mark line and fit up of DS7 Produced Water Tank spiral stair way support pads before welding
Inspection for UT for the flange to pipe joint of DS7 Pre-separator shell nozzle N1 and N28
Inspection for UT for the flange to pipe joint of DS7 Produced Water Tank shell nozzle N1 and N28
Visual Inspection for welds of the personal protection supports to shellplate after welding
Visual inspection and MT for the welds of DS7 Produced Water Tank spiral stair and ladder support pads on shel
plates
Inspection for the mark line, fit up and visual inspection of DS7 Produced Water Tank personnel protection supp
Witness measuring the elevation of the shell and bottom settlement measurement points of Tank D8-ABJ681050
before hydrostatic test
Inspection UT test for butt welds of shell nozzles after welding N1,N28
Inspection for random checking of L clips welding heating input and hardness test for the shell horizontal and ve
welds near to L clips welds DS7 Pre-separator
Visual inspection for the welds of roof platform and handrail support pads of DS7 Pre-separator
Visual inspection for the welds of roof platform and handrail support pads of DS7 Produced Water Tank
Pre Hydrotest walk down for Tank D8-ABJ681050
Witness the UT test for internal pipe joints of Tank D8-ABJ681050
Inspection bolt-up for pipe flanges of the tank. Include the flanges of water distribution and level transmitter.

Internal walkdown for PRE-SEPAERATOR prior to Hydro-test at DS6


Attending the walk down for Tank D8-ABJ681050 before Hydrostatic Test
Visual Inspection for welds of cable clip and MT for baseplate to shellplate after welding
Inspection for MT test for temp welds removed area of bottom plate
Inspection for the foundation readiness of DS7 IGF packages for mechanical installation
Inspection for the elevation of DS7 IGF packages shim plate before equipment and skids installation
Inspection for shim plates fixed and grouting thickness of DS7 IGF Separator
Inspection for the fit up and torque tightness of DS7 Pre-separator inner pipe flanges
Inspection for the fit up and torque tightness of DS7 Produced Water Tank inner pipe flanges
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up for supports of tank roof platform before welding.
Witness measuring the elevation of the shell and bottom settlement measurement points of Tank D8-ABJ681050
before hydrostatic test
Checking the location and witness the fit-up of cathodic protection connecting plates of Tank D8-ABJ681050 befo
welding
Visual inspection and witness the MT test for the cathodic protection connecting plates of Tank D8-ABJ681050 a
welding
Inspection for the mark line, fit up and PT of DS7 Pre-separator CP lugs before welding
Inspection for the mark line, fit up and PT of DS7 Produced Water Tank CP lugs before welding
Inspection for the elevation, plumbness and ceterline deviation of DS7 IGF equipment and skids after installation
Inspection for the orientation of DS7 IGF euqipments, skids and the nozzles after installation
Inspection for the shim plates placing and fixing of DS7 IGF equipments and skids before tack welding
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up of cathodic protection plates to shellplate before welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Visual Inspection for welds of cathodic protection plates to shellplate after welding.
2. Inspection for PT test for welds of cathodic protection plates to shellplate after welding.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Witness for measuring the elevation of the shell and bottom settlement measurement points before hydrostat
test.
Inspection Request for Starting the Hydrostatic Test for Tank D8-ABJ681050
Inspection for the foundation readiness of DS7 IGF Separator (train 1& train 2)access platform
Inspection for the foundation readiness of DS7 Clarifier tank (train 1 & train 2)access platform
Inspection for the walk down for DS7 Pre-separator tank before hydrostatic test
Inspection for the walk down for DS7 Produced Water Tank before hydrostatic test
Inspection for shim plate tack welding and grouting thickness of DS7 IGF equipment
Measuring the settlement of Tank D8-ABJ681050 after filling 25% Hydrostatic water
Inspection for elevation and orientation of DS7 Clarifier tank access platform (train 1 & train 2)
Inspection for shim plate placing and fixing of DS7 Clarifier tank access platform (train 1 & train 2)
Inspection for the elevation and fit up of DS7 Pre-separator tank roof circular platform supports
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Walkdown for PRE-SEPARATOR TANK before hydrostatic test.
Witness taking hydrotest water sample inside tank after filling 25% water of Tank D8-ABJ681050
Inspection for shim plate tack welding and grouting thickness of DS7 Clarifier Tank access platform (train 1 & tra
Inspection for bolt tightness of DS7 IGF Separator top platform ( Train 1 & Train 2)
Witness the water sample analysis test at AL FAO Center Lab for the Hydrostatic Test of Tank D8-ABJ681050
Measuring the settlement of Tank D8-ABJ681050 after filling 50% Hydrostatic water
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for start filling water for PRE-SEPARATOR TANK for hydrostatic test.
Witness the water sample analysis test at AL FAO Center Lab for the Hydrostatic Test of Tank D8-ABJ681050
Inspection for the elevation of the shell and bottom settlement measurement points of DS7 Pre-separator befor
hydrostatic test
Inspection for the elevation of the shell and bottom settlement measurement points of DS7 Produced Water Ta
before hydrostatic test
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Measure the settlement for TANK after filling 25% of the hydrostatic water.
Witness the water sample analysis test at AL FAO Center Lab for the Hydrostatic Test of Tank D8-ABJ681050
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Measure the settlement for TANK after filling 25% of the hydrostatic water and holding 24 hours.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for filling water up to 50% of hydrostatic test of PRE-SEPARATOR TANK.
Measuring the settlement of Tank D8-ABJ681050 after filling 75% Hydrostatic water
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Measure the settlement for TANK after filling 50% of the hydrostatic water and during holding time
Witness adding chemical into the hydrotest water during 75%~100% level for Tank D8-ABJ681050
Inspceiton for the elevation and fit up of DS7 Produced Water Tank roof circular platform supports
Witness roof pressure test for Tank D8-ABJ681050 during the Hydrostatic test
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for filling water up to 75% of hydrostatic test of PRE-SEPARATOR TANK.
2. Measure the settlement for TANK after filling 75% of the hydrostatic water and during holding time
Inspection for elevation and orientation of DS7 IGF Separator access platform(Train 1 & Train 2)
Inspection for shim plate fixing and grouting thickness of DS7 IGF Separator access platform (Train 1 & Train2)

Inspection Request for PRE-SEPRATOR(D6-ABJ681050)


1. Inspection for filling water up to 100% of hydrostatic test of PRE-SEPARATOR TANK.
2. Measure the settlement for TANK after filling 100% of the hydrostatic water and during holding time.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Witness chemical injection for hydrostatic water of the PRE-SEPARATOR tank.
Measuring the settlement of Tank D8-ABJ681050 after filling 100% Hydrostatic water and holding 3 days
Inspceiton for fit up of DS7 Pre-separator handrails on roof plate
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for roof leak test and pressure test during hydrostatic test
Inspceiton for fit up of DS7 Produced Water Tank handrails on roof plate
IR Measuring the settlement of Tank D8-ABJ681050 after filling 100% Hydrostatic water and holding 6 days
Measuring the settlement of Tank D8-ABJ681050 after filling 100% Hydrostatic water and holding 7 days
Inspection for hydrotest starting for DS7 Pre-separator Tank
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Witness sampling for the hydrostaic water of PRE-SEPARATOR tank.
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for start discharging hydrostatic water of PRE-SEPARATOR tank.
Measuring the settlement of Tank D8-ABJ681050 after filling 100% Hydrostatic water and holding 8 days
Witness taking hydrotest water sample of Tank D8-ABJ681050 before discharging
Inspection for shell settlement measuring of DS7 Pre-separator Tank after filling 25% Hydrostatic Water
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up for supports and frame angle of tank roof platform before welding
Inspection for hydrotest starting for DS7 Produced Water Tank
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Witness water sample analysis for the Hydrostatic Test of Tank D6-ABJ681050 at AL FAO Center Lab.
Measuring the settlement of Tank D8-ABJ681050 after filling 100% Hydrostatic water and holding 9 days
Inspection for shell settlement measuring of DS7 Pre-separator with 25% water filling hold one day
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Witness sampling for the hydrostatic water of PRE-SEPARATOR tank

Inspection Request for PRE-SEPRATOR(D6-ABJ681050)


1. Witness water sample analysis for the Hydrostatic Test water of Tank D6-ABJ681050 at AL FAO Center Lab..
Inspection for shell settlement measuring of DS7 Pre-separator with 50% water filling
Measuring the settlement of Tank D8-ABJ681050 after filling 100% Hydrostatic water and holding 10 days
Inspection Request for PRE-SEPRATOR(D6-ABJ681050)
1. Inspection for fit up for handrail of roof platform before welding.
Witness taking hydrotest water sample before discharging of Tank D8-ABJ681050
Discharging water Hydrostatic Test water of Tank D8-ABJ681050
Inspection for shell settlement measuring of DS7 Pre-separator with 50% water filling hold one day
Inspected Date location Signature Report Accepted Rejected
2017.06.11 DS6 yes yes yes
2017.06.11 DS6 yes yes yes
2017.06.25 DS6 yes yes
2017.06.22 DS6 yes yes
2017.06.20 DS6 yes yes
2017.07.19 DS6 yes yes
2017.07.20 DS6 yes yes
2017.06.28 DS8 yes yes
2017.06.28 DS6 yes yes
2017.07.02 DS8 yes yes
2017.07.03 DS6 yes yes
2017.07.13 DS6 yes yes
2017.07.13 DS6 yes YES
DS6
2017.07.13 yes YES
DS6
2017.07.13 yes YES
2017.07.05 DS8 yes YES

2017.07.13 DS7 yes YES

2017.07.14 DS8
yes YES
2017.07.14 DS6 yes yes
2017.07.15 DS7 yes YES
2017.07.15 DS8 yes YES
2017.07.20 DS6 yes yes
2017.07.18 DS7 yes YES
2017.07.16 DS6 yes YES
2017.07.18 DS7 yes YES

2017.07.20 DS7 yes YES

2017.07.23 DS8
yes YES
2017.07.18 DS7 yes YES
2017.07.30 DS7 yes yes

2017.07.18 DS8
yes YES
2017.07.27 DS8 yes YES
2017.07.26 DS8 yes YES
2017.07.19 DS7 yes YES
2017.07.26 DS8
yes YES
2017.07.20 DS6
yes YES
2017.07.24 DS6
yes YES
2017.07.25 DS7 yes YES

2017.07.23 DS6
yes YES
2017.07.24 DS7 yes YES

2017.07.25 DS7 yes YES

2017.07.25 DS8
yes YES

2017.07.30 DS7 yes YES

2017.07.30 DS7 yes YES

2017.07.27 DS6
yes yes

2017.07.30 DS7 yes YES

2017.07.30 DS7 yes YES

2017.07.30 DS6 yes yes


2017.07.29 DS8 yes YES
DS8
yes YES

2017.07.31 DS7 yes YES

Cancel DS7

2017.08.01 DS6
yes yes
2017.08.01 DS8
yes yes
2017.08.01 DS6
yes yes
2017.08.01 DS8
yes YES
2017.08.02 DS7 yes YES
2017.-08.04 DS6
yes yes
2017.08.02 DS7 yes YES
2017.08.02 DS7 yes YES

2017.08.02 DS7 yes YES

2017.08.03 DS8
yes yes
2017.08.13 DS8
yes yes
2017.08.03 DS6
yes YES
Cancel DS7

Cancel DS7

Rejected DS7 yes

2017.08.09 DS7 YES YES

2017.08.07 DS7 yes yes

2017.08.07 DS7 yes yes


2017.08.07 DS7 yes yes
2017.08.09 DS7 yes yes
2017.08.06 DS8
yes yes
2017.-08.05 DS6
yes yes
2017.-08.05 DS6
yes yes
2017.08.06 DS8
yes yes
2017.-08.06 DS6
yes yes
2017.08.09 DS7 yes yes

2017.08.13 DS8
yes yes

2017.-08.07 DS6
yes yes
2017.08.09 DS7 yes yes
2017.08.09 DS7 yes yes
2017.08.13 DS8
yes yes
2017.08.18 DS6 YES YES
DS6
2017.08.12 yes yes
2017.08.09 DS7 yes yes
2017.08.16 DS7 yes yes

DS6
2017.08.12 yes yes
DS6
2017.08.18 YES YES
Cancel DS8
2017.08.12 DS7 yes yes
2017.08.13 DS8
yes yes
2017.08.12 DS6 yes yes
2017.08.12 DS7 yes yes
2017.08.12 DS7 yes yes
2017.08.12 DS6 yes yes
2017.08.13 DS8
yes yes
2017.08.16 DS7 yes yes
2017.08.16 DS7 yes yes
2017.08.18 DS6 YES YES
2017.08.16 DS7 yes yes
2017.08.16 DS7 yes yes
2017.08.22 DS8 YES YES
2017.08.18 DS6 YES YES
2017.08.16 DS7 yes yes
2017.08.16 DS7 yes yes

2017.08.15 DS7 YES YES

2017.08.16 DS8
YES YES
DS8
YES YES
DS6
2017.08.18 YES YES
DS6
2017.08.18 YES YES
2017.08.16 DS8
YES YES
2017.08.21 DS7
YES YES
2017.08.21 DS7
YES YES
2017.08.21 DS7 YES YES
2017.08.19 DS8 YES YES
2017.08.27 DS7 YES YES
2017.08.21 DS7 YES YES
2017.08.19 DS8 YES YES
2017.08.18 DS6 YES YES
2017.08.18 DS6 YES YES
2017.08.21 DS7 YES YES
2017.08.21 DS7 YES YES
2017.08.23 DS6 YES YES
2017.08.22 DS8
YES YES
DS6
2017.08.23 YES YES
2017.08.21 DS7 YES YES
2017.08.21 DS7 YES YES

2017.08.27 DS7 YES YES

2017.08.22 DS8
YES YES

DS6
2017.08.23 YES YES
DS6
YES YES
2017.08.29 DS7 YES YES
2017.08.24 DS7 YES YES
2017.08.24 DS7 YES YES
2017.08.27 DS7 YES YES
2017.08.22 DS8 YES YES
DS6
2017.08.23 YES YES
2017.08.24 DS7 YES YES

2017.08.27 DS8
YES YES
2017.08.24 DS7 YES YES
2017.08.24 DS7 YES YES

DS6
2017.08.24 YES YES
2017.08.27 DS7 YES YES
2017.08.27 DS7 YES YES

DS7 YES YES

2017.08.27 DS8
YES YES
DS6
2017.08.28 YES YES
2017.08.27 DS7 YES YES
2017.08.27 DS8 YES YES
DS6
2017.08.28 YES YES
2017.08.27 DS7 YES YES
DS7 YES YES
2017.08.27 DS8
YES YES

DS6
YES YES

DS6
YES YES
DS7 YES YES
DS8
YES YES

DS6
YES YES
DS7 YES YES
DS7 YES YES

DS8
YES YES
DS8
YES YES

DS6
YES YES
DS7 YES YES
DS7 YES YES
DS8 YES YES
DS6
YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS6
YES YES
DS6
YES YES
DS6
YES YES
DS8
YES YES
DS7 YES YES
DS7 YES YES
DS6
YES YES

DS6
YES YES
DS6
YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES

DS7 YES YES

DS8
YES YES
DS8
YES YES
DS8
YES YES
DS8
YES YES
DS6
YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS8
YES YES
DS7 YES YES
DS7 YES YES

DS7 YES YES


DS7 YES YES
cancel DS8

DS8
YES YES
DS8
YES YES

DS6
YES YES

DS6
YES YES
DS8
YES YES
DS7 YES YES

DS6
YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES

07-Sep-17 DS8
YES YES
07-Sep-17 DS8
YES YES
DS7 YES YES

DS6
YES YES
DS6
YES YES

DS6
YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS8 YES YES
DS7 YES YES
DS6
YES YES
DS7 YES YES
DS7 YES YES
DS8
YES YES
DS8
YES YES
DS8
YES YES
DS6
YES YES

DS6
YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES

DS7 YES YES

DS7 YES YES


DS8 YES YES
DS8 YES YES
DS6
YES YES
DS7 YES YES
DS7 YES YES
DS8 YES YES
DS8 YES YES
DS7 YES YES
DS7 YES YES

DS6
YES YES
DS8 YES YES
DS8 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES yes
DS8 YES YES
DS7 YES yes
DS7 YES yes
DS6
YES YES
DS7 YES yes
DS7 YES yes
DS8 YES YES
DS6 YES YES

DS6 YES yes

DS7 YES yes


DS7 YES yes
DS7 YES yes
DS7 YES yes
DS8 YES YES
cancel DS8
DS8 YES YES
DS7 YES yes
DS6 YES YES

DS6
YES YES
DS6 YES YES
DS7 YES yes
DS7 YES yes

DS6 YES YES

DS6 YES YES


DS7 YES yes
DS7 YES yes

DS7 YES yes

DS7 YES yes


DS7 YES yes
DS7 YES yes
DS6 YES YES
DS7
DS7 YES yes
DS8 YES YES
DS6 YES YES

DS6 YES YES


DS7 YES yes
DS7 YES yes
DS7 YES yes
DS8 YES YES
DS8 YES YES
DS8 YES YES

DS6
YES YES

DS6
YES YES
DS6 YES YES
DS8 YES YES
DS8 YES YES
DS7 YES yes
DS7 YES YES
DS7 YES yes
DS6 YES
YES
DS6
YES YES
DS6
YES YES
DS7 YES YES
DS8
YES YES
DS8
YES YES
DS8 YES YES
DS7 YES yes

DS6
YES YES
DS6
YES YES
DS7 YES YES
DS8
YES YES

DS6
YES YES

DS6 YES YES

DS6 YES YES


DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS8 YES YES
DS8
YES YES
DS8
YES YES
DS7 YES YES
DS6 YES YES

DS7 YES YES


DS7 YES YES
DS8 YES YES
DS8
YES YES
DS6
YES YES
DS6 YES YES

DS6
YES YES
DS6 YES YES
DS7 YES YES
DS8 YES YES
DS7 YES YES
DS7 YES YES
DS6 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS8 YES YES
DS8 YES YES
DS7 YES YES
DS7 YES YES

DS6 YES YES

DS6 YES YES

DS6 YES YES

DS7 YES YES


DS8 YES YES
DS8
YES YES
DS7 YES YES
DS7 YES YES
DS8 YES YES

YES YES
DS6

YES YES
DS6
YES YES
DS6

YES YES
DS6
YES YES
DS6
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS8
YES YES
DS8 YES YES
DS8 YES YES
YES YES
DS6

YES YES
DS6
DS7 YES YES

DS7 YES YES

DS7 YES YES


DS7 YES YES
DS7 YES YES
DS7 YES YES

DS6 YES YES

DS7 YES YES


DS7 YES YES
DS7 YES YES
DS7 YES YES
DS8 YES YES
YES YES
DS6
DS6 YES YES
DS7 YES YES
DS8 YES YES
DS8 YES YES
DS8
YES YES
DS8
YES YES
DS8 YES YES
YES YES
DS6
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS6 YES
YES
DS6 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS8
YES YES
DS8 YES YES
DS7 YES YES
YES YES
DS6
DS8
DS7 YES YES
DS7 YES YES
DS7 YES YES

DS7 YES YES

DS6 YES YES

DS6 YES YES

DS7 YES YES


DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES

DS6 YES YES


DS7 YES YES
DS7 YES YES

DS7 YES YES

DS6 yes yes


DS6 YES YES

DS6 YES YES

DS6 YES YES

DS7 YES YES

DS7 YES YES


DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES

DS7 YES YES


DS6 YES YES
DS8 YES YES
DS7 YES YES
DS8 YES YES
DS8 YES YES
DS6 YES YES
DS6 YES YES
DS8 YES YES
DS7 YES YES
DS6 YES YES
DS6 YES YES
DS6 YES YES
DS6 YES YES
DS8
YES YES
DS6 YES YES
DS7 YES YES
04-Nov-17 DS6 YES YES

05-Nov-17 DS7 YES YES

05-Nov-17 DS6 YES YES


DS8 YES YES
DS7 YES YES

DS7 YES YES

DS7 YES YES


DS7 YES YES
DS6 YES YES
09-Nov-17 DS6 YES YES

10-Nov-17 DS6 YES YES

11-11-2017 DS7 YES YES


11-11-2017 DS7 YES YES
11-11-2017 DS7 YES YES
11-11-2017 DS7 YES YES
11-11-2017 DS7 YES YES
11-11-2017 DS7 YES YES
DS8
YES YES
DS8 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS6 YES YES
DS6 YES YES
DS6 YES YES
DS7 YES YES

DS7 YES YES


DS8 YES YES
DS7 YES YES

DS7 YES YES


DS8 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS6 YES YES
DS7 YES YES

DS7 YES YES

DS8
DS6 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
cancel DS8
DS8
DS6 YES YES
DS6 YES YES
DS8
DS6 YES YES
DS6 YES YES
DS7
DS7 YES YES
cancel DS7
DS7 YES YES
DS7 YES YES
DS6

DS8

DS8

DS8
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS6

DS6

DS6

DS8
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS8
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS6
DS8
DS7 YES YES
DS7 YES YES
DS8
DS8
DS6

cancel DS8

DS7 YES YES

DS7 YES YES

DS6

DS8

DS6

DS6
DS8
DS6
DS8
DS7 YES YES
DS8

DS6

DS7 YES YES


DS7 YES YES

DS6

DS6
DS8
DS7
DS6
DS7 YES YES
DS8
DS8
DS7 YES YES
DS6

DS6
DS8
cancel DS8
DS7 YES YES
DS6
DS7 YES YES
DS6
DS8
DS7 YES YES
DS6

DS6

DS7
DS8
DS6
DS8
DS8
DS7
Close Comments Remark
yes
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

YES

YES
YES

YES

YES
YES
YES
YES
YES
YES
YES
YES

YES

YES
YES
YES

YES
YES
YES
YES
YES

YES

YES
YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES
YES
YES

YES

YES

YES

YES
YES
YES

YES
YES
YES

YES

YES

YES
YES

YES

YES

YES
YES
YES

YES

YES

YES

YES

YES
yes

YES

YES
YES
YES

YES
YES

YES
yes
yes

YES

YES

yes

YES
YES
yes
yes
YES

YES
yes
yes
YES
yes
yes
YES
YES
yes
yes

YES

YES

YES

YES

YES

YES

YES

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

YES

YES
YES
YES

YES

YES

YES

YES
YES
YES
YES
YES
YES

YES
YES

YES
YES
YES

YES
YES
YES

YES

YES

YES
YES
YES

YES
YES
YES

YES

YES

YES
YES

YES

YES
YES
YES

YES

YES

YES
YES
YES
YES

YES
YES
YES
YES
YES
YES

YES

YES

YES

YES
YES
YES
YES

YES

YES
YES
YES
YES
YES

YES

YES

YES

YES

YES

YES
YES
YES
YES
YES

YES
YES
YES

YES
YES

YES

YES

YES

YES

YES
YES

YES
YES
YES
YES
YES

YES

YES
YES

YES

YES

YES
YES
YES
YES
YES
YES
YES
YES
YES

YES
YES
YES

YES

YES

YES

YES

YES
YES
YES
YES

YES

YES
YES
YES

YES
YES
YES
YES
YES
YES
YES

YES
YES
YES
YES
YES
yes
YES
yes
yes

YES yes
yes
yes
YES
YES

yes

yes
yes
yes
yes
YES

YES
yes
YES

YES
YES
yes
yes

YES

YES
yes
yes

yes

yes
yes
yes
YES

yes
YES
YES

YES
yes
yes
yes
YES
YES
YES

YES

YES
YES
YES
YES
yes
YES
yes
YES

YES

YES
YES

YES

YES
YES
yes

YES

YES
YES

YES

YES

YES

YES
YES
YES
YES
YES
YES
YES
YES

YES

YES
YES
YES

YES
YES
YES

YES
YES
YES

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

YES

YES

YES

YES
YES

YES
YES
YES
YES

YES

YES

YES

YES

YES
YES
YES
YES

YES
YES
YES
YES

YES

YES

YES

YES
YES
YES
YES

YES

YES
YES
YES
YES
YES
YES

YES
YES
YES
YES

YES

YES
YES
YES YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

YES
YES
YES
YES
YES

YES
YES
YES
YES YES

YES
YES
YES

YES

YES

YES

YES
YES
YES
YES
YES

YES
YES
YES

YES

yes
YES

YES

YES

YES

YES
YES
YES
YES
YES

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

YES
YES
YES
YES

YES

YES
YES
YES

YES

YES
YES
YES
YES YES

YES

YES
YES
YES
YES
YES
YES

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

YES
YES
YES

YES
YES
YES
YES
YES
YES
YES

YES

YES
YES
YES
YES
YES
YES YES

YES
YES

YES

YES
YES

YES
YES
YES
YES
YES

YES
YES
YES
YES
YES

YES
YES
YES

YES
YES
YES

YES

YES

YES
YES

YES

YES
YES

YES

YES
IR No. Soft Copy
CE-E 0002 IR scan\IR No CE-E 0002.pdf
CE-E 0003 IR scan\IR No CE-E 0003.pdf
CE-E 0004 IR scan\IR No CE-E 0004.pdf
CE-E 0005 IR scan\IR No CE-E 0005.PDF
CE-E 0006 IR scan\IR No CE-E 0006.PDF
CE-E 0007
CE-E 0007 IR scan\CE-E 0008.pdf
CE-E 0009
CE-E 0010
CE-E 0011 IR scan\CE-E 0011.pdf
CE-E 0012
CE-E 0013 IR scan\CE-E 0013.pdf
CE-E 0014 IR scan\CE-E 0014.pdf

CE-EL 0001
CE-EL 0002
Produced Water Treatment M109
Description of work Inspected Date
Inspection for receiving of Tank Plates batch S0005 2017.04.05
Inspection for receiving of CP Materaial 1st Shipment 2017.05.08
Inspection for receiving of Anchor Bolts 1 st Shipment 2017.05.08
Inspection for receiving of 26 pieces Tank Plates remained 2017.06.14
Inspection
witness for for receivingofof
inspaction coating
below cp actitives Tank IDQ8 ABJ-681050 2017.05.12
Inspection
1- for of
Installation receiving
permetof thinner
copper/copper shluphate(cse) refrance electrodes 2017.05.18
2- installation of 2 UPVC slotted tube with geo-textille sock.
Witness for testing continuity of anode grid and cable under TANK IQD7-ABJ 2017.07.03
Witness for testing continuity of anode grid and cable under TANK IQD7-ABJ 2017.07.03
2017.07.06

2017.07.06
2017.07.11
Inspection Request for Pump shelter area earthing
1. Witness inspection earthing installation.
Inspection
2. Witness Request forthe
inspection around pump
earthing shelter
cable area
trench earthing
backfilling 7-Oct-2017
1. Witness inspection earthing installation.
14-Oct-2017
2. Witness inspection the earthing cable trench backfilling
location Signature Report Accepted Rejected Close
CPECC Rumaila Camp yes yes yes
DS6 Accomdation camp yes yes yes
DS7 CPECC OFFICE STORE yes yes yes
CPECC Rumaila Camp yes yes yes
CPECC Rumaila Camp yes yes YES
CPECC Rumaila Camp yes yes YES

DS7
DS7
DS6 yes YES YES

DS6 YES YES YES


DS6 YES YES YES

DS6 YES YES YES


DS6 YES YES YES
Comments

Need Procurement Signature


Remark
IR No. Soft Copy
CE-S 0001
CE-S 0002

CE-S 0003
CE-S 0004

CE-S 0005
CE-S 0006
CE-S 0007
CE-S 0008
CE-S 0009

CE-S 0010

CE-S 0011

CE-S 0012
CE-S 0013
CE-S 0014
CE-S 0015

CE-S 0016
CE-S 0017
CE-S 0018
CE-S 0019

CE-S 0020
CE-S 0021
CE-S 0022
CE-S 0023

CE-S 0024
CE-S 0025
CE-S 0026
CE-S 0027
CE-S 0028
CE-S 0029
CE-S 0030
CE-S 0031
CE-S 0032
CE-S 0033
CE-S 0034
CE-S 0035

CE-S 0036

CE-S 0037
CE-S 0038
CE-S 0039
CE-S 0040
CE-S 0041
CE-S 0042
CE-S 0043
CE-S 0044
CE-S 0045
CE-S 0046
CE-S 0047
CE-S 0048
CE-S 0049
CE-S 0050
CE-S 0051
CE-S 0052
CE-S 0053
CE-S 0054
CE-S 0055
CE-S 0056
CE-S 0057
CE-S 0058
CE-S 0059
CE-S 0060
CE-S 0061
CE-S 0062
CE-S 0063
CE-S 0064
CE-S 0065
CE-S 0066
CE-S 0067
CE-S 0068
CE-S 0069
CE-S 0070
CE-S 0071
CE-S 0072
CE-S 0073
CE-S 0074
CE-S 0075
CE-S 0076
CE-S 0077
CE-S 0078
CE-S 0079
CE-S 0080
CE-S 0081
CE-S 0082
CE-S 0083
CE-S 0084
CE-S 0085
CE-S 0086
CE-S 0087
CE-S 0088
Produced Water Treatment M109
Description of work
Inspection for the doucuments availability before steel structure erecting
Inspection for the bolt tightening of the Platform near DS7 Produced Water Tank
Inspection for the beam. column, bracing assembling as per approved drawing of the Platform near DS7 Produce
Water Tank
Inspection for the foundation readiness of the Platform near DS7 Produced Water Tank
Inspection for the column, beam, bracing assembling as per approved drawing of of the Platform near Pre-Separ
Tank.
Inspection for the bolt tightening of the Platform near Pre-Separator Tank
Inspection for dimension and elevation of the Foundation of Platform near Pre-Separator Tank.
Checking the foundation readiness of the Platform near Tank D8-ABJ681050 before installation
Inspection for the foundation readiness of the Platform near DS7 Pre-separator
Inspection Request for Steel Structure at DS6
1. Inspection for Foundation of the transfer pumps shelter.
Inspection for the compaction for shim plate of the Platform near DS7 Produced Water Tank before tack weldin
Inspection for the column final plumbness, elevation of base plate and anchor bolt tightness of the Platform nea
DS7 Produced Water Tank
Inspection for the foundation readiness of the pump shelter IQD7-PBE681051AB & IQD7-PBE681052AB
Inspection for the foundation readiness of the pump shelter IQD7-PBE681054ABC
Inspection for the compaction for shim plate of the Platform near DS7 Pre-separator IQD7-ABJ681050
Inspection for the column final plumbness, elevation of base plate and anchor bolt tightness of the Platform nea
DS7 Pre-separator IQD7-ABJ681050
Inspection for the foundation readiness of piping support foundtation in DS7
Inspection for column installation of Platform near Pre-Separator Tank
Inspection for the bolt tightening of the Platform near DS7 Pre-separator IQD7-ABJ681050
Inspection for the beam. column, bracing assembling as per approved drawing of the Platform near DS7 Pre-
separator IQD7-ABJ681050
Inspection for the bolt tightening for ladder, handrail and grating of the Platform Near Pre-Separator Tank
Inspection for the beam, column,bracing assembling as per approved drawing of DS7 pipe rack
Final inspection for the elevation, plumbness and bolt tightness for DS7 pipe rack
Final inspection for the elevation, plumbness and bolt tightness for DS7 pump shelter IQD7-PBE681051AB&052A
Final inspection for the elevation, plumbness and bolt tightness for DS7 pump shelter IQD7-PBE681054ABC
Inspection for column installation of pumps shelter
Checking the assembling of columns, beams and bracings of platform near Tank DS8-ABJ681050
Checking the bolts tightness of platform near Tank D8-ABJ681050
Inspection for the shim plate fixed of pump shelter IQD7-PBE681051AB&052AB before tack welding
Inspection for the shim plate fixed of pump shelter IQD7-PBE681054ABC before tack welding
Checking the elevation and plumbness of platform near Tank D8-ABJ681050
Checking the shim plate fixed of platform near Tank D8-ABJ681050 before tack weld
Inspection for shim plate fixation and tack welding of the Platform Near Pre-Separator Tank before grouting.
Inspection for shim plate fixation and tack welding of the Pumps Shelter before grouting.
Inspection for the grouting thickness and anchor bolt tightness of DS7 Platform near Pre-separator IQD7-ABJ681
Inspection for the grouting thickness and anchor bolt tightness of DS7 Platform near Produced Water Tank IQD7
ABJ681053
Inspection for the grouting thickness and anchor bolt tightness of DS7 Pump Shelter IQD7- PBE681051AB&052A
Inspection for the grouting thickness and anchor bolt tightness of DS7 Pump Shelter IQD7- PBE681053ABC
Inspection for the grouting thickness and anchor bolt tightness of DS7 Pipe Rack
Inspection for the roof sheeting installation of DS7 Pump Shelter IQD7-PBE681151AB&251AB
Inspection for the roof sheeting installation of DS7 Pump Shelter IQD7-PBE681054ABC
Inspection for the foundation readiness of DS7 PSV tower
Inspection for the elevation, plumbness and bolt tightness for DS7 pipe rack
Inspection for the beam, column,bracing assembling as per approved drawing of DS7 pipe rack
Inspection for shim plate placing and fixing before tack welding of DS7 pipe rack
Checking the foundation readiness of DS8 pump shelter
Checking the assembling of columns, beams and bracings of DS8 pump shelter
Checking the elevation and plumbness of DS8 pump shelter
Checking the bolts tightness of DS8 pump shelter
Inspection for shim plate tack welding and grouting thickness of DS7 Pipe Rack
Inspection Request for Steel Structure at DS6
1. Inspection for dimension and elevation of piping support foundation for erecting steel structure.
Inspection for the elevation, plumbness and bolt tightness for DS7 pipe rack
Inspection for the beam, column,bracing assembling as per approved drawing of DS7 pipe rack
Inspection for shim plate placing, tack welding and grouting thickness of DS7 Pipe Rack
Checking the foundation readiness of DS8 Pipe Support
Checking the assembling of columns, beams and bracings of DS8 Pipe Support
Checking the elevation and plumbness of DS8 Pipe Support
Checking the bolts tightness of DS8 Pipe Support
Inspection for bolt tightness of DS7 PSV tower
Inspection for foundation readiness of DS7 pipe rack
Inspection for the elevation, plumbness and bolt tightness of DS7 pipe rack
Inspection for the beam, column, bracing assembling as per approved drawing of DS7 pipe rack
Inspection for shim plate fixing and grout thickness of DS7 pipe rack
Inspection for foundation readiness of DS7 Pump Shelter IQWD7-PBE681153ABC&D7-V681154
Inspection for foundation readiness of DS7 Pump Shelter IQWD7-PBE681253ABC&D7-V681254
Inspection for anchor bolts tightness for DS7 Pipe Rack
Inspection for orientation, elevation and plumbness of DS7 PSV Tower
Inspection for Mechanical Completion check of Platform IQD7-ABJ681050 near DS7 Pre-separator Tank
Inspection for the beam, column, bracing, ladders and other accessories assembling as per approved drawing o
DS7 PSV Tower
Inspection for shim plate fixing, tack welding and grouting thickness of DS7 PSV Tower
Inspection for foundation readiness of DS7 Pipe Rack
Inspection for beams, column, bracing assembling as per approved drawing of DS7 pipe rack
Inspection for elevation, plumbness and bolt tightness for DS7 pipe rack
Inspection for shim plate fixing, tack welding and grouting thickness of DS7 Pipe Rack
Inspection for Mechanical Completion check of Platform IQD7-ABJ681053 near DS7 Produced Water Tank
Inspection for Mechanical Completion check of Pump Shelter IQD7-PBE681051AB&052AB
Inspection for Mechanical Completion check of Pump Shelter IQD7-PBE681054ABC
Inspection for anchor bolts tightness for DS7 Pipe Rack
Inspection for foundation readiness of DS7 Pipe Rack
Inspection for the elevation, plumbness and bolt tightness of DS7 pipe rack
Inspection for the beam, column, bracing assembling as per approved drawing of DS7 pipe rack
Inspection for shim plate fixing and grout thickness of DS7 pipe rack
Inspection for foundation readiness of DS7 Pipe Rack
Inspection for the elevation, plumbness and bolt tightness of DS7 pipe rack
Inspection for the beam, column, bracing assembling as per approved drawing of DS7 pipe rack
Inspection for shim plate fixing and grout thickness of DS7 pipe rack
Visual inspection for the welds of DS7 pipe rack top beam base plate
Inspection Request for Steel Structure at DS6
1. Inspection for dimension and elevation of piping support foundation for erecting steel structure
Inspected Date location Signature Report Accepted Rejected
DS7 YES YES
DS7 YES YES
DS7
YES YES
DS7 YES YES
DS6 YES YES
DS6 YES YES
DS6 YES YES
DS8 YES YES
06-Nov-17 DS7 YES YES
06-Nov-17 DS6 YES YES

DS7
YES YES
DS7
YES YES
08-Nov-17 DS7 YES YES
08-Nov-17 DS7 YES YES
08-Nov-17 DS7 YES YES
08-Nov-17 DS7
YES YES
DS7 YES YES
DS6 YES YES
DS7 YES YES
DS7 YES YES
DS6
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS6
18-Nov-17 DS8 YES YES
18-Nov-17 DS8 YES YES
DS7 YES YES
DS7 YES YES
20-Nov-17 DS8 YES YES
20-Nov-17 DS8 YES YES
DS6 YES YES
DS6 YES YES
DS7 YES YES

DS7 YES YES

DS7 YES YES


DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
ongoing DS8 YES YES
DS8 YES YES
DS8 YES YES
DS8 YES YES
DS7 YES YES
DS6
DS7 YES YES
DS7 YES YES
DS7 YES YES
ongoing DS8
DS8 YES YES
DS8 YES YES
DS8 YES YES
DS7
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7 YES YES
DS7
DS7 YES YES
DS7 YES YES
DS7
DS6
Close Comments Remark
YES
YES

YES
YES
YES
YES
YES
YES
YES
YES

YES

YES
YES
YES
YES

YES
YES
YES
YES

YES

YES
YES
YES
YES

YES
YES
YES
YES
YES
YES
YES
YES
YES

YES

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

YES
YES
YES

YES
YES
YES

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

YES
YES
IR No. Soft Copy
CE-M 0008
CE-M 0009
CE-M 0010
CE-M 0011
CE-M 0012
CE-M 0013
CE-M 0017
CE-M 0018
CE-M 0019
CE-M 0024
CE-M 0027
CE-M 0031
CE-M 0038
CE-M 0049
CE-M 0053
CE-M 0062
CE-M 0085

CE-P 0001
CE-P 0002
CE-P 0003
CE-P 0004
CE-P 0005

CE-P 0006

CE-P 0007

CE-P 0008

CE-P 0009
CE-P 0010
CE-P 0011
CE-P 0012
CE-P 0013
CE-P 0014
CE-P 0015
CE-P 0016
CE-P 0017
Produced Water Treatment M109

Description of work
Inspection for painter qualification test
Inspection for CPT
Inspection for coating applicator documents preparation
Inspection for Blasting &Painting process of Tank bottom plates-System-G DS6 Pre-sperator
Inspection for Blasting &Painting process of Tank bottom plates-System-G DS8 Pre-sperator
Inspection for Blasting &Painting process of Tank Shell Plates-System-M DS6 Pre-sperator
Inspection for Blasting &Painting process of Tank Shell Plates-System-M DS6 Pre-sperator
Inspection for Blasting &Painting process of Tank Shell Plates-System-M DS8 Pre-sperator
Inspection for Blasting &Painting process of Tank Drain Sewage Pit of all Tanks-System-G
Inspection for Blasting &Painting process of Tank bottom plates-System-G DS7 Pre-sperator
Inspection continuation-1 for Blasting &Painting process of Tank Shell Plates-System-M DS8 Pre-sperator
Inspection for Blasting &Painting process of Tank bottom plates-System-G DS7 Produced Water Tank
Inspection for Blasting &Painting process of Tank Shell Plates-System-M DS7 Pre-sperator
Inspection for Blasting &Painting process of Tank Shell Plates-System-M DS7 Produced Water Tank
Inspection for Blasting &Painting process of the underside surface of four tanks Clean Out Door (COD) bottom
plate- System-G
Inspection continuation 1 for Blasting &Painting process of Tank Shell Plates-System-M DS7 Produced Water
Tank
Inspection continuation 2 for Blasting &Painting process of Tank Shell Plates-System-M DS7 Produced Water
Tank
Inspection for Blasting & Painting process of drain sewage pit System-G of four tanks
Inspection for Blasting & Painting process of wind intermediate stiffener of four tanks
Inspection for Blasting & Painting process of roof plates of D6 Pre-separator tanks
Inspection for Blasting & Painting process of top angle of three tanks
Inspection for Blasting & Painting process of top angle of tank D7-ABJ681053
Inspection for Blasting & Painting process of Inspection for Blasting & Painting process of stiffener of nuzzle
of four tanks
Inspection for Blasting & Painting process of Inspection for Blasting & Painting process of D7 Pipe Coating for
fabricates spools
Inspection for Blasting & Painting process of Inspection for Blasting & Painting process of anchor chair of four
tanks
Inspection for Blasting & Painting process of Inspection for Blasting & Painting process of roof plates of D7
Pre-separator tanks
Inspection request for closing CAR # AWQ0109-QRCAR-0004
Inspection for Blasting & Painting process of roof plates of D8 Pre-separator tank
Inspection for Blasting & Painting Process of Roof Plates of D7 Produced Water Tank

Inspection for Blasting & Painting process of Pipe of Produced Water Treatment
Inspection for painter qallification test
Inspection for Blasting & Painting process of D7 Pipe Coating for fabricates spools
Inspection for Blasting & Painting process of D7 Pipe Coating for fabricates spools
Inspection for Blasting & Painting process of D7 Pipe Coating for fabricates spools(6th batch)
Inspected Date location Signature Report Accepted Rejected
2017.05.24 CPECC Rumaila Camp yes yes yes
2017.05.24 CPECC Rumaila Camp yes yes yes
2017.05.24 CPECC Rumaila Camp yes yes
2017.05.19 CPECC Rumaila Camp yes yes yes
2017.05.27 CPECC Rumaila Camp yes yes yes
2017.06.09 CPECC Rumaila Camp yes yes yes
2017.06.16 CPECC Rumaila Camp yes yes yes
2017.06.20 CPECC Rumaila Camp yes yes yes
Cancel
2017.07.01 CPECC Rumaila Camp yes yes yes
2017.07.01 CPECC Rumaila Camp yes yes yes
2017.07.01 CPECC Rumaila Camp yes yes yes
2017.07.06 CPECC Rumaila Camp yes yes yes
2017.07.16 CPECC Rumaila Camp yes yes yes
2017.07.13 CPECC Rumaila Camp yes yes yes
2017.07.23 CPECC Rumaila Camp yes yes YES

2017.07.24 CPECC Rumaila Camp yes yes YES

2017.08.05 CPECC Rumaila Camp yes yes YES


CPECC Rumaila Camp yes yes YES
12-Sep-17 CPECC Rumaila Camp yes YES
CPECC Rumaila Camp yes yes YES
12-Sep-17 CPECC Rumaila Camp yes YES

16-Sep-17 CPECC Rumaila Camp yes YES

29-Oct-17 CPECC Rumaila Camp yes YES

16-Sep-17 CPECC Rumaila Camp yes YES

19-Sep-17 CPECC Rumaila Camp yes YES

15-Sep-17 CPECC Rumaila Camp yes YES


24-Sep-17 CPECC Rumaila Camp yes YES
19-Sep-17 CPECC Rumaila Camp yes YES
20-Oct-17 CPECC Rumaila Camp
20-Oct-17 CPECC Rumaila Camp yes YES
04-Nov-17 CPECC Rumaila Camp
13-Nov-17 CPECC Rumaila Camp
18-Nov-17 CPECC Rumaila Camp
Close
yes
yes
yes
yes
yes
yes
yes
yes

YES
yes
yes
yes
yes
yes
YES

YES

YES
YES
YES
YES
YES

YES

YES

YES

YES

YES
YES
YES

YES
Comments
Remark
IR No. Soft Copy

CE-M 0001
CE-M 0014

CE-M 0020
CE-M 0021

CE-M 0023

CE-M 0028

CE-M 0034

CE-M 0035

CE-M 0036

CE-M 0040

CE-M 0042

CE-M 0045

CE-M 0046

CE-M 0050

CE-M 0054

CE-M 0060
CE-M 0066
CE-M 0067
CE-M 0078

CE-M 0079

CE-M 0083

CE-M 0084

CE-M 0089

CE-M 0090

CE-M 0092

CE-M 0095
CE-M 0096

CE-M 0097

CE-M 0099

CE-M 0100

CE-M 0101

CE-M 0103

CE-M 0105

CE-M 0111

CE-M 0113

CE-M 0114

CE-M 0118

CE-M 0122

CE-M 0123

CE-M 0129

CE-M 0140

CE-M 0141

CE-M 0145

CE-M 0158
CE-M 0164

CE-M 0165

CE-M 0169

CE-M 0170

CE-M 0171

CE-M 0176

CE-M 0177
CE-M 0181
CE-M 0182

CE-M 0240

CE-M 0241

CE-M 0321

CE-M 0356

CE-M 0388
Produced Water Treatment M109
Description of work Inspected Date
Tank plates cutting and preparation for DS6 pre-separator at Rumaila
fabrication shop 2017.05.03
Inspection for tank plate dimensions and quality after cutting and grinding 2017.06.11
Inspection for Penetrant Testing for the welds of Clamping Fixture Lifting Lugs
2017.06.16
Inspection for Dimensions of Drain Sewage Pits Components 2017.06.16
Inspection for the radian of the shell plates after rolling for DS6 Pre-separator
2017.06.18
Inspection for the quality and dimensions of shell plates after rolling of D6 Pre-
separator 2017.06.24
Inspeciton for the welding assembling quality for the drain sewage pit of four
tanks before welding 2017.06.29
Inspection for the welding assembling quality for roof plates of DS7 Produced
Water Tank before welding 2017.06.29
Inspeciton for the butt welding quality for the drain sewage pit item ⑥ of four
tanks after welding 2017.07.01
Inspection for the Radiographic Testing Proceeding for the sludge drain item ⑥
butt weld of four tanks 2017.07.01
Inspection for roof plates dimensions and quality of DS7-Produced Water Tank
after cutting and grinding 2017.7.30
Inspection for the welding assembling quality for roof plates of DS7 Produced Water
Tank before welding 2017.07.04
Inspeciton for the welding quality for the drain sewage pit of four tanks after
welding 2017.07.11
Inspection for Fit-up for roof plates of DS7 Produced Water Tank (Before
Welding) 2017.07.12
Inspection for the quality and dimensions of shell plates after rolling of D7-Pre-
separator 2017.07.10
Inspection for Fit-up for roof plates of DS7 Produced Water Tank (Before
Welding) 2017.07.14
Inspection for Fit-up for roof plates of DS7 Produced Water Tank (Before
2017.07.17
Welding)
Inspection for Fit-up for central roof plates of four tanks (Before Welding) 2017.07.20
Inspection for Fit-up for roof plates of DS7 Produced Water Tank (Before
2017.07.26
Welding)
Visual inspection request for roof plates welds of DS7 Produced Water Tank
2017.07.20
(Welding Completed)
Inspection for Fit-up of DS7 Produced Water Tank Roof Plates(Before Welding)
2017.07.24
Visual inspection request for roof plates welds of DS7 Produced Water Tank
(Welding Completed) 2017.07.24
Inspection for Fit-up of DS6 Pre-separator Roof PLate Stiffener(Before Welding)
2017.07.26
Visual inspection request for roof plates welds of DS7 Produced Water Tank
(Welding Completed) 2017.07.24
Inspection for Penetrant Testing proceeding for the fillet welds of drain sewage
2017.07.26
pits of four tanks
Inspection for Fit-up of DS7 Produced Water Tank Roof Plates(Before Welding)
2017.07.26
Inspection for Fit-up of DS6 Pre-separator Roof PLate Stiffener(Before Welding)
2017.07.26
Visual inspection request for the welds of DS6 Pre-separator roof plate stiffener
(Welding Completed) 2017.07.26
Inspection for Fit-up of DS6 Pre-separator Roof PLate Stiffener(Before Welding)
2017.07.28
Visual inspection request for the welds of DS6 Pre-separator roof plate stiffener
2017.07.28
(Welding Completed)
Inspection for the quality and dimensions of shell plates after rolling of D7-
2017.07.28
Produced Water Tank
Inspection for Fit-up of DS6 Pre-separator Roof PLate Stiffener(Before Welding)
2017.7.30
Visual inspection request for roof plates welds of DS7 Produced Water Tank
2017.07.29
(Welding Completed)
Inspection request for Fit-up of DS7 Produced Water Tank Roof Plate (Before
Welding) 2017.8.2
Inspection for Fit-up of DS6 Pre-separator Roof PLate Stiffener(Before Welding)
2017.8.1
Visual inspection request for the welds of DS6 Pre-separator roof plate stiffener
(Welding Completed) 2017.8.1
Inspection for Fit-up of DS6 Pre-separator Roof PLate Stiffener(Before Welding)
2017.8.2
Witness the qualification test of 3 welders for WPS 07 and WPS 08 2G
(Horizontal weld) and 3G 2017.8.5
Visual inspection request for the welds of DS6 Pre-separator roof plate stiffener
(Welding Completed) 2017.8.3

Inspection for Fit-up of DS6 Pre-separator Roof PLate Stiffener(Before Welding) 2017.8.5
Visual inspection request for the welds of DS6 Pre-separator roof plate stiffener
(Welding Completed) 2017.08.13
Inspection for Fit-up of DS8 Pre-separator Roof Plate Stiffener(Before Welding)
2017.8.6
Inspection for Fit-up of DS8 Pre-separator Roof Plate Stiffener(Before Welding)
2017.08.08
Inspection for Fit-up of DS8 Pre-separator Roof Plate Stiffener(Before Welding)
2017.08.13
Inspection Request for Piping Welder Qualification Testing 2017.08.16
Visual inspection request for the welds of DS8 Pre-separator roof plate stiffener
(Welding Completed)
2017.08.17
Visual inspection request for the welds of DS8 Pre-separator roof platestiffener
(Welding Completed
Inspection for Fit-up of DS7 Pre-separator Roof PLate Stiffener(Before Welding)
Visual inspection request for roof plates welds of DS7 Produced Water Tank
(Welding Completed) 2017.08.17
Inspection for Fit-up of DS7 Pre-separator Roof PLate Stiffener(Before Welding)
Visual inspection request for the welds of DS8 Pre-separator roof plate stiffener
(Welding Completed)
Inspection request for Fit-up of DS7 Produced Water Tank Roof Plate (Before
Welding) 2017.08.17
Inspection Request for Piping Welder Qualification Testing 2017.08.16
Inspection request for the welds of Tank roof plate stiffener, Check the fit up
before welding and visual inspection after welding.(Tank NO. D7-ABJ681053)
TYPE Ⅰ
Inspection request for the welds of Tank roof plate stiffener, Check the fit up
before welding and visual inspection after welding.(Tank NO. D7-ABJ681053)
TYPE Ⅱ Ⅲ
Inspection request for the welds of Tank roof plate stiffener, Check the fit up
before welding and visual inspection after welding
Inspection request for closing CAR #: AWQ0109-QRCAR-0003:
16-Sep-17
Inpsection for NDE for DS7 Pre-separator shell manway MW3 and MW4 after
welding completed
location Signature Report Accepted Rejected Close
CPECC Rumaila Camp
yes yes YES
CPECC Rumaila Camp yes yes yes YES
CPECC Rumaila Camp
yes yes yes
CPECC Rumaila Camp yes yes YES
CPECC Rumaila Camp
yes yes YES
CPECC Rumaila Camp
yes yes YES
CPECC Rumaila Camp
yes yes YES
CPECC Rumaila Camp
yes yes YES
CPECC Rumaila Camp
yes yes YES
CPECC Rumaila Camp
yes yes YES
CPECC Rumaila Camp
yes yes yes
CPECC Rumaila Camp
yes YES YES
CPECC Rumaila Camp
yes YES YES
CPECC Rumaila Camp
yes YES YES
CPECC Rumaila Camp
yes YES YES
CPECC Rumaila Camp
yes YES YES
CPECC Rumaila Camp
yes YES YES
CPECC Rumaila Camp yes YES YES
CPECC Rumaila Camp
yes YES YES
CPECC Rumaila Camp
yes YES YES
CPECC Rumaila Camp
yes YES YES
CPECC Rumaila Camp
yes YES YES
CPECC Rumaila Camp
yes YES YES
CPECC Rumaila Camp
yes YES YES
CPECC Rumaila Camp
yes YES YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp yes YES YES

CPECC Rumaila Camp YES


yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp yes YES YES

CPECC Rumaila Camp YES


yes YES

CPECC Rumaila Camp YES


yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
CPECC Rumaila Camp YES
yes YES
Comments
shall waiting for CPECC's Response to release new Drawing (As-Built) Based on the compane's Response in
RFI:R-CE109-EMIL-0209
Remark
IR No. Soft Copy
CE-ROT 0001

CE-ROT 0002
CE-ROT 0003
Produced Water Treatment M109
Description of work
Inspection for foundation readiness of DS7 Treated Produced Water Pump D7-PBE681153A/B/C&253A/B/C
Inspection Request for rotating equipment.
1. Inspection for foundation readiness of DS6 Pre-Treated Water Transfer Pumps D6-PAX681051AB and D6-
PBE681052AB
Checking foundation readiness of DS8 Pre-Treated Water Transfer Pumps D8-PBE681051A/B
Inspected Date location Signature Report Accepted Rejected
DS7

DS6

DS8
Close Comments Remark
IR No. Soft Copy

IR-CE-PIPING-RU-0001

IR-CE-PIPING-RU-0002

IR-CE-PIPING-RU-0003

IR-CE-PIPING-RU-0004
IR-CE-PIPING-RU-0005

IR-CE-PIPING-RU-0006
IR-CE-PIPING-RU-0007

IR-CE-PIPING-RU-0008
IR-CE-PIPING-RU-0009

IR-CE-PIPING-RU-0010
IR-CE-PIPING-RU-0011

IR-CE-PIPING-RU-0012
IR-CE-PIPING-RU-0013
Produced Water Treatment M109

Description of work Inspected Date

Inspection request for Fit-up of DS7 piping work(Before Welding) 2017.8.17

Witness for Piping Installation and Welding

Witness for Piping Installation and Welding


Witness and Inspectionof Piping Fit Up and, Visual Inspection of Complete
Welds
24-Sep-17
Daily Weld
Witness andReport No's. WQ1-CE-DS7-F-0022
Inspectionof TO WQ1-CE-DS7-F-00028
Piping Fit Up and, Visual Inspection of Complete
8", 10", 12" Pipe spools as per attcached Daily Weld Reports
Welds
16-Sep-17
Daily Weld Report No's. WQ1-CE-DS7-F-0029 TO WQ1-CE-DS7-F-00035
3", 4", 6", 8", 10", 12" Pipe spools as per attcached Daily Weld Reports
Witness for Piping Installation and Welding

Witness for Piping Installation and Welding


Conducting radiographic testing for the prefabricated piping that's already
shooted by CPECC
Witness for Piping Installation and Welding

Witness for Piping Installation and Welding 09-Oct-17

Witness for Piping Installation and Welding for DS 8 29-Oct-17


Conducting radiographic testing for the prefabricated piping that’s already
27-Oct-17
shooted by CPECC
Witness for Piping Installation and Welding for DS 7 28-Oct-17
location Signature Report Accepted Rejected Close

CPECC Rumaila Camp yes yes yes

CPECC Rumaila Camp yes yes yes

CPECC Rumaila Camp yes yes yes

CPECC Rumaila Camp yes yes yes yes

CPECC Rumaila Camp yes yes yes yes

CPECC Rumaila Camp yes yes yes yes

CPECC Rumaila Camp yes yes yes yes

CPECC Rumaila Camp yes yes yes

CPECC Rumaila Camp yes yes yes yes

CPECC Rumaila Camp yes yes yes

CPECC Rumaila Camp

CPECC Rumaila Camp yes yes yes

CPECC Rumaila Camp


Comments
Remark
Summary IR log for M(109 /DS6)
1 IR total No. IR last week(Thurs
total Accepted Rejected/cancelled follow up total Accepted
279.00 217.00 28.00 34.00 9 1

3 NCR OPEN CLOSED


2 0 2

4 CAR OPEN CLOSED


0 0 0

5 Training 0

6 Audit 0

Summary IR log for M(109/DS7)


1 IR total No. IR last week(Thurs
total Accepted Rejected/cancelled follow up total Accepted
1144.00 866.00 125.00 153.00 42 10

3 NCR OPEN CLOSED


2 0 2

4 CAR OPEN CLOSED


1 1 0

5 Training 1

6 Audit 0

Summary IR log for M(109/DS8)


IR total No. IR last week(Thurs
total Accepted Rejected/cancelled follow up total Accepted
415.00 283.00 71.00 61.00 18 6

NCR OPEN CLOSED


0 0 0

CAR OPEN CLOSED


0 0 0

Training 0

Audit 0

Surveillance reports 33
M(109 /DS6)
IR last week(Thursday-Wednesday)
Rejected/cancelled follow up
0 8

M(109/DS7)
IR last week(Thursday-Wednesday)
Rejected/cancelled follow up
0 32

M(109/DS8)
IR last week(Thursday-Wednesday)
Rejected/cancelled follow up
3 9