You are on page 1of 5
Date: 2 Sep-13, SINOPEC ERC MIDDLE EAST CO.LTD lone Time SADARA PROJECT |Contract No.: 10023 ome Previous iV No. (if applicable) INSPECTION NOTIFICATION (IN) ae Tocation (Area): Tem Description: C | _ the fabrication area ‘The inspection of POR|LTCS FLANGE) ° N s T R U |Ref. Drawing(s): attach document € [Ref STO / Code(s): __Aswie w T |Ref.Spesification(s}: 1 ‘On: 35ep:3 Next Event Start On ‘ = Ready for inspection aoa i N yooshiping 2Sepas Name Date Signature ‘MuRaur 2sepe3 IN Received By Date Time | Signature Inspection Result (See attachment if applicable) comments: c Approved ‘Approved with comments Not Approved ‘MURAD 2sep13 300aM_| Name Date Time Signature IN Received By Date Time Signature ‘Comments F E u o R\T] approved ‘Approved with comments Not Approved Name Date Time Signature QaAC | remem Sosa abe —7 "| eee as (ieanptOrty angi os a me * BP 61 = Denton Ggeasand uk vnina ioe er Quine Teale [Pcernaaneripetemm ASTI { AENE A/SA 350 2007] meteor (Ramuaentctee rd = ee ‘ame and gualifeaton Nome Egensei Dave ranzp2017 ee A "ni 128 Roem La

You might also like