Date: 2 Sep-13,
SINOPEC ERC MIDDLE EAST CO.LTD
lone Time
SADARA PROJECT |Contract No.: 10023 ome
Previous iV No. (if applicable)
INSPECTION NOTIFICATION (IN) ae
Tocation (Area): Tem Description:
C | _ the fabrication area ‘The inspection of POR|LTCS FLANGE)
°
N
s
T
R
U |Ref. Drawing(s): attach document
€ [Ref STO / Code(s): __Aswie w
T |Ref.Spesification(s}:
1 ‘On: 35ep:3 Next Event Start On
‘ = Ready for inspection aoa i
N yooshiping 2Sepas
Name Date Signature
‘MuRaur 2sepe3
IN Received By Date Time | Signature
Inspection Result (See attachment if applicable)
comments:
c
Approved ‘Approved with comments Not Approved
‘MURAD 2sep13 300aM_|
Name Date Time Signature
IN Received By Date Time Signature
‘Comments
F
E
u
o
R\T] approved ‘Approved with comments Not Approved
Name Date Time Signature
QaAC| remem Sosa abe —7
"| eee as
(ieanptOrty
angi os a
me * BP 61
= Denton Ggeasand uk vnina ioe
er Quine Teale [Pcernaaneripetemm ASTI { AENE A/SA 350 2007]
meteor (Ramuaentctee
rd
= ee
‘ame and gualifeaton
Nome Egensei
Dave ranzp2017ee A
"ni 128
Roem La