EngSolutions RCB Version 7.2.1 - License No: B7834-A4319 Page No.

1
==============================================================================================
Company: Colinas de Buen, S.A. de C.V. Engineer: Ing. Gerardo Esquivel
Project: EDIFICIO DE INVESTIGACION ENAH (DISEÑO DE TRABES Y MUROS) 04:38:42 p.m. 30/08/2012
==============================================================================================

LOAD COMBINATIONS
No Load combination
______ ____________________________________________

1 1.5D0 + 1.5DL + 1.5LLM


2 1.1D0 + 1.1DL + 1.1LLI + 1.1EQX + .33EQY
3 1.1D0 + 1.1DL + 1.1LLI - 1.1EQX - .33EQY
4 1.1D0 + 1.1DL + 1.1LLI + 1.1EQX - .33EQY
5 1.1D0 + 1.1DL + 1.1LLI - 1.1EQX + .33EQY
6 1.1D0 + 1.1DL + 1.1LLI + .33EQX + 1.1EQY
7 1.1D0 + 1.1DL + 1.1LLI - .33EQX - 1.1EQY
8 1.1D0 + 1.1DL + 1.1LLI - .33EQX + 1.1EQY
9 1.1D0 + 1.1DL + 1.1LLI + .33EQX - 1.1EQY

MATERIALS
Number of materials = 2

REINFORCED CONCRETE

Mat Name f'c fy fys1 fys2 E G w


Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/m3
___ ______________ _________ _________ _________ _________ _________ _________ _________
1 RConcrete1 300 4200 2800 4200 221359 88544 2400.0

BEAM SECTIONS
Number of prismatic sections = 2

Sec Name Shapeb h tw tf P1 P2 A I2 I3 J


(cm) (cm) (cm) (cm) (cm) (cm) (cm2) (cm4) (cm4) (cm4)
___ ________ _______ ______ ______ ______ ______ ______ ______ ________ __________ __________ _________

1 Beam1 Rectang 30.00 40.00 - - - - 1200.0 160000 90000 189900


2 W24x84 I 22.91 61.21 1.19 1.96 0.00 - 159.3 98647 3929 154

Design Results - Beams

BEAM: 2(C-D) FLOOR: 4


=================================================================================================================
Length: L = 2.70 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 2.70 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.27 0.54 0.81 1.08 1.35 1.62 1.89 2.16 2.43 2.70
Mu(-), ton-m: -12.25 -9.70 -7.18 -4.69 -2.21 0.00 -2.72 -5.51 -8.32 -11.16 -14.02
Mu(+), ton-m: 13.53 10.88 8.21 5.51 2.79 0.24 2.67 5.07 7.45 9.81 12.15
As(-), cm2: 10.30 7.95 5.75 3.67 3.04 3.04 3.04 4.35 6.74 9.28 12.01
As(+), cm2: 11.53 9.02 6.64 4.35 3.04 3.04 3.04 3.99 5.99 8.05 10.20
Vu, ton: 9.89 9.89 9.95 10.03 10.12 10.20 10.29 10.37 10.46 10.52 10.52
Tu, ton-m: 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.44 17.21 17.05 17.05
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
C-2 9 #3@ 17.5 7 #3@ 15 D-2
EngSolutions RCB Version 7.2.1 - License No: B7834-A4319 Page No. 2
==============================================================================================
Company: Colinas de Buen, S.A. de C.V. Engineer: Ing. Gerardo Esquivel
Project: EDIFICIO DE INVESTIGACION ENAH (DISEÑO DE TRABES Y MUROS) 04:38:42 p.m. 30/08/2012
==============================================================================================
BEAM: 6(B-D) FLOOR: 4
=================================================================================================================
Length: L = 4.65 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 4.65 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.47 0.93 1.40 1.86 2.33 2.79 3.26 3.72 4.18 4.65
Mu(-), ton-m: -5.10 -3.62 -2.30 -1.14 -0.17 0.00 -0.20 -1.41 -2.79 -4.35 -6.07
Mu(+), ton-m: 3.44 3.25 2.89 2.37 1.68 1.06 1.31 1.78 2.08 2.20 2.15
As(-), cm2: 4.02 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.40 4.81
As(+), cm2: 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04
Vu, ton: 3.11 3.02 2.66 2.31 1.95 2.03 2.40 2.78 3.16 3.53 3.62
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
B-6 27 #3@ 17.5 D-6

BEAM: 9(C-D) FLOOR: 4


=================================================================================================================
Length: L = 2.70 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 2.70 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.27 0.54 0.81 1.08 1.35 1.62 1.89 2.16 2.43 2.70
Mu(-), ton-m: -3.50 -2.68 -1.90 -1.16 -0.47 0.00 -0.76 -1.83 -2.95 -4.11 -5.32
Mu(+), ton-m: 4.82 3.99 3.13 2.22 1.27 0.33 0.80 1.37 1.89 2.38 2.82
As(-), cm2: 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.21 4.19
As(+), cm2: 3.78 3.11 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04
Vu, ton: 3.17 3.17 3.28 3.44 3.60 3.75 3.91 4.07 4.22 4.33 4.33
Tu, ton-m: 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
C-9 16 #3@ 17.5 D-9

BEAM: 2(C-D) FLOOR: 7


=================================================================================================================
Length: L = 2.70 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 2.70 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.27 0.54 0.81 1.08 1.35 1.62 1.89 2.16 2.43 2.70
Mu(-), ton-m: -14.86 -11.78 -8.72 -5.68 -2.67 0.00 -3.33 -6.73 -10.16 -13.61 -17.08
Mu(+), ton-m: 16.60 13.34 10.05 6.74 3.41 0.32 3.29 6.23 9.15 12.05 14.92
As(-), cm2: 12.85 9.85 7.08 4.49 3.04 3.04 3.04 5.37 8.36 11.61 15.16
As(+), cm2: 14.65 11.34 8.27 5.38 3.04 3.04 3.04 4.95 7.46 10.11 12.91
Vu, ton: 12.16 12.16 12.22 12.30 12.39 12.47 12.56 12.65 12.73 12.79 12.79
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 14.05 14.05 13.94 13.80 13.65 13.51 13.37 13.24 13.10 13.01 13.01
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
C-2 22 #3@ 12.5 D-2

BEAM: 6(B-D) FLOOR: 7


=================================================================================================================
Length: L = 4.65 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 4.65 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.47 0.93 1.40 1.86 2.33 2.79 3.26 3.72 4.18 4.65
Mu(-), ton-m: -4.41 -3.03 -1.82 -0.77 -0.03 0.00 -0.28 -1.45 -2.81 -4.33 -6.03
Mu(+), ton-m: 3.19 3.03 2.70 2.21 1.55 1.11 1.37 1.73 1.92 1.93 1.78
As(-), cm2: 3.45 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.39 4.78
As(+), cm2: 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04
Vu, ton: 2.88 2.79 2.43 2.08 1.72 1.97 2.34 2.72 3.09 3.47 3.56
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
B-6 27 #3@ 17.5 D-6
EngSolutions RCB Version 7.2.1 - License No: B7834-A4319 Page No. 3
==============================================================================================
Company: Colinas de Buen, S.A. de C.V. Engineer: Ing. Gerardo Esquivel
Project: EDIFICIO DE INVESTIGACION ENAH (DISEÑO DE TRABES Y MUROS) 04:38:42 p.m. 30/08/2012
==============================================================================================
BEAM: 9(C-D) FLOOR: 7
=================================================================================================================
Length: L = 2.70 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 2.70 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.27 0.54 0.81 1.08 1.35 1.62 1.89 2.16 2.43 2.70
Mu(-), ton-m: -5.35 -4.13 -2.95 -1.82 -0.73 0.00 -1.37 -2.97 -4.62 -6.30 -8.03
Mu(+), ton-m: 7.36 6.01 4.62 3.18 1.71 0.36 1.32 2.29 3.21 4.08 4.92
As(-), cm2: 4.22 3.22 3.04 3.04 3.04 3.04 3.04 3.04 3.62 5.01 6.48
As(+), cm2: 5.90 4.76 3.62 3.04 3.04 3.04 3.04 3.04 3.04 3.19 3.87
Vu, ton: 5.12 5.12 5.23 5.39 5.54 5.70 5.86 6.01 6.17 6.28 6.28
Tu, ton-m: 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
C-9 16 #3@ 17.5 D-9

BEAM: 2(C-D) FLOOR: 10


=================================================================================================================
Length: L = 2.70 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 2.70 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.27 0.54 0.81 1.08 1.35 1.62 1.89 2.16 2.43 2.70
Mu(-), ton-m: -16.11 -12.78 -9.47 -6.18 -2.92 -0.49 -4.18 -7.89 -11.63 -15.39 -19.18
Mu(+), ton-m: 17.63 14.06 10.46 6.83 3.19 0.33 3.54 6.74 9.91 13.06 16.18
As(-), cm2: 14.14 10.80 7.74 4.91 3.04 3.04 3.26 6.36 9.72 13.40 17.50
As(+), cm2: 15.77 12.05 8.63 5.46 3.04 3.04 3.04 5.38 8.14 11.07 14.21
Vu, ton: 13.32 13.32 13.38 13.46 13.55 13.64 13.72 13.81 13.89 13.95 13.95
Tu, ton-m: 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 12.42 12.42 12.34 12.22 12.11 12.00 11.89 11.78 11.68 11.60 11.60
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
C-2 27 #3@ 10 D-2

BEAM: 6(B-D) FLOOR: 10


=================================================================================================================
Length: L = 4.65 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 4.65 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.47 0.93 1.40 1.86 2.33 2.79 3.26 3.72 4.18 4.65
Mu(-), ton-m: -4.45 -3.10 -1.90 -0.85 -0.07 0.00 -0.32 -1.53 -2.90 -4.43 -6.12
Mu(+), ton-m: 3.60 3.34 2.92 2.35 1.62 1.05 1.34 1.74 1.99 2.07 2.00
As(-), cm2: 3.48 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.47 4.86
As(+), cm2: 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04
Vu, ton: 2.82 2.74 2.41 2.08 1.75 2.08 2.43 2.77 3.12 3.47 3.56
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
B-6 27 #3@ 17.5 D-6

BEAM: C(1-2) FLOOR: 4


=================================================================================================================
Length: L = 6.00 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 6.00 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.60 1.20 1.80 2.40 3.00 3.60 4.20 4.80 5.40 6.00
Mu(-), ton-m: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mu(+), ton-m: 0.00 4.20 7.47 9.80 11.20 11.67 11.20 9.80 7.47 4.20 0.00
As(-), cm2: 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04
As(+), cm2: 3.04 3.28 6.00 8.04 9.32 9.75 9.32 8.04 6.00 3.28 3.04
Vu, ton: 6.87 6.22 4.67 3.11 1.56 0.00 1.56 3.11 4.67 6.22 6.87
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
C-1 35 #3@ 17.5 C-2
EngSolutions RCB Version 7.2.1 - License No: B7834-A4319 Page No. 4
==============================================================================================
Company: Colinas de Buen, S.A. de C.V. Engineer: Ing. Gerardo Esquivel
Project: EDIFICIO DE INVESTIGACION ENAH (DISEÑO DE TRABES Y MUROS) 04:38:42 p.m. 30/08/2012
==============================================================================================
BEAM: D(1-2) FLOOR: 4
=================================================================================================================
Length: L = 6.00 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 6.00 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.60 1.20 1.80 2.40 3.00 3.60 4.20 4.80 5.40 6.00
Mu(-), ton-m: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mu(+), ton-m: 0.00 4.47 7.95 10.43 11.92 12.42 11.92 10.43 7.95 4.47 0.00
As(-), cm2: 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04
As(+), cm2: 3.04 3.50 6.41 8.61 9.99 10.46 9.99 8.61 6.41 3.50 3.04
Vu, ton: 7.31 6.62 4.97 3.31 1.66 0.00 1.66 3.31 4.97 6.62 7.31
Tu, ton-m: 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
D-1 35 #3@ 17.5 D-2

BEAM: C(1-2) FLOOR: 7


=================================================================================================================
Length: L = 6.00 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 6.00 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.60 1.20 1.80 2.40 3.00 3.60 4.20 4.80 5.40 6.00
Mu(-), ton-m: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mu(+), ton-m: 0.00 4.20 7.47 9.80 11.20 11.67 11.20 9.80 7.47 4.20 0.00
As(-), cm2: 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04
As(+), cm2: 3.04 3.28 6.00 8.04 9.32 9.75 9.32 8.04 6.00 3.28 3.04
Vu, ton: 6.87 6.22 4.67 3.11 1.56 0.00 1.56 3.11 4.67 6.22 6.87
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
C-1 35 #3@ 17.5 C-2

BEAM: D(1-2) FLOOR: 7


=================================================================================================================
Length: L = 6.00 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 6.00 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.60 1.20 1.80 2.40 3.00 3.60 4.20 4.80 5.40 6.00
Mu(-), ton-m: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mu(+), ton-m: 0.00 4.47 7.95 10.43 11.92 12.42 11.92 10.43 7.95 4.47 0.00
As(-), cm2: 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04
As(+), cm2: 3.04 3.50 6.41 8.61 9.99 10.46 9.99 8.61 6.41 3.50 3.04
Vu, ton: 7.31 6.62 4.97 3.31 1.66 0.00 1.66 3.31 4.97 6.62 7.31
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
D-1 35 #3@ 17.5 D-2

BEAM: C(1-2) FLOOR: 10


=================================================================================================================
Length: L = 6.00 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 6.00 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.60 1.20 1.80 2.40 3.00 3.60 4.20 4.80 5.40 6.00
Mu(-), ton-m: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mu(+), ton-m: 0.00 3.67 6.52 8.56 9.78 10.19 9.78 8.56 6.52 3.67 0.00
As(-), cm2: 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04
As(+), cm2: 3.04 3.04 5.19 6.94 8.02 8.39 8.02 6.94 5.19 3.04 3.04
Vu, ton: 6.00 5.43 4.07 2.72 1.36 0.00 1.36 2.72 4.07 5.43 6.00
Tu, ton-m: 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
C-1 35 #3@ 17.5 C-2
EngSolutions RCB Version 7.2.1 - License No: B7834-A4319 Page No. 5
==============================================================================================
Company: Colinas de Buen, S.A. de C.V. Engineer: Ing. Gerardo Esquivel
Project: EDIFICIO DE INVESTIGACION ENAH (DISEÑO DE TRABES Y MUROS) 04:38:42 p.m. 30/08/2012
==============================================================================================
BEAM: D(1-2) FLOOR: 10
=================================================================================================================
Length: L = 6.00 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 6.00 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.60 1.20 1.80 2.40 3.00 3.60 4.20 4.80 5.40 6.00
Mu(-), ton-m: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Mu(+), ton-m: 0.00 3.90 6.93 9.09 10.39 10.82 10.39 9.09 6.93 3.90 0.00
As(-), cm2: 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04
As(+), cm2: 3.04 3.04 5.54 7.41 8.57 8.97 8.57 7.41 5.54 3.04 3.04
Vu, ton: 6.37 5.77 4.33 2.89 1.44 0.00 1.44 2.89 4.33 5.77 6.37
Tu, ton-m: 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
D-1 35 #3@ 17.5 D-2

BEAM: 1(C-D) FLOOR: 4


=================================================================================================================
Length: L = 2.70 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 2.70 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.27 0.54 0.81 1.08 1.35 1.62 1.89 2.16 2.43 2.70
Mu(-), ton-m: -17.16 -13.64 -10.14 -6.66 -3.20 -0.02 -3.79 -7.60 -11.42 -15.27 -19.15
Mu(+), ton-m: 18.54 14.88 11.19 7.48 3.74 0.23 3.64 7.02 10.39 13.73 17.04
As(-), cm2: 15.25 11.64 8.34 5.31 3.04 3.04 3.04 6.11 9.52 13.27 17.46
As(+), cm2: 16.77 12.87 9.31 6.01 3.04 3.04 3.04 5.62 8.57 11.72 15.12
Vu, ton: 13.64 13.64 13.70 13.79 13.87 13.96 14.04 14.13 14.22 14.28 14.28
Tu, ton-m: 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 12.12 12.12 12.04 11.93 11.83 11.72 11.62 11.51 11.41 11.34 11.34
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
C-1 27 #3@ 10 D-1

BEAM: 11(A-E) FLOOR: 4


=================================================================================================================
Length: L = 9.00 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 9.00 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.90 1.80 2.70 3.60 4.50 5.40 6.30 7.20 8.10 9.00
Mu(-), ton-m: -2.61 -1.13 -0.17 0.00 0.00 0.00 0.00 0.00 -0.30 -1.32 -2.91
Mu(+), ton-m: 0.00 0.00 0.36 0.98 1.47 1.62 1.41 0.85 0.22 0.00 0.00
As(-), cm2: 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04
As(+), cm2: 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04
Vu, ton: 1.76 1.52 1.13 0.74 0.36 0.12 0.42 0.81 1.20 1.59 1.83
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
A-11 52 #3@ 17.5 E-11

BEAM: 1(C-D) FLOOR: 7


=================================================================================================================
Length: L = 2.70 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 2.70 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.27 0.54 0.81 1.08 1.35 1.62 1.89 2.16 2.43 2.70
Mu(-), ton-m: -17.91 -14.22 -10.56 -6.92 -3.31 -0.10 -4.07 -8.07 -12.09 -16.13 -20.19
Mu(+), ton-m: 19.41 15.55 11.67 7.77 3.84 0.28 3.85 7.40 10.92 14.42 17.90
As(-), cm2: 16.07 12.21 8.73 5.53 3.04 3.04 3.18 6.52 10.14 14.15 18.68
As(+), cm2: 17.76 13.55 9.75 6.26 3.04 3.04 3.04 5.94 9.06 12.41 16.05
Vu, ton: 14.35 14.35 14.41 14.49 14.58 14.67 14.75 14.84 14.92 14.98 14.98
Tu, ton-m: 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 11.34 11.34 11.27 11.18 11.08 10.99 10.90 10.81 10.72 10.66 10.66
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
C-1 27 #3@ 10 D-1
EngSolutions RCB Version 7.2.1 - License No: B7834-A4319 Page No. 6
==============================================================================================
Company: Colinas de Buen, S.A. de C.V. Engineer: Ing. Gerardo Esquivel
Project: EDIFICIO DE INVESTIGACION ENAH (DISEÑO DE TRABES Y MUROS) 04:38:42 p.m. 30/08/2012
==============================================================================================
BEAM: 11(A-E) FLOOR: 7
=================================================================================================================
Length: L = 9.00 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 9.00 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.90 1.80 2.70 3.60 4.50 5.40 6.30 7.20 8.10 9.00
Mu(-), ton-m: -2.68 -1.27 -0.29 0.00 0.00 0.00 0.00 0.00 -0.46 -1.50 -3.07
Mu(+), ton-m: 0.00 0.00 0.35 0.88 1.36 1.50 1.29 0.76 0.18 0.00 0.00
As(-), cm2: 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04
As(+), cm2: 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04
Vu, ton: 1.75 1.51 1.12 0.73 0.37 0.15 0.43 0.82 1.21 1.60 1.84
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
A-11 52 #3@ 17.5 E-11

BEAM: 1(C-D) FLOOR: 10


=================================================================================================================
Length: L = 2.70 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 2.70 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.27 0.54 0.81 1.08 1.35 1.62 1.89 2.16 2.43 2.70
Mu(-), ton-m: -16.71 -13.25 -9.82 -6.40 -3.02 0.00 -3.63 -7.37 -11.14 -14.93 -18.75
Mu(+), ton-m: 18.37 14.76 11.13 7.48 3.80 0.35 3.69 7.01 10.31 13.59 16.84
As(-), cm2: 14.77 11.26 8.06 5.10 3.04 3.04 3.04 5.92 9.26 12.93 17.01
As(+), cm2: 16.58 12.75 9.25 6.00 3.04 3.04 3.04 5.61 8.50 11.58 14.90
Vu, ton: 13.43 13.43 13.49 13.58 13.66 13.75 13.83 13.92 14.00 14.06 14.06
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 12.34 12.34 12.26 12.15 12.03 11.93 11.82 11.71 11.61 11.54 11.54
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
C-1 27 #3@ 10 D-1

BEAM: 9(C-D) FLOOR: 10


=================================================================================================================
Length: L = 2.70 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 2.70 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.27 0.54 0.81 1.08 1.35 1.62 1.89 2.16 2.43 2.70
Mu(-), ton-m: -5.22 -4.03 -2.88 -1.77 -0.70 0.00 -1.37 -2.95 -4.58 -6.25 -7.96
Mu(+), ton-m: 7.32 5.98 4.59 3.16 1.69 0.36 1.32 2.27 3.18 4.05 4.88
As(-), cm2: 4.11 3.14 3.04 3.04 3.04 3.04 3.04 3.04 3.59 4.97 6.42
As(+), cm2: 5.87 4.74 3.59 3.04 3.04 3.04 3.04 3.04 3.04 3.16 3.84
Vu, ton: 5.11 5.11 5.21 5.36 5.51 5.66 5.81 5.96 6.10 6.21 6.21
Tu, ton-m: 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
C-9 16 #3@ 17.5 D-9

BEAM: 11(A-E) FLOOR: 10


=================================================================================================================
Length: L = 9.00 m a = 0.00 m Section: b = 30.0 cm Sec: Beam1
Lu = 9.00 m c = 0.00 m h = 40.0 cm Mat: RConcrete1
------------------------------------------------------------------------------------------------
X, m: 0.00 0.90 1.80 2.70 3.60 4.50 5.40 6.30 7.20 8.10 9.00
Mu(-), ton-m: -2.56 -1.15 -0.18 0.00 0.00 0.00 0.00 0.00 -0.35 -1.38 -2.94
Mu(+), ton-m: 0.00 0.00 0.41 1.00 1.48 1.62 1.41 0.86 0.25 0.00 0.00
As(-), cm2: 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04
As(+), cm2: 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04
Vu, ton: 1.75 1.51 1.12 0.73 0.37 0.14 0.43 0.82 1.21 1.60 1.84
Tu, ton-m: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Stirrup: #3 #3 #3 #3 #3 #3 #3 #3 #3 #3 #3
Spacing, cm: 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50 17.50
| |______________________________________________________________________________________| |
DESIGN | |
| |
| |--------------------------------------------------------------------------------------| |
A-11 52 #3@ 17.5 E-11

Design Results - Walls


EngSolutions RCB Version 7.2.1 - License No: B7834-A4319 Page No. 7
==============================================================================================
Company: Colinas de Buen, S.A. de C.V. Engineer: Ing. Gerardo Esquivel
Project: EDIFICIO DE INVESTIGACION ENAH (DISEÑO DE TRABES Y MUROS) 04:38:42 p.m. 30/08/2012
==============================================================================================
HORIZONTAL REINFORCEMENT VERTICAL REINFORCEMENT
--------------------------- ----------------------------------------------------
Wall Story B H t Mat LCmb Vu Reinforcement LCmb Pu Mu2 As tot As ctr As end Ends
(m) (m) (cm) - crit (ton) crit (ton) (ton-m) (cm2) (cm2) (cm2)
_______ ____ ____ ____ ____ ___ ___ _____ __________ _____ ___ _____ ______ _____ _____ _____ ________

A(2-3) 1 3.45 9.50 30.0 1 9 22.17 2Ly#3@19 .0025 8 422.48 72.87 34.77 16.96 8.90 30x59*

E(2-3) 1 3.45 9.50 30.0 1 6 25.35 2Ly#3@19 .0025 7 431.76 74.48 34.77 16.96 8.90 30x59*

2(A-C) 1 3.15 9.50 30.0 1 9 22.12 2Ly#3@19 .0025 1 335.30 63.65 32.52 14.72 8.90 30x59*

2(D-E) 1 3.15 9.50 30.0 1 6 24.14 2Ly#3@19 .0025 1 338.22 61.59 32.52 14.72 8.90 30x59*

A(2-3) 2 3.45 2.70 30.0 1 9 22.15 2Ly#3@19 .0025 8 369.64 63.75 33.63 18.11 7.76 30x52*

A(5-7) 2 2.40 2.70 30.0 1 9 111.81 2Ly#3@19 .0025 1 482.16 57.86 24.75 11.25 6.75 30x45*

A(8-10) 2 2.40 2.70 30.0 1 5 112.02 2Ly#3@19 .0025 1 300.08 36.00 24.75 11.25 6.75 30x45*

E(2-3) 2 3.45 2.70 30.0 1 6 24.82 2Ly#3@19 .0025 1 387.07 66.76 33.63 18.11 7.76 30x52*

E(5-7) 2 2.40 2.70 30.0 1 2 105.30 2Ly#3@19 .0025 9 560.88 69.23 40.08 18.48 10.79 30x45*

E(8-10) 2 2.40 2.70 30.0 1 3 114.98 2Ly#3@19 .0025 1 301.01 36.11 24.75 11.25 6.75 30x45*

2(A-C) 2 3.15 2.70 30.0 1 9 16.65 2Ly#3@19 .0025 1 286.51 45.13 30.70 16.54 7.09 30x47*

2(D-E) 2 3.15 2.70 30.0 1 6 19.79 2Ly#3@19 .0025 1 271.48 42.75 30.70 16.54 7.09 30x47*

6(A-B) 2 1.20 2.70 30.0 1 9 55.84 2Ly#3@19 .0025 9 235.13 125.25 60.22 2.25 28.98 30x45*

6(D-E) 2 3.15 2.70 30.0 1 8 284.76 Insuff. Sectn 8 467.60 725.02 196.91 50.52 73.19 30x47*

9(A-C) 2 3.15 2.70 30.0 1 8 54.40 2Ly#3@19 .0025 7 238.63 100.72 30.70 16.54 7.09 30x47*

9(D-E) 2 3.15 2.70 30.0 1 7 58.25 2Ly#3@19 .0025 8 247.72 66.58 30.70 16.54 7.09 30x47*

A(1-11) 3 59.70 1.40 30.0 1 8 213.91 2Ly#3@19 .0025 8 1035.9 3092.3 447.75 - - -

E(1-11) 3 59.70 1.40 30.0 1 7 219.72 2Ly#3@19 .0025 7 1140.3 3404.0 447.75 - - -

1(A-C) 3 3.15 1.40 30.0 1 6 1.85 2Ly#3@19 .0025 6 1.47 0.31 23.62 - - -

1(D-E) 3 3.15 1.40 30.0 1 7 3.24 2Ly#3@19 .0025 7 0.67 1.69 23.62 - - -

2(A-C) 3 3.15 1.40 30.0 1 9 10.28 2Ly#3@19 .0025 1 230.96 36.38 30.70 16.54 7.09 30x47

2(D-E) 3 3.15 1.40 30.0 1 9 16.18 2Ly#3@19 .0025 9 111.26 72.69 23.62 - - -

6(A-B) 3 1.20 1.40 30.0 1 7 43.90 2Ly#3@19 .0025 1 149.49 9.92 15.75 2.25 6.75 30x45*

6(D-E) 3 3.15 1.40 30.0 1 8 269.23 Insuff. Sectn 8 257.92 240.52 77.26 54.08 11.59 30x47*

9(A-C) 3 3.15 1.40 30.0 1 8 52.22 2Ly#3@19 .0025 8 93.22 88.83 23.62 - - -

9(D-E) 3 3.15 1.40 30.0 1 9 55.36 2Ly#3@19 .0025 9 46.09 113.36 23.62 - - -

A(1-11) 4 59.70 1.00 30.0 1 8 176.52 2Ly#3@19 .0025 8 719.46 2295.5 447.75 - - -

E(1-11) 4 59.70 1.00 30.0 1 7 173.27 2Ly#3@19 .0025 7 763.78 2279.8 447.75 - - -

1(A-C) 4 3.15 1.00 30.0 1 8 31.20 2Ly#3@19 .0025 8 -19.20 45.20 23.62 - - -

1(D-E) 4 3.15 1.00 30.0 1 7 32.50 2Ly#3@19 .0025 7 -14.92 57.15 23.62 - - -

2(A-C) 4 3.15 1.00 30.0 1 9 72.05 2Ly#3@19 .0025 9 183.50 124.69 23.62 - - -

2(D-E) 4 3.15 1.00 30.0 1 6 66.44 2Ly#3@19 .0025 6 168.82 122.40 23.62 - - -

6(A-B) 4 1.20 1.00 30.0 1 6 25.04 2Ly#3@19 .0025 1 137.77 8.27 15.75 2.25 6.75 30x45*

6(D-E) 4 3.15 1.00 30.0 1 1 45.50 2Ly#3@19 .0025 1 233.33 36.75 30.70 16.54 7.09 30x47

9(A-C) 4 3.15 1.00 30.0 1 7 75.76 2Ly#3@19 .0025 7 193.83 120.16 23.62 - - -

9(D-E) 4 3.15 1.00 30.0 1 8 71.41 2Ly#3@19 .0025 8 171.61 125.15 23.62 - - -

A(1-3) 5 9.45 0.70 30.0 1 9 111.13 2Ly#3@13.9 .0025 9 121.70 264.23 70.87 - - -

A(5-7) 5 2.40 0.70 30.0 1 4 70.30 2Ly#3@13.9 .0025 1 335.26 40.22 24.75 11.25 6.75 30x45*

A(8-11) 5 7.05 0.70 30.0 1 5 79.41 2Ly#3@13.9 .0025 5 163.08 366.16 52.88 - - -

E(1-3) 5 9.45 0.70 30.0 1 6 94.76 2Ly#3@13.9 .0025 6 134.13 293.44 70.87 - - -

E(5-7) 5 2.40 0.70 30.0 1 2 74.73 2Ly#3@13.9 .0025 1 273.82 32.86 24.75 11.25 6.75 30x45*
EngSolutions RCB Version 7.2.1 - License No: B7834-A4319 Page No. 8
==============================================================================================
Company: Colinas de Buen, S.A. de C.V. Engineer: Ing. Gerardo Esquivel
Project: EDIFICIO DE INVESTIGACION ENAH (DISEÑO DE TRABES Y MUROS) 04:38:42 p.m. 30/08/2012
==============================================================================================
Wall Story B H t Mat LCmb Vu Reinforcement LCmb Pu Mu2 As tot As ctr As end Ends
_______ ____ ____ ____ ____ ___ ___ _____ __________ _____ ___ _____ ______ _____ _____ _____ ________

E(8-11) 5 7.05 0.70 30.0 1 3 73.66 2Ly#3@13.9 .0025 3 181.44 411.85 52.88 - - -

1(A-C) 5 3.15 0.70 30.0 1 8 28.54 2Ly#3@13.9 .0025 8 -12.55 21.71 23.62 - - -

1(D-E) 5 3.15 0.70 30.0 1 7 31.88 2Ly#3@13.9 .0025 7 -11.36 27.87 23.62 - - -

2(A-C) 5 3.15 0.70 30.0 1 9 72.48 2Ly#3@13.9 .0025 9 151.77 87.13 23.62 - - -

2(D-E) 5 3.15 0.70 30.0 1 6 70.26 2Ly#3@13.9 .0025 6 144.38 80.20 23.62 - - -

6(A-B) 5 1.20 0.70 30.0 1 6 22.35 2Ly#3@13.9 .0025 1 96.72 10.27 15.75 2.25 6.75 30x45*

6(D-E) 5 3.15 0.70 30.0 1 1 44.25 2Ly#3@13.9 .0025 1 178.07 28.04 23.62 - - -

9(A-C) 5 3.15 0.70 30.0 1 7 74.80 2Ly#3@13.9 .0025 7 158.17 92.62 23.62 - - -

9(D-E) 5 3.15 0.70 30.0 1 8 71.69 2Ly#3@13.9 .0025 8 141.88 92.38 23.62 - - -

A(1-11) 6 59.70 1.40 30.0 1 8 178.05 2Ly#3@19 .0025 8 727.90 2172.7 447.75 - - -

E(1-11) 6 59.70 1.40 30.0 1 6 177.50 2Ly#3@19 .0025 6 463.70 1384.1 447.75 - - -

1(A-C) 6 3.15 1.40 30.0 1 8 30.65 2Ly#3@19 .0025 8 -3.17 14.71 23.62 - - -

1(D-E) 6 3.15 1.40 30.0 1 7 32.93 2Ly#3@19 .0025 7 -4.40 15.27 23.62 - - -

2(A-C) 6 3.15 1.40 30.0 1 9 75.58 2Ly#3@19 .0025 9 116.68 81.23 23.62 - - -

2(D-E) 6 3.15 1.40 30.0 1 6 71.70 2Ly#3@19 .0025 6 112.83 70.51 23.62 - - -

6(A-B) 6 1.20 1.40 30.0 1 6 22.79 2Ly#3@19 .0025 6 64.69 21.43 9.00 - - -

6(D-E) 6 3.15 1.40 30.0 1 1 41.93 2Ly#3@19 .0025 1 141.78 38.15 23.62 - - -

9(A-C) 6 3.15 1.40 30.0 1 7 76.33 2Ly#3@19 .0025 7 119.44 94.55 23.62 - - -

9(D-E) 6 3.15 1.40 30.0 1 8 72.73 2Ly#3@19 .0025 8 111.98 83.66 23.62 - - -

A(1-11) 7 59.70 1.00 30.0 1 8 193.52 2Ly#3@19 .0025 8 419.07 2389.5 447.75 - - -

E(1-11) 7 59.70 1.00 30.0 1 6 193.24 2Ly#3@19 .0025 6 212.33 1360.8 447.75 - - -

1(A-C) 7 3.15 1.00 30.0 1 6 37.84 2Ly#3@19 .0025 6 -9.10 34.38 23.62 - - -

1(D-E) 7 3.15 1.00 30.0 1 9 42.45 2Ly#3@19 .0025 9 -7.01 47.36 23.62 - - -

2(A-C) 7 3.15 1.00 30.0 1 9 52.41 2Ly#3@19 .0025 9 82.43 53.84 23.62 - - -

2(D-E) 7 3.15 1.00 30.0 1 6 45.04 2Ly#3@19 .0025 6 75.25 46.59 23.62 - - -

6(A-B) 7 1.20 1.00 30.0 1 1 12.89 2Ly#3@19 .0025 1 75.72 4.53 9.00 - - -

6(D-E) 7 3.15 1.00 30.0 1 6 52.29 2Ly#3@19 .0025 6 108.26 17.04 23.62 - - -

9(A-C) 7 3.15 1.00 30.0 1 7 62.20 2Ly#3@19 .0025 7 87.80 49.88 23.62 - - -

9(D-E) 7 3.15 1.00 30.0 1 8 52.45 2Ly#3@19 .0025 8 78.37 39.13 23.62 - - -

A(1-3) 8 9.45 0.70 30.0 1 7 145.47 2Ly#3@14 .0025 7 95.79 268.70 70.87 - - -

A(5-7) 8 2.40 0.70 30.0 1 9 85.48 2Ly#3@14 .0025 9 116.76 14.01 18.00 - - -

A(8-11) 8 7.05 0.70 30.0 1 8 135.75 2Ly#3@14 .0025 8 100.62 176.52 52.88 - - -

E(1-3) 8 9.45 0.70 30.0 1 8 131.32 2Ly#3@14 .0025 8 100.52 280.47 70.87 - - -

E(5-7) 8 2.40 0.70 30.0 1 6 92.75 2Ly#3@14 .0025 6 97.18 11.65 18.00 - - -

E(8-11) 8 7.05 0.70 30.0 1 7 134.32 2Ly#3@14 .0025 7 109.47 196.49 52.88 - - -

1(A-C) 8 3.15 0.70 30.0 1 6 34.16 2Ly#3@14 .0025 6 0.13 9.31 23.62 - - -

1(D-E) 8 3.15 0.70 30.0 1 9 37.61 2Ly#3@14 .0025 9 -1.86 11.35 23.62 - - -

2(A-C) 8 3.15 0.70 30.0 1 9 54.79 2Ly#3@14 .0025 9 60.50 31.11 23.62 - - -

2(D-E) 8 3.15 0.70 30.0 1 6 52.18 2Ly#3@14 .0025 6 55.75 30.07 23.62 - - -

6(A-B) 8 1.20 0.70 30.0 1 1 12.47 2Ly#3@14 .0025 1 36.40 6.13 9.00 - - -

6(D-E) 8 3.15 0.70 30.0 1 6 51.79 2Ly#3@14 .0025 6 59.13 26.62 23.62 - - -

9(A-C) 8 3.15 0.70 30.0 1 7 59.50 2Ly#3@14 .0025 7 54.58 32.91 23.62 - - -

9(D-E) 8 3.15 0.70 30.0 1 8 50.56 2Ly#3@14 .0025 8 49.75 26.39 23.62 - - -
EngSolutions RCB Version 7.2.1 - License No: B7834-A4319 Page No. 9
==============================================================================================
Company: Colinas de Buen, S.A. de C.V. Engineer: Ing. Gerardo Esquivel
Project: EDIFICIO DE INVESTIGACION ENAH (DISEÑO DE TRABES Y MUROS) 04:38:42 p.m. 30/08/2012
==============================================================================================
Wall Story B H t Mat LCmb Vu Reinforcement LCmb Pu Mu2 As tot As ctr As end Ends
_______ ____ ____ ____ ____ ___ ___ _____ __________ _____ ___ _____ ______ _____ _____ _____ ________

A(1-11) 9 59.70 1.40 30.0 1 8 198.42 2Ly#3@19 .0025 8 436.67 1632.7 447.75 - - -

E(1-11) 9 59.70 1.40 30.0 1 6 200.11 2Ly#3@19 .0025 6 333.88 996.61 447.75 - - -

1(A-C) 9 3.15 1.40 30.0 1 6 40.31 2Ly#3@19 .0025 6 15.59 6.57 23.62 - - -

1(D-E) 9 3.15 1.40 30.0 1 9 43.25 2Ly#3@19 .0025 9 13.14 3.92 23.62 - - -

2(A-C) 9 3.15 1.40 30.0 1 9 71.91 2Ly#3@19 .0025 9 33.27 41.84 23.62 - - -

2(D-E) 9 3.15 1.40 30.0 1 6 63.06 2Ly#3@19 .0025 6 35.61 35.52 23.62 - - -

6(A-B) 9 1.20 1.40 30.0 1 9 11.64 2Ly#3@19 .0025 9 2.70 13.56 9.00 - - -

6(D-E) 9 3.15 1.40 30.0 1 6 51.11 2Ly#3@19 .0025 6 12.26 60.56 23.62 - - -

9(A-C) 9 3.15 1.40 30.0 1 7 60.27 2Ly#3@19 .0025 7 18.93 42.70 23.62 - - -

9(D-E) 9 3.15 1.40 30.0 1 8 49.68 2Ly#3@19 .0025 8 19.79 33.52 23.62 - - -

A(1-11) 10 59.70 1.00 30.0 1 3 29.25 2Ly#3@19 .0025 3 121.61 1575.4 447.75 - - -

E(1-11) 10 59.70 1.00 30.0 1 5 28.80 2Ly#3@19 .0025 5 118.30 1515.4 447.75 - - -

1(A-C) 10 3.15 1.00 30.0 1 6 3.21 2Ly#3@19 .0025 6 15.69 8.67 23.62 - - -

1(D-E) 10 3.15 1.00 30.0 1 6 2.44 2Ly#3@19 .0025 6 -0.04 5.90 23.62 - - -

A(2-3) 11 3.45 2.50 30.0 1 2 18.12 2Ly#3@19 .0025 2 81.80 44.81 25.87 - - -

E(2-3) 11 3.45 2.50 30.0 1 5 17.87 2Ly#3@19 .0025 5 67.45 44.15 25.87 - - -