0% found this document useful (0 votes)
160 views1 page

Quality Control Record Sheet

This quality control record sheet documents a sealing project. It records the client, site address, project number, operatives, materials used, fire ratings, attendance hours, works completed, and sign-off by the client representative. Photos were taken and access equipment was checked to ensure the sealing works between the client and LONUT LTD were properly carried out and completed to the client's satisfaction.

Uploaded by

Iosefina Dudeanu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
160 views1 page

Quality Control Record Sheet

This quality control record sheet documents a sealing project. It records the client, site address, project number, operatives, materials used, fire ratings, attendance hours, works completed, and sign-off by the client representative. Photos were taken and access equipment was checked to ensure the sealing works between the client and LONUT LTD were properly carried out and completed to the client's satisfaction.

Uploaded by

Iosefina Dudeanu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

QUALITY CONTROL RECORD SHEET

CLIENT: DATE: OPERATIVE/SUPERVISOR;

SITE ADDRESS: PLEASE TICK BOX: OPERATIVE 2:

PROJECT NO: DAY NIGHT WEEKEND SAFE SYSTEM OF WORK: I HAVE READ AN UNDERSTOOD MY RAMS YES NO

SEAL NO. LOCATION / BLOCK / LEVEL / AREA (to be completed) No. WIDTH (mm) HEIGHT (mm) MATERIAL WALL/FLOOR SERVICE TREATMENT USED No. FIRE RATING
USED

ATTENDANCE RECORD CONFIRMATION TICK BOXES MATERIAL & PLANT USED

HOURS All Available Works Have Been Carried Out:

NPO Drawing Received:

Photos Taken:

Access Equipment Checked:

The signature of the clients representative on this sheet confirms that LONUT LTD have been instructed by the client to attend site to carry out the
above works in accordance with agreed rates and that these works have been completed on site to the clients satisfaction.

Client Representative: Signature:

Position: Date:

You might also like