41021-1601
‘Mitsubishi Heavy Industies, Lid
Confidential & Proprietary Information
‘Technical information and trade secrets in tis drawing or document
is the property of Mitsubishi Heavy Industries, Lid. (MHI) and is
not to be disclosed, reproduced or copied in whole or in part, or
used for the beneft of anyone other than MHI without NHI's prior
writen consent,
‘This document or drawing is protected by copyright law, unfair
Ccompeition law, civil law and intemational treaty provisions, and
‘any applicable laws of Japan end the country in which itis being
used,
SRER
COME, XRICEN SHH, SRRIRATHEA
FAT SLOTHY, RHE, BRLOBLMMETAT
HURT, SBRIRBARLORSIL SATE CL
XC, RE MOLSSEAMMEMRL, RUSH
BOLO MBIMMT SOL ERLE,
UAB, BR, FERS, BE
DWORAERU CA SOREAMEN SHORE E
STREET.
DRAWING
4, 41021-1011 (PO-MN-AX-PAC-WE1-00001)
CONSTRUCTION PURPOSE FOR SUBCONTRACTOR
REFERENCE DRAWING
PLANT SEAWATER SUPPLY PUMP SPECIFICATION
2. 41021-1201 (PO-MN-AX-PAC-WE1-00002)
PLANT SEAWATER SUPPLY PUMP OUTLINE DRAWING
3. 41021-1211 (PO-MN-AX-PAC-WE1-00003)
PLANT SEAWATER SUPPLY PUMP SECTIONAL ASSEMBLY DRAWING
RE. DESCRIPTION pxeaeene! nya |i Aree ESOATE
leo OWNER:
eal &2
jalan yjaSilg al 6 il
Shana waters Cutcmer® Cour
ea SHUQAIQ WATER AND ELECTRICITY COMPANY
sa _
Ist °* SHUQAIQ-2 INDEPENDENT WATER AND POWER PLANT
ee [CONTRACT No. —_ ~
i ta z lbw. TLE: PLANT SEAWATER SUPPLY PUMP
is Ee OPERATION & MAINTENANCE MANUAL (OM-10.01)
eee own ATU i BERATENDE INGENIEURE GMBH
poe ha6(AR"3) :
BSE LAY O\ASX 3 oesioneo]y op aba lereoes | ZZ wero La
ace vent one Jorawny DATE Bec. § , 2008
res CONFERRED _|SECTION SCALE [CUSTOMER DRAWING No. REV.NO. |
os Pin PLANT ENGINEERING | None PO-MN-AX-PAC-WE1-00005 0
JORDER [ITEM |MANUFACTURE DRAWING No. REV.NO,
0co01 41300 41021-1604 0
a
MITSUBISHT HEAVY INDUSTRIES, LTD.
NAGASAKI SHIPYARD & MACHINERY WORKS
DRAWNDEC «- 8
2008 IssuECONTENTS
No. DESCRIPTION PAGE
1 | SAFETY aoe : 5~10
2 | CHAPTER 1 GENERAL : : 11~12
3 | CHAPTER 2 ASSEMBLY AND DISASSEMBLY 13~28
4 | CHAPTER 3 ee : 29~32
5 | CHAPTER 4 MAINTENANCE AND CONTROL : 33~39
6 | CHAPTER 5 TROUBLE SHOOTING 40~42
7 | CHAPTER 6 GUARANTEE AND SERVICE 5
8 | CHAPTER7 ACCOMPANYING DRAWINGS AND DOCUMENTS 44~125
9 | CHAPTER 8 OPERATION MANUAL FOR ACCESSORIES 126~192
10
LIST OF WARNING LABELS
193
ct
CONTACTS
194
0c001, 41021-1601CUSTOMER] MITSUBISHI HEAVY INDUSTRIES, LTD.
(PROJECT NAME) SAUD! ARABIA/SHUQAIQ IWPP Phase ll
MAINTENANCE & OPERATION
MANUAL
PLANT SEAWATER SUPPLY PUMP
a a
isa 100ss0. Revised marked A [is[T]__MAoyama MAoyama Miwabuchi
=~ [F094s0.i [Fret Ive = tol @ seananena | Eom
wre [SERIA eon frei Dewar | MANE_1109450VPF_1
weit 102" | TE VPFO-2F- care 1720