Pipeline:

CDC: Mentionne les donn�es sont dans les Plans de pose.


SARPI: Manque Plans de Pose.

CDC: Specification for Pipeline Construction


14.2 Ppieline Bedding: the bottom of the trench shall be uniformly graded and
dressed along the lenght of the trench.
15: Pipeline lowering: pipeline shall be lowered into the ditch once the ditch bed
has been correctly inspected.
Touat Oil PHASE 2 - BASIS OF DESIGN
11.1. GATHERING SYSTEM SIZING CRITERIA: Flow lines should be above ground from
wells up to the field manifolds, and from field manifolds to processing facilities.

SARPI: le Pipeline est enterr� ou a�riens

CDC: Touat Oil PHASE 2 - BASIS OF DESIGN


Coordinate are refrenced to UTM 31.
ETUDE TOPOGRAPHIQUE CHAMPS TOUAT HUILE/Profil EN LONG: UTM 30N

SARPI: Which topographic system is correct.

CDC: SPECIFICATION FOR PIPELINE CONSTRUCTION_Touat Phase 2


7. Preconstruction survey: All information collected during the confirmatory
topographical field survey shall be available to contractor in form of route maps,
Alignment Sheets.
SARPI: Documents missing on CDC given.

CDC:
7 PRECONSTRUCTION SURVEY: Sub-Contractor shall carry out a confirmatory
topographical survey prior to
commencement of any construction activities