CDC: Mentionne les donn�es sont dans les Plans de pose.
SARPI: Manque Plans de Pose.
CDC: Specification for Pipeline Construction
14.2 Ppieline Bedding: the bottom of the trench shall be uniformly graded and dressed along the lenght of the trench. 15: Pipeline lowering: pipeline shall be lowered into the ditch once the ditch bed has been correctly inspected. Touat Oil PHASE 2 - BASIS OF DESIGN 11.1. GATHERING SYSTEM SIZING CRITERIA: Flow lines should be above ground from wells up to the field manifolds, and from field manifolds to processing facilities.
SARPI: le Pipeline est enterr� ou a�riens
CDC: Touat Oil PHASE 2 - BASIS OF DESIGN
Coordinate are refrenced to UTM 31. ETUDE TOPOGRAPHIQUE CHAMPS TOUAT HUILE/Profil EN LONG: UTM 30N
SARPI: Which topographic system is correct.
CDC: SPECIFICATION FOR PIPELINE CONSTRUCTION_Touat Phase 2
7. Preconstruction survey: All information collected during the confirmatory topographical field survey shall be available to contractor in form of route maps, Alignment Sheets. SARPI: Documents missing on CDC given.
CDC: 7 PRECONSTRUCTION SURVEY: Sub-Contractor shall carry out a confirmatory topographical survey prior to commencement of any construction activities