Professional Documents
Culture Documents
Making and Using Variograms in Petrel
Making and Using Variograms in Petrel
8 September 2017
KSO PEP-GKM
Office Lay Out
5 Total Rental Fee + Service Charge / month 238.000 30.702.000 235.000 30.315.000
Notes :
Above cost will based of management decisions (telephone lines, parker car, etc.)
Menara Anugerah - Pictures
in Mega Kuningan Area Free from Odd-Even road
Location Mega
Kuningan
Area 129sqm
Manager Room 4
Meeting Room 1
Lobby Area 1
Pantry 1
Staff Area 2
Furniture 10%
Menara Anugerah - Map
Samples of Furniture Need to be Purchased
Chairs and Desks (Second)
Samples of Furniture Need to be Purchased
Cabinet and Meeting Room table
Price Ref.
Budget for Electrical Installation
1. Material Electrical for :
1. Staf Area 1 & 2
2. Engineering Area
No. Item Brand Qty Unit Price @ IDR Total Price IDR
Materials
1 Cable size 2 x 1.5 cm ETERNA 1 Roll/50 m 286.500,00 286.500,00
2 Down Light PHILIPS 3 ea 55.000,00 165.000,00
3 Bulb LED PHILIPS 5 ea 35.000,00 175.000,00
4 Stop Contact UTICON 10 ea 26.000,00 260.000,00
5 Others (tape, clamp, etc) 1 ea 113.500,00 113.500,00
6 Electrician Service for Installation (Lumpsum Cost) 500.000,00
TOTAL 1.500.000,00