Monsoon plane during 2017 monsoon

1. Sump pumps of pyrite conveying system are to be brought at ground level for checking. At
present these are drowned under accumulated water and coal particle. The job can be taken up
after civil department cleans the area.
2. Mill A is to be overhauled before monsoon.