You are on page 1of 2

Inspection and Test Plans (ITP) – MUBM-04

Installation of cable and wiring checklist


Client: Project Name: Project No:

Area: Drawing No’s: Date: Sheet: 1 of 2


Check Conducted By: Signature: Check Approved By: Signature:

INSPECTION CHECKLIST FOR: INSTALLATION OF CABLE AND WIRING CHECKLIST


The below checks are to be completed by the Controls Contractor prior to start up and commissioning

INSPECTION HISTORY
NO: DESCRIPTION: INSPECTION:
ACCEPTABLE: DATE: COMMENTS:

Quality Control
Confirm that cable support system has been completed as
1 Yes No Yes No
documented
Installation
Electrical cables have been appropriately sized and
2 selected to ensure that they will support currently Yes No Yes No
installed and future equipment
Mechanical protection has been provided to minimise the
3 Yes No Yes No
likelihood of physical damage to cabling
Cabling has been concealed where possible in ceiling
4 Yes No Yes No
spaces, wall cavities or risers
Commissioning
Connections have been correctly terminated and
5 insulated to ensure perfect connectivity and protect Yes No Yes No
against faults and interference
Check all field instruments cable for end-to-end continuity
6 breaks and shorts using multimeter before termination at Yes No Yes No
field instruments.
Check all field instruments for correct number & type of
7 Yes No Yes No
cables as mentioned in Cable Schedule given by Specialist.

1
Inspection and Test Plans (ITP) – MUBM-04
Installation of cable and wiring checklist
INSPECTION HISTORY
NO: DESCRIPTION: INSPECTION:
ACCEPTABLE: DATE: COMMENTS:
Check all field instruments for correct wiring termination
8 of field instruments as instructed in the installation Yes No Yes No
details.
Check all field instruments for dressing, furling and
9 crimping of wiring of field instruments as instructed by Yes No Yes No
Specialist.
10 Check all internal wiring as per panel wiring diagram. Yes No Yes No
Check for all field instruments cables including cables
11 between controller and MCC to be available in controller Yes No Yes No
cabinet with proper furling, dressing and crimping.

ADDITIONAL COMMENTS:

You might also like