You are on page 1of 1

PT.

PLN (PERSERO)

SUMBER PUCUNG

LAPORAN PEMBACAAN INSTANTANEOUS PELANGGAN


KWH METER WASION

Data Pelanggan :
Nama : PJU BENDUNGAN LAHOR
Alamat : RAYA KARANGKATES
ID Pelanggan : 513050440200 Type Meter : iMeter310
No. Gardu : 242 Factor Meter : (kali)
Tariff / Daya : P3 / 33 (kVA) Tgl. Meter : 23-01-2019 10:32:51
ID Meter : 201301006768 Dicetak tgl. : 02-01-2013 10:33:44

Laporan Pembacaan Instantaneous

Arus Saat Ini Diagram Phasor Tegangan Saat Ini


Arus(Amp) Sudut Arus Teg.(Volt) Sudut Teg.
Phase R 18.833 9.440 Phase R 233.664 0.000
Phase S 25.150 27.520 Phase S 234.522 242.400
Phase T 18.872 10.840 Phase T 235.023 124.514
Netral 9.288
Suhu(¡ãC) Null

Daya aktif Dy Reaktif kW+ kW-


Phase R --> --> Phase R 3.540 0.000
Phase S --> --> Phase S 4.738 0.000
Phase T --> --> Normal Phase T 3.594 0.000

Urutan Tegangan Reverse

Beban Saat Ini Stand Energi Saat Ini


Total Beban Aktif (kW) 11.872 kWh kVarh
Rate
Beban Reaktif (kVar) 3.742 Kirim Terima mutlak Lag Lead
Power Factor 0.9537 T1 352457.46 0.00 352457.47 120039.14 311.66
Frekwensi 49.95 T2 81132.58 0.00 81132.58 25180.73 80.64
T3 0.00 0.00 0.00 0.00 0.00
KVA Max Total 13.168 T4 0.00 0.00 0.00 0.00 0.00
Tgl. 06-01-2019 06:40:02 Total 433590.05 0.00 433590.05 145219.88 392.30
KVA Max T1 13.168
Tgl. 06-01-2019 06:40:02 PIHAK PELANGGAN PLN AREA PLN RAYON
PJU BENDUNGAN SUMBER PUCUNG
KVA Max T2 12.993 LAHOR
Tgl. 18-01-2019 21:51:02
KVA Max T3 0.000
Tgl. 01-01-2019 10:00:01
KVA Max T4 0.000 Catatan:

Tgl. 01-01-2019 10:00:01

You might also like