Professional Documents
Culture Documents
Uas Numerik
Uas Numerik
PEKERJAAN : -
LOKASI : -
TAHUN ANGGARAN : -
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
I BAHAN DASAR
1 BATU KALI Bulat Utuh m3
Bulat Belah m3 190,000
Pecah 10/15 m3 190,000
Pecah 5/7 m3 200,000
Pecah 3/5 m3 198,300
2 KERIKIL Timbunan Pilihan m3 114,000
Sawur / Koral m3 84,200
Beton 0,5/1 m3 101,600
Beton 1/2 m3 214,850
Beton 2/3 m3 206,000
Biasa m3
Tras Giling m3
3 BATU BATA ex lokal bh 650
Concrete Blok (CB 15) / Batako (Lubang2) bh
Batako Padat bh
Rosteer beton cetak 12 x 11 x 24 cm bh
Rosteer tanah liat bakar 12 x 11 x 24 cm bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
II B A H A N P E N U T U P A T A P
1 SIRAP (100 lbr) pak
Sirap asbes semen m2
2 GENTENG BETON
Genteng Beton Warna standard bh
Genteng Beton Warna Special bh
Genteng Beton Warna Khusus bh
Kerpus Beton Warna Standard bh 4,900
Kerpus Beton Warna Special bh
Kerpus Beton Warna Khusus bh
Genteng beton ex. Mutiara bh
Genteng beton flat ex. Mutiara bh
Genteng press beton polos tipe nusantara 2,400
4 GENTENG KACA
Vlaam tebal 2 mm bh
Vlaam tebal 3 mm bh
Kodok tebal 2 mm bh
Kodok tebal 3 mm bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
6 ASBES PLAT
. 100cm X 100 cm X 3 mm bh 17,300
. 100cm X 100 cm X 4 mm bh
. 50 cm X 200 cm X 3 mm bh
. 40 cm X 200 cm X 3 mm bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
III B A H A N K A Y U
1 JATI Papan m3
Balok/pesagen m3
Reng m3
Balok kelas II m3 13,537,100
Balok kelas III m3 11,454,500
Papan kelas II m3 14,578,500
Papan kelas III m3 12,495,800
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
Besar 10 - 12 x 400 cm bt
Kayu cetakan m3
Kayu bakar m3
Bambu bt 13,200
Kayu list m'
Kayu list profil m'
Anyaman Bambu m2
Bilik Bambu m2 20,000
Reng bangkirai 2/3 m 3,300
Reng bangkirai m3 5,227,200
Reng jati 2/3 kelas III m 5,700
Reng jati kelas II m3 10,290,000
Reng jati kelas III m3 8,712,300
Kayu usuk bangkirai m3 8,500,000
Kayu usuk kruing m3 5,400,000
Reng Kamfer m3 5,800,000
4 UBIN PORSELIN
Lokal 11 X 11 putih dos
11 X 11 warna dos
Lokal 15 X 15 putih dos
15 X 15 warna dos
5 MOZAIK PORSELIN
10 X 20 cm m2
15 X 15 cm m2
20 X 20 cm m2
20 X 25 cm m2
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
25 x 25 cm m2
15 x 20 cm m2
Keramik anti slip 38,000
Keramik warna pola 30/30 m2 42,100
Keramik warna pola 40/40 m2 52,800
Keramik dinding 20/25 m2 44,600
Keramik dinding 20/20 m2 44,600
Keramik dinding list 5/20 bh 4,000
Keramik plin 10/20 bh 3,000
Karpet m2 110,000
7 Parquet Jati m2 160,000
Wallpaper m2 35,000
8 Batu Candi m2 99,100
Batu andesit m2 150,000
Batu andesit alur m2 170,000
9 Batu Tempel Hitam m2
10 GRANITO 40 x 40 cm m2 157,000
30 x 30 cm m2
11 Marmer m2 98,000
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm bh
Ø 20 cm - 100 cm bh 27,250
Ø 30 cm - 100 cm bh 42,100
Ø 40 cm - 100 cm bh 52,000
Ø 50 cm - 100 cm bh 77,650
Ø 60 cm - 100 cm bh 115,700
Ø 70 cm - 100 cm bh
Ø 80 cm - 100 cm bh
Ø 100 cm - 100 cm bh 229,700
Ø 80 cm - 50 cm bh 78,500
Ø 90 cm - 50 cm bh 86,700
Ø 100 cm - 50 cm bh 114,800
U 10 cm - 100 cm bh
U 15 cm - 100 cm bh
U 20 cm - 100 cm bh 37,150
U 30 cm - 100 cm bh 47,100
U 50 cm - 100 cm bh
VI B A H A N B E S I
1 BESI BETON besi beton polos kg 10,000
besi beton prestress kg
besi beton ulir kg 10,000
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
7 LAIN-LAIN
Paku asbes kg 23,100
Paku sekrup asbes bh 18,100
Paku crampon bh
Dynabolt ukuran 8 mm x 65 mm bh
Baut gording kg
Hollow Galvanis 2.4. 400 bt
Hollow Galvanis 4.4. 400 bt
Baja Ringan C.75 ex. Taso bt
Skrup Fixer bh 750
Sealant bh 50,000
Venetions Blinds atau Vertical Blinds (tirai) m2 95,000
VII B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS btg 14,800
Pipa PVC DN 25 ( ¾" ) AW JIS btg 20,600
Pipa PVC DN 32 ( 1" ) AW JIS btg 28,900
Pipa PVC DN 40 ( 1½" ) btg 24,700
Pipa PVC DN 63 ( 2" ) btg 48,700
Pipa PVC DN 90 ( 3" ) btg -
Pipa PVC DN 110 ( 4" ) btg 152,800
Pipa PVC DN 160 ( 6" ) btg -
Pipa PVC DN 200 ( 8" ) btg -
Pipa PVC DN 250 ( 10" ) btg -
Pipa PVC DN 315 ( 12" ) btg -
Pipa PVC Ø 4" (AW - SCJ) 4 m 152,800
Pipa PVC Ø 2" (AW - SCJ) 4 m 48,700
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
VIII B A H A N L A N G I T - L A N G I T
1 AKUSTIK-uk : 30 X 30 lbr
30 X 60 lbr
60 X 120 lbr
List Kayu Profil m' 6,600
2 SOFT BOARD-uk: 4'X 8' (1,2 x2,4 m2)
Gypsum tebal 9 mm lbr 60,000
Gypsum tebal 12 mm lbr
List Gypsum m'
Gypsum tebal 9 mm (120 x 240) lbr
lbr
lbr
lbr
lbr
Sekrup Gypsum bh
Compound zak
GRC Board lbr
Dinabolt Bh
Cotton Plaster bh
List Gypsum m'
Tepung Gypsum kg
4 PLY WOOD
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
Teak wood
90 X 210 X 3 mm lbr
. 120 X 240 X 3 mm lbr 80,000
. 90 X 210 X 4 mm lbr 52,800
. 90 X 210 X 9 mm lbr
. 90 X 210 X 12 mm lbr
. 90 X 210 X 15 mm lbr
. 90 X 210 X 18 mm lbr
Tripleks
. 120 X 240 X 3 mm lbr 52,800
. 120 X 240 X 4 mm lbr 62,800
. 120 X 240 X 6 mm lbr
Multipleks
. 120 X 240 X 9 mm lbr 109,000
. 120 X 240 X 12 mm lbr 138,800
. 120 X 240 X 15 mm lbr
. 120 X 240 X 18 mm lbr
Formika ukuran pintu lbr 75,000
2 TEMBOK
Kalkarium kg
Kapur sirih kg
Plamur kg 13,200
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
3 BESI
Menie kg 27,250
Cat mengkilat kg
Cat kg 50,000
Thinner A ltr
Minyak cat ltr 14,000
Thinner Super ltr
Residu (teer/aspal) drum 296,000
Fibre glass (tanki air)
kapasitas 550 liter. bh
kapasitas 1100 liter. bh
Lem Aica Aibon kg 15,700
X BAHAN KACA
1 POLOS 3 mm m2 57,000
5 mm m2 78,000
8 mm m2
12 mm m2
2 ES KABUR 3 mm m2
5 mm m2
3 RAY BAND 3 mm m2
5 mm m2 89,000
8 mm m2
12 mm m2
4 TEMPERED 12 mm m2
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
2 SKAKELAR
Out bauw . Seri bh
Engkel bh
In bauw . Seri bh
Engkel bh
4 STEKER - Biasa bh
Arde bh
T Biasa bh
T dengan Arde bh
5 FITING Flaon bh
Gantung bh
Kap bh
Kombinasi bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
2 X slag bh 131,400
Kuda : 1 X slag bh -
2 X slag bh 49,500
2 KUNCI SLOOD -
Sekelas Kuda Terbang bh 49,500
Sekelas Anchor bh 156,100
Kunci Lemari bh 5,000
2 ENGSEL DAN GERENDEL
Engsel Angin bh
Kupu-kupu biasa bh 8,200
Nylon kupu-kupu bh -
Espagnoled - dalam negeri bh -
Grendel Tanam luar negeri bh -
Grendel biasa bh 3,300
Kait Angin bh 2,400
Door Stop bh
XIIIBAHAN SANITAIR
1 KLOSET DUDUK bh 961,900
2 KLOSET JONGKOK bh 125,600
3 WASTAFEL PEDESTAL bh -
4 WASTAFEL MEJA OVAL bh -
5 WASTAFEL GANTUNG BULAT bh 261,900
6 WASTAFEL GANTUNG SUDUT bh -
7 WASTAFEL GANTUNG SUDUT KECIL bh -
8 WASTAFEL BAK CUCI bh -
9 TEMPAT SABUN GANTUNG bh -
10 TEMPAT SABUN TANAM bh -
URINOIR KERAMIK STANDART bh 1,151,200
BAK MANDI FIBRE GLASS 70.70.80 bh 261,900
11 SEPTIC TANK (ETERNIT GRESIK) -
5 Pemakai 500 liter unit -
10 Pemakai 1.000 liter unit -
12 LAIN - LAIN -
Kran Air 1/2" bh -
Kran Air 3/4" bh 19,800
Seal tape bh 3,300
Floor drain bh 3,300
Roof drain kuningan
Bak Cuci Piring bh 230,500
Water drain bh 50,000
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
4PAKU - beton kg
5MUR BAUT (kuda-kuda) kg
6ANGKUR BAUT bh
7LEM KAYU bh 15,700
8Tali Ijuk kg 2,000
Paku Pancing 60 x 230 kg 15,500
XV POMPA AIR
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh
2 POMPA AIR LISTRIK
Sanyo 100 watt bh
Fuji 250 watt bh
Shimizu . 100 watt bh
. 90 watt bh
Dab . 125 watt bh
. 175 watt bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
Hotmix Tebal = 4 Cm m2
Hotmix Tebal = 5 Cm m2
Hotmix Tebal = 6 Cm m2
Hotmix Tebal = 7 Cm m2
Binder Course ton
Wearing Course ton
Hot Roller Sheet ton
Sand Sheet ton
Sand Sheet Emulsi ton
Cold Mix ton
Prime / Tack Coard RC liter
Prime Coat MC liter
Prime / Tack Coat Emulsi liter
10 K A C A
Cermin tebal 5 mm m2
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
Air m3 72,500
Koas Alang-alang ikat
Solar (Industri) ltr 6,400
Premium (Industri) ltr 6,700
Pelumas ltr 15,700
Vynil 30 x 30 cm bh
13 WATER PROOFING 5 kg
5 kg
20 Ltr
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00
0.00 229,000.00
190,000.00 157,020.00 239,000.00 159,000
190,000.00 157,020.00 260,000.00 142,000
200,000.00 165,280.00 135,000.00
200,000.00 163,880.00 200,000.00 240,000
94,210.00 110,000.00 114,000
69,580.00 0.00 102,000
83,960.00 240,000.00 123,000
177,560.00 230,000.00 260,000
170,240.00 215,000.00 250,000
0.00 0.00
0.00 0.00
530.00 760 700
0.00 3400
0.00 3920
0.00 3700
0.00 3700
0.00
86,770.00 125000 102,000
185,000.00 152,890.00 210000 159,000
152,890.00 224000 159,000
35,120.00 72000 52,000
0.00 0
0.00 112000
163,630.00 275000 240,000
0.00 0
0.00
51,230.00 63200 62,000
51,230.00 0 62,000
0.00 0
0.00 0
0.00 0
1,100.00 1580 1,625
0.00 112000
0.00 140000
1,450.00 13500 13,500
0.00
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00
0.00 728000
0.00 42790
0.00
0.00
0.00 0
0.00 0
0.00 0
4,040.00 0 6,000
0.00 0
0.00 0
0.00 6280
0.00 6720
1,980.00 3,000
0.00
0.00
330.00 0 400
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
1,900.00 0 3,000
4,000.00 6,000
4,700.00 7,000
4,700.00 7,000
1250
2250
3600
2580
10640
9860
4480
7280
25200
1,500.00 2,200
1,400.00 2,100
1,100.00 1,800
1,100.00 1,700
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00
0.00 79300
0.00 0
0.00 105800
0.00 0
0.00 0
0.00 0
0.00 0
33,050.00 0
38,010.00 53800
42,970.00 0
49,580.00 72800
56,190.00 0
62,800.00 0
53,710.00
47,680.00
0.00
0.00 0
0.00 0
0.00 0
0.00
25,950.00 0 38,000
0.00 0
0.00 0
0.00
0.00
14,290.00 0 21,000 17,300
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 25200 -
0.00 35300 -
0.00 53800 -
27,270.00 0 40,000 33,000
0.00 0 -
0.00 -
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 -
19,750.00 29,000 23,900
28,670.00 42,000 34,700
0.00 -
0.00 0 -
39,580.00 0 58,000 47,900
49,170.00 42600 72,000 59,500
65,530.00 58300 96,000 79,300
0.00 0 -
41,650.00 -
0.00 -
0.00 50000 -
0.00 75000 -
0.00 800 -
0.00 20000 -
0.00 -
0.00 -
0.00 26280000 -
0.00 23968000 -
0.00 21400000 -
11,187,680.00 16,380,000 13,537,100
9,466,520.00 13,860,000 11,454,500
12,048,340.00 17,640,000 14,578,500
10,327,100.00 15,120,000 12,495,800
0.00 -
6,249,500.00 9800000 9,150,000 7,561,900
6,048,010.00 9072000 8,855,000 7,318,100
0.00 -
4,793,380.00 6498000 7,337,000 6,063,600
4,628,090.00 5936000 9,244,000 7,639,600
0.00 -
3,801,650.00 5600000 6,325,000 5,227,200
3,388,420.00 5152000 5,693,000 4,704,900
0.00 3304000 -
0.00 -
0.00 3696000 -
1,652,890.00 3136000 2,530,000 2,090,900
0.00 -
8,512,390.00 12880000 11,845,000 9,789,200
7,685,950.00 11760000 10,925,000 9,028,900
0.00 -
2,479,330.00 3696000 3,795,000 3,136,300
2,066,110.00 3136000 3,163,000 2,614,000
0.00 -
14,870.00 20000 20,000 18,000
0.00 16000 -
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 25000 -
0.00 0 -
0.00 812000 -
10,900.00 14200 16,000 13,200
0.00 33750 -
0.00 9700 -
0.00 26900 -
16,520.00 -
0.00 -
0.00 -
0.00 40320 -
0.00 31360 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
34,130.00 50400 50,000 41,300
34,790.00 0 51,000 42,100
0.00 0 -
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 0 -
0.00 0 -
31,400.00 46,000 38,000
34,790.00 51,000 42,100
43,630.00 64,000 52,800
36,850.00 54,000 44,600
36,850.00 54,000 44,600
3,300.00
2,470.00
90,900.00
132,230.00 0 -
28,920.00 -
81,900.00 0 -
123,960.00 -
0.00 0 -
0.00 -
129,750.00 0 190,000 157,000
0.00 0 -
80,990.00 107520 107,520 97,745
0.00 -
0.00 60480 -
0.00 50400 -
0.00 58240 -
0.00 68320 -
0.00 90720 -
0.00 78400 -
0.00 98560 -
0.00 49280 -
0.00 57120 -
0.00 62720 -
0.00 72800 -
0.00 107520 -
0.00 85120 -
0.00 924000 -
0.00 284480 -
0.00 470400 -
0.00 154560 -
81,900.00 143360 120,000 99,100
0.00 201600 -
0.00 61600 -
0.00 154560 -
0.00 -
0.00 175000 -
0.00 15000 -
0.00 23000 -
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 -
0.00 -
0.00 -
0.00 0 -
22,520.00 39200 33,000 27,200
34,790.00 56000 51,000 42,100
42,970.00 67200 63,000 52,000
64,170.00 75100 94,000 77,600
95,610.00 0 140,000 115,700
0.00 0 -
0.00 100800 -
189,830.00 134100 278,000 229,700
64,870.00 95,000 78,500
71,650.00 105,000 86,700
94,870.00 139,000 114,800
0.00 0 -
0.00 0 -
30,700.00 37000 45,000 37,100
38,920.00 42600 57,000 47,100
0.00 0 -
0.00 -
0.00 -
4,950.00 0 6,000 4,900
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
8,260.00 10650 11,000 9,000
0.00 0 -
8,260.00 10650 11,000 9,000
0.00 -
3,380.00 10650 5,000 4,100
0.00 -
9,500.00 12900 14,000 11,500
12,230.00 18,000 14,800
0.00 -
0.00 0 -
0.00 0 -
0.00 616000 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
9,540.00 13900 14,000 11,500
0.00 -
12,970.00 16800 19,000 15,700
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 17250 -
0.00 16000 -
21,480.00 32,000 26,400
0.00 -
0.00 -
19,090.00 23600 28,000 23,100
14,950.00 650 22,000 18,100
0.00 1750 -
0.00 1600 -
0.00 12600 -
0.00 21300 -
0.00 28000 -
0.00 75000 -
610.00 -
0.00 -
0.00 -
0.00 -
12,230.00 0 18,000 14,800
17,020.00 0 25,000 20,600
23,880.00 0 35,000 28,900
20,410.00 0 30,000 24,700
40,240.00 0 59,000 48,700
0.00 0 -
126,280.00 0 185,000 152,800
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
126,280.00 185,000 152,800
40,240.00 59,000 48,700
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
20,410.00 30,000 24,700
23,880.00 35,000 28,900
17,020.00 25,000 20,600
12,230.00 18,000 14,800
0.00 -
0.00 -
73,710.00 0 108,000 89,200
90,080.00 0 132,000 109,000
135,200.00 0 198,000 163,600
237,680.00 0 348,000 287,600
299,090.00 0 438,000 361,900
0.00 0 -
467,100.00 0 684,000 565,200
458,920.00 0 672,000 555,300
1,040,900.00 0 1,524,000 1,259,500
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
5,450.00 9700 8,000 6,600
0.00 -
49,580.00 67968 76,000 62,800
0.00 84096 -
0.00 9000 -
0.00 80000 -
0.00 75000 -
0.00 75000 -
0.00 65000 -
0.00 65000 -
0.00 12.57142857 -
0.00 75000 -
0.00 68000 -
0.00 7200 -
0.00 15000 -
0.00 8500 -
0.00 12500 -
0.00 -
13,420.00 -
18,590.00
0.00 -
0.00 0 -
0.00 -
0.00 -
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 -
0.00 0 -
66,110.00 0 -
43,630.00 0 64,000 52,800
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
43,630.00 50400 64,000 52,800
51,900.00 67200 76,000 62,800
0.00 84000 -
0.00 -
90,080.00 128800 132,000 109,000
114,710.00 168000 168,000 138,800
0.00 0 -
0.00 0 -
61,980.00 0 -
0.00 -
0.00 85200 -
0.00 34800 -
0.00 46000 -
14,290.00 15700 21,000 17,300
0.00 66100 -
43,630.00 -
0.00 -
0.00 -
1.98 23,880.00 33600 35,000 28,900
2.88 10,900.00 23600 16,000 13,200
0.6875 4,710.00 9600 7,000 5,700
36,300 0.00 22400 -
51,900.00 0 76,000 62,800
0.00 0 -
0.00 0 -
6,110.00 0 9,000 7,400
0.00 58300 -
0.00 39200 -
0.00 18000 -
34,790.00 0 51,000 42,100
34,790.00 0 51,000 42,100
0.00 -
0.00 -
0.00 0 -
0.00 0 -
10,900.00 23600 16,000 13,200
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 80640 -
0.00 0 -
0.00 0 -
0.00 112500 -
0.00 0 -
0.00 67200 -
0.00 67200 -
0.00 64960 -
13,220.00 21,000 17,300
0.00 -
0.00 -
22,520.00 33600 35,000 28,900
0.00 58300 -
41,320.00 0 76,000 62,800
0.00 23600 -
11,570.00 25200 17,000 14,000
0.00 0 -
244,620.00 0 360,000 297,500
0.00 -
0.00 0 -
0.00 0 -
12,970.00 0 19,000 15,700
0.00 -
0.00 -
47,100.00 0 70,000 57,800
64,460.00 60500 95,000 78,500
0.00 69500 -
0.00 106400 -
0.00 -
0.00 0 -
0.00 79600 -
0.00 -
0.00 0 -
73,550.00 68900 82,000 67,700
0.00 74500 -
0.00 117600 -
0.00 -
0.00 1200000 -
0.00 -
0.00 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
40,900.00 0 60,000 49,500
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
108,590.00 0 159,000 131,400
0.00 0 -
40,900.00 67200 60,000 49,500
0.00 -
40,900.00 60,000 49,500
129,000.00 189,000 156,100
4,130.00 -
0.00 -
0.00 0 -
6,770.00 0 10,000 8,200
0.00 0 -
0.00 0 -
0.00 0 -
2,720.00 0 4,000 3,300
1,980.00 0 3,000 2,400
0.00 0 -
0.00 -
0.00 -
794,950.00 2184000 1,164,000 961,900
103,800.00 129000 152,000 125,600
0.00 0 -
0.00 0 -
216,440.00 0 317,000 261,900
0.00 278000 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
951,400.00 1,393,000 1,151,200
216,440.00 317,000 261,900
0.00 -
0.00 0 -
0.00 0 -
0.00 -
0.00 17000 -
16,360.00 29500 24,000 19,800
2,720.00 3400 4,000 3,300
2,720.00 56000 4,000 3,300
0.00 79000 -
190,490.00
0.00 -
0.00 -
11,570.00 14600 17,000 14,000
0.00 0 -
14,950.00 0 22,000 18,100
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 0 -
0.00 0 -
0.00 0 -
12,970.00 0 19,000 15,700
1,650.00 2500 2,500 2,000
12,800.00 -
0.00 -
0.00 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
1,980.00 0 3,000 2,400
0.00 0 -
30,660.00 58240 45,000 37,100
40,900.00 91840 60,000 49,500
0.00 69440 -
0.00 103040 -
30,660.00 45,000 37,100
40,900.00 60,000 49,500
49,580.00 68,000 56,100
66,110.00 80,000 66,100
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
53,710.00 77,000 63,600
71,070.00 90,000 74,300
0.00 -
0.00 -
0.00 1270 -
0.00 1460 -
0.00 1580 -
0.00 2180 -
0.00 2450 -
0.00 3320 -
0.00 2810 -
0.00 3840 -
0.00 4310 -
0.00 2170 -
0.00 2510 -
0.00 2720 -
0.00 3280 -
0.00 7310 -
0.00 1510 -
0.00 1730 -
0.00 1880 -
0.00 2450 -
0.00 2710 -
0.00 3640 -
0.00 3320 -
0.00 4310 -
0.00 4770 -
0.00 2590 -
0.00 2970 -
0.00 3220 -
0.00 4330 -
0.00 8340 -
0.00 26910 -
0.00 -
0.00 -
0.00 1860 -
0.00 2570 -
0.00 1690 -
0.00 2890 -
0.00 1250 -
0.00 2460 -
0.00 30360 -
0.00 36960 -
0.00 47520 -
0.00 52800 -
0.00 58080 -
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
0.00 55440 -
0.00 16050 -
0.00 23120 -
0.00 -
0.00 -
0.00 -
0.00 0 -
0.00 0 -
67,760.00 0 82,000 67,700
75,200.00 0 91,000 75,200
235,530.00 0 285,000 235,500
366,110.00 0 443,000 366,100
0.00 0 -
60,740.00 0 72,000 59,500
64,870.00 0 78,000 64,400
0.00 -
0.00 0 -
5,160.00 -
0.00 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 0 -
0.00 -
0.00 0 -
0.00 -
0.00 0 -
0.00 0 -
0.00 -
11,570.00 6000 17,000 14,000
450,740.00 0 660,000 545,400
0.00 0 -
0.00 8580 -
22,470.00 0 33,000 27,200
0.00 0 -
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp) (Rp) (Rp)
59,910.00 80000 80,000 66,100
0.00 0 -
5,280.00 0 6,400 5,200
5,530.00 0 6,700 5,500
12,970.00 0 19,000 15,700
0.00 0 -
0.00 -
0.00 78500 -
0.00 71000 -
0.00 525000 -
0.00 -
0.00 -
60,740.00 85000 72,000 59,500
64,870.00 108000 78,000 64,400
0.00 102000 -
0.00 -
0.00 28000 -
0.00 25500 -
0.00 75000 -
0.00 30000 -
0.00 35000 -
0.00 35000 -
0.00 600 -
0.00 6000 -
0.00 250000 -
0.00 25000 -
0.00 455000 -
0.00 55000 -
0.00 15000 -
0.00 1490000 -
0.00 637000 -
0.00 260000 -
0.00 -
-
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
530.00
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
40000 44000
46000 50600
52000 57200
60000 66000
68000 74800
132000 110000 76000 83600
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
6,000,000.00
6,000,000.00
9,500,000.00
9,500,000.00
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
42,000.00 40,000.00
49,000.00 48,000.00
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
55000
45,000.00 43000
47,000.00 45000
49,000.00 48000
49,000.00 49000
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
50,000.00
60,000.00
65,000.00
75,000.00
85,000.00
90,000.00
100,000.00
27,500.00
35,000.00
9,500.00
9,500.00
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
14,000.00
20,000.00 15,000.00
35000
160000
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
29000
22000
20000
18000
59,000.00
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
50,000.00
60,000.00
100,000.00
140,000.00
15,000.00
26,000.00
29,000.00 28,000.00
45,000.00 50,000.00
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
19,000.00 18,000.00
29,000.00
10000 20000
55,000.00
65,000.00
75,000.00
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
65,000.00
10,000.00 10,000.00
5000
5,000.00
600,000.00 650,000.00
145,000.00 140,000.00
350,000.00
15,000.00 15,000.00
12,000.00
CK Boyolali
HARGA SURVEI I HARGA SURVEI II INTERNET (Rp)
(Rp) (Rp)
13000 13000
24
CK Boyolali
DAFTAR HARGA SATUAN BAHAN BANGUNAN
PEKERJAAN : -
LOKASI : -
TAHUN ANGGARAN : -
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
I BAHAN DASAR
1 BATU KALI Bulat Utuh m3
Bulat Belah m3 230,000
Pecah 10/15 m3 230,000
Pecah 5/7 m3 242,000
Pecah 3/5 m3 242,000
2 KERIKIL Timbunan Pilihan m3 114,000
Sawur / Koral m3 102,000
Beton 0,5/1 m3 123,000
Beton 1/2 m3 260,000
Beton 2/3 m3 250,000
Biasa m3
Tras Giling m3
3 BATU BATA ex lokal bh 700
Concrete Blok (CB 15) / Batako (Lubang2) bh
Batako Padat bh
Rosteer beton cetak 12 x 11 x 24 cm bh
Rosteer tanah liat bakar 12 x 11 x 24 cm bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
II B A H A N P E N U T U P A T A P
1 SIRAP (100 lbr) pak
Sirap asbes semen m2
2 GENTENG BETON
Genteng Beton Warna standard bh
Genteng Beton Warna Special bh
Genteng Beton Warna Khusus bh
Kerpus Beton Warna Standard bh 6,000
Kerpus Beton Warna Special bh
Kerpus Beton Warna Khusus bh
Genteng beton ex. Mutiara bh
Genteng beton flat ex. Mutiara bh
Genteng press beton polos tipe nusantara 3,000
4 GENTENG KACA
Vlaam tebal 2 mm bh
Vlaam tebal 3 mm bh
Kodok tebal 2 mm bh
Kodok tebal 3 mm bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
6 ASBES PLAT
. 100cm X 100 cm X 3 mm bh 21,000
. 100cm X 100 cm X 4 mm bh
. 50 cm X 200 cm X 3 mm bh
. 40 cm X 200 cm X 3 mm bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
10 ASPAL BITUMEN
Atap Onduvila lbr
Nok Onduvila lbr
Skrup pcs
Lisplank GRC 2/20 m'
III B A H A N K A Y U
1 JATI Papan m3
Balok/pesagen m3
Reng m3
Balok kelas II m3 16,380,000
Balok kelas III m3 13,860,000
Papan kelas II m3 17,640,000
Papan kelas III m3 15,120,000
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
Kayu cetakan m3
Kayu bakar m3
Bambu bt 16,000
Kayu list m'
Kayu list profil m'
Anyaman Bambu m2
4 UBIN PORSELIN
Lokal 11 X 11 putih dos
11 X 11 warna dos
Lokal 15 X 15 putih dos
15 X 15 warna dos
5 MOZAIK PORSELIN
10 X 20 cm m2
15 X 15 cm m2
20 X 20 cm m2
20 X 25 cm m2
8 Batu Paras m2
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
10 GRANITO 40 x 40 cm m2 190,000
30 x 30 cm m2
11 Marmer m2 107,520
V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm bh
Ø 20 cm - 100 cm bh 33,000
Ø 30 cm - 100 cm bh 51,000
Ø 40 cm - 100 cm bh 63,000
Ø 50 cm - 100 cm bh 94,000
Ø 60 cm - 100 cm bh 140,000
Ø 70 cm - 100 cm bh
Ø 80 cm - 100 cm bh
Ø 100 cm - 100 cm bh 278,000
Ø 80 cm - 50 cm bh 95,000
Ø 90 cm - 50 cm bh 105,000
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
Ø 100 cm - 50 cm bh 139,000
U 10 cm - 100 cm bh
U 15 cm - 100 cm bh
U 20 cm - 100 cm bh 45,000
U 30 cm - 100 cm bh 57,000
U 50 cm - 100 cm bh
VI B A H A N B E S I
1 BESI BETON besi beton polos kg 11,000
besi beton prestress kg
besi beton ulir kg 11,000
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
7 LAIN-LAIN
Paku asbes kg 28,000
Paku sekrup asbes bh 22,000
Paku crampon bh
Dynabolt ukuran 8 mm x 65 mm bh
Baut gording kg
Hollow Galvanis 2.4. 400 bt
Hollow Galvanis 4.4. 400 bt
Baja Ringan C.75 ex. Taso bt
VII B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS btg 18,000
Pipa PVC DN 25 ( ¾" ) AW JIS btg 25,000
Pipa PVC DN 32 ( 1" ) AW JIS btg 35,000
Pipa PVC DN 40 ( 1½" ) btg 30,000
Pipa PVC DN 63 ( 2" ) btg 59,000
Pipa PVC DN 90 ( 3" ) btg
Pipa PVC DN 110 ( 4" ) btg 185,000
Pipa PVC DN 160 ( 6" ) btg
Pipa PVC DN 200 ( 8" ) btg
Pipa PVC DN 250 ( 10" ) btg
Pipa PVC DN 315 ( 12" ) btg
Pipa PVC Ø 4" (AW - SCJ) 4 m 185,000
Pipa PVC Ø 2" (AW - SCJ) 4 m 59,000
Pipa PVC Ø 1 1/2" (AW - SCJ) 4 m 30,000
Pipa PVC Ø 1" (AW - SCJ) 4 m 35,000
Pipa PVC Ø 3/4" (AW - SCJ) 4 m 25,000
Pipa PVC Ø 1/2" (AW - SCJ) 4 m 18,000
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
VIII B A H A N L A N G I T - L A N G I T
1 AKUSTIK-uk : 30 X 30 lbr
30 X 60 lbr
60 X 120 lbr
List Kayu Profil m' 8,000
2 SOFT BOARD-uk: 4'X 8' (1,2 x2,4 m2)
Gypsum tebal 9 mm lbr 76,000
Gypsum tebal 12 mm lbr
List Gypsum m'
Gypsum tebal 9 mm (120 x 240) lbr
lbr
lbr
lbr
lbr
Sekrup Gypsum bh
Compound zak
GRC Board lbr
Dinabolt Bh
Cotton Plaster bh
List Gypsum m'
Tepung Gypsum kg
4 PLY WOOD
Teak wood
90 X 210 X 3 mm lbr
. 120 X 240 X 3 mm lbr
. 90 X 210 X 4 mm lbr 64,000
. 90 X 210 X 9 mm lbr
. 90 X 210 X 12 mm lbr
. 90 X 210 X 15 mm lbr
. 90 X 210 X 18 mm lbr
Tripleks
. 120 X 240 X 3 mm lbr 64,000
. 120 X 240 X 4 mm lbr 76,000
. 120 X 240 X 6 mm lbr
Multipleks
. 120 X 240 X 9 mm lbr 132,000
. 120 X 240 X 12 mm lbr 168,000
. 120 X 240 X 15 mm lbr
. 120 X 240 X 18 mm lbr
Formika ukuran pintu lbr
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
IX B A H A N F I N I S H I N G
1 KAYU
Menie kg 35,000
Dempul plamur kg 16,000
Ambril/amplas lbr 7,000
Batu Apung kg
Cat dasar kg 76,000
. Emco kg
. Yunior 66 (nippon paint) kg
- Koas bh 9,000
. Deculux kg
. Siralax ons
. Spiritus ltr
. Plitur jadi ltr 51,000
. Vernis ltr 51,000
2 TEMBOK
Kalkarium kg
Kapur sirih kg
Plamur kg 16,000
Cat Tembok ex. Nippon Weatherbond kg
Sintex 5 kg
Danabride 5 kg
Catylac 5 kg
Mowilex 5 kg
Alkali Tembok ex. Nippon 3-in 1 Anti-Alkali Primer Sealer kg
MOWILEX PRECOAT VARNISH BATU ALAM lt
Mowilex Clear Coating lt
Cat tembok kg 21,000
3 BESI
Menie kg 35,000
Cat mengkilat kg
Cat kg 76,000
Thinner A ltr
Minyak cat ltr 17,000
Thinner Super ltr
Residu (teer/aspal) drum 360,000
Fibre glass (tanki air)
kapasitas 550 liter. bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
X BAHAN KACA
1 POLOS 3 mm m2 70,000
5 mm m2 95,000
8 mm m2
12 mm m2
2 ES KABUR 3 mm m2
5 mm m2
3 RAY BAND 3 mm m2
5 mm m2 82,000
8 mm m2
12 mm m2
4 TEMPERED 12 mm m2
2 SKAKELAR
Out bauw . Seri bh
Engkel bh
In bauw . Seri bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
Engkel bh
4 STEKER - Biasa bh
Arde bh
T Biasa bh
T dengan Arde bh
5 FITING Flaon bh
Gantung bh
Kap bh
Kombinasi bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
3 WASTAFEL PEDESTAL bh
4 WASTAFEL MEJA OVAL bh
5 WASTAFEL GANTUNG BULAT bh 317,000
6 WASTAFEL GANTUNG SUDUT bh
7 WASTAFEL GANTUNG SUDUT KECIL bh
8 WASTAFEL BAK CUCI bh
9 TEMPAT SABUN GANTUNG bh
10 TEMPAT SABUN TANAM bh
URINOIR KERAMIK STANDART bh 1,393,000
BAK MANDI FIBRE GLASS 70.70.80 bh 317,000
11 SEPTIC TANK (ETERNIT GRESIK)
5 Pemakai 500 liter unit
10 Pemakai 1.000 liter unit
12 LAIN - LAIN
Kran Air 1/2" bh
Kran Air 3/4" bh 24,000
Seal tape bh 4,000
Floor drain bh 4,000
Roof drain kuningan bh
XV POMPA AIR
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh
2 POMPA AIR LISTRIK
Sanyo 100 watt bh
Fuji 250 watt bh
Shimizu . 100 watt bh
. 90 watt bh
Dab . 125 watt bh
. 175 watt bh
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
3 UNIDECOR Abu-abu m2
Merah/hitam m2
4 UNI Abu-abu m2
Merah/hitam m2
5 TRIHEX Abu-abu m2
Merah/hitam m2
6 OLYMPIA HEXA Abu-abu m2
7 HEXAGONAL Abu-abu m2
Merah/hitam m2
8 CASTLE Abu-abu m2
9 TRAPEZ Abu-abu m2
10 TRAPEZ GRASS BLOCK
Abu-abu m2
11 STANDARD GRASS BLOCK ABU-ABU BH
12 BATACO BH 3,000
13 KANSTEEN m'
14 Paving block natural 6 cm ( K- 175 ) m2 45,000
15 Paving block natural 8 cm ( K-175 ) m2 60,000
16 Paving block warna 6 cm ( K- 175 ) m2
17 Paving block warna 8 cm ( K-175 ) m2
Paving abu-abu tebal 6 cm m2 45,000
Paving abu-abu tebal 8 cm m2 60,000
Paving abu-abu K.225 tebal 6 cm m2 68,000
Paving abu-abu K.225 tebal 8 cm m2 80,000
Paving abu-abu K.275 tebal 6 cm m2 77,000
Paving abu-abu K.275 tebal 8 cm m2 90,000
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
8 ASPAL.
Aspal Ex Pertamina isi Net 160 kg drum
Hotmix Tebal = 4 Cm m2
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
Hotmix Tebal = 5 Cm m2
Hotmix Tebal = 6 Cm m2
Hotmix Tebal = 7 Cm m2
Binder Course ton
Wearing Course ton
Hot Roller Sheet ton
Sand Sheet ton
Sand Sheet Emulsi ton
Cold Mix ton
Prime / Tack Coard RC liter
Prime Coat MC liter
Prime / Tack Coat Emulsi liter
10 K A C A
Cermin tebal 5 mm m2
13 WATER PROOFING 5 kg
5 kg
20 Ltr
CK Boyolali
HARGA
NO. J E N I S B A H A N SATUAN (Rp)
Skrup Fixer bh
Profil Kaca m'
Handle Pintu + Kunci set
Spagnolet Tanam bh
Door Closer set
Spandek PVC m2
Sindik Pintu bh
Floor Hinge Ex. Dekson set
Patch Fitting bh
Pull Handle set
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00
0.00 229,000.00
190,000.00 190,080.00 239,000.00 159,000
190,000.00 190,080.00 260,000.00 142,000
200,000.00 200,000.00 135,000.00
200,000.00 200,000.00 200,000.00 240,000
94,210.00 110,000.00 114,000
84,290.00 0.00 102,000
101,650.00 240,000.00 123,000
214,870.00 230,000.00 260,000
206,610.00 215,000.00 250,000
0.00 0.00
0.00 0.00
570.00 760 700
0.00 3400
0.00 3920
0.00 3700
0.00 3700
0.00
84,290.00 125000 102,000
185,000.00 131,400.00 210000 159,000
131,400.00 224000 159,000
42,970.00 72000 52,000
0.00 0
0.00 112000
198,340.00 275000 240,000
0.00 0
0.00
51,230.00 63200 62,000
51,230.00 0 62,000
0.00 0
0.00 0
0.00 0
1,340.00 1580 1,625
0.00 112000
0.00 140000
11,150.00 13500 13,500
0.00
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00
0.00 728000
0.00 42790
0.00
0.00
0.00 0
0.00 0
0.00 0
4,950.00 0 6,000
0.00 0
0.00 0
0.00 6280
0.00 6720
2,470.00 3,000
0.00
0.00
330.00 0 400
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
2,470.00 0 3,000
4,950.00 6,000
5,780.00 7,000
5,780.00 7,000
0.00 1250
0.00 2250
0.00 3600
0.00 2580
0.00 10640
0.00 9860
0.00 4480
0.00 7280
0.00 25200
1,810.00 2,200
1,730.00 2,100
1,480.00 1,800
1,400.00 1,700
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00
0.00 79300
0.00 0
0.00 105800
0.00 0
0.00 0
0.00 0
0.00 0
36,360.00 0 44,000
41,810.00 53800 50,600
47,270.00 0 57,200
54,540.00 72800 66,000
61,810.00 0 74,800
85,120.00 0 103,000 132000
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00
31,400.00 0 38,000
0.00 0
0.00 0
0.00
0.00
17,350.00 0 21,000
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 25200
0.00 35300
0.00 53800
33,050.00 0 40,000
0.00 0
0.00
0.00
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
23,960.00 29,000
34,710.00 42,000
0.00
0.00 0
47,930.00 0 58,000
59,500.00 42600 72,000
79,330.00 58300 96,000
0.00 0
0.00
0.00
0.00 50000
0.00 75000
0.00 800
0.00 20000
0.00
0.00
0.00 26280000
0.00 23968000
0.00 21400000
13,537,190.00 16,380,000
11,454,540.00 13,860,000
14,578,510.00 17,640,000
12,495,860.00 15,120,000
0.00
7,561,980.00 9800000 9,150,000
7,318,180.00 9072000 8,855,000
0.00
6,063,630.00 6498000 7,337,000 6,000,000.00
7,639,660.00 5936000 9,244,000 6,000,000.00
0.00
5,227,270.00 5600000 6,325,000
4,704,950.00 5152000 5,693,000
0.00 3304000
0.00
0.00 3696000
2,090,900.00 3136000 2,530,000
0.00
9,789,250.00 12880000 11,845,000 9,500,000.00
9,028,920.00 11760000 10,925,000 9,500,000.00
0.00
3,136,360.00 3696000 3,795,000
2,614,040.00 3136000 3,163,000
0.00
16,520.00 20000 20,000
0.00 16000
0.00 25000
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00 812000
13,220.00 14200 16,000
0.00 33750
0.00 9700
0.00 26900
0.00
0.00
0.00
0.00 40320
0.00 31360
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
41,320.00 50400 50,000 42,000.00
42,140.00 0 51,000 49,000.00
0.00 0
0.00 0
0.00 0
38,010.00 46,000
42,140.00 51,000 45,000.00
52,890.00 64,000 47,000.00
44,620.00 54,000 49,000.00
44,620.00 54,000 49,000.00
0.00 0
0.00
0.00 0
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00
0.00 0
0.00
157,020.00 0 190,000
0.00 0
88,850.00 107520 107,520
0.00
0.00 60480
0.00 50400
0.00 58240
0.00 68320
0.00 90720
0.00 78400
0.00 98560
0.00 49280
0.00 57120
0.00 62720
0.00 72800
0.00 107520
0.00 85120
0.00 924000
0.00 284480
0.00 470400
0.00 154560
99,170.00 143360 120,000
0.00 201600
0.00 61600
0.00 154560
0.00
0.00 175000
0.00 15000
0.00 23000
0.00
0.00
0.00
0.00 0
27,270.00 39200 33,000
42,140.00 56000 51,000
52,060.00 67200 63,000
77,680.00 75100 94,000
115,700.00 0 140,000
0.00 0
0.00 100800
229,750.00 134100 278,000
78,510.00 95,000
86,770.00 105,000
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
114,870.00 139,000
0.00 0
0.00 0
37,190.00 37000 45,000
47,100.00 42600 57,000
0.00 0
0.00
0.00
4,950.00 0 6,000
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00
9,090.00 10650 11,000
0.00 0
9,090.00 10650 11,000
0.00
4,130.00 10650 5,000
0.00
11,570.00 12900 14,000
14,870.00 18,000
0.00
0.00 0
0.00 0
0.00 616000
0.00 0
0.00 0
0.00 0
0.00 0
11,570.00 13900 14,000
0.00
15,700.00 16800 19,000
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 17250
0.00 16000
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
26,440.00 32,000
0.00
0.00
23,140.00 23600 28,000 20,000.00
18,180.00 650 22,000
0.00 1750
0.00 1600
0.00 12600
0.00 21300
0.00 28000
0.00 75000
0.00
0.00
0.00
0.00
14,870.00 0 18,000
20,660.00 0 25,000
28,920.00 0 35,000
24,790.00 0 30,000
48,760.00 0 59,000
0.00 0
152,890.00 0 185,000
0.00 0
0.00 0
0.00 0
0.00 0
152,890.00 185,000 160000
48,760.00 59,000
24,790.00 30,000 29000
28,920.00 35,000 22000
20,660.00 25,000 20000
14,870.00 18,000 18000
0.00
0.00
89,250.00 0 108,000
109,090.00 0 132,000
163,630.00 0 198,000
287,600.00 0 348,000
361,980.00 0 438,000
0.00 0
565,280.00 0 684,000
555,370.00 0 672,000
1,259,500.00 0 1,524,000
0.00 0
0.00 0
0.00
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00
0.00 0
0.00 0
0.00 0
6,610.00 9700 8,000
0.00
62,800.00 67968 76,000
0.00 84096
0.00 9000
0.00 80000
0.00 75000
0.00 75000
0.00 65000
0.00 65000
0.00 12.57142857
0.00 75000
0.00 68000
0.00 7200
0.00 15000
0.00 8500
0.00 12500
0.00
0.00
0.00
0.00 0
0.00
0.00
0.00
0.00 0
0.00 0
52,890.00 0 64,000
0.00 0
0.00 0
0.00 0
0.00 0
0.00
52,890.00 50400 64,000 50,000.00
62,800.00 67200 76,000 60,000.00
0.00 84000
0.00
109,090.00 128800 132,000
138,840.00 168000 168,000
0.00 0
0.00 0
0.00 0
0.00
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 85200
0.00 34800
0.00 46000
17,350.00 15700 21,000 15,000.00
0.00 66100
0.00
0.00
0.00
28,920.00 33600 35,000
13,220.00 23600 16,000 29,000.00
5,780.00 9600 7,000
0.00 22400
62,800.00 0 76,000 45,000.00
0.00 0
0.00 0
7,430.00 0 9,000
0.00 58300
0.00 39200
0.00 18000
42,140.00 0 51,000
42,140.00 0 51,000
0.00
0.00
0.00 0
0.00 0
13,220.00 23600 16,000
0.00 80640
0.00 0
0.00 0
0.00 112500
0.00 0
0.00 67200
0.00 67200
0.00 64960
17,350.00 21,000 19,000.00
0.00
0.00
28,920.00 33600 35,000 29,000.00
0.00 58300
62,800.00 0 76,000
0.00 23600
14,040.00 25200 17,000 10000
0.00 0
297,520.00 0 360,000
0.00
0.00 0
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
15,700.00 0 19,000
0.00
0.00
57,850.00 0 70,000 55,000.00
78,510.00 60500 95,000 65,000.00
0.00 69500
0.00 106400
0.00
0.00 0
0.00 79600
0.00
0.00 0
67,760.00 68900 82,000 75,000.00
0.00 74500
0.00 117600
0.00
0.00 1200000
0.00
0.00
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
49,580.00 0 60,000
131,400.00 0 159,000
0.00 0
49,580.00 67200 60,000
0.00
49,580.00 60,000
156,190.00 189,000
0.00
0.00
0.00 0
8,260.00 0 10,000 10,000.00
0.00 0
0.00 0
0.00 0
3,300.00 0 4,000
2,470.00 0 3,000
0.00 0
0.00
0.00
961,980.00 2184000 1,164,000 600,000.00
125,610.00 129000 152,000 145,000.00
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00 0
261,980.00 0 317,000 350,000.00
0.00 278000
0.00 0
0.00 0
0.00 0
0.00 0
1,151,230.00 1,393,000
261,980.00 317,000
0.00
0.00 0
0.00 0
0.00
0.00 17000
19,830.00 29500 24,000 15,000.00
3,300.00 3400 4,000
3,300.00 56000 4,000
0.00 79000
0.00
0.00
14,040.00 14600 17,000 12,000.00
0.00 0
18,180.00 0 22,000
0.00 0
0.00 0
0.00 0
15,700.00 0 19,000 13000
2,060.00 2500 2,500
0.00
0.00 24
0.00
0.00 0
0.00
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00
0.00 0
0.00 0
0.00 0
0.00 0
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00 0
2,470.00 0 3,000
0.00 0
37,190.00 58240 45,000
49,580.00 91840 60,000
0.00 69440
0.00 103040
37,190.00 45,000
49,580.00 60,000
56,190.00 68,000
66,110.00 80,000
63,630.00 77,000
74,380.00 90,000
0.00
0.00
0.00 1270
0.00 1460
0.00 1580
0.00 2180
0.00 2450
0.00 3320
0.00 2810
0.00 3840
0.00 4310
0.00 2170
0.00 2510
0.00 2720
0.00 3280
0.00 7310
0.00 1510
0.00 1730
0.00 1880
0.00 2450
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 2710
0.00 3640
0.00 3320
0.00 4310
0.00 4770
0.00 2590
0.00 2970
0.00 3220
0.00 4330
0.00 8340
0.00 26910
0.00
0.00
0.00 1860
0.00 2570
0.00 1690
0.00 2890
0.00 1250
0.00 2460
0.00 30360
0.00 36960
0.00 47520
0.00 52800
0.00 58080
0.00 55440
0.00 16050
0.00 23120
0.00
0.00
0.00
0.00 0
0.00 0
67,760.00 0 82,000
75,200.00 0 91,000
235,530.00 0 285,000
366,110.00 0 443,000
0.00 0
59,500.00 0 72,000
64,460.00 0 78,000
0.00
0.00 0
0.00
0.00
0.00 0
0.00
0.00 0
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
0.00
0.00 0
0.00
0.00 0
0.00 0
0.00
14,040.00 6000 17,000
545,450.00 0 660,000
0.00 0
0.00 8580
27,270.00 0 33,000
0.00 0
66,110.00 80000 80,000
0.00 0
5,280.00 0 6,400
5,530.00 0 6,700
15,700.00 0 19,000
0.00 0
0.00
0.00 78500
0.00 71000
0.00 525000
0.00
0.00
59,500.00 85000 72,000
64,460.00 108000 78,000
0.00 102000
0.00
0.00 28000
0.00 25500
0.00 75000
0.00 30000
0.00 35000
0.00 35000
CK Boyolali
HARGA HARGA HARGA INDEX
HARGA HARGA SURVEI I
INDEK/1.21 BOYOLALI 2015
KESEPAKATAN (Rp)
(Rp) (Rp) (Rp)
0.00 600
0.00 6000
0.00 250000
0.00 25000
0.00 455000
0.00 55000
0.00 15000
0.00 1490000
0.00 637000
0.00 260000
0.00
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
530.00
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
40000 44000
46000 50600
52000 57200
60000 66000
68000 74800
110000 76000 83600
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
40,000.00
48,000.00
55000
43000
45000
48000
49000
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
50,000.00
60,000.00
65,000.00
75,000.00
85,000.00
90,000.00
100,000.00
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
27,500.00
35,000.00
9,500.00
9,500.00
14,000.00
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
15,000.00
35000
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
59,000.00
100,000.00
140,000.00
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
26,000.00
28,000.00
50,000.00
18,000.00
20000
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
65,000.00
10,000.00
5000
5,000.00
650,000.00
140,000.00
CK Boyolali
HARGA SURVEI II INTERNET (Rp)
(Rp)
15,000.00
13000
CK Boyolali
DAFTAR SEWA PERALATAN
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
CK Boyolali
DAFTAR SEWA PERALATAN
KET.
CK Boyolali
DAFTAR UPAH PEKERJA
TAHUN 2015 KABUPATEN SUKOHARJO
1 Pekerja Hr
2 Mandor Hr
3 Tukang listrik Hr
4 Tukang kayu Hr
5 Kep. tk. kayu Hr
6 Tukang batu Hr
7 Kep. tk. batu Hr
8 Tukang besi Hr
9 Kep. tk. besi Hr
10 Tukang cat Hr
11 Kep. tk. cat Hr
12 Tukang plitur Hr
13 Tukang jalan Hr
14 Tukang gali Hr
15 Tukang masak aspal Hr
16 Tk. leideng Hr
17 Masinis Hr
18 Pemb. Masinis Hr
19 Penjaga api Hr
20 Penjaga malam Hr
21 Sopir Hr
22 Pembantu Sopir Hr
Sukoharjo, 2015
Diperiksa, Direncana
KEPALA BIDANG CIPTA KARYA KASI BINA TEKNIS
BIDANG CIPTA KARYA
CK Boyolali
DAFTAR UPAH PEKERJA
TAHUN 2015 KABUPATEN SUKOHARJO
HARGA (Rp)
41,400.00
61,950.00
61,950.00
61,950.00
66,100.00
57,850.00
66,100.00
57,850.00
66,100.00
57,850.00
66,100.00
57,850.00
57,850.00
57,850.00
57,850.00
57,850.00
61,950.00
49,550.00
49,550.00
49,550.00
49,550.00
41,300.00
Sukoharjo, 2015
Mengetahui
KEPALA DINAS PEKERJAAN UMUM
KABUPATEN SUKOHARJO
CK Boyolali
REKAPITULASI RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE
REKAPITULASI
NO. URAIAN PEKERJAAN TOTAL PEK
1 2 3
A PEKERJAAN PERSIAPAN Rp.
B PEKERJAAN TANAH Rp.
C PEKERJAAAN MINI PILE CONCREATE Rp.
D PEKERJAAN PONDASI Rp.
E PEKERJAAN BETON Rp.
F PEKERJAAN DINDING DAN PLESTERAN Rp.
G PEKERJAAN PENUTUP LANTAI DAN DINDING Rp.
H PEKERJAAN TANGGA Rp.
I PEKERJAAN KUSEN,PINTU DAN JENDELA ALUMUNIUM Rp.
J PEKERJAAN PENGGANTUNG DAN PENGUNCI Rp.
K PEKERJAAN LANGIT-LANGIT Rp.
L PEKERJAAN PENUTUP ATAP Rp.
M PEKERJAAN SANITAIR Rp.
N PEKERJAAN PLIMBING Rp.
O PEKERJAAN MEKANIKAL DAN ELEKTRIKAL Rp.
P PEKERJAAN PENGECETAN Rp.
Q PEKERJAAN LAIN - LAIN Rp.
II PPN 10 % Rp.
IV PEMBULATAN Rp.
Terbilang : //Delapan Ratus dua Puluh Delapan Juta Seratus Empat Belas Ribu Rupiah //
PERENCAN
PERENCAN
AHMADI
GARAN BIAYA
TOTAL PEKERJAAN
3
32,027,452.76
17,639,639.33
83,733,064.00
77,306,159.70
130,569,326.83
101,837,283.56
28,485,835.43
72,969,181.08
27,709,229.68
8,276,942.50
30,461,828.76
68,813,472.78
15,733,611.00
12,258,054.44
18,920,000.00
12,020,047.21
14,070,000.00
752,831,129.04
75,283,112.90
828,114,241.94
828,114,000.00
Belas Ribu Rupiah //
PERENCANA
PERENCANA
AHMADI
RENCANA ANGGARAN BIAYA
ENGINEERING ESTIMATE
A. PEKERJAAN PERSIAPAN
NO. URAIAN PEKERJAAN VOLUME
1 2 3
1 Pembersihan lokasi dan perataan tanah 72.00
2 Pengukuran dan pemasangan bowplank 69.00
3 Air kerja + listrik 1.00
4 Papan nama proyek 1.00
5 Administrasi, Pelaporan & Dokumentasi 1.00
6 Serobong kerja lengkap
-Direksi Keet 9.00
-Gudang 9.00
-Pos Jaga 4.00
Jumlah
B. PEKERJAAN TANAH
NO. URAIAN PEKERJAAN VOLUME
1 2 3
1 Galian tanah sedalam sampai 1m 14.65
2 Galian tanah sedalam sampai 3m 151.98
3 Urug tanah kembali bekas galian 41.66
4 Urug tanah mendatangkan 28.80
5 Pemadatan urug 43.20
6 Urug pasir 16.66
Jumlah
Jumlah
D. PEKERJAAN PONDASI
NO. URAIAN PEKERJAAN VOLUME
1 2 3
1 Bangunan Utama
- Pasangan pondasi batu gunung 1 : 4 93.31
- Pasangan bt. Kosong/aanstampeng 24.99
Jumlah
E. PEKERJAAN BETON
NO. URAIAN PEKERJAAN VOLUME
1 2 3
1 lantai kerja beton mutu f'c = 7,4 Mpa (K-100) 1.29
2 Beton Footplate cor beton mutu f’c =21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
a. bekesting 2x pemakaian 51.20
b. tulangan 1,911.51
c. cor beton 23.04
3 Beton Sloof 15/20cm cor beton mutu f’c =21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
a. bekesting 2x pemakaian 8.19
b. tulangan 86.64
c. cor beton 0.50
4 Beton Sloof 20/25cm cor beton mutu f’c =21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
a. bekesting 2x pemakaian 38.40
b. tulangan 426.85
c. cor beton 2.40
5 Beton Kolom K1 30/30cm cor beton mutu f’c = =21,7 MPa (K250), slum (12±2)cm, w/c =
0,56
a. bekesting 2x pemakaian 41.16
b. tulangan 511.04
c. cor beton 16.46
6 Beton Kolom Praktis Kp 11/11cm cor beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, 58.80
w/c = 0,66
7
Beton Balok B1 20/15cm cor beton mutu f’c = 21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
a. bekesting 8.25
b. tulangan 8.25
c. cor beton 0.90
8 Beton Balok Latiu BL 10/15 cm cor beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, 30.00
w/c = 0,66
9 plat beton bertulang lantai t.12 K.250
a. bekesting 72.00
b. tulangan 133.16
c. cor beton 14.40
10 Kanopi jendela
a. bekesting 2.70
b. tulangan 13.24
c. cor beton 0.78
Jumlah
F. PEKERJAAN DINDING DAN PLESTERAN
NO. URAIAN PEKERJAAN VOLUME
1 2 3
LANTAI - 1
Jumlah
1 2 3
LANTAI - 1
LANTAI - 2
Jumlah
H. PEKERJAAN TANGGA
NO. URAIAN PEKERJAAN VOLUME
1 2 3
PEKERJAAN TANGGA
1 Cor Pondasi Plat Beton
a. Cor beton K.225 0.43
b. Pembesian Ø 12 - 15 21.93
c. Pembesian Ø 16 - 15 52.98
d. Pasang begisting 2.24
e. Bongkar begisting 2.24
2 Anak Tangga
a. Cor beton K.225 0.85
b. Pembesian Ø 10 135.29
c. Pasang begisting 7.98
d. Bongkar begisting 7.98
3 Sloof memanjang
a. Cor beton K.225 0.77
b. Pembesian Ø 10 - 15 18.74
c. Pembesian Ø 16 - 12 38.67
d. Pasang begisting 6.03
e. Bongkar begisting 6.03
4 Plat Tangga dan Bordes
a. Cor beton K.225 1.92
b. Pembesian Ø 10 - 15 161.01
c. Pembesian Ø 16 - 12 515.22
d. Pasang begisting 9.79
e. Bongkar begisting 19.59
5 Benangan sudut 33.72
6 Pasangan Keramik Anti Slip Tangga dan Bordes 44.00
7 Pasangan Railing Pengaman Tangga 8.00
8 Pasangan Keramik 20 x 25 cm Tangga dan Bordes 26.75
Jumlah
1 2 3
LANTAI - 1
1 Kusen jendela dan pintu kayu jati kelas II 0.22
2 Daun jendela kayu jati kelas II 4.00
3 Daun Pintu dobel Kayu Jati kelas II 1.00
4 Daun Pintu Kayu Jati kelas II 4.00
LANTAI - 2
1 Kusen jendela dan pintu kayu jati kelas II 0.22
2 Daun jendela kayu jati kelas II 6.00
3 Daun Pintu Kayu Jati kelas II 7.00
Jumlah
J. PEKERJAAN PENGGANTUNG DAN PENGUNCI
NO. URAIAN PEKERJAAN VOLUME
1 2 3
LANTAI - 1
1 Engsel 4" 18.00
2 Engsel 3" 8.00
3 Grendel 8.00
4 Tarikan 4.00
5 Hak angin 8.00
6 Handle Pintu double 1.00
7 Kunci tanam khusus Pintu double 2 x putar 1.00
8 Grendel tanam khusus Pintu double 1.00
9 Kunci tanam 2 x putar 4.00
10 Kaca Reflectif penahan radiasi setara stopsol T. 5 mm u. Pintu/Jendela 19.58
LANTAI - 2
1 Engsel 4" 21.00
2 Engsel 3" 12.00
3 Grendel 6.00
4 Tarikan 6.00
5 Hak angin 12.00
6 Kunci tanam 2 x putar 7.00
7 Kaca Reflectif penahan radiasi setara stopsol T. 5 mm 29.38
Jumlah
1 2 3
LANTAI - 1
1 Pekerjaan Rangka Metal 71.83
2 Penutup Plafond Gypsum Board 9 mm 71.83
3 List Plafond gypsum board 94.55
LANTAI - 2
1 Pekerjaan Rangka Metal 64.34
2 Penutup Plafond Gypsum Board 9 mm 64.34
3 List Plafond gypsum board 190.30
Jumlah
1 2 3
PEKERJAAN PASANGAN & PLESTERAN
1 Plesteran beton lantai atap camp 1pc:2psr 72.00
2 Acian 72.00
3 waterproofing atap 9.42
4 Roof drain atap 4.00
Jumlah
M. PEKERJAAN SANITAIR
NO. URAIAN PEKERJAAN VOLUME
1 2 3
LANTAI - 1
1 Pasang Closed Duduk 2.00
2 bak mandi batu bata volume 0,3 M3 ( 60 x 60 ) 2.00
3 Pasang flor drain 2.00
4 Pasang wastafel 1.00
5 Kran air 1/2" 4.00
6 Pembuatan Septick tank 1.00
7 Aksesoris 1.00
LANTAI - 2
1 Pasang Closed Duduk 2.00
2 bak mandi batu bata volume 0,3 M3 ( 60 x 60 ) 2.00
3 Pasang flor drain 4.00
4 Kran air 1/2" 4.00
5 Pasang Wastafel 1.00
6 Aksesoris 1.00
Jumlah
N. PEKERJAAN PLUMBING
NO. URAIAN PEKERJAAN VOLUME
1 2 3
LANTAI - 1
PEKERJAAN INSTALASI AIR BERSIH
1 Pengadaan dan Pemasangan pipa 2" 31.50
2 Pengadaan dan Pemasangan Gate Valve 2" 1.00
3 Pengadaan dan Pemasangan pipa 3/4" AW 8.00
4 Pengadaan dan Pemasangan pipa 1/2" AW 19.50
5 Penyambungan pipa PDAM 1.00
PEKERJAAN INSTALASI AIR KOTOR
1 Pengadaan dan Pemasangan pipa 4" PVC 23.25
PIPA AIR HUJAN
1 Pemasangan pipa 3" PVC 14.70
LANTAI - 2
PEKERJAAN INSTALASI AIR BERSIH
1 Pengadaan dan Pemasangan Gate Valve 2" 1.00
2 Pengadaan dan Pemasangan pipa 3/4" AW 8.00
3 Pengadaan dan Pemasangan pipa 1/2" AW 16.00
PEKERJAAN INSTALASI AIR KOTOR
1 Pengadaan dan Pemasangan pipa 4" PVC 16.00
PIPA AIR HUJAN
1 Pemasangan pipa 3" PVC 14.70
Jumlah
O. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
NO. URAIAN PEKERJAAN VOLUME
1 2 3
LANTAI - 1
1 Instalasi titik lampu + Stop Kontak 17.00
2 Lampu Philip SL 18 watt + taman 2.00
3 Lampu SL 18 watt 10.00
4 Saklar Tunggal 8.00
5 Saklar Ganda 1.00
6 Stop Kontak Dinding 7.00
7 Main Panel Box Lantai - 1 1.00
11 Instalasi Pendingin System ( Titik AC ) 4.00
LANTAI - 2
1 Instalasi titik lampu + Stop kontak 16.00
2 Lampu SL 18 watt 11.00
3 Saklar Tunggal 5.00
4 Saklar Ganda 2.00
5 stop Kontak Dinding 5.00
6 Instalasi Pendingin System ( Titik AC ) 4.00
Jumlah
P. PEKERJAAN PENGECATAN
NO. URAIAN PEKERJAAN VOLUME
1 2 3
LANTAI - 1
1 Cat dinding tembok dengan cat air + Plamir 247.52
2 Pengecatan Plafond dengan cat air + Plamir 71.83
3 Pengecatan cotting batu alam 16.80
LANTAI - 2,3
1 Cat dinding tembok dengan cat air + Plamir 252.17
2 Pengecatan Plafond dengan cat air + Plamir 64.34
4 Pengecatan Cotting batu alam 16.80
Jumlah
Jumlah
BIAYA
M2 1,070,721.30 9,636,491.70
M2 936,815.00 8,431,335.00
M2 407,058.64 1,628,234.56
32,027,452.76
17,639,639.33
83,733,064.00
HARGA SATUAN JUMLAH
VOLUME
( Rp. ) ( Rp. )
3 4 5
M3 714,681.00 66,686,884.11
M3 424,941.00 10,619,275.59
77,306,159.70
HARGA SATUAN JUMLAH
VOLUME
( Rp. ) ( Rp. )
3 4 5
M3 793,102.47 1,023,102.19
M2 86,146.27 4,410,689.02
Kg 13,515.48 25,835,002.21
M3 1,056,898.59 24,350,943.51
-
M2 86,146.27 705,537.95
Kg 13,515.48 1,170,981.19
M3 1,056,898.59 528,449.30
M2 86,146.27 3,308,016.77
Kg 13,515.48 5,769,082.64
M3 1,056,898.59 2,536,556.62
M2 86,146.27 3,545,780.47
Kg 13,515.48 6,906,950.90
M3 1,056,898.59 17,396,550.79
M1 68,497.61 4,027,659.47
M2 86,146.27 710,706.73
Kg 13,515.48 111,502.71
M3 1,056,898.59 951,208.73
M1 94,101.99 2,823,059.70
M2 86,146.27 6,202,531.44
Kg 13,515.48 1,799,721.32
M3 1,056,898.59 15,219,339.70
M2 86,146.27 232,594.93
Kg 13,515.48 178,977.66
M3 1,056,898.59 824,380.90
130,569,326.83
HARGA SATUAN JUMLAH
VOLUME
( Rp. ) ( Rp. )
3 4 5
M3 1,209,182.84 4,038,670.67
M3 215,506.50 5,585,928.48
M2 76,354.96 1,964,613.12
M2 71,165.60 14,189,708.98
M2 20,131.32 112,735.39
M2 242,797.50 4,078,998.00
M2 1,209,182.84 20,314,271.63
M' 34,334.30 2,208,382.18
M3 215,506.50 6,437,179.16
M2 71,165.60 16,351,719.91
M2 20,131.32 112,735.39
M2 242,797.50 4,078,998.00
M2 1,209,182.84 20,314,271.63
M' 34,334.30 2,049,071.02
101,837,283.56
M2 171,877.75 11,703,156.00
M2 150,099.51 561,372.17
M2 165,902.77 2,193,234.62
M2 171,877.75 9,826,250.97
M2 150,099.51 1,076,213.49
M2 165,902.77 3,125,608.19
28,485,835.43
M3 1,015,165.34 431,699.06
Kg 13,414.50 294,179.99
Kg 13,414.50 710,700.21
M2 257,895.00 577,684.80
M2 9,837.30 22,035.55
M3 1,015,165.34 863,398.12
Kg 13,414.50 1,814,847.71
M2 257,895.00 2,058,002.10
M2 9,837.30 78,501.65
M3 1,015,165.34 781,169.73
Kg 13,414.50 251,387.73
Kg 13,414.50 518,738.72
M2 257,895.00 1,555,106.85
M2 9,837.30 59,318.92
M3 1,015,165.34 1,952,406.59
Kg 13,414.50 2,159,868.65
Kg 13,414.50 6,911,418.69
M2 356,238.00 3,487,570.02
M2 9,837.30 192,712.71
M' 12,985.00 437,854.20
M' 250,000.00 11,000,000.00
M' 4,046,585.00 32,372,680.00
M2 165,902.77 4,437,899.10
72,969,181.08
M3 19,796,997.00 4,355,339.34
Buah 643,042.40 2,572,169.60
Unit 1,933,558.00 1,933,558.00
Buah 966,779.00 3,867,116.00
M3 19,796,997.00 4,355,339.34
Buah 643,042.40 3,858,254.40
Unit 966,779.00 6,767,453.00
27,709,229.68
HARGA SATUAN JUMLAH
VOLUME
( Rp. ) ( Rp. )
3 4 5
Bh 14,000.00 252,000.00
Bh 8,200.00 65,600.00
Bh 4,000.00 32,000.00
Bh 25,000.00 100,000.00
Bh 18,217.13 145,737.00
Bh 225,000.00 225,000.00
Bh 450,000.00 450,000.00
Bh 125,000.00 125,000.00
Bh 131,400.00 525,600.00
M2 95,000.00 1,860,100.00
Bh 14,000.00 294,000.00
Bh 8,200.00 98,400.00
Bh 4,000.00 24,000.00
Bh 25,000.00 150,000.00
Bh 18,217.13 218,605.50
Bh 131,400.00 919,800.00
M2 95,000.00 2,791,100.00
8,276,942.50
M2 119,102.50 8,555,132.58
M2 42,795.50 3,074,000.77
M' 29,546.00 2,793,574.30
M2 119,102.50 7,663,054.85
M2 42,795.50 2,753,462.47
M' 29,546.00 5,622,603.80
30,461,828.76
Kg 26,328.33 5,982,586.31
Kg 26,328.33 4,983,426.21
Kg 26,328.33 9,920,514.56
Kg 26,328.33 826,709.55
bh 15,000.00 2,250,000.00
Kg 26,328.33 56,869.19
bh 2,500.00 740,000.00
Kg 13,515.48 511,831.29
Kg 13,515.48 58,251.73
M2 90,000.00 5,433,300.00
M2 165,000.00 23,997,600.00
M' 75,000.00 4,176,000.00
M' 50,000.00 2,000,000.00
M' 65,000.00 1,560,000.00
68,813,472.78
Bh 1,621,125.00 3,242,250.00
Bh 1,176,709.60 2,353,419.20
Bh 13,887.50 27,775.00
Bh 529,240.80 529,240.80
Bh 56,933.25 227,733.00
Unit 1,945,000.00 1,945,000.00
Ls 500,000.00 500,000.00
Bh 1,621,125.00 3,242,250.00
Bh 1,176,709.60 2,353,419.20
Bh 13,887.50 55,550.00
Bh 56,933.25 227,733.00
Bh 529,240.80 529,240.80
Ls 500,000.00 500,000.00
15,733,611.00
18,920,000.00
HARGA SATUAN JUMLAH
VOLUME
( Rp. ) ( Rp. )
3 4 5
M2 16,684.25 4,129,685.56
M2 16,684.25 1,198,429.68
M2 42,000.00 705,600.00
M2 16,684.25 4,207,267.32
M2 16,684.25 1,073,464.65
M2 42,000.00 705,600.00
12,020,047.21
Bh 1,570,000.00 1,570,000.00
Unit 2,500,000.00 2,500,000.00
M1 1,250,000.00 10,000,000.00
14,070,000.00
DAFTAR UPAH PEKERJA
1 Pekerja Hr 50,000.00
2 Mandor Hr 75,000.00
3 Tukang listrik Hr 70,000.00
3 Tukang kayu Hr 70,000.00
4 Kep. tk. kayu Hr 75,000.00
5 Tukang batu Hr 70,000.00
6 Kep. tk. batu Hr 75,000.00
7 Tukang besi Hr 70,000.00
8 Kep. tk. besi Hr 75,000.00
9 Tukang cat Hr 70,000.00
10 Kep. tk. cat Hr 75,000.00
11 Tukang plitur Hr 70,000.00
12 Tukang jalan Hr 70,000.00
13 Tukang gali Hr 70,000.00
14 Tukang masak aspal Hr 70,000.00
15 Tk. leideng Hr 70,000.00
16 Operator M a s i n i s Hr 70,000.00
17 Pemb. Masinis Hr 60,000.00
18 Penjaga api Hr 60,000.00
19 Penjaga malam Hr 60,000.00
20 Sopir Hr 60,000.00
21 Pembantu Sopir Hr 50,000.00
CK Boyolali
DAFTAR HARGA SATUAN BAHAN BAN
Pekerjaan : Pembangunan Gedung Rumah T
Lokasi :
NO. J E N I S B A H A N
I BAHAN DASAR
1 BATU KALI Bulat Belah
Pecah
Pecah
Pecah
2 KERIKIL Timbunan Pilihan/sirtu
Sawur / Koral
Beton
Beton
Beton
3 BATU BATA
4 PASIR Urug
Pasang
Beton
5 TANAH Padas
6 KAPUR Pasang
7 PORTLAND CEMENT
Portland Cement
Semen warna
CK Boyolali
NO. J E N I S B A H A N
2 KAMPER Papan
Balok/pesagen
3 KRUING Papan
Balok/pesagen
4 MERANTI Papan
Balok/pesagen
6 BENGKIRAI Papan
Balok/pesagen
7 SENGON Papan
CK Boyolali
NO. J E N I S B A H A N
Balok/pesagen
V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm
Ø 20 cm - 100 cm
Ø 30 cm - 100 cm
Ø 40 cm - 100 cm
Ø 50 cm - 100 cm
Ø 60 cm - 100 cm
Ø 100 cm - 100 cm
Ø 80 cm - 50 cm
Ø 90 cm - 50 cm
CK Boyolali
NO. J E N I S B A H A N
Ø 100 cm - 50 cm
CK Boyolali
NO. J E N I S B A H A N
U 20 cm - 100 cm
U 30 cm - 100 cm
VI BAHAN BESI
1 BESI BETON besi beton polos
besi beton ulir
2 BESI PLAT Besi Strip
3 BESI PROFIL Besi Profil
Besi Profil WF
5 BESI SIKU L All Size
6 KAWAT - Ikat beton/bendrat
- Kawat las
7 LAIN-LAIN
Paku asbes
Paku sekrup asbes
Skrup Fixer
Sealant
Venetions Blinds atau Vertical Blinds (tirai)
CK Boyolali
NO. J E N I S B A H A N
5 PLY WOOD
Teak wood
. 120 X 240 X 3 mm
. 90 X 210 X 4 mm
Tripleks
. 120 X 240 X 3 mm
. 120 X 240 X 4 mm
Multipleks
. 120 X 240 X 9 mm
. 120 X 240 X 12 mm
Formika ukuran pintu
Eternit
GRC (1,2 x 2,4 m2 tb 4 mm)
Plywood tebal 4 mm uk.90x220cm
Plywood tebal 4 mm uk.120x240cm
CK Boyolali
NO. J E N I S B A H A N
IX BAHAN FINISHING
1 KAYU
Menie
Dempul plamur
Ambril/amplas
Cat dasar
- Koas
. Plitur jadi
. Vernis
2 TEMBOK
Plamur
Cat tembok
3 BESI
Menie
Cat
Minyak cat
Residu (teer/aspal)
Lem Aica Aibon
X BAHAN KACA
1 POLOS 3 mm
5 mm
2 RAY BAND 5 mm
Kuda :
CK Boyolali
NO. J E N I S B A H A N
2 KLOSET JONGKOK
3 WASTAFEL GANTUNG BULAT
4 URINOIR KERAMIK STANDART
5 BAK MANDI FIBRE GLASS 70.70.80
6 LAIN - LAIN
Kran Air 3/4"
Seal tape
Floor drain
Bak Cuci Piring
Water drain
XV LAIN -LAIN
1 Naco rayban 5 mm per Daun
2 Naco bening 5 mm per Daun
3 Rolling door Besi
4 Rolling door Almunium
5 Kusen Almunium 4" Putih
6 Kusen Almunium 4" Coklat
7 Besi Holo rangka gypsum
8 Minyak Beton & bekisting
9 Pintu Lipat Besi 0.8 mm
10 Soda api
11 Air
12 Solar (Industri)
13 Premium (Industri)
14 Pelumas
CK Boyolali
NO. J E N I S B A H A N
CK Boyolali
DAFTAR HARGA SATUAN BAHAN BANGUNAN
: Pembangunan Gedung Rumah Tinggal 2 Lantai
bh 400.00
Nok kerpus plentong super bh 3,000.00
Kerpus press beton bh 6,000.00
Kerpus press mantili bh 7,000.00
Kerpus press tipe soka kebumen bh 7,000.00
Genteng mantili kebumen plentong besar bh 3,100.00
Genteng mantili kebumen plentong kecil bh 2,100.00
Genteng press mantili mojolaban besar bh 2,400.00
Genteng press mantili mojolaban kecil bh 1,700.00
CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)
m3
Balok/pesagen m3 1,900,000.00
m3 10,300,000.00
Balok/pesagen m3 9,500,000.00
m3 3,000,000.00
CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)
Balok/pesagen m3 2,300,000.00
30 X 30 cm polos m2 45,000.00
40 X 40 cm polos m2 48,000.00
20 X 20 cm KM/WC m2 42,100.00
Keramik anti slip 40/40 m2 60,000.00
Keramik warna pola 30/30 m2 42,100.00
Keramik warna pola 40/40 m2 59,000.00
Keramik dinding 20/25 m2 44,600.00
Keramik dinding 20/20 m2 44,600.00
Keramik dinding list 5/20 bh 4,000.00
Keramik plin 10/20 bh 3,000.00
m2 160,000.00
m2 35,000.00
m2 120,000.00
m2 160,000.00
m2 170,000.00
40 x 40 cm m2 157,000.00
m2 98,000.00
m2 120,000.00
10 cm - 100 cm bh
20 cm - 100 cm bh 35,000.00
30 cm - 100 cm bh 50,000.00
40 cm - 100 cm bh 63,000.00
50 cm - 100 cm bh 94,000.00
60 cm - 100 cm bh 140,000.00
100 cm - 100 cm bh 278,000.00
80 cm - 50 cm bh 95,000.00
90 cm - 50 cm bh 105,000.00
CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)
100 cm - 50 cm bh 139,000.00
CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)
20 cm - 100 cm bh 45,000.00
30 cm - 100 cm bh 57,000.00
bh 6,000.00
kg 28,000.00
kg 18,100.00
bh 750.00
bh 50,000.00
m2 95,000.00
btg 18,000.00
btg 25,000.00
btg 35,000.00
btg 50,000.00
btg 59,000.00
btg 185,000.00
btg 185,000.00
btg 59,000.00
btg 50,000.00
btg 35,000.00
btg 25,000.00
btg 18,000.00
btg 82,000.00
btg 108,600.00
btg 163,200.00
btg 287,400.00
btg 565,200.00
btg 832,800.00
CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)
m' 8,000.00
lbr 76,000.00
m1 16,500.00
m1 26,500.00
lbr 85,000.00
lbr 77,500.00
lbr 52,800.00
lbr 62,800.00
lbr 109,000.00
X 12 mm lbr 150,000.00
lbr 75,000.00
m2 18,500.00
(1,2 x 2,4 m2 tb 4 mm) lbr 60,000.00
lbr 52,800.00
lbr 80,000.00
CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)
kg 29,000.00
kg 25,000.00
lbr 5,700.00
kg 62,800.00
bh 9,000.00
ltr 51,000.00
ltr 42,100.00
kg 15,000.00
kg 21,000.00
kg 30,000.00
kg 55,000.00
ltr 17,000.00
drum 296,000.00
kg 35,000.00
m2 70,000.00
m2 95,000.00
m2 108,000.00
1 X slag bh 49,500.00
2 X slag bh 131,400.00
2 X slag bh 49,500.00
bh 14,000.00
bh 8,200.00
bh 4,000.00
bh 3,000.00
bh
bh 1,150,000.00
CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)
bh 135,000.00
bh 261,900.00
bh 1,393,000.00
bh 225,000.00
bh 19,800.00
bh 3,300.00
bh 4,000.00
bh 230,500.00
bh 50,000.00
kg 13,000.00
kg 18,100.00
bh 250.00
bh 19,000.00
kg 4,000.00
kg 15,500.00
BH 4,250.00
m2 37,100.00
m2 49,500.00
m2 45,000.00
m2 60,000.00
bh 82,000.00
bh 91,000.00
m2 285,000.00
m2 443,000.00
m' 72,000.00
m' 78,000.00
m1 6,250.00
ltr 17,000.00
m2 660,000.00
kg 27,200.00
m3 72,500.00
ltr 8,700.00
ltr 6,950.00
ltr 33,000.00
CK Boyolali
J E N I S B A H A N SATUAN HARGA (Rp)
CK Boyolali
REKAPITULASI ANALISA HAR
Pekerjaan : Pembangunan Gedung Rumah Tinggal 2 Lantai
Lokasi :
CK Boyolali
NO. KODE URAIAN PEKER
CK Boyolali
NO. KODE URAIAN PEKER
CK Boyolali
NO. KODE URAIAN PEKER
CK Boyolali
NO. KODE URAIAN PEKER
CK Boyolali
NO. KODE URAIAN PEKER
CK Boyolali
NO. KODE URAIAN PEKER
CK Boyolali
NO. KODE URAIAN PEKER
CK Boyolali
NO. KODE URAIAN PEKER
CK Boyolali
NO. KODE URAIAN PEKER
Catatan :
1 Harga belum termasuk PPN
2 Harga ini hanya sebagai pedoman untuk perencanaan
3 Untuk penyusunan Harga Perkiraan Sendiri (HPS) harus
disesuaikan dengan harga upah dan bahan riil saat penyusunan HPS.
CK Boyolali
REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN
: Pembangunan Gedung Rumah Tinggal 2 Lantai
CK Boyolali
URAIAN PEKERJAAN SAT
CK Boyolali
URAIAN PEKERJAAN SAT
CK Boyolali
URAIAN PEKERJAAN SAT
CK Boyolali
URAIAN PEKERJAAN SAT
CK Boyolali
URAIAN PEKERJAAN SAT
Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Jati Kelas II m3
Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Jati Kelas III m3
Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Bengkirai m3
Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Kamfer m3
Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu Kruing m3
Pembuatan & Pemasangan Pintu Klamp Standard Kayu Jati Kelas II m2
Pembuatan & Pemasangan Pintu Klamp Standard Kayu Jati Kelas III m2
Pembuatan & Pemasangan Pintu Klamp Standard Kayu Bengkirai m2
Pembuatan & Pemasangan Pintu Klamp Standard Kayu Kamfer m2
Pembuatan & Pemasangan Pintu Klamp Standard Kayu Kruing m2
Pembuatan & Pemasangan Daun Pintu Panel, Kayu Jati Kelas II m2
Pembuatan & Pemasangan Daun Pintu Panel, Kayu Jati Kelas III m2
Pembuatan & Pemasangan Daun Pintu Panel, Kayu Bengkirai m2
Pembuatan & Pemasangan Daun Pintu Panel, Kayu Kamfer m2
Pembuatan & Pemasangan Daun Pintu Panel, Kayu Kruing m2
Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Jati Kelas II m2
Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Jati Kelas III m2
Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Bengkirai m2
Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Kamfer m2
Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Kruing m2
Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Jati Kelas II m2
Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Jati Kelas III m2
Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Bengkirai m2
Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Kamfer m2
Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Kruing m2
Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Jati Klas II (lbr s/d 90 cm) m2
Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Jati Klas III (lbr s/d 90 cm) m2
Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Bengkirai (lbr s/d 90 cm) m2
Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Kamfer (lbr s/d 90 cm) m2
Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Kruing (lbr s/d 90 cm) m2
Pembuatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu Jati kelas II m2
Pembuatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu Jati kelas III m2
Pembuatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu Bengkirai m2
Pembuatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu Kamfer m2
Pembuatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu Kruing m2
Pembuatan & Pemasangan Jalusi mati Kosen Kayu Jati Kelas II m2
Pembuatan & Pemasangan Jalusi mati Kosen Kayu Jati Kelas III m2
Pembuatan & Pemasangan Jalusi mati Kosen Kayu Bengkirai m2
Pembuatan & Pemasangan Jalusi mati Kosen Kayu Kamfer m2
Pembuatan & Pemasangan Jalusi mati Kosen Kayu Kruing m2
Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Jati Kelas II m2
Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Jati Kelas III m2
Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Bengkirai m2
Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Kamfer m2
Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Kruing m2
CK Boyolali
URAIAN PEKERJAAN SAT
CK Boyolali
URAIAN PEKERJAAN SAT
CK Boyolali
URAIAN PEKERJAAN SAT
CK Boyolali
URAIAN PEKERJAAN SAT
CK Boyolali
A HARGA SATUAN PEKERJAAN
HARGA SATUAN
PEKERJAAN
(Rp) 2016
106,353.50
1,070,721.30
936,815.00
9,625.00
256,399.00
248,593.40
788,315.00
369,407.50
6,325.00
8,043.75
16,940.00
1,925.00
###
###
43,312.50
53,212.50
63,277.50
57,640.00
87,450.00
69,712.50
3,162.50
18,975.00
14,437.50
31,625.00
188,925.00
35,887.50
197,312.50
78,925.00
###
###
862,207.50
810,425.00
774,521.00
749,281.50
714,681.00
695,233.00
666,484.50
CK Boyolali
HARGA SATUAN
PEKERJAAN
(Rp) 2016
424,941.00
2,360,781.50
802,246.50
###
###
844,487.68
884,551.98
915,969.35
793,102.47
953,112.24
988,611.83
1,015,165.34
1,032,737.69
1,062,935.89
1,072,312.81
1,140,723.21
1,153,000.87
13,414.50
142,670.00
153,120.00
279,730.00
287,320.00
358,930.00
313,280.00
257,895.00
86,828.50
3,685,165.00
4,535,080.00
7,446,890.00
5,731,302.50
5,255,882.50
5,031,235.00
5,361,400.00
65,304.25
89,292.50
987,607.50
760,677.50
787,902.50
###
25,190.00
27,384.50
523,462.50
3,554.10
482,295.00
CK Boyolali
HARGA SATUAN
PEKERJAAN
(Rp) 2016
789,525.00
631,675.00
98,274.00
105,534.00
407,715.00
431,915.00
155,072.50
350,331.88
133,952.50
144,842.50
182,099.50
66,253.00
84,260.00
105,572.50
###
238,535.00
224,889.50
215,506.50
210,936.00
209,968.00
199,099.45
114,482.50
107,902.30
104,192.00
101,862.20
100,713.80
98,147.50
100,017.50
197,366.40
198,376.20
249,480.00
###
###
58,185.16
50,999.96
47,939.54
45,810.60
44,657.36
43,711.14
43,208.44
42,705.74
44,449.90
42,515.00
68,243.78
CK Boyolali
HARGA SATUAN
PEKERJAAN
(Rp) 2016
64,163.22
61,245.80
59,786.98
58,446.52
29,477.36
34,334.30
20,131.32
9,669.00
43,126.60
25,355.00
CK Boyolali
HARGA SATUAN
PEKERJAAN
(Rp) 2016
###
153,578.25
158,507.25
171,877.75
173,093.25
150,099.51
77,588.36
82,162.65
165,110.00
165,902.77
165,902.77
242,797.50
291,197.50
303,297.50
59,556.64
83,611.00
100,936.00
###
###
33,500.50
40,771.50
36,646.50
356,188.25
321,823.70
285,593.00
255,893.00
211,343.00
42,795.50
16,643.00
###
76,683.75
68,103.75
97,603.00
97,603.00
59,741.00
54,373.00
46,321.00
51,073.00
69,179.00
88,715.00
59,466.00
28,484.50
###
CK Boyolali
HARGA SATUAN
PEKERJAAN
(Rp) 2016
19,796,997.00
17,047,965.00
14,468,025.00
12,488,025.00
9,320,025.00
752,416.50
660,777.70
564,162.50
484,962.50
366,162.50
966,779.00
875,140.20
778,525.00
699,325.00
580,525.00
643,042.40
588,059.12
530,090.00
482,570.00
411,290.00
1,351,651.40
1,205,029.32
1,050,445.00
923,725.00
733,645.00
690,280.25
633,006.00
572,621.50
523,121.50
448,871.50
731,389.56
672,740.73
610,907.00
560,219.00
484,187.00
1,199,313.50
1,061,855.30
916,932.50
798,132.50
619,932.50
744,757.75
687,483.50
627,099.00
577,599.00
503,349.00
CK Boyolali
HARGA SATUAN
PEKERJAAN
(Rp) 2016
645,084.00
17,801,971.00
15,282,025.00
12,917,080.00
11,102,080.00
8,198,080.00
20,141,214.50
17,392,182.50
14,812,242.50
12,832,242.50
9,664,242.50
17,260,991.00
14,741,045.00
12,376,100.00
10,561,100.00
7,657,100.00
260,984.55
228,912.51
169,615.38
172,892.50
123,348.50
295,485.26
263,413.22
190,318.26
204,572.50
145,524.50
272,190.97
236,911.73
203,802.50
178,392.50
137,736.50
119,102.50
283,695.20
246,354.19
211,310.00
184,415.00
141,383.00
121,660.00
197,585.08
172,842.60
146,756.50
125,372.50
93,296.50
200,077.35
174,876.68
CK Boyolali
HARGA SATUAN
PEKERJAAN
(Rp) 2016
148,307.50
126,527.50
93,857.50
466,360.18
402,216.10
342,017.50
295,817.50
221,897.50
558,474.18
494,330.10
434,131.50
387,931.50
314,011.50
559,546.68
495,402.60
435,204.00
389,004.00
315,084.00
305,595.95
289,559.16
272,651.50
258,791.50
238,001.50
36,239.50
174,273.00
132,693.00
120,373.00
215,869.72
188,379.40
162,580.00
142,780.00
111,100.00
96,580.00
31,515.00
43,065.00
17,733,331.00
15,213,385.00
12,848,440.00
11,033,440.00
8,129,440.00
###
###
184,827.50
93,843.75
183,933.75
CK Boyolali
HARGA SATUAN
PEKERJAAN
(Rp) 2016
23,251.25
18,136.25
17,572.50
84,232.50
189,942.50
28,294.75
98,374.38
128,624.38
144,354.38
###
9,993.50
47,408.90
60,853.10
28,732.00
50,211.70
11,693.00
31,636.00
16,684.25
12,298.00
72,256.25
20,556.25
41,415.00
38,062.20
###
1,621,125.00
356,180.00
2,147,970.00
529,240.80
867,075.00
1,176,709.60
93,786.55
710,138.00
343,612.50
510,757.50
666,182.00
36,171.67
43,730.50
59,246.00
103,367.00
187,836.00
263,879.00
14,932.50
17,916.25
22,178.75
32,202.50
36,038.75
CK Boyolali
HARGA SATUAN
PEKERJAAN
(Rp) 2016
105,173.75
337,012.50
56,933.25
13,887.50
239,354.48
302,145.50
361,491.05
440,884.09
544,444.14
699,019.98
122,870.19
159,592.20
195,329.71
250,916.73
327,651.24
100,395.65
111,950.30
CK Boyolali
DAFTAR ANALISA PEKERJAAN GEDUNG PROYEK
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
ALISA PEKERJAAN GEDUNG PROYEK
HARGA JUMLAH
BAHAN/UPAH
Rp Rp
106,353.50
13,125.00
50,000.00 5,000.00
70,000.00 7,000.00
75,000.00 750.00
75,000.00 375.00
83,560.00
5,600,000.00 67,200.00
13,000.00 260.00
2,300,000.00 16,100.00
96,685.00
9,668.50
106,353.50
1,070,721.30
336,250.00
50,000.00 100,000.00
70,000.00 140,000.00
70,000.00 70,000.00
75,000.00 22,500.00
75,000.00 3,750.00
637,133.00
18,000.00 22,500.00
2,300,000.00 414,000.00
13,000.00 1,040.00
5,000.00 5,500.00
1,400.00 49,000.00
215,000.00 32,250.00
215,000.00 21,500.00
220,000.00 33,000.00
650.00 19,500.00
25,000.00 6,250.00
82,000.00 16,400.00
70,000.00 5,600.00
CK Boyolali
HARGA JUMLAH
BAHAN/UPAH
Rp Rp
49,500.00 7,425.00
52,800.00 3,168.00
973,383.00
97,338.30
1,070,721.30
CK Boyolali
HARGA JUMLAH
BAHAN/UPAH
Rp Rp
936,815.00
208,750.00
50,000.00 50,000.00
70,000.00 140,000.00
75,000.00 15,000.00
75,000.00 3,750.00
642,900.00
18,000.00 30,600.00
2,300,000.00 483,000.00
13,000.00 3,900.00
1,400.00 14,700.00
215,000.00 6,450.00
220,000.00 11,000.00
58,000.00 87,000.00
25,000.00 6,250.00
851,650.00
85,165.00
936,815.00
9,625.00
8,750.00
50,000.00 5,000.00
75,000.00 3,750.00
8,750.00
875.00
9,625.00
256,399.00
23,250.00
70,000.00 21,000.00
75,000.00 2,250.00
209,840.00
5,800,000.00 208,800.00
5,600,000.00 -
13,000.00 1,040.00
233,090.00
23,309.00
256,399.00
CK Boyolali
HARGA JUMLAH
BAHAN/UPAH
Rp Rp
248,593.40
208,750.00
50,000.00 50,000.00
70,000.00 140,000.00
75,000.00 15,000.00
75,000.00 3,750.00
17,244.00
13,200.00 16,500.00
4,000.00 744.00
225,994.00
22,599.40
248,593.40
788,315.00
716,650.00
50,000.00 666,700.00
75,000.00 49,950.00
CK Boyolali
HARGA JUMLAH
BAHAN/UPAH
Rp Rp
716,650.00
71,665.00
788,315.00
369,407.50
335,825.00
50,000.00 333,350.00
75,000.00 2,475.00
335,825.00
33,582.50
369,407.50
63,250.00
57,500.00
50,000.00 50,000.00
75,000.00 7,500.00
57,500.00
5,750.00
63,250.00
Untuk 1 m2 6,325.00
80,437.50
73,125.00
50,000.00 50,000.00
70,000.00 17,500.00
75,000.00 1,875.00
75,000.00 3,750.00
73,125.00
7,312.50
80,437.50
Untuk 1 m2 8,043.75
169,400.00
154,000.00
CK Boyolali
HARGA JUMLAH
BAHAN/UPAH
Rp Rp
50,000.00 100,000.00
70,000.00 42,000.00
75,000.00 4,500.00
75,000.00 7,500.00
154,000.00
15,400.00
169,400.00
Untuk 1 m2 16,940.00
19,250.00
17,500.00
50,000.00 10,000.00
75,000.00 7,500.00
17,500.00
1,750.00
19,250.00
Untuk 1 m2 1,925.00
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
43,312.50
39,375.00
50,000.00 37,500.00
75,000.00 1,875.00
39,375.00
10% 3,937.50
43,312.50
53,212.50
48,375.00
50,000.00 45,000.00
75,000.00 3,375.00
48,375.00
10% 4,837.50
53,212.50
63,277.50
57,525.00
50,000.00 52,500.00
75,000.00 5,025.00
57,525.00
10% 5,752.50
63,277.50
57,640.00
52,400.00
50,000.00 50,000.00
75,000.00 2,400.00
52,400.00
10% 5,240.00
57,640.00
87,450.00
79,500.00
50,000.00 75,000.00
75,000.00 4,500.00
79,500.00
10% 7,950.00
87,450.00
69,712.50
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
63,375.00
50,000.00 60,000.00
75,000.00 3,375.00
63,375.00
10% 6,337.50
69,712.50
3,162.50
2,875.00
50,000.00 2,500.00
75,000.00 375.00
2,875.00
10% 287.50
3,162.50
18,975.00
17,250.00
50,000.00 16,500.00
75,000.00 750.00
17,250.00
10% 1,725.00
18,975.00
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
14,437.50
rugan Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian
13,125.00
50,000.00 12,500.00
75,000.00 625.00
13,125.00
10% 1,312.50
14,437.50
31,625.00
28,750.00
50,000.00 25,000.00
75,000.00 3,750.00
28,750.00
10% 2,875.00
31,625.00
188,925.00
15,750.00
50,000.00 15,000.00
75,000.00 750.00
156,000.00
130,000.00 156,000.00
171,750.00
10% 17,175.00
188,925.00
32,625.00
10% 3,262.50
35,887.50
197,312.50
14,375.00
50,000.00 12,500.00
75,000.00 1,875.00
165,000.00
137,500.00 165,000.00
179,375.00
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
10% 17,937.50
197,312.50
78,925.00
13,250.00
50,000.00 12,500.00
75,000.00 750.00
58,500.00
45,000.00 58,500.00
71,750.00
10% 7,175.00
78,925.00
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAA
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAA
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAA
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAA
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN PONDASI
Pemasangan Pondasi Batu Belah 1SP : 3 PP 862,207.50
138,750.00
50,000.00 75,000.00
70,000.00 52,500.00
75,000.00 5,625.00
75,000.00 5,625.00
645,075.00
215,000.00 258,000.00
1,400.00 282,800.00
215,000.00 104,275.00
783,825.00
10% 78,382.50
Harga Satuan Pekerjaan (D+E) 862,207.50
736,750.00
10% 73,675.00
Harga Satuan Pekerjaan (D+E) 810,425.00
704,110.00
10% 70,411.00
Harga Satuan Pekerjaan (D+E) 774,521.00
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN PONDASI
542,415.00
215,000.00 258,000.00
1,400.00 163,800.00
215,000.00 120,615.00
681,165.00
10% 68,116.50
Harga Satuan Pekerjaan (D+E) 749,281.50
649,710.00
10% 64,971.00
Harga Satuan Pekerjaan (D+E) 714,681.00
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN PONDASI
632,030.00
10% 63,203.00
Harga Satuan Pekerjaan (D+E) 695,233.00
605,895.00
10% 60,589.50
Harga Satuan Pekerjaan (D+E) 666,484.50
386,310.00
10% 38,631.00
Harga Satuan Pekerjaan (D+E) 424,941.00
Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah 2,360,781.50
248,625.00
50,000.00 170,000.00
70,000.00 59,500.00
75,000.00 6,375.00
75,000.00 12,750.00
1,897,540.00
215,000.00 103,200.00
10,500.00 1,323,000.00
1,400.00 271,600.00
215,000.00 67,080.00
220,000.00 102,960.00
16,500.00 29,700.00
2,146,165.00
10% 214,616.50
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN PONDASI
Harga Satuan Pekerjaan (D+E) 2,360,781.50
729,315.00
10% 72,931.50
Harga Satuan Pekerjaan (D+E) 802,246.50
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
3 A.4.1.1.3 1.00 m3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm
A Tenaga
L.01 1.650 OH Pekerja
L.02 0.275 OH Tukang Batu
L.03 0.028 OH Kepala Tukang
L.04 0.083 OH Mandor
B Bahan
299.000 Kg Portland Semen
799.000 kg Pasir Beton
1017.000 kg Kerikil (maksimum 30 mm)
215.000 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
4 A.4.1.1.4 1.00 m3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slu
A Tenaga
L.01 1.200 OH Pekerja
L.02 0.200 OH Tukang Batu
L.03 0.020 OH Kepala Tukang
L.04 0.060 OH Mandor
B Bahan
230.000 Kg Portland Semen
893.000 kg Pasir Beton
1027.000 kg Kerikil (maksimum 30 mm)
200.000 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
767,716.07
10% 76,771.61
844,487.68
0.10
Mpa (K125), slum (12±2)cm, w/c = 0,78 884,551.98
110,075.00
50,000.00 82,500.00
70,000.00 19,250.00
75,000.00 2,100.00
75,000.00 6,225.00
694,063.16
1,400.00 386,400.00
153.57 127,157.14
162.96 164,918.52
72.50 15,587.50
804,138.16
10% 80,413.82
884,551.98
832,699.40
10% 83,269.94
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
915,969.35
721,002.25
10% 72,100.22
793,102.47
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
866,465.67
10% 86,646.57
953,112.24
898,738.03
10% 89,873.80
988,611.83
922,877.58
10% 92,287.76
1,015,165.34
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
162.96 169,318.52
72.50 15,587.50
938,852.45
10% 93,885.24
1,032,737.69
966,305.36
10% 96,630.54
1,062,935.89
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
864,754.83
1,400.00 578,200.00
153.57 104,582.14
162.96 166,385.19
72.50 15,587.50
974,829.83
10% 97,482.98
1,072,312.81
1,037,021.10
10% 103,702.11
1,140,723.21
1,048,182.61
10% 104,818.26
1,153,000.87
134,145.00
9,225.00
50,000.00 3,500.00
70,000.00 4,900.00
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
75,000.00 525.00
75,000.00 300.00
112,725.00
10,500.00 110,250.00
16,500.00 2,475.00
121,950.00
10% 12,195.00
134,145.00
untuk 1 Kg 13,414.50
142,670.00
48,100.00
50,000.00 26,000.00
70,000.00 18,200.00
75,000.00 1,950.00
75,000.00 1,950.00
81,600.00
1,900,000.00 76,000.00
13,000.00 3,900.00
17,000.00 1,700.00
129,700.00
10% 12,970.00
142,670.00
153,120.00
48,100.00
50,000.00 26,000.00
70,000.00 18,200.00
75,000.00 1,950.00
75,000.00 1,950.00
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
91,100.00
1,900,000.00 85,500.00
13,000.00 3,900.00
17,000.00 1,700.00
139,200.00
10% 13,920.00
153,120.00
279,730.00
61,050.00
50,000.00 33,000.00
70,000.00 23,100.00
75,000.00 2,475.00
75,000.00 2,475.00
193,250.00
1,900,000.00 76,000.00
13,000.00 5,200.00
17,000.00 3,400.00
2,300,000.00 34,500.00
109,000.00 38,150.00
18,000.00 36,000.00
254,300.00
10% 25,430.00
279,730.00
287,320.00
61,050.00
50,000.00 33,000.00
70,000.00 23,100.00
75,000.00 2,475.00
75,000.00 2,475.00
200,150.00
1,900,000.00 76,000.00
13,000.00 5,200.00
17,000.00 3,400.00
2,300,000.00 41,400.00
109,000.00 38,150.00
18,000.00 36,000.00
261,200.00
10% 26,120.00
287,320.00
358,930.00
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
61,050.00
50,000.00 33,000.00
70,000.00 23,100.00
75,000.00 2,475.00
75,000.00 2,475.00
265,250.00
1,900,000.00 76,000.00
13,000.00 5,200.00
17,000.00 3,400.00
2,300,000.00 34,500.00
109,000.00 38,150.00
18,000.00 108,000.00
326,300.00
10% 32,630.00
358,930.00
313,280.00
61,050.00
50,000.00 33,000.00
70,000.00 23,100.00
75,000.00 2,475.00
75,000.00 2,475.00
223,750.00
1,900,000.00 57,000.00
13,000.00 5,200.00
17,000.00 3,400.00
2,300,000.00 46,000.00
109,000.00 38,150.00
18,000.00 54,000.00
5,000.00 20,000.00
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
284,800.00
10% 28,480.00
313,280.00
257,895.00
61,050.00
50,000.00 33,000.00
70,000.00 23,100.00
75,000.00 2,475.00
75,000.00 2,475.00
173,400.00
1,900,000.00 57,000.00
13,000.00 5,200.00
17,000.00 2,550.00
2,300,000.00 34,500.00
109,000.00 38,150.00
18,000.00 36,000.00
234,450.00
10% 23,445.00
257,895.00
86,828.50
11,975.00
50,000.00 7,500.00
70,000.00 3,500.00
75,000.00 375.00
75,000.00 600.00
66,960.00
1,900,000.00 50,160.00
13,000.00 7,800.00
18,000.00 9,000.00
78,935.00
10% 7,893.50
86,828.50
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
2,861,875.00
1,900,000.00 380,000.00
13,000.00 19,500.00
17,000.00 6,800.00
10,500.00 1,653,750.00
16,500.00 37,125.00
1,400.00 470,400.00
215,000.00 116,100.00
220,000.00 178,200.00
3,350,150.00
10% 335,015.00
3,685,165.00
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
4,122,800.00
10% 412,280.00
4,535,080.00
6,769,900.00
10% 676,990.00
7,446,890.00
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
220,000.00 178,200.00
2,300,000.00 322,000.00
109,000.00 305,200.00
18,000.00 288,000.00
5,210,275.00
10% 521,027.50
5,731,302.50
4,778,075.00
10% 477,807.50
5,255,882.50
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
4,573,850.00
10% 457,385.00
5,031,235.00
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
4,874,000.00
10% 487,400.00
5,361,400.00
59,367.50
10% 5,936.75
65,304.25
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
57,520.00
1,900,000.00 5,700.00
13,000.00 260.00
10,500.00 37,800.00
16,500.00 825.00
1,400.00 7,700.00
215,000.00 1,935.00
220,000.00 3,300.00
81,175.00
10% 8,117.50
89,292.50
987,607.50
133,125.00
50,000.00 100,000.00
70,000.00 24,500.00
75,000.00 2,625.00
75,000.00 6,000.00
764,700.00
1,400.00 470,400.00
215,000.00 116,100.00
220,000.00 178,200.00
897,825.00
10% 89,782.50
987,607.50
760,677.50
107,875.00
50,000.00 82,500.00
70,000.00 17,500.00
75,000.00 1,875.00
75,000.00 6,000.00
583,650.00
1,400.00 275,800.00
215,000.00 101,050.00
220,000.00 206,800.00
691,525.00
10% 69,152.50
760,677.50
787,902.50
107,875.00
50,000.00 82,500.00
CK Boyolali
HARGA JUMLAH
PEKERJAAN BAHAN/UPAH
Rp Rp
70,000.00 17,500.00
75,000.00 1,875.00
75,000.00 6,000.00
608,400.00
1,400.00 305,200.00
215,000.00 111,800.00
220,000.00 191,400.00
716,275.00
10% 71,627.50
787,902.50
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
17 A.4.2.1.18a 1 m' Pemasangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJL
A Tenaga
L.01 0.15 OH Pekerja
L.02 0.3 OH Tukang Kayu
L.03 0.03 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
1.05 m' Seng Plaat BJLS 30 Lebar 60 cm
0.01 Kg Paku Biasa 1 - 2,5 cm
0.5 Kg Besi strip
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
25,190.00
7,875.00
50,000.00 3,000.00
70,000.00 4,200.00
75,000.00 450.00
75,000.00 225.00
15,025.00
11,500.00 13,225.00
30,000.00 1,800.00
22,900.00
10% 2,290.00
25,190.00
27,384.50
7,875.00
50,000.00 3,000.00
70,000.00 4,200.00
75,000.00 450.00
75,000.00 225.00
17,020.00
14,800.00 17,020.00
24,895.00
10% 2,489.50
27,384.50
475,875.00
10% 47,587.50
523,462.50
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
35,541.00
3,700.00
50,000.00 2,000.00
70,000.00 1,400.00
75,000.00 150.00
75,000.00 150.00
28,610.00
32,000.00 12,800.00
8,700.00 2,610.00
33,000.00 13,200.00
32,310.00
10% 3,231.00
35,541.00
Untuk 1 cm 3,554.10
482,295.00
153,450.00
50,000.00 60,000.00
70,000.00 84,000.00
75,000.00 9,000.00
75,000.00 450.00
285,000.00
285,000.00 285,000.00
438,450.00
10% 43,845.00
482,295.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
ding Door) 0.8 mm 789,525.00
57,750.00
50,000.00 22,000.00
70,000.00 30,800.00
75,000.00 3,300.00
75,000.00 1,650.00
660,000.00
660,000.00 660,000.00
717,750.00
10% 71,775.00
789,525.00
631,675.00
131,250.00
50,000.00 50,000.00
70,000.00 70,000.00
75,000.00 7,500.00
75,000.00 3,750.00
443,000.00
443,000.00 443,000.00
574,250.00
10% 57,425.00
631,675.00
89,340.00
10% 8,934.00
98,274.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
5,640.00
50,000.00 2,150.00
70,000.00 3,010.00
75,000.00 322.50
75,000.00 157.50
90,300.00
78,000.00 85,800.00
750.00 1,500.00
50,000.00 3,000.00
95,940.00
10% 9,594.00
105,534.00
370,650.00
10% 37,065.00
407,715.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
ka Allumunium Coklat 431,915.00
11,250.00
50,000.00 4,250.00
70,000.00 5,950.00
75,000.00 675.00
75,000.00 375.00
381,400.00
78,500.00 345,400.00
5,000.00 22,500.00
50,000.00 13,500.00
392,650.00
10% 39,265.00
431,915.00
140,975.00
10% 14,097.50
155,072.50
350,331.88
219,150.00
50,000.00 83,500.00
70,000.00 116,900.00
75,000.00 12,525.00
75,000.00 6,225.00
99,333.53
500.00 3,088.50
3,554.10 96,245.03
318,483.53
10% 31,848.35
350,331.88
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
yban 5 mm & Tralis 133,952.50
25,575.00
50,000.00 10,000.00
70,000.00 14,000.00
75,000.00 1,500.00
75,000.00 75.00
96,200.00
82,000.00 90,200.00
250.00 2,500.00
500.00 3,500.00
121,775.00
10% 12,177.50
133,952.50
131,675.00
10% 13,167.50
144,842.50
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
rai , Seng BJLS 30 Lebar 90 cm 182,099.50
26,250.00
50,000.00 10,000.00
70,000.00 14,000.00
75,000.00 1,500.00
75,000.00 750.00
139,295.00
42,000.00 44,100.00
13,000.00 195.00
5,000,000.00 95,000.00
165,545.00
10% 16,554.50
182,099.50
60,230.00
10% 6,023.00
66,253.00
76,600.00
10% 7,660.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
BESI & ALLUMUNIUM
84,260.00
95,975.00
10% 9,597.50
105,572.50
CK Boyolali
5000
7000
75
375
8700
3300
24,450.00
360000
384,450.00
CK Boyolali
355,410.00
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
rah ukuran (5x11x22) cm Tebal 1 bata Camp. 1SP: 2PP 238,535.00
47,750.00
50,000.00 30,000.00
70,000.00 14,000.00
75,000.00 1,500.00
75,000.00 2,250.00
169,100.00
650.00 91,000.00
1,400.00 60,900.00
215,000.00 17,200.00
216,850.00
10% 21,685.00
238,535.00
204,445.00
10% 20,444.50
224,889.50
CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
650.00 91,000.00
1,400.00 37,170.00
215,000.00 19,995.00
195,915.00
10% 19,591.50
215,506.50
191,760.00
10% 19,176.00
210,936.00
CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
143,130.00
650.00 91,000.00
1,400.00 25,900.00
215,000.00 26,230.00
190,880.00
10% 19,088.00
209,968.00
180,999.50
10% 18,099.95
199,099.45
rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 2PP 114,482.50
23,875.00
50,000.00 15,000.00
70,000.00 7,000.00
75,000.00 750.00
75,000.00 1,125.00
80,200.00
650.00 45,500.00
1,400.00 26,530.00
215,000.00 8,170.00
104,075.00
CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
10% 10,407.50
114,482.50
rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP 107,902.30
23,875.00
50,000.00 15,000.00
70,000.00 7,000.00
75,000.00 750.00
75,000.00 1,125.00
74,218.00
650.00 45,500.00
1,400.00 20,118.00
215,000.00 8,600.00
98,093.00
10% 9,809.30
107,902.30
rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP 104,192.00
23,875.00
50,000.00 15,000.00
70,000.00 7,000.00
75,000.00 750.00
75,000.00 1,125.00
70,845.00
650.00 45,500.00
1,400.00 16,100.00
215,000.00 9,245.00
94,720.00
10% 9,472.00
104,192.00
CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP 101,862.20
23,875.00
50,000.00 15,000.00
70,000.00 7,000.00
75,000.00 750.00
75,000.00 1,125.00
68,727.00
650.00 45,500.00
1,400.00 13,552.00
215,000.00 9,675.00
92,602.00
10% 9,260.20
101,862.20
rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP 100,713.80
23,875.00
50,000.00 15,000.00
70,000.00 7,000.00
75,000.00 750.00
75,000.00 1,125.00
67,683.00
650.00 45,500.00
1,400.00 11,648.00
215,000.00 10,535.00
91,558.00
10% 9,155.80
100,713.80
rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 8PP 98,147.50
23,875.00
50,000.00 15,000.00
70,000.00 7,000.00
75,000.00 750.00
75,000.00 1,125.00
65,350.00
CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
650.00 45,500.00
1,400.00 9,100.00
215,000.00 10,750.00
89,225.00
10% 8,922.50
98,147.50
rah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3KP 100,017.50
23,875.00
50,000.00 15,000.00
70,000.00 7,000.00
75,000.00 750.00
75,000.00 1,125.00
67,050.00
650.00 45,500.00
1,400.00 6,300.00
215,000.00 10,750.00
300,000.00 4,500.00
90,925.00
10% 9,092.50
100,017.50
179,424.00
CK Boyolali
HARGA JUMLAH
N PEKERJAAN BAHAN/UPAH
Rp Rp
ASANGAN DINDING
10% 17,942.40
197,366.40
180,342.00
10% 18,034.20
198,376.20
226,800.00
10% 22,680.00
249,480.00
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
1 Pp Tebal 15 mm 58,185.16
27,750.00
50,000.00 15,000.00
70,000.00 10,500.00
75,000.00 1,125.00
75,000.00 1,125.00
25,145.60
1,400.00 21,705.60
215,000.00 3,440.00
52,895.60
10% 5,289.56
58,185.16
2 Pp Tebal 15 mm 50,999.96
27,750.00
50,000.00 15,000.00
70,000.00 10,500.00
75,000.00 1,125.00
75,000.00 1,125.00
18,613.60
1,400.00 14,313.60
215,000.00 4,300.00
46,363.60
10% 4,636.36
50,999.96
3 Pp Tebal 15 mm 47,939.54
27,750.00
50,000.00 15,000.00
70,000.00 10,500.00
75,000.00 1,125.00
75,000.00 1,125.00
15,831.40
1,400.00 10,886.40
215,000.00 4,945.00
43,581.40
10% 4,358.14
47,939.54
4 Pp Tebal 15 mm 45,810.60
27,750.00
50,000.00 15,000.00
70,000.00 10,500.00
75,000.00 1,125.00
75,000.00 1,125.00
13,896.00
1,400.00 8,736.00
215,000.00 5,160.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
41,646.00
10% 4,164.60
45,810.60
5 Pp Tebal 15 mm 44,657.36
27,750.00
50,000.00 15,000.00
70,000.00 10,500.00
75,000.00 1,125.00
75,000.00 1,125.00
12,847.60
1,400.00 7,257.60
215,000.00 5,590.00
40,597.60
10% 4,059.76
44,657.36
6 Pp Tebal 15 mm 43,711.14
27,750.00
50,000.00 15,000.00
70,000.00 10,500.00
75,000.00 1,125.00
75,000.00 1,125.00
11,987.40
1,400.00 6,182.40
215,000.00 5,805.00
39,737.40
10% 3,973.74
43,711.14
7 Pp Tebal 15 mm 43,208.44
27,750.00
50,000.00 15,000.00
70,000.00 10,500.00
75,000.00 1,125.00
75,000.00 1,125.00
11,530.40
1,400.00 5,510.40
215,000.00 6,020.00
39,280.40
10% 3,928.04
43,208.44
8 Pp Tebal 15 mm 42,705.74
27,750.00
50,000.00 15,000.00
70,000.00 10,500.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
75,000.00 1,125.00
75,000.00 1,125.00
11,073.40
1,400.00 4,838.40
215,000.00 6,235.00
38,823.40
10% 3,882.34
42,705.74
40,409.00
10% 4,040.90
44,449.90
2 Kp : 8 Pp Tebal 15 mm 42,515.00
28,650.00
50,000.00 18,000.00
70,000.00 8,400.00
75,000.00 900.00
75,000.00 1,350.00
10,000.00
1,400.00 4,200.00
300,000.00 1,500.00
215,000.00 4,300.00
38,650.00
10% 3,865.00
42,515.00
2 Pp Tebal 20 mm 68,243.78
37,150.00
50,000.00 20,000.00
70,000.00 14,000.00
75,000.00 1,500.00
75,000.00 1,650.00
24,889.80
1,400.00 19,084.80
215,000.00 5,805.00
62,039.80
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
10% 6,203.98
68,243.78
58,330.20
10% 5,833.02
64,163.22
4 Pp Tebal 20 mm 61,245.80
37,150.00
50,000.00 20,000.00
70,000.00 14,000.00
75,000.00 1,500.00
75,000.00 1,650.00
18,528.00
1,400.00 11,648.00
215,000.00 6,880.00
55,678.00
10% 5,567.80
61,245.80
54,351.80
10% 5,435.18
59,786.98
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
15,983.20
1,400.00 8,243.20
215,000.00 7,740.00
53,133.20
10% 5,313.32
58,446.52
29,477.36
13,950.00
50,000.00 7,500.00
70,000.00 5,250.00
75,000.00 600.00
75,000.00 600.00
12,847.60
1,400.00 7,257.60
215,000.00 5,590.00
26,797.60
10% 2,679.76
29,477.36
34,334.30
23,875.00
50,000.00 15,000.00
70,000.00 7,000.00
75,000.00 750.00
75,000.00 1,125.00
7,338.00
1,400.00 6,048.00
215,000.00 1,290.00
31,213.00
10% 3,121.30
34,334.30
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
18,301.20
10% 1,830.12
20,131.32
8,790.00
10% 879.00
9,669.00
39,206.00
10% 3,920.60
43,126.60
25,355.00
18,500.00
50,000.00 10,000.00
70,000.00 7,000.00
75,000.00 750.00
75,000.00 750.00
4,550.00
1,400.00 4,550.00
23,050.00
10% 2,305.00
25,355.00
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
14 A.4.4.3.63b 1 m' Pemasangan Plint Kayu Jati kelas III (lebar 10 cm tebal 2 c
Tenaga
L.01 0.12 OH Pekerja
L.02 0.12 OH Tukang Batu
L.03 0.012 OH Kepala Tukang
L.04 0.006 OH Mandor
Bahan
0.003 m3 Papan Kayu jati Klas III
0.05 kg Paku Sekrup 5 cm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
153,578.25
64,750.00
50,000.00 35,000.00
70,000.00 24,500.00
75,000.00 2,625.00
75,000.00 2,625.00
74,866.59
4,090.91 48,559.09
1,400.00 14,000.00
215,000.00 9,675.00
1,755.00 2,632.50
139,616.59
10% 13,961.66
153,578.25
158,507.25
64,750.00
50,000.00 35,000.00
70,000.00 24,500.00
75,000.00 2,625.00
75,000.00 2,625.00
79,347.50
8,000.00 53,040.00
1,400.00 14,000.00
215,000.00 9,675.00
1,755.00 2,632.50
144,097.50
10% 14,409.75
158,507.25
156,252.50
10% 15,625.25
171,877.75
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
70,000.00 24,500.00
75,000.00 2,625.00
75,000.00 2,625.00
92,607.50
10,000.00 66,300.00
1,400.00 14,000.00
215,000.00 9,675.00
1,755.00 2,632.50
157,357.50
10% 15,735.75
173,093.25
150,099.51
64,750.00
50,000.00 35,000.00
70,000.00 24,500.00
75,000.00 2,625.00
75,000.00 2,625.00
71,704.10
1,684.00 44,626.00
1,400.00 14,560.00
1,755.00 2,843.10
215,000.00 9,675.00
136,454.10
10% 13,645.41
150,099.51
77,588.36
52,350.00
50,000.00 45,000.00
70,000.00 6,300.00
75,000.00 675.00
75,000.00 375.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
18,184.88
3,000.00 15,900.00
1,400.00 1,596.00
215,000.00 645.00
1,755.00 43.88
70,534.88
10% 7,053.49
77,588.36
82,162.65
52,350.00
50,000.00 45,000.00
70,000.00 6,300.00
75,000.00 675.00
75,000.00 375.00
22,343.32
4,000.00 21,200.00
1,400.00 798.00
215,000.00 322.50
1,755.00 22.82
74,693.32
10% 7,469.33
82,162.65
165,110.00
22,350.00
50,000.00 8,500.00
70,000.00 11,900.00
75,000.00 1,275.00
75,000.00 675.00
127,750.00
110,000.00 115,500.00
35,000.00 12,250.00
150,100.00
10% 15,010.00
165,110.00
165,902.77
83,250.00
50,000.00 45,000.00
70,000.00 31,500.00
75,000.00 3,375.00
75,000.00 3,375.00
67,570.70
44,600.00 47,276.00
1,400.00 13,020.00
215,000.00 3,870.00
1,755.00 3,404.70
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
150,820.70
10% 15,082.07
165,902.77
165,902.77
83,250.00
50,000.00 45,000.00
70,000.00 31,500.00
75,000.00 3,375.00
75,000.00 3,375.00
67,570.70
m2 44,600.00 47,276.00
Kg 1,400.00 13,020.00
m3 215,000.00 3,870.00
Kg 1,755.00 3,404.70
150,820.70
10% 15,082.07
165,902.77
242,797.50
64,750.00
50,000.00 35,000.00
70,000.00 24,500.00
75,000.00 2,625.00
75,000.00 2,625.00
155,975.00
120,000.00 132,000.00
1,400.00 16,450.00
215,000.00 7,525.00
220,725.00
10% 22,072.50
242,797.50
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
291,197.50
64,750.00
50,000.00 35,000.00
70,000.00 24,500.00
75,000.00 2,625.00
75,000.00 2,625.00
199,975.00
160,000.00 176,000.00
1,400.00 16,450.00
215,000.00 7,525.00
264,725.00
10% 26,472.50
291,197.50
303,297.50
64,750.00
50,000.00 35,000.00
70,000.00 24,500.00
75,000.00 2,625.00
75,000.00 2,625.00
210,975.00
170,000.00 187,000.00
1,400.00 16,450.00
215,000.00 7,525.00
275,725.00
10% 27,572.50
303,297.50
54,142.40
10% 5,414.24
59,556.64
83,611.00
27,200.00
50,000.00 12,000.00
70,000.00 5,600.00
75,000.00 600.00
75,000.00 9,000.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP LANTAI dan DINDING
48,810.00
45,000.00 47,250.00
130,000.00 1,560.00
76,010.00
10% 7,601.00
83,611.00
100,936.00
27,200.00
50,000.00 12,000.00
70,000.00 5,600.00
75,000.00 600.00
75,000.00 9,000.00
64,560.00
60,000.00 63,000.00
130,000.00 1,560.00
91,760.00
10% 9,176.00
100,936.00
CK Boyolali
1.0608
10
0.045
1.5
0.7
0.35
0.035
0.03
0.16 6.25
0.09 11.1111111111
CK Boyolali
0.16
6.25
285000
0.36
2.7777777778
105555.5555556
CK Boyolali
100,000.00
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
30,455.00
10% 3,045.50
Satuan Pekerjaan (D+E) 33,500.50
37,065.00
10% 3,706.50
Satuan Pekerjaan (D+E) 40,771.50
33,315.00
10% 3,331.50
Satuan Pekerjaan (D+E) 36,646.50
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
323,807.50
10% 32,380.75
Satuan Pekerjaan (D+E) 356,188.25
292,567.00
10% 29,256.70
Satuan Pekerjaan (D+E) 321,823.70
259,630.00
10% 25,963.00
Satuan Pekerjaan (D+E) 285,593.00
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
232,630.00
10% 23,263.00
Satuan Pekerjaan (D+E) 255,893.00
192,130.00
10% 19,213.00
Satuan Pekerjaan (D+E) 211,343.00
38,905.00
10% 3,890.50
Satuan Pekerjaan (D+E) 42,795.50
CK Boyolali
HARGA JUMLAH
URAIAN PEKERJAAN BAHAN/UPAH
Rp Rp
15,130.00
10% 1,513.00
Satuan Pekerjaan (D+E) 16,643.00
CK Boyolali
270,000.00
CK Boyolali
jati papan kelas II
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP ATAP
76,683.75
13,912.50
50,000.00 7,500.00
70,000.00 5,250.00
75,000.00 562.50
75,000.00 600.00
55,800.00
3,100.00 55,800.00
69,712.50
10% 6,971.25
76,683.75
61,912.50
10% 6,191.25
68,103.75
69,179.00
18,500.00
50,000.00 10,000.00
70,000.00 7,000.00
75,000.00 750.00
75,000.00 750.00
44,390.00
4,000.00 44,000.00
13,000.00 390.00
62,890.00
10% 6,289.00
69,179.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP ATAP
88,730.00
10% 8,873.00
97,603.00
88,730.00
10% 8,873.00
97,603.00
88,715.00
37,000.00
50,000.00 20,000.00
70,000.00 14,000.00
75,000.00 1,500.00
75,000.00 1,500.00
43,650.00
6,000.00 21,000.00
13,000.00 650.00
1,400.00 15,120.00
215,000.00 6,880.00
80,650.00
10% 8,065.00
88,715.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP ATAP
59,466.00
11,100.00
50,000.00 6,000.00
70,000.00 4,200.00
75,000.00 450.00
75,000.00 450.00
42,960.00
61,000.00 42,700.00
13,000.00 260.00
54,060.00
10% 5,406.00
59,466.00
28,484.50
13,375.00
50,000.00 7,500.00
70,000.00 4,900.00
75,000.00 525.00
75,000.00 450.00
12,520.00
40,000.00 12,000.00
13,000.00 520.00
25,895.00
10% 2,589.50
28,484.50
54,310.00
10% 5,431.00
59,741.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
PENUTUP ATAP
15,500.00 1,860.00
49,430.00
10% 4,943.00
54,373.00
42,110.00
10% 4,211.00
46,321.00
46,430.00
10% 4,643.00
51,073.00
CK Boyolali
3/25/2014
5/13/2014
11/9/2014
59,090.90
52,454.54
CK Boyolali
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
17,997,270.00
0.10 1,799,727.00
19,796,997.00
15,498,150.00
0.10 1,549,815.00
17,047,965.00
13,152,750.00
0.10 1,315,275.00
14,468,025.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
9,635,250.00
8,000,000.00 9,600,000.00
13,000.00 16,250.00
19,000.00 19,000.00
11,352,750.00
0.10 1,135,275.00
12,488,025.00
8,472,750.00
0.10 847,275.00
9,320,025.00
684,015.00
0.10 68,401.50
752,416.50
600,707.00
0.10 60,070.70
660,777.70
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
512,875.00
0.10 51,287.50
564,162.50
440,875.00
0.10 44,087.50
484,962.50
332,875.00
0.10 33,287.50
366,162.50
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
19,000.00 9,500.00
878,890.00
0.10 87,889.00
966,779.00
795,582.00
0.10 79,558.20
875,140.20
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
707,750.00
0.10 70,775.00
778,525.00
635,750.00
0.10 63,575.00
699,325.00
527,750.00
0.10 52,775.00
580,525.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
584,584.00
0.10 58,458.40
643,042.40
534,599.20
0.10 53,459.92
588,059.12
481,900.00
0.10 48,190.00
530,090.00
438,700.00
0.10 43,870.00
482,570.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
75,000.00 18,000.00
75,000.00 3,000.00
144,900.00
5,800,000.00 139,200.00
19,000.00 5,700.00
373,900.00
0.10 37,390.00
411,290.00
1,228,774.00
0.10 122,877.40
1,351,651.40
1,095,481.20
0.10 109,548.12
1,205,029.32
954,950.00
0.10 95,495.00
1,050,445.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
839,750.00
0.10 83,975.00
923,725.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
380,700.00
5,800,000.00 371,200.00
19,000.00 9,500.00
666,950.00
0.10 66,695.00
733,645.00
Pintu kayu lapis (Plywood) Rangkap rangka Kayu Jati Klas I 690,280.25
200,375.00
50,000.00 35,000.00
70,000.00 147,000.00
75,000.00 15,750.00
75,000.00 2,625.00
427,152.50
14,578,500.00 364,462.50
13,000.00 390.00
19,000.00 9,500.00
52,800.00 52,800.00
627,527.50
0.10 62,752.75
660,722.43 690,280.25
Pintu kayu lapis (Plywood) Rangkap rangka Kayu Jati Klas II 633,006.00
200,375.00
50,000.00 35,000.00
70,000.00 147,000.00
75,000.00 15,750.00
75,000.00 2,625.00
375,085.00
12,495,800.00 312,395.00
13,000.00 390.00
19,000.00 9,500.00
52,800.00 52,800.00
575,460.00
0.10 57,546.00
633,006.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
520,565.00
0.10 52,056.50
572,621.50
475,565.00
0.10 47,556.50
523,121.50
408,065.00
0.10 40,806.50
448,871.50
664,899.60
0.10 66,489.96
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
731,389.56
Pintu Plywood rangkap, rangka expose kayu Jati kelas III 672,740.73
229,000.00
50,000.00 40,000.00
70,000.00 168,000.00
75,000.00 18,000.00
75,000.00 3,000.00
382,582.48
12,495,800.00 319,892.48
13,000.00 390.00
19,000.00 9,500.00
52,800.00 52,800.00
611,582.48
0.10 61,158.25
672,740.73
555,370.00
0.10 55,537.00
610,907.00
509,290.00
0.10 50,929.00
560,219.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
229,000.00
50,000.00 40,000.00
70,000.00 168,000.00
75,000.00 18,000.00
75,000.00 3,000.00
211,170.00
5,800,000.00 148,480.00
13,000.00 390.00
19,000.00 9,500.00
52,800.00 52,800.00
440,170.00
0.10 44,017.00
484,187.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
876,660.00
14,578,500.00 874,710.00
13,000.00 1,950.00
1,090,285.00
0.10 109,028.50
1,199,313.50
965,323.00
0.10 96,532.30
1,061,855.30
833,575.00
0.10 83,357.50
916,932.50
725,575.00
0.10 72,557.50
798,132.50
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
213,625.00
50,000.00 33,500.00
70,000.00 140,000.00
75,000.00 15,000.00
75,000.00 25,125.00
349,950.00
5,800,000.00 348,000.00
13,000.00 1,950.00
563,575.00
0.10 56,357.50
619,932.50
677,052.50
0.10 67,705.25
744,757.75
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
395,985.00
12,495,800.00 312,395.00
13,000.00 390.00
19,000.00 5,700.00
77,500.00 77,500.00
624,985.00
0.10 62,498.50
687,483.50
570,090.00
0.10 57,009.00
627,099.00
525,090.00
0.10 52,509.00
577,599.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
19,000.00 5,700.00
77,500.00 77,500.00
457,590.00
0.10 45,759.00
503,349.00
586,440.00
0.10 58,644.00
645,084.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
16,183,610.00
0.10 1,618,361.00
17,801,971.00
13,892,750.00
0.10 1,389,275.00
15,282,025.00
11,742,800.00
0.10 1,174,280.00
12,917,080.00
10,092,800.00
0.10 1,009,280.00
11,102,080.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
1,145,000.00
50,000.00 200,000.00
70,000.00 840,000.00
75,000.00 90,000.00
75,000.00 15,000.00
6,307,800.00
5,600,000.00 6,160,000.00
5,000.00 75,000.00
13,000.00 72,800.00
7,452,800.00
0.10 745,280.00
8,198,080.00
18,310,195.00
0.10 1,831,019.50
20,141,214.50
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
13,893,200.00
11,454,500.00 13,745,400.00
5,000.00 75,000.00
13,000.00 72,800.00
15,811,075.00
0.10 1,581,107.50
17,392,182.50
13,465,675.00
0.10 1,346,567.50
14,812,242.50
11,665,675.00
0.10 1,166,567.50
12,832,242.50
8,785,675.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
0.10 878,567.50
9,664,242.50
15,594,736.00 15,691,810.00
0.10 1,559,473.60 1,569,181.00
17,154,209.60 17,260,991.00
13,400,950.00
0.10 1,340,095.00
14,741,045.00
11,251,000.00
0.10 1,125,100.00
12,376,100.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
70,000.00 504,000.00
75,000.00 54,000.00
75,000.00 9,000.00
8,914,000.00
8,000,000.00 8,800,000.00
5,000.00 75,000.00
13,000.00 39,000.00
9,601,000.00
0.10 960,100.00
10,561,100.00
6,961,000.00
0.10 696,100.00
7,657,100.00
237,258.68
0.10 23,725.87
260,984.55
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
13,000.00 3,250.00
208,102.28
0.10 20,810.23
228,912.51
154,195.80
0.10 15,419.58
169,615.38
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
157,175.00
0.10 15,717.50
172,892.50
112,135.00
0.10 11,213.50
123,348.50
268,622.96
0.10 26,862.30
295,485.26
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
226,341.56
11,454,500.00 160,363.00
8,712,300.00 62,728.56
13,000.00 3,250.00
239,466.56
0.10 23,946.66
263,413.22
173,016.60
0.10 17,301.66
190,318.26
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
185,975.00
0.10 18,597.50
204,572.50
132,295.00
0.10 13,229.50
145,524.50
247,446.34
0.10 24,744.63
272,190.97
215,374.30
0.10 21,537.43
236,911.73
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
70,000.00 21,000.00
75,000.00 2,250.00
75,000.00 5,625.00
148,900.00
9,500,000.00 146,300.00
13,000.00 2,600.00
185,275.00
0.10 18,527.50
203,802.50
162,175.00
0.10 16,217.50
178,392.50
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
125,215.00
0.10 12,521.50
137,736.50
108,275.00
0.10 10,827.50
119,102.50
257,904.73
0.10 25,790.47
283,695.20
223,958.35
0.10 22,395.84
246,354.19
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
75,000.00 2,250.00
75,000.00 750.00
158,100.00
9,500,000.00 154,850.00
13,000.00 3,250.00
192,100.00
0.10 19,210.00
211,310.00
167,650.00
0.10 16,765.00
184,415.00
128,530.00
0.10 12,853.00
141,383.00
110,600.00
0.10 11,060.00
121,660.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
179,622.80
0.10 17,962.28
197,585.08
157,129.64
0.10 15,712.96
172,842.60
133,415.00
0.10 13,341.50
146,756.50
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
13,000.00 1,300.00
113,975.00
0.10 11,397.50
125,372.50
84,815.00
0.10 8,481.50
93,296.50
181,888.50
0.10 18,188.85
200,077.35
158,978.80
0.10 15,897.88
174,876.68
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
70,000.00 14,000.00
75,000.00 1,500.00
75,000.00 375.00
113,950.00
10,300,000.00 113,300.00
13,000.00 650.00
134,825.00
0.10 13,482.50
148,307.50
115,025.00
0.10 11,502.50
126,527.50
85,325.00
0.10 8,532.50
93,857.50
423,963.80
0.10 42,396.38
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
466,360.18
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
322,676.00
11,454,500.00 320,726.00
13,000.00 1,950.00
365,651.00
0.10 36,565.10
402,216.10
310,925.00
0.10 31,092.50
342,017.50
268,925.00
0.10 26,892.50
295,817.50
201,725.00
0.10 20,172.50
221,897.50
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
42,975.00
50,000.00 7,500.00
70,000.00 31,500.00
75,000.00 3,375.00
75,000.00 600.00
464,728.80
13,537,100.00 379,038.80
13,000.00 1,950.00
85,000.00 73,100.00
19,000.00 10,640.00
507,703.80
0.10 50,770.38
558,474.18
449,391.00
0.10 44,939.10
494,330.10
394,665.00
0.10 39,466.50
434,131.50
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
75,000.00 3,375.00
75,000.00 600.00
309,690.00
8,000,000.00 224,000.00
13,000.00 1,950.00
85,000.00 73,100.00
19,000.00 10,640.00
352,665.00
0.10 35,266.50
387,931.50
285,465.00
0.10 28,546.50
314,011.50
508,678.80
0.10 50,867.88
559,546.68
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
11,454,500.00 320,726.00
13,000.00 1,950.00
80,000.00 68,800.00
19,000.00 10,640.00
450,366.00
0.10 45,036.60
495,402.60
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
395,640.00
0.10 39,564.00
435,204.00
353,640.00
0.10 35,364.00
389,004.00
286,440.00
0.10 28,644.00
315,084.00
277,814.50
0.10 27,781.45
305,595.95
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
263,235.60
0.10 26,323.56
289,559.16
247,865.00
0.10 24,786.50
272,651.50
235,265.00
0.10 23,526.50
258,791.50
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
75,000.00 2,250.00
44,615.00
5,800,000.00 40,600.00
13,000.00 1,300.00
18,100.00 2,715.00
216,365.00
0.10 21,636.50
238,001.50
32,945.00
0.10 3,294.50
36,239.50
158,430.00
0.10 15,843.00
174,273.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
120,630.00
0.10 12,063.00
132,693.00
109,430.00
0.10 10,943.00
120,373.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
196,245.20
0.10 19,624.52
215,869.72
171,254.00
0.10 17,125.40
188,379.40
147,800.00
0.10 14,780.00
162,580.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
129,800.00
0.10 12,980.00
142,780.00
101,000.00
0.10 10,100.00
111,100.00
87,800.00
0.10 8,780.00
96,580.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
31,515.00
10,325.00
50,000.00 2,500.00
70,000.00 7,000.00
75,000.00 750.00
75,000.00 75.00
18,325.00
16,500.00 17,325.00
250.00 1,000.00
28,650.00
10% 2,865.00
31,515.00
43,065.00
10,325.00
50,000.00 2,500.00
70,000.00 7,000.00
75,000.00 750.00
75,000.00 75.00
28,825.00
26,500.00 27,825.00
250.00 1,000.00
39,150.00
10% 3,915.00
43,065.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
5,000.00 75,000.00
13,000.00 10,400.00
16,121,210.00
0.10 1,612,121.00
17,733,331.00
13,830,350.00
0.10 1,383,035.00
15,213,385.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
75,000.00 90,000.00
75,000.00 15,000.00
10,535,400.00
9,500,000.00 10,450,000.00
5,000.00 75,000.00
13,000.00 10,400.00
11,680,400.00
0.10 1,168,040.00
12,848,440.00
10,030,400.00
0.10 1,003,040.00
11,033,440.00
CK Boyolali
HARGA BAHAN/UPAH JUMLAH
AN PEKERJAAN
Rp Rp
7,390,400.00
0.10 739,040.00
8,129,440.00
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
KUNCI dan KACA
184,827.50
36,625.00
50,000.00 500.00
70,000.00 35,000.00
75,000.00 750.00
75,000.00 375.00
131,400.00
131,400.00 131,400.00
168,025.00
10% 16,802.50
184,827.50
93,843.75
35,812.50
50,000.00 250.00
70,000.00 35,000.00
75,000.00 375.00
75,000.00 187.50
49,500.00
49,500.00 49,500.00
85,312.50
10% 8,531.25
93,843.75
183,933.75
35,812.50
50,000.00 250.00
70,000.00 35,000.00
75,000.00 375.00
75,000.00 187.50
131,400.00
131,400.00 131,400.00
167,212.50
10% 16,721.25
183,933.75
23,251.25
12,937.50
50,000.00 750.00
70,000.00 10,500.00
75,000.00 1,125.00
75,000.00 562.50
8,200.00
8,200.00 8,200.00
21,137.50
10% 2,113.75
23,251.25
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
KUNCI dan KACA
18,136.25
8,287.50
50,000.00 500.00
70,000.00 7,000.00
75,000.00 750.00
75,000.00 37.50
8,200.00
8,200.00 8,200.00
16,487.50
10% 1,648.75
18,136.25
17,572.50
12,975.00
50,000.00 750.00
70,000.00 10,500.00
75,000.00 1,125.00
75,000.00 600.00
3,000.00
3,000.00 3,000.00
15,975.00
10% 1,597.50
17,572.50
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
KUNCI dan KACA
76,575.00
10% 7,657.50
84,232.50
189,942.50
16,575.00
50,000.00 1,000.00
70,000.00 14,000.00
75,000.00 1,500.00
75,000.00 75.00
156,100.00
156,100.00 156,100.00
172,675.00
10% 17,267.50
189,942.50
28,294.75
20,722.50
50,000.00 1,250.00
70,000.00 17,500.00
75,000.00 1,875.00
75,000.00 97.50
5,000.00
5,000.00 5,000.00
25,722.50
10% 2,572.25
28,294.75
98,374.38
12,431.25
50,000.00 750.00
70,000.00 10,500.00
75,000.00 1,125.00
75,000.00 56.25
77,000.00
70,000.00 77,000.00
89,431.25
10% 8,943.13
98,374.38
128,624.38
12,431.25
50,000.00 750.00
70,000.00 10,500.00
75,000.00 1,125.00
75,000.00 56.25
104,500.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
KUNCI dan KACA
95,000.00 104,500.00
116,931.25
10% 11,693.13
128,624.38
144,354.38
12,431.25
50,000.00 750.00
70,000.00 10,500.00
75,000.00 1,125.00
75,000.00 56.25
118,800.00
108,000.00 118,800.00
131,231.25
10% 13,123.13
144,354.38
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
AIAN PEKERJAAN BAHAN/UPAH
Rp Rp
EKERJAAN PENGECATAN
rokan Permukaan Cat Tembok Lama 9,993.50
7,725.00
50,000.00 7,500.00
75,000.00 225.00
1,360.00
27,200.00 1,360.00
9,085.00
10% 908.50
9,993.50
43,099.00
10% 4,309.90
47,408.90
55,321.00
10% 5,532.10
60,853.10
CK Boyolali
HARGA JUMLAH
AIAN PEKERJAAN BAHAN/UPAH
Rp Rp
EKERJAAN PENGECATAN
28,732.00
11,360.00
50,000.00 2,000.00
70,000.00 4,410.00
75,000.00 4,725.00
75,000.00 225.00
14,760.00
41,000.00 14,760.00
26,120.00
10% 2,612.00
28,732.00
CK Boyolali
HARGA JUMLAH
AIAN PEKERJAAN BAHAN/UPAH
Rp Rp
EKERJAAN PENGECATAN
50,211.70
7,625.00
50,000.00 2,000.00
70,000.00 4,200.00
75,000.00 1,200.00
75,000.00 225.00
38,022.00
51,000.00 7,650.00
51,000.00 18,972.00
5,700.00 11,400.00
45,647.00
10% 4,564.70
50,211.70
10,630.00
10% 1,063.00
11,693.00
31,636.00
20,625.00
50,000.00 8,000.00
70,000.00 11,200.00
75,000.00 1,200.00
75,000.00 225.00
8,135.00
42,100.00 6,315.00
25,000.00 1,250.00
5,700.00 570.00
28,760.00
10% 2,876.00
31,636.00
CK Boyolali
HARGA JUMLAH
AIAN PEKERJAAN BAHAN/UPAH
Rp Rp
EKERJAAN PENGECATAN
15,000.00 1,500.00
21,000.00 2,100.00
21,000.00 5,460.00
15,167.50
10% 1,516.75
16,684.25
11,180.00
10% 1,118.00
12,298.00
72,256.25
16,687.50
50,000.00 1,000.00
70,000.00 14,000.00
75,000.00 1,500.00
75,000.00 187.50
49,000.00
35,000.00 42,000.00
35,000.00 7,000.00
65,687.50
10% 6,568.75
72,256.25
18,687.50
CK Boyolali
HARGA JUMLAH
AIAN PEKERJAAN BAHAN/UPAH
Rp Rp
EKERJAAN PENGECATAN
10% 1,868.75
20,556.25
37,650.00
10% 3,765.00
41,415.00
38,062.20
9,500.00
50,000.00 3,500.00
70,000.00 5,250.00
75,000.00 562.50
75,000.00 187.50
25,102.00
25,000.00 3,750.00
62,800.00 10,676.00
62,800.00 10,676.00
34,602.00
10% 3,460.20
38,062.20
CK Boyolali
6.1.1
6.1.2
6.2
6.2.1
6.6.1 Bahan
0.08 Kg Dempul Jadi
0.02 Kg Minyak Cat
0.1 lbr Amplas
6.6.2 Tenaga
0.04 OH Pekerja
0.04 OH Tukang Cat
0.004 OH Kepala Tukang
0.0025 OH Mandor
6.7.2 Tenaga
0.07 OH Pekerja
0.075 OH Tukang Cat
0.0075 OH Kepala Tukang
0.0025 OH Mandor
6.8.2 Tenaga
0.07 OH Pekerja
0.009 OH Tukang Cat
0.006 OH Kepala Tukang
0.0025 OH Mandor
CK Boyolali
6.9 1 m2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)
1 lap.Cat Dasar & 3 lap.Cat Penutup
6.9.1 Bahan
0.2 Kg Cat Meni
0.15 Kg Plamir
0.17 Kg Cat Dasar
0.35 Kg Cat Penutup 2 kali
6.9.2 Tenaga
0.07 OH Pekerja
0.105 OH Tukang Cat
0.004 OH Kepala Tukang
0.0025 OH Mandor
CK Boyolali
6.10
6.10.1
6.10.2
6.11
6.11.1
6.11.2
6.12
6.12.1
6.12.2
6.13
6.13.1
6.14 1
6.14.2
CK Boyolali
6.15
6.15.1
6.15.2
6.20
6.20.1
6.20.2
CK Boyolali
6.21
6.21.1
6.21.2
0.1
0.01
0.002
CK Boyolali
is Seng (Galvanis) secara
sional dg Tebal 200 μm
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
27 A.5.1.1.37 1 m1 Pas. Buis beton dia 20 cm dengan rolag bata 1 : 4 (rolag pen
A Bahan
0.063 Urugan pasir : 0.1 x 0.7 x 0.9
1.41435 Pas. Bata 1: 4 : 3.143 x 0.45 x 1
1 Pas. Buis beton Ø 20 cm : 1 buah
B Tenaga
0.63 Galian tanah : 0.7 x 0.9 x 1
0.21 Urugan kembali : 1/3 x 0.7 x 0.9 x 1
0.063 Urugan pasir : 0.1 x 0.7 x 0.9
1.41435 Pas. Bata 1: 4 : 3.143 x 0.45 x 1
1 Pas. Buis beton Ø 20 cm : 1 buah
0.42 Pembuangan tanah : 2/3 x 0.7 x 0.9 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
28 A.5.1.1.38 1 m1 Pas. Buis beton dia 30 cm dengan rolag bata 1 : 4 (rolag pen
A Bahan
0.08 Urugan pasir : 0.1 x 0.8 x 1
1.72865 Pas. Bata 1: 4 : 3.143 x 0.55 x 1
1 Pas. Buis beton Ø 30 cm : 1 buah
B Tenaga
0.8 Galian tanah : 0.8 x 1 x 1
0.266667 Urugan kembali : 1/3 x 0.8 x 1 x 1
0.08 Urugan pasir : 0.1 x 0.8 x 1
1.72865 Pas. Bata 1: 4 : 3.143 x 0.55 x 1
1 Pas. Buis beton Ø 30 cm : 1 buah
0.533333 Pembuangan tanah : 2/3 x 0.8 x 1 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
29 A.5.1.1.39 1 m1 Pas. Buis beton dia 40 cm dengan rolag bata 1 : 4 (rolag pen
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
30 A.5.1.1.40 1 m1 Pas. Buis beton dia 50 cm dengan rolag bata 1 : 4 (rolag pen
A Bahan
0.1 Urugan pasir : 0.1 x 1 x 1
2.35725 Pas. Bata 1: 4 : 3.143 x 0.75 x 1
1 Pas. Buis beton Ø 50 cm : 1 buah
B Tenaga
1.2 Galian tanah : 1 x 1.2 x 1
0.4 Urugan kembali : 1/3 x 1 x 1.2 x 1
0.1 Urugan pasir : 0.1 x 1 x 1
2.35725 Pas. Bata 1: 4 : 3.143 x 0.75 x 1
1 Pas. Buis beton Ø 50 cm : 1 buah
0.6 Pembuangan tanah : 2/3 x 0.9 x 1 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
31 A.5.1.1.41 1 m1 Pas. Buis beton dia 60 cm dengan rolag bata 1 : 4 (rolag pen
A Bahan
0.11 Urugan pasir : 0.1 x 1.1 x 1
2.67155 Pas. Bata 1: 4 : 3.143 x 0.85 x 1
1 Pas. Buis beton Ø 60 cm : 1 buah
B Tenaga
1.43 Galian tanah : 1.1 x 1.3 x 1
0.476667 Urugan kembali : 1/3 x 1.1 x 1.3 x 1
0.11 Urugan pasir : 0.1 x 1.1 x 1
2.67155 Pas. Bata 1: 4 : 3.143 x 0.85 x 1
1 Pas. Buis beton Ø 60 cm : 1 buah
0.953333 Pembuangan tanah : 2/3 x 1.1 x 1.3 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
32 A.5.1.1.42 1 m1 Pas. Buis beton dia 80 cm dengan rolag bata 1 : 4 (rolag pen
A Bahan
0.13 Urugan pasir : 0.1 x 1.3 x 1
3.30015 Pas. Bata 1: 4 : 3.143 x 1.05 x 1
2 Pas. Buis beton Ø 80 cm : 2 buah
B Tenaga
1.82 Galian tanah : 1.3 x 1.4 x 1
0.606667 Urugan kembali : 1/3 x 1.3 x 1.4 x 1
0.13 Urugan pasir : 0.1 x 1.3 x 1
3.30015 Pas. Bata 1: 4 : 3.143 x 1.05 x 1
2 Pas. Buis beton Ø 80 cm : 2 buah
1.213333 Pembuangan tanah : 2/3 x 1.3 x 1.4 x 1
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
1,621,125.00
254,750.00
50,000.00 165,000.00
70,000.00 77,000.00
75,000.00 750.00
75,000.00 12,000.00
1,219,000.00
1,150,000.00 1,150,000.00
1,150,000.00 69,000.00
1,473,750.00
10% 147,375.00
1,621,125.00
356,180.00
178,250.00
50,000.00 50,000.00
70,000.00 105,000.00
75,000.00 11,250.00
75,000.00 12,000.00
145,550.00
135,000.00 135,000.00
1,400.00 8,400.00
215,000.00 2,150.00
323,800.00
10% 32,380.00
356,180.00
2,147,970.00
131,250.00
50,000.00 50,000.00
70,000.00 70,000.00
75,000.00 7,500.00
75,000.00 3,750.00
1,821,450.00
1,393,000.00 1,393,000.00
1,393,000.00 417,900.00
1,400.00 8,400.00
215,000.00 2,150.00
1,952,700.00
10% 195,270.00
2,147,970.00
529,240.80
177,250.00
50,000.00 60,000.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
70,000.00 101,500.00
75,000.00 11,250.00
75,000.00 4,500.00
303,878.00
261,900.00 261,900.00
261,900.00 31,428.00
1,400.00 8,400.00
215,000.00 2,150.00
481,128.00
10% 48,112.80
529,240.80
867,075.00
536,250.00
50,000.00 150,000.00
70,000.00 315,000.00
75,000.00 3,750.00
75,000.00 67,500.00
252,000.00
225,000.00 225,000.00
225,000.00 27,000.00
788,250.00
10% 78,825.00
867,075.00
1,176,709.60
534,750.00
50,000.00 300,000.00
70,000.00 210,000.00
75,000.00 22,500.00
75,000.00 2,250.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
534,986.00
650.00 97,500.00
0.11 1,400.00 168,000.00
0.0121 215,000.00 64,500.00
82.6446280992 1,784.00 194,456.00
1,755.00 10,530.00
1,069,736.00
10% 106,973.60
1,176,709.60
93,786.55
12,950.00
50,000.00 7,000.00
70,000.00 4,900.00
75,000.00 525.00
75,000.00 525.00
72,310.50
35,000.00 38,500.00
487,500.00 13,162.50
1,400.00 5,488.00
215,000.00 12,040.00
130,000.00 3,120.00
85,260.50
10% 8,526.05
93,786.55
710,138.00
35,150.00
50,000.00 19,000.00
70,000.00 13,300.00
75,000.00 1,425.00
75,000.00 1,425.00
610,430.00
278,000.00 305,800.00
487,500.00 268,125.00
1,400.00 14,420.00
215,000.00 13,115.00
130,000.00 8,970.00
645,580.00
10% 64,558.00
710,138.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
70,000.00 50,400.00
75,000.00 5,400.00
75,000.00 825.00
147,750.00
650.00 26,000.00
1,400.00 61,600.00
215,000.00 15,050.00
215,000.00 12,900.00
220,000.00 15,400.00
10,500.00 16,800.00
312,375.00
10% 31,237.50
343,612.50
464,325.00
10% 46,432.50
510,757.50
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
Batu Bata 60x60 tinggi 60 cm 666,182.00
242,525.00
50,000.00 160,000.00
70,000.00 80,500.00
75,000.00 825.00
75,000.00 1,200.00
363,095.00
650.00 79,950.00
1,400.00 159,600.00
215,000.00 39,560.00
215,000.00 25,800.00
10,500.00 50,925.00
220,000.00 7,260.00
605,620.00
10% 60,562.00
666,182.00
36,171.67
11,700.00
50,000.00 2,700.00
70,000.00 6,300.00
75,000.00 675.00
75,000.00 2,025.00
21,183.33
13,666.67 16,400.00
13,666.67 4,783.33
32,883.33
10% 3,288.33
36,171.67
43,730.50
11,700.00
50,000.00 2,700.00
70,000.00 6,300.00
75,000.00 675.00
75,000.00 2,025.00
28,055.00
18,100.00 21,720.00
18,100.00 6,335.00
39,755.00
10% 3,975.50
43,730.50
59,246.00
11,700.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
50,000.00 2,700.00
70,000.00 6,300.00
75,000.00 675.00
75,000.00 2,025.00
42,160.00
27,200.00 32,640.00
27,200.00 9,520.00
53,860.00
10% 5,386.00
59,246.00
103,367.00
19,725.00
50,000.00 5,400.00
70,000.00 12,600.00
75,000.00 1,350.00
75,000.00 375.00
74,245.00
47,900.00 57,480.00
47,900.00 16,765.00
93,970.00
10% 9,397.00
103,367.00
187,836.00
24,750.00
50,000.00 6,750.00
70,000.00 15,750.00
75,000.00 1,725.00
75,000.00 525.00
146,010.00
94,200.00 113,040.00
94,200.00 32,970.00
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
170,760.00
10% 17,076.00
187,836.00
263,879.00
24,750.00
50,000.00 6,750.00
70,000.00 15,750.00
75,000.00 1,725.00
75,000.00 525.00
215,140.00
138,800.00 166,560.00
138,800.00 48,580.00
239,890.00
10% 23,989.00
263,879.00
14,932.50
6,600.00
50,000.00 1,800.00
70,000.00 4,200.00
75,000.00 450.00
75,000.00 150.00
6,975.00
4,500.00 5,400.00
4,500.00 1,575.00
13,575.00
10% 1,357.50
14,932.50
17,916.25
6,600.00
50,000.00 1,800.00
70,000.00 4,200.00
75,000.00 450.00
75,000.00 150.00
9,687.50
6,250.00 7,500.00
6,250.00 2,187.50
16,287.50
10% 1,628.75
17,916.25
22,178.75
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
6,600.00
50,000.00 1,800.00
70,000.00 4,200.00
75,000.00 450.00
75,000.00 150.00
13,562.50
8,750.00 10,500.00
8,750.00 3,062.50
20,162.50
10% 2,016.25
22,178.75
32,202.50
9,900.00
50,000.00 2,700.00
70,000.00 6,300.00
75,000.00 675.00
75,000.00 225.00
19,375.00
12,500.00 15,000.00
12,500.00 4,375.00
29,275.00
10% 2,927.50
32,202.50
36,038.75
9,900.00
50,000.00 2,700.00
70,000.00 6,300.00
75,000.00 675.00
75,000.00 225.00
22,862.50
14,750.00 17,700.00
14,750.00 5,162.50
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
32,762.50
10% 3,276.25
36,038.75
105,173.75
23,925.00
50,000.00 4,050.00
70,000.00 9,450.00
75,000.00 10,125.00
75,000.00 300.00
71,687.50
46,250.00 55,500.00
46,250.00 16,187.50
95,612.50
10% 9,561.25
105,173.75
337,012.50
25,875.00
50,000.00 1,500.00
70,000.00 21,000.00
75,000.00 2,250.00
75,000.00 1,125.00
280,500.00
230,500.00 230,500.00
50,000.00 50,000.00
306,375.00
10% 30,637.50
337,012.50
56,933.25
31,875.00
50,000.00 500.00
70,000.00 28,000.00
75,000.00 3,000.00
75,000.00 375.00
19,882.50
19,800.00 19,800.00
3,300.00 82.50
51,757.50
10% 5,175.75
56,933.25
13,887.50
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
8,625.00
50,000.00 500.00
70,000.00 7,000.00
75,000.00 750.00
75,000.00 375.00
4,000.00
4,000.00 4,000.00
12,625.00
10% 1,262.50
13,887.50
217,594.98
10% 21,759.50
239,354.48
274,677.73
10% 27,467.77
302,145.50
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
221,772.79
156,000.00 14,040.00
70,845.00 144,732.79
63,000.00 63,000.00
106,855.43
39,375.00 38,981.25
13,125.00 4,331.25
15,750.00 1,417.50
23,875.00 48,775.43
3,000.00 3,000.00
17,250.00 10,350.00
328,628.22
10% 32,862.82
361,491.05
400,803.72
10% 40,080.37
440,884.09
494,949.22
10% 49,494.92
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
544,444.14
635,472.71
10% 63,547.27
699,019.98
111,700.17
10% 11,170.02
122,870.19
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
145,083.82
10% 14,508.38
159,592.20
177,572.47
10% 17,757.25
195,329.71
228,106.12
10% 22,810.61
250,916.73
CK Boyolali
HARGA JUMLAH
AN PEKERJAAN BAHAN/UPAH
Rp Rp
SANITASI DALAM GEDUNG
23,875.00 19,134.98
4,000.00 4,000.00
17,250.00 12,650.00
297,864.76
10% 29,786.48
327,651.24
91,268.78
10% 9,126.88
100,395.65
101,773.00
10% 10,177.30
111,950.30
CK Boyolali
0.9922
0.0121 360 4.356
0.04 109 4.36 25
108.9
CK Boyolali
263,289.93
CK Boyolali
135,157.21
CK Boyolali
280,450.51
183,469.85
12,600.00
55,169.85
115,700.00
71,485.17
35,858.63
3,984.29
1,303.95
CK Boyolali
15,865.20
4,000.00
10,473.10
254,955.01
25,495.50
280,450.51
4000
CK Boyolali
HARGA JUMLAH
No. KOEF SAT. 0 BAHAN/UPAH
Rp Rp
HARGA SATUAN PEKERJAAN BEGESTING
1 1 m2 Memasang Bekisting untuk Pondasi 85,506.67
A Tenaga 48,100.00
0.52 OH Pekerja 50,000.00 26,000.00
0.26 OH Tukang Kayu 70,000.00 18,200.00
0.03 OH Kepala Tukang 75,000.00 1,950.00
0.03 OH Mandor 75,000.00 1,950.00
B Bahan 29,633.33
0.01 m3 Kayu Klas III 1,900,000.00 25,333.33
0.20 Kg Paku Biasa 2" - 5" 13,000.00 2,600.00
0.10 Ltr Minyak Bekisting 17,000.00 1,700.00
C PERALATAN
D Jumlah A + B + C 77,733.33
E Overhead & Profit 10% 7,773.33
F Harga Satuan Pekerjaan (D+E) 85,506.67
CK Boyolali
A Tenaga 61,050.00
0.66 OH Pekerja 50,000.00 33,000.00
0.33 OH Tukang Kayu 70,000.00 23,100.00
0.03 OH Kepala Tukang 75,000.00 2,475.00
0.03 OH Mandor 75,000.00 2,475.00
B Bahan 285,950.00
0.04 m3 Kayu Klas III 1,900,000.00 76,000.00
0.40 Kg Paku Biasa 2" - 5" 13,000.00 5,200.00
0.20 Ltr Minyak Bekisting 17,000.00 3,400.00
0.02 m3 Balok Kayu Klas II (Borneo) 5,600,000.00 84,000.00
0.35 Lbr Plywood tebal 9mm 109,000.00 38,150.00
6.00 Btg Bambu 13,200.00 79,200.00
C PERALATAN
D Jumlah A + B + C 347,000.00
E Overhead & Profit 10% 34,700.00
F Harga Satuan Pekerjaan (D+E) 381,700.00
CK Boyolali
No. KOEF SAT. URAIAN PEKERJAAN
CK Boyolali
HARGA JUMLAH
BAHAN/UPAH
Rp Rp
Err:509
175,000.00
50,000.00 100,000.00
75,000.00 75,000.00
Err:509
72,500.00 87,000.00
Err:509 Err:509
13,200.00 13,200.00
Err:509
Err:509
Err:509
Err:509
43,750.00
50,000.00 25,000.00
75,000.00 18,750.00
Err:509
72,500.00 43,500.00
Err:509 Err:509
Err:509
Err:509
Err:509
CK Boyolali