10" CHB 34 3 102 90 sq.

m chb wall
1.6 0.6 0.96
1.5 1.5 2.25 mortar 90 sq.m rsb
0.5 0.5 0.25 cement 47 bags ver 192
0.5 0.5 0.25 sand 4 cu.m hor 194
1.5 1.5 2.25
0.8 2.1 1.68 plaster 152 sq.m
0.8 2.1 1.68 cement 36 bags
0.8 2.1 1.68 vibro 3 cu.m
0.7 2.1 1.47
l.m
l.m
SCOPE OF WORK QUANTITY UNIT UNIT COST

I CLEARING AND DEMOLITION


Roof Stripping
Site Clearing

II EXCAVATION
Roof Stripping
Erection of trusses

II MASONRY WORKS
Concrete Hollow Blocks 1200 pcs 6
Portland Cement 85 bags 240
Sand S1 (CHB Mortar) 4 cu.m
Vibro Sand (Plastering) 3 cu.m
10mm Ø Reinforcing Steel Bar 70 pcs 0
GI Wire 3 kgs 0
Labor manhour 68

TOTAL COST

II REINFORCED CONCRETE WORKS


Portland Cement 85 bags 240
Sand S1 (CHB Mortar) 4 cu.m
Gravel 3 cu.m
16mm Ø Reinforcing Steel Bar 70 pcs 0
10mm Ø Reinforcing Steel Bar 70 pcs 0
GI Wire 3 kgs 0
Labor manhour 68
TOTAL COST

0
0

0
0

7200
20400
0
0
0
0
0

27600

20400
0
0
0
0
0
0