Exp Joint Installation http://www.psi-linedpipe.com/ExpJointInstll.

htm

Suggested Installation as Pump Connectors

End Suction Vertical Discharge Pump


End Suction Vertical Discharge Pump Pump is mounted on spring-supported inertia block Discharge and suction piping
Pump is solid mounted Pipe is anchored to support it and to have been arranged to be parallel with drive shaft of pump. Locating flexible coupling
stabilize bellows flanges farthest from pump. Use "H-frame" further away from pump minimizes strain from misalignment or angular deflection.
anchor for vertical discharge and pipe leg anchor for horizontal
suction piping.

Double suction Split Case Pump Solid Mounted


Flexible couplings in horizontal lines Similar to Plate 3 except anchors are located at
Double Suction Split Case Pump Solid Mounted 90° elbows where piping changes from horizontal to vertical. Flanges farthest from
Flexible connectors in vertical lines "H-frame" supports contain pump are stabilized. Design prevents excessive misalignment or angular deflection.
end thrust and prevent lateral motion that might cause Pipe-leg anchor and floor flange must be designed to withstand the forces and
excessive misalignment. Anchors are welded to pipe before movements imposed on it by the piping system.
installation of bellows. Weight of pipe should not compress the
bellows.

1 de 3 26/09/2008 3:16 PM
Exp Joint Installation http://www.psi-linedpipe.com/ExpJointInstll.htm

Suggested Installation as Expansion Joints


Typical Piping Layout Procedures and practices for bellows expansion joint applications include installation of anchors and guides in accordance with
EJMA standards.
Bellows Installation Instructions

Do not bore out threads in bolt holes.


Do not exceed pressure/temperature ratings shown here
Safeguard units in hazardous service. (See below)
Follow sound installation procedures. A typical reference in the "Piping Handbook" by Nayyar, published by
McGraw-Hill.
Leave limit bolts in "as received" factory settings. Severe damage can result if the limit bolts and stop nuts are
removed, replaced or altered to exceed the factory setting.
Remove flange covers only when ready to install bellows.
Insure that sealing faces are clean, smooth & parallel.
For hot service install nearly extended; for cold service install nearly compressed.
Thread installation bolt from mating flange side to prevent possible damage to the TFE element. Do not extend bolts
behind bellows flange more than 1-2 threads. Nut not necessary.

Additional information & specific bolt torque data will be found on the detailed installation instruction sheet included in the box of
each & every unit shipped.

WARNING: Failure to follow the above installation instructions may cause premature failure and/or rupture of the unit resulting
in property damage, serious personal injury or death.

Bolt Torque Information


Bolts should be tightened using the following torques as a guide and with well lubricated threads. Additional information &
specific bolt torque data will be found on the detailed
installation instruction sheet included in the box of each & every unit shipped.
Nominal Expansion Joint
1 1 1/2 2 2 1/2 3 4 5 6 8 10 12
Size (inches)

2 de 3 26/09/2008 3:16 PM
Exp Joint Installation http://www.psi-linedpipe.com/ExpJointInstll.htm

Flange Bolt Torque


10 15 25 30 40 30 40 60 75 70 75
ft.-lbs.
No. of Holes
4 4 4 4 4 8 8 8 8 12 12
Per Flange

Note: The values in this table are a guide.


In some instances, higher torque may be
required. However, excessive torque
should be avoided. Do not exceed twice
the given values.

Use of Internal Sleeves in Expansion Joints - Certain abrasive


applications, such as slurries, or high velocity flow rates may damage the inside
surfaces of the bellows convolutes or the radius surface at the end flares. In such
circumstances a nozzle liner may be factory installed in the up-stream side (inlet) of
the bellows to help protect the unit or smooth out the flow. While such liners may
greatly extend useful service life of the bellows, they will restrict movement unless
all deflection is confined to straight axial compression and/or extension. Unless
other wise specified, overall length is 6". Available for use with bellows units
through 8" sizes.

Safeguarding - The Chemical Plant and Petroleum Refinery Pressure Piping Code, ANSI/ASME B31.3, in
Appendix G outlines recommendations for safeguarding piping systems. PSI subscribes to this emphasis on
safety and endorses the code suggestion for shielding bellows units where hazardous fluids are conveyed.

Information on wrap-around safety shields

Limit Bolt - Limit bolts with elastic stop nuts are factory set at the maximum travel position to prevent
overextension.

Severe damage or personal injury can result if the limit bolts and stop nuts are removed or altered to
exceed the factory setting or if non-locking nuts are installed.