Professional Documents
Culture Documents
htm
1 de 3 26/09/2008 3:16 PM
Exp Joint Installation http://www.psi-linedpipe.com/ExpJointInstll.htm
Additional information & specific bolt torque data will be found on the detailed installation instruction sheet included in the box of
each & every unit shipped.
WARNING: Failure to follow the above installation instructions may cause premature failure and/or rupture of the unit resulting
in property damage, serious personal injury or death.
2 de 3 26/09/2008 3:16 PM
Exp Joint Installation http://www.psi-linedpipe.com/ExpJointInstll.htm
Safeguarding - The Chemical Plant and Petroleum Refinery Pressure Piping Code, ANSI/ASME B31.3, in
Appendix G outlines recommendations for safeguarding piping systems. PSI subscribes to this emphasis on
safety and endorses the code suggestion for shielding bellows units where hazardous fluids are conveyed.
Limit Bolt - Limit bolts with elastic stop nuts are factory set at the maximum travel position to prevent
overextension.
Severe damage or personal injury can result if the limit bolts and stop nuts are removed or altered to
exceed the factory setting or if non-locking nuts are installed.
3 de 3 26/09/2008 3:16 PM