Department Head :
Scope of Work:
Number of Resources:
Number of ERP Users:
Number of Resources for Manual activ
Any other Remarks/Reports
Department Structure:
PPC
Sudhindra Kulkarni
1. The objective of the process is to plan and ensure that the products are
manufactured in a controlled manner as per the customer purchase order
and/or contract (accepted configuration).
2. To meet on-time and quality customer delivery rate fluctuation linked to
customer demand variation by taking into account demonstrated capacity
in planning activities.
3. Develop priority planning to satisfy demand at each level of the
production management system.
4. Ensuring the right level of resources.
15
15
2
High Level Business Unit Process Flow Chart
[The below steps are just for example purpose..Please delete
them and then add your department specific steps]
CU/ Forecasted
APM A Resource planning as per AxMP-01.2.
sales order
(Infrastructure, Capacity, Manpower).
DUH/ Cutting tool plan per Business
AxMP-05.5plan
and Budget
APM. plan
Yes
PPC MPS
C
B
PPC MPS
SCM
Check inventory coverage SCM
for tracker
rolling 12 months.
SCM tracker
SCM and action
tracker.
Raise MPR for which material is
not ordered/MPR not raised.
Raise MPR for which material is
not ordered/MPR not raised.
SCM tracker
SCM and action
tracker.
No
On track?
3 months
PPC production
Yes plan.
Escalate.
Adaptive actions as AxMP-05.2.
PPC LoB/MRP
Follow AxMP-05.2 “Delay
Management” process.
D 3 months
PPC production
plan.
A C D
3 months
PPC Confirm next 3 months Production production
plan. plan.
3 months
PPC No production
Acceptable? plan.
Yes
3 months
PPC production
Load for maximum demonstrated
plan
capacity.
Load for maximum demonstrated
capacity.
Monthly
PPC scheduling
plan.
Trigger overtime, tactical
outsourcing, production process
changes request, etc., as needed.
Route card
PPC and shop
order.
Mfg. of parts,
E and QA
Prod. clearance on
r/c, parts.
Monthly sales
APM plan
Monitor and track daily.
Products
Follow AxMP-05.2 “Dela
cleared from
QAmanagement” process.
QA on r/c and
ERP.
Line impacting
delivery dates?
Buffer stock
PPC and APM monitoring
tracker, LoB.
Monthly
PPC Monitoring
production of stock levels
plan
monthly basis as agreed w
customer.
As per contract?
Route card
PPC and shop
order release.
Routecard Management
Route card
signed and
QA and stores Route card and shop order released and
stamped,
handover to stores. material.
R/C holding responsibility – Stores.
SCPO, parts,
In-process inspection as per theroute
defined
card
signed and
routings by QA inspectors.
SCM and QA
R/C holding responsibility –stamped
QA. for
previous
operations.
A
GRN
clearance,
route card
QA signed and
stamped for
Movement of material to suppliers after
RI, parts.
100% machining completion as per
routing.
R/C holding responsibility – Stores.
Route card,
Prod. parts.
Receipt of parts from suppliers. Raise
GRN, move and handover the original r/c
to receiving inspection.
Inspect and clear parts. FG parts
R/C holding responsibility –credited
QA. to
stores,
QA transactions
in ERP, r/c
signed and
stamped.
Move to subsequent operation if
applicable.
R/C holding responsibility – Prod.
Outputs / Control
Process Steps Resp. / Sup Documents method
12 months Monthly sales
PPC Engineer forecast
plan review
report.
PPC/
Capacity plan Monthly sales
plan review
Planning. APM
MPS mapped
PPC Engineer with capacity Monthly sales
requirement plan review
apacity required. report.
level).
nstrated capacity.
MPS mapped
with capacity Monthly sales
PPC Engineer requirement plan review
report.
machines planned
y required. MPS mapped
with capacity
requirement Monthly sales
PPC Engineer report. plan review
Action list if
No any.
PPC
Engineer/SC Action Monthly sales
tracker plan review
M
Monthly
PPC Engineer Material
MPRs’. planning
/ME review
Monthly
SCM/
SCM tracker. Material
planning
ME review
Monthly
PPC/ SCM tracker Material
and action planning
tracker.
SCM review
Monthly
PPC/ SCM tracker Material
and action planning
tracker.
SCM review
Delay
PPC and SCM management
tracker, SCM Sales review
tracker.
PPC/ Delay
management Sales review
meetings
SCM tracker.
PPC/ 3 months
Sales review
production meetings
APM plan.
Lob reflecting
3 months
PPC/ production Sales review
plan meetings
populated
with material
availability.
. SCM
AxMP-05.2.
Lob reflecting
3 months
production Sales review
PPC plan meetings
.2 “Delay populated
with material
process. availability.
Cutting tool
Prod/ plan
incorporated Sales review
into monthly meetings
plan/LoB.
SCM
Agreed 3
months
production
PPC and APM plan Sales review
published, meetings
Action
tracker, if
applicable.
Agreed 3
months
production
plan Sales review
PPC published, meetings
Action
tracker, if
applicable.
Relevant
requests such
PPC/ as Sales review
outsourcing, meetings
ECRs’,
overtime, etc.
SCM
Concerned Relevant Sales review
Process records meetings
owners applicable.
Sales and
PPC/ Monthly Production
scheduling
review
plan.
Prod. meetings
Route card Sales and
and shop Production
PPC orders
review
released for meetings
manufacture.
Route cards
Prod and Sales and
updated for
SCM/ Production
manufacturin review
g stages, meetings
products.
QA
Route cards
updated for
manufacturin Sales and
g stages, Production
Prod and QA products, review
stage meetings
clearances in
ERP.
Sales and
Sales tracker Production
PPC updated, review
Action list. meetings
Sales and
Sales tracker Production
PPC updated, review
Action list. meetings
Delay
management Sales review
PPC meetings
tracker.
Concerned Delay Sales review
process management meetings
owners tracker.
Delay
Follow AxMP-05.2 “Delay management
Sales review
management” process. tracker
meetings
updated.
PPC Products
credited to
stores with
Take adaptive actions as documents.
per AxMP-05.2
PPC
Line impacting
delivery dates? Buffer stock
APM/ monitoring Sales review
tracker, meetings
Recovery
plan, LoB.
PPC
CreditProcess
to stores. Outputs / Control
Steps Resp. / Sup Documents method
Hard copy of
Route card
and shop Sales review
Monitoring of stock levels
PPCon order and meetings.
monthly basis as agreed with released in
customer. ERP.
Material
released,
route card
As per contract? and shop
order Production
Stores updated with review
traceability meetings.
requirements
, signed and
Recovery planstamped
(LoB). on
r/c andplan
Include in 3 months s/o.
to build buffer stock.
Material
released,
Present Buffer stock status in route card
MRM. and shop
order Production
QA updated with review
traceability meetings.
requirements
, signed and
stamped on
r/c and s/o.
Physical
movement of Production
Prod. material to review
WIP area in meetings.
production.
Route card
updates,
clearances in Production
ERP and
Prod. review
physical
movement of meetings.
parts to work
centers.
Route card
updates,
clearances in Production
QA ERP, stamped review
meetings.
and signed
on r/c.
Route card
updates,
clearances in
Production
ERP and
Prod. review
physical
movement of meetings.
parts to work
centers.
Route card
updates,
clearances in
ERP and
Stores and Sales review
Logistics/SCM physical
movement of meetings.
parts to
suppliers, DC
and SCPO.
Receipt of
finished parts
as per routing
from
Stores and suppliers, Sales review
QA GRN, ERP meetings.
clearances,
receiving
inspection
reports.
ERP
transactions Production
and
Prod. movement of review
meetings.
parts for
processing.
Credit of
finished parts
as per
routing, GRN, Sales review
QA ERP meetings.
clearances,
inspection
reports.
Records
QA Audits.
maintained.
MRP & MPS
Capacity planning
WIP report
S. No. Steps in detail Process Person Responsible
1 We are having orders from Inter unit (ASM1-- Sales Order APM
>ASM2, ASM -->API, AAI-->ASM, ASYM-->ASM). Creation
Eventhogh all orders are in Navigen , we need to
enter the data in each unit again manual
16 Green Tag, Yellow tag and Red tag should generate Quality Control Devanand
from system.
22 System Flow and Physical flow not matching ERP Integration Maria
23 Shelf life order should trigger with Consumption Purchase Order Vinod
and expiry date
61 Auto trigger on the status where it increases more Delay management CFT
than L/T /Trigger for deviation in
Production,Vendor,Deburr,QA
65 Auto GRN updation in SO (Split the SO as per Shop order control PPC
Heatnumber) for indentified qty (Ex: 50pcs launch-
SO has to split automatically based on heatnumber
in system
66 Consume RM based on Heatnumber available in RC Inventory Control Stored
Manual Demand, Stock, Current System doesn't support MRP. System should run
WIP,PO,PR MRP automatically (Family, Customer, Part level etc..)
Manual Demand, Stock, MPS is manual and it need to be done automated for
WIP,PO,PR 18months. SIOP not in place and it should generate
Considering RM, Capacity in Plance
Manual WIP, Production Pllan Production Plan and Actual should be through system and
realtime.
Manual WIP System does not calculate the WIP valuation automatically.
And it also doesn't tell about planned cost and actual cost
at WIP
ERP System WIP Parts physically credited to store and system tells at WIP
and Vice versa.
Manual Quality Based on the acceptence, all quality tags should come
from system and not manual-currently manual
Manual Demand, Stock, Data integration with other scheduler to be smooth and
WIP,PO,PR easy data transfer in both way.
ERP System Stock, WIP Planner not getting realtime WIP which is impacting the
decision making
ERP System PO, DC , Invoice There are many duplication of work in ERP.(GRN Creation
for Interunit DC, PO etc..)
ERP System DC We create the DC for "X" vendor and send the parts to "X"
vendor subcontracting. But "X" denies the parts due to his
load etc… In this we cannot reverse the DC and send it to
another vendor
ERP System Flow of Information Parts physically goes to store , but shows in WIP and Vice
Versa
ERP System MRP,PO The material which are having Shelflife,PR should generate
based on Expiry date and Min Max Stock
ERP System Access Control Currently anybody can move inventory from any location
to any location
ERP System BOM, Routing Current BOM and Routing is not operation wise -stage
wise. Which is impacting the inventory control and WIP
Control
ERP System SO,Routing, Master System should record the average actual cycle time /month
wise and populate the same in routing file
ERP System Item Card Current item codes have duplication( Same material
-procuring at 3 different codes) causing inventory variation
ERP System Item Whenever the MO revised, system should trigger DFAI
Card,BOM,Routing automatically in System and to be printed on SO. DFAI SO
should prioritize in Planning. DFAI SO list with change
details to be avaialble in System
ERP System Item Whenver Delta FAI production order generated, alert mail
Card,BOM,Routing should go to CFT.
ERP System PO Whenever SCM revised PO date(Deviation to PR date),
change content should go to Indenter.
ERP System Demand, Stock, We need a report for the visibilty for coverage of Parts
WIP,PO,PR against demand and Production
ERP System Demand, Stock, We need a report for the visibilty for Status of Demand
WIP,PO,PR (FG Stock, WIP, RM Coverage etc..)
ERP System Sales Order, GRN, RC COC is manual process. We need automated.
ERP System Configuration data Whenever part has revised, Revised parts Production order
should process 1st and then subsequent production order
ERP System Scheduling, Production Plan Vs Actual report to be generated and automail should
Actual go from system.
ERP System Scheduling, Production Auto generated plan to deburring, QA, vendor and Stores
Actual for their function
ERP System Stock, WIP End bits identified for disposal should not be taken for RM
Ordering
ERP System Stock, WIP Double inventory should not get generated for any
production order.
ERP System Production actual Production confirmation should happen against operation
wise
ERP System Sales Order, Production Series production Order should not release before
order mastering the data
ERP System Stock Inventory Should consume based on FIFO at all levels
ERP System Production order, Rework Production order and Rework Purchase order
Purchase order should happen automatically
ERP System Production Order Assembly order should not be launched unless we have
child parts in stock
ERP System Production order, Customer PO number to be appear on Delivery challan and
Purchase order assembly order.
ERP System Purchase Order Transit Inventory details should be there in system (ASN to
be updated in system)
Manual Production Order card Production order card should have visibility that part is
Class-1 Part.
Manual Production Order card Whenever we have launched as AOG or Premium, System
should trigger in System and also Routecard as critical
ERP System Production order, Lot number to update auto for all parts
Purchase order
ERP System Production Order card There should be identification for FG,CP, Spare routecard.
ERP System Production order, No Inventory credit without input material consumption.
Purchase order However there should be provision for Positive re call.
ERP System Stock Whenver partial bulk material is partially used, mandatory
field to update the balance size also.
ERP System Sales Order Whenever demand updates in firm zone, there should be
alert communication to CFT
ERP System Sales Order, Production Sales tracker to be reviewed through System
order,
ERP System Stock Whenver any part declared as scrap and physical
disposition of scrap made (Scrap sales), Inventory to be
removed from system.
ERP System Production Order Whenevr any production order delayed at any stage more
than planned, there should be trigger in System for
delayed stage
ERP System WIP Data Production order aging data with status of parts.
ERP System Master data ECR to be filled throgh system and monitored via system
ERP System Sales order Actual OTIF and Projected OTIF to be get from system
ERP System Production Actual Planned Vs Actual usage of Machine hours for FAI
ERP System NC Data Historical data of Scrap ratio / Rework ratio of parts
ERP System Production Order/Sales Production should plan based on batch size of Production
Order
ERP System Production Order/Sales Production should plan based on Scrap/Rework ratio
Order,NC Data
ERP System BOM, Routing,MPS Capacity to be calculated based on actual OEE and
Standard OEE
ERP System Production order Partial inventory should not be made for workcenter
ERP System Sales Order BD has to maintain standard cost of Child parts and its
actual cost to be monitired
ERP System BOM,Routing Standard and actual through put time each time should be
made in System.
ERP System Master data Varaiable leadtime wrt Vendor and part should be
available
ERP System Routing,Production Set-up time and Inspection time should be consider in
scheduling
ERP System Routing,Production MPS should run based on fgbuild plan of various situation
(Absolute number, Based on demand, etc…)
ERP System Production Order Outsourced orders to be identified by stores team, so that
RM can be sent against these orders to vendor.
SAP Team comments Remarks
SAP Standard
SAP Standard
SAP Standard
Other Module SD
SAP Standard
SAP Standard
SAP Standard
SAP Standard
SAP Standard
SAP Standard
SAP Standard
SAP Standard
SAP Standard
SAP Standard
SAP Standard
SAP Standard
SAP Standard
SAP Standard
SAP Standard
SAP Standard
SAP Standard
SAP Standard
SAP Standard
SAP Standard
SAP Standard
SAP Standard
SAP Standard Not Possible in case of External processing.
If it is Material subcon You may create
manually.
SAP Standard
Other Module MM
SAP Standard
Other Module SD
SAP Standard
SAP Standard
Need more information.
SAP Standard
WRICEF Enhancement.
SAP Standard
SAP Standard
SAP Standard
SAP Standard
Other Module MM
Remedy
MRP Run
MPS Run
MPS Run
MRP Run
WIP Reporting
To be checked during
configuration -Process flow
Automatic TECO
No. duplication of
confirmations
Based on launching -
Serialisation to be updated
Blanket SCPO
Transaction
FG credit report
Capacity planning
Costing
MPS based on FG build plan
Some Customization in
System OR Give SO of
different colour
Requirements
1) Sales Order data - Firm & FCST (12 Mnths & 18 Mnths)
2) MPS & MRP
3) Capacity Planning
4) Shop Scheduling
5) WIP valuation
6) Transaction Control
No. of Machines 52 1 Serration