‘oal Mine Brief Summary
MINING LOCATION
‘COMPANY NAME
‘COAL MINE LICENSE
‘MINING LICENCE STATUS
‘ADMINISTRATIVE AREA PLAN
PILOT PROJECT PLAN
DRILL HOLE
RESERVE
STRIPPING RATIO.
LOCATION
HAULING ROAD DISTANCE
HAULING ROAD WIDTH
COAL QUALITY PRIORITY
‘NUMBER OF COAL SEAM
HARBOUR
BARGE CAPACITY
‘CONVEYOR LOADING RATE
JETTY STOCKPILE CAPACITY
‘NAME OF ANCHORAGE
DISTANCE - JETTY TO ANCHORAGE
sPAKEN FOR BARGE TRAVEL FROM JETTY
‘ovauiry
PEO)
OTAL MOISTURE)
SH CONTENT)
‘VM VOLATILE MATTER )
retarted)
TS (TOTAL SULPHUR )
CV (CALORIFIC VALUE )
HGI (Hardgrove Grindability Index )
SUV SA Cea) i
PI. FISI FERNANDO SEJAHTERA (FS )
S4O(010TUP-OP MB-PBAT/IN2013
‘jin Berlaku SD Tabun 2021
‘OPERATION PRODUCTION (1UP-0P)
1224 HA,
200HA
ADA (Done)
25 MILLION MT (Indicated Reserved)
74 MILLION MT ( Pre-Mineable Reserved 200 Ha)
MAXIMUM 6:1
ESA SEPARI
‘TENGGARONG SEBERANG - EAST KALIMANTAN
19 KM FROM MINING AREA
1SMETER
6300 Up Kealkg (GAR)
11 MAIN SEAMS
ESA SEPARI (Jenbayan Port)
300 FT (Mahakam River)
+ hours (2000 mt hour).
000 + 40.000 MT
MA BERAU.
296 Miles Nautical
12 Hours (Average)
(aps)
(ARB)
co)
7)
ey)
a)
(ON)
(ADB)
PO
errr
38.60% - 44.5
TUP-OP Sampai Tahun 2021 dan Sudah C&C
DOES DR tee nd)2. TITIK ORDINAT3. PETA KONSESI