Professional Documents
Culture Documents
Conceptual Framework
Conceptual Framework
PHASE IV: Evaluating the Conclusion the PHASE III: Testing the Project.
Project.
11. Evaluating the Pre-Testing
12. Statistical Rice Hull
Treatment of the Briquette Machine
data. in terms of:
a.) Time
Production Yes
b.) Efficiency of Is it
13. Reading the parts with respect Final Testing working?
result of the data. to time and power
consumed.
No