Professional Documents
Culture Documents
The Learners Demonstrate An Understanding of Concepts and Principles in Installing Configuring Computer Systems
The Learners Demonstrate An Understanding of Concepts and Principles in Installing Configuring Computer Systems
Department of Education
Region VII, Central Visayas
Division of City Schools – Tagbilaran
Tagbilaran City
CONTENT COMPETENCY CODE NO. OF DATE & LOCAL MATERIAL PROJECT ASSESSMENT STRATEGIES LEARNING
WEEKS DAY INTEGRATED/ RESOURCES
TAUGHT CONTEXTUALIZATION
INTEGRATION
Software Installers preparation L.O. 2 Prepare installer TLE_IACSS9- 5 weeks July 10 – Instructional Individual Conferencing Discussion Curriculum
and OS installation procedures 12ICCS-If-j- Aug. 11, Module Hard copy Flash Drive Oral Test Reporting Guide
Application and 29 2017 Distance Learning TESDA
devices/drivers installation 2.1 Create portable Module (at least 2 ) Training
procedures bootable devices in 25 days Textbooks for Regulation
Desktop PC interface/ hook up accordance with software Computer System Created Internet
procedures manufacturer instruction MTWTHF Servicing Bootable Flash CBLM
Application packages and use Photocopy of Drive 8GB DLP/DLL
80 hrs/sem
of application programs Images for using Rufus
Bootable devices Computer System
- -CD/DVD bootable 2.2 Prepare customized Activity Sheets
- -USB bootable using Rufus installers in accordance 4 hrs/week Video clip
software with software utilization Create
- -USB bootable using CD/DVD
diskpart/CMD Installer using
guide and end user Free
agreement OS/Application
Software
Installation of Operating LO 3. Install operating TLE_IACSS9- 10 weeks Aug. 13 – Instructional o Practical PPT Curriculum
System system and drivers for 12ICCS-IIa-j- Oct. 20, Module Hard copy Demonstration Presentation Guide
- Windows Server 2008/higher peripherals/ devices 30 2017 Video clip w/ oral Discussion TESDA
version Distance Learning questioning Training
- Windows XP/7/8/10 50 days MTWTHF Module Regulation
Install and configure of Textbooks for Internet
peripherals devices 3.1 Install Operating Computer System CBLM
Install /Update Operating System (OS) in accordance 80 hrs/sem Servicing DLP/DLL
system with established Photocopy of
Checking of work installation procedures Images for
Computer System
and to comply with end-
4 hrs/week Activity Sheets
user requirements