You are on page 1of 1

- Prepare drawings such as key plan, plot plan, general arrangement, piping plan/layout, isometric,

isometric stress, equipment nozzle orientation, section & detail, pipeline schematic diagram, alignment
sheet, standard & special pipe support, typical warning sign, aerial marker, sketch, as-built drawings, and
other general drawings.
- Create MTO based on PFD and P&ID drawings.
- Review of vendor drawings for equipment or package items.
- Estimate loading data, Tie-In, pipe support, etc.
- Confer with material engineer to select and determine piping material specifications.
- Compare and check 2D CAD drawings with 3D drawings like PDMS Review, Navisworks, and SmartPlant
Review.
- Participate in piping department programs and weekly coordinations meeting.
- Discuss with piping engineer and other disciplines (process, civil/structure, mechanical, electrical,
instrument) to resolve any design problems with the vendor drawings or interferences.
- Ensure that all quality assurance/control programs and safety procedures are strictly followed in the
performance of all drawings.

You might also like