INTERPOLASI BIAYA

1 Pembangunan IKH Rp. 4.341.000.000,00

4.363.179.000,00 4.341.000.000,00 4.310.799.750,00


Konsultan Perencana 757.899,91
DIHITUNG DENGAN INTERPOLASI :
DATA : TABEL TERTINGGI Pagu Anggaran TABEL TERENDAH INTERPOLASI
Total Biaya 4.363.179.000,00 4.341.000.000,00 4.310.799.750,00 4.341.000.000,00
Biaya Fisik 4.100.000.000,00 4.050.000.000,00 4.078.828.448,29
Perencanaan 142.106.000,00 140.791.500,00 141.549.399,91
Pengawasan 98.728.000,00 97.834.500,00 98.349.664,37
Pengelola 22.345.000,00 22.173.750,00 22.272.487,44

PERHITUNGAN INTERPOLASI BIAYA :

REKAPITULASI BIAYA (DIBULATKAN) :


A TOTAL BIAYA FISIK BANGUNAN Rp. 4.078.828.000,00
B BIAYA KONSULTAN PERENCANAAN Rp. 141.550.000,00
C BIAYA KONSULTAN PENGAWASAN Rp. 98.349.600,00
D BIAYA PENGELOLA KEGIATAN Rp. 22.272.400,00

TOTAL BIAYA PEMBANGUNAN Rp. 4.341.000.000,00