CONTRACTOR: | METHOD STATEMENT FOR BORED | PMC: | OWNER:
FCOnS CAST IN-SITU PILE |
PROJECT:CONSTRUCTION OF COAL BERTH NO 4 AT KAMARAIAR PORT,
ENNORE, TAMILNADU, INDIA. _
Issuing | Document Doe. Fi eH
Tentine __ Department Area eas Neater | Rev Date
‘AFC_| PLN CBARER MS 002 i [18132015
METHOD STATEMENT FOR BORED CAST IN-SITU.
PILE
APPROVED
PROJECT:CONSTRUCTION OF COAL BERTH NO.4 AT KAMARAJAR
PORT, ENNORE, TAMILNADU, INDIA.
OWNER: KAMARAJAR PORT LIMITED (KPL)
PMC: HOWE Engineering Projects (INDIA) Pvt. Ltd.
CONTRACTOR: —— AFCONS Infrastructure Limited.
Document No: AFC/PLN/CB4&ER/MS/002 Rev.1 - 18.11.2015
AFCONS
Reason for
Revision | Prepared By | Checked By
Rey No. | Date of Revision
Approved By
|
1 18.12.2015 Approval | Sgro Qe | Qe
0 14.11.2015 ‘Approval |
Selvakumar |
: Mbit | VMadhusudanan | —K.Radesh
‘Sr. Engineer | Project
lege | Planning Head |
B
XS
Q. Papmp RATOLU-RE*i
CONTRACTOR: | METHOD STATEMENT FOR BORED | PMC: i
CAST IN-SITU PILE @ ‘ |
‘CONSTRUCTION OF COAL BERTH NO.4 AT KAMARAJAR PORT
PROJEC > ed
ENNORE, TAMILNADU, INDIA. |
Issuing Document Doc. 1
Entity Department Area Type Number Rev. 5 Date )
AFC PLN CB4 & ER MS. 002, 1 18.12.2015, eae
INDEX
\ S.NO DESCRIPTIOIN PAGE NO
1) PURPOSE t
3
{ i
ca |
2) SCOPE 3
| 3) ‘REFERENCE | 4 | Ve |
4) LUST OF EQUIPMENTS 4 4
al
5 RESPONSIBILITIES 6 |
|
I |
6) PROCEDURES 6
c|
| 7) HEALTH, SAFETY AND ENVIRONMENT | 15
* |
8) QUALITY CONTROL / QUALITY ASSURANCE | 15 CCONTRACTOR: | METHOD STATEMENT FOR BORED
) CAST IN-SITU PILE
PROSE CONSTRUCTION OF COAL BERTH NO.4 AT KAMARAJAR PORT,
| ENNORE, TAMILNADU, INDIA.
Issuing Document Doc.
Tati, _| Department Area Type Number | Rev Date
“AFC PLN CBI & ER MS) 002 1 18.12.2015
4. PURPOSE
The purpose of this procedure is to describe the system to be followed for construction of
bored cast in-situ piles. This procedure is intended to summarize Afcons proposal for the
construction of pilling work. The construction of Bored Cast-in-situ piles in land shall be
completed with the Hydraulic Piling Rig and Marine Piles will be installed by percussion
method by chisel and baller. The area in which piling rig will work in land shall be suitably
} leveled compacted and made secure. Necessary services such as Service crane,
Trailer/Dumpers Loader Welding generators, Lighting arrangements, Transit mixtures, ete.,
shall be provided to complete the piling works. Area for steel reinforcement cage fabrication
shall be provided close to rig working location.
2. WORKSCOPE
‘The scope of the work shall the following activities.
a) Layout of structure and control of alignment
> b) Positioning of the piling rig
) Installation of permanent casing
4) Boring of pile and disposal of bore muck/spoil
@) Termination of bore
f) Cleaning of Bore
9) Cutting bending, and typing of reinforcement cage as per approved drawings
h) Transporting Rebar cage to site
i) Placing & lowering of reinforcement cage
}) Lowering of Tremie pipe and flushing
k) Producing and transporting the concrete to site as per the approved mix design
1) Conereting of bore hole