Internship Program Report. July +2015
—_
J2W Steel
Bringing alive a billion dreams
Report on
Internship Program at JSW Steel Ltd
Karnataka.
06" July 2015 to 18" July 2015
Prepared by, Submitted to,
Shivalinegesh Aiholli
Basaveshwar Engineering College Officer (HR),
Bagalkot JSWSteel Ltd
JSWSteel Ltd. Basaveshwar Engineering collage-BagalkotInternship Program Report. July +2015
CONTENTS
« Introduction
¢ Safety Training
« Raw Material Handling Systems (RMHS)
« Beneficiation Plant
¢ Pellet
« Sinter Plant
« Coke Ovens and CDQ
« Blast Furnace
« DRI
« Steel Making Shop (SMS)
« Logistics
¢ Hot Strip Mill (HSM), Cold Rolling Mill (CRM), Bar-Rod
Mill & Wire Rod Mill
JSWSteel Ltd. Basaveshwar Engineering collage-BagalkotInternship Program Report. July +2015
INTRODUCTION
$11 billion conglomerate, the JSW Group isa part of the O.P. Jindal Group. JSW has setup
business facilities in various core sectors of India. With verticals that are exploring innovative and
sustainable avenues insteel, energy, infrastructure and cement, the Group is paving the way for
India’s development as a global superpower.
ISW Steel is India’s leading integrated steel producer with a capacity of 14 MTPA. The Group is
also leading from the front in every sector that it operates in. By maintaining exemplary
operational efficiencies, JSW Energy has grown ten-fold in ust three years while JSW Cement
creates the building blocks of India with its environment friendly product. JSW Infrastructure is
contributing to the nation’s development by providing world class services toclients through
state-of-the-art ports, terminals, shipyards and other facilities.
The JSW Group is committed to creating more smiles at every step of the journey. JSW
Foundation, the Group's CSRand sustainability arm, is in constant pursuit of making life better
for communities with its various initiatives in the fields of health, education, livelihood and
sports along with art and culture
JSW's zero effluent plants, green townships and happy employees are changing the course of the
nation with their spirited growth. JSW Group is proud to be charting a course to excellence that
creates opportunities for every Indian and leads to the creation of a sustainable, dynamic and
developed nation.
JSW Vijayanagar Works:
India’s first 10 MTPA steel plant at single location, “the fastest growing steel plant
in India”.
The JSW Steel Vijayanagar plantis the first integrated steel plant to reach 10 MTPA
capacity in a single location. It is the first in India to use the Corex technology for
hot metal production.
The first hot strip mill at Vijayanagar was commissioned in 1997. Since then it has
grown exponentially and now has an installed capacity to produce 10 MTPA of
steel. Located at a remote village Toranagallu part of under developed North
Karnatakain the Bellary-Hospet iron ore belt of Karnataka, the fully integrated steel
plant, is well-connected with both the Goa and Chennai ports.
JSWSteel Ltd. Basaveshwar Engineering collage-Bagalkot