DESCRIPTION QTY NU UNIT U/P BUDGET

1 Persiapan 1 1 lpsm 10,000,000 10,000,000


2 Pemetaan Geologi (6.13 Ha) 1 1 lpsm 30,000,000 30,000,000
3 Pemboran Coring 2 holes 60 m 750,000 90,000,000
4 Core Analysis 1 8 sample 3,000,000 24,000,000
5 Survey Geofisika - Geolistrik 1 6 line 3,500,000 21,000,000
6 Survey Topografi 1 8 Ha 4,000,000 32,000,000
7 Penyusunan Dokumen Teknis
a. Laporan Eksplorasi 1 1 lpsm 30,000,000 30,000,000
b. Mine Design 1 1 lpsm 30,000,000 30,000,000
c. Dokumen Rencana Sarana dan Prasarana Tambang 1 1 lpsm 20,000,000 20,000,000
d. Dokumen Rencana Reklamasi dan Pasca Tambang 1 1 lpsm 40,000,000 40,000,000
e. Dokumen UKL/UPL - Izin Lingkungan 1 1 lpsm 60,000,000 60,000,000
f. Dokumen Studi Kelayakan 1 1 lpsm 35,000,000 35,000,000
g. Dokumen RKAB Tahap Operasi Produksi 1 1 lpsm 30,000,000 30,000,000

TOTAL 452,000,000