You are on page 1of 4
Project [REPAIR AND RENOVATION OF THE BUILDING OF NPQSD_ STATION 6, MICP Location "ManlaInterationa Container Port, sla Putting Bato, Tondo uration 120 Calendar Days owner Pr. NPQSD MOBILIZATION AND DEMOBILIZATION Scope of Work "The portion ofthe work specie by this section inches mobization, dembization, Erection and maintenance of temporary feaites, safety prowsion, secure Of necessary Permits and licenses, bonds and insurence’s and uives Ste aderk. Mobitzation and Demebization “The Contractor shal have the sole responsibilty of brnging the manpower and ‘equipment/tools tothe job ste needed inthe efficient and satisfactory performance ofthe subject project. Lkewise, shal be responsibilty ofthe Contractor to move out his men and ‘equipment/tools upon completion ofthe project. a TL. _ REMOVAL WORKS Scope of works. “The Contractor shall remove he ensing roo! shee, rot trusses and cling ‘Stoo materias removed from the bulling shal be hauled and stacked propery na desinated area, TIE. CONCRETE WORKS Scope of Work “The work indudes concrete construction complete in accordance withthe plans and standaré Speccatins for concrete and reinforced concrete Works. Proportions ‘Strength requirements shal be 3,000 psi concrete shapes dimensions and reinforcements 35 ‘shown in the plans for reinforced concrete columns, refered concrete beams, sab and concrete stars. IV, MASONRY WORK ‘Scope of Work “The work incide furishng of labor, equipment and materi, and performing al operations Required to complete concrete masonry works as Shown and specified on the drawings ane ‘Specncatons Mora sal te mixed inte volumetric proportons of one part Portard cement, nd tree ars sano. Meterals Fer lead bearing walle use 600 pi pareve unit and 1000 psifor (5) units secon the ‘Average gross area (Use 4% 6° 16° CHB for imerir parton and 9° x8" x 26" for ener wl Al joints re Calle shal be soli lied frm te face ote Nocs to the dest of the face, completely ané compact. ‘surface Fishes “The surface ofthe val shal thorughiy wetted, and shal be Paster of 3/8" tick. Smocth fish ROOFING MATERIALS AND ACCESSORIES Scope of Work “The work ncudes fuming foro and instalation cf rotng sheets and pecesores. meters » Rb type ong span sheets sal be comtmunus Hotip Zire~nated ste! cot a nara ano ‘anenet, tepcont/baccoot with of fee palyestr, roofing sheet shall not es than 040mm ‘and sable length orto have us re exc leopho Vi DOORS AND GLASS WINDOWS Scope of Wot “Tis work shall nude furshing of llaber, materi, supples and equpment and Perfrming al operators In conmecion wt te fericiuon and rstalaton of doors and Vicor incuding miscsloneovs works complete n abict compliance with the drawings this specications. Genera A doors and windows and misceenecus shal bo of the de and type ndcated on the an o 2s drecte by the Engine and sal be products of rpuiable krown tobe approved By the Engineer vi. CEILING WORKS Seope of Work ‘Tis tem of works shal ncuces tuning, faoncaton afd Wstattion Of ceting materials Inelding cabinet cover Pyboare M2ARE anne pyvood for cable cover, AF! macine hywoed for Iceror cling unbers Use lube: of approved quality, wallseasoned tteroughy hed and fee from large loose vim. TILE WORK sonpe of work ‘The work const of fuishing all materia, bor and performing all operations in connection witht ishing of faor and was, ats ‘Ceramic es sal be ungiaved, vtreous ties for fers and olazed , seni-itreus tes for Walt. Tey shal conferm to te requreents of ceramic ts, whase samples Sol be ‘Submited othe end user for approval. 1% PLUMBING WORKS. Scope of Work “Tis Secon cris of performing esse work in fumshing an Inzalng pba Haterale nceseary tn cneuct and conpiee the vete supply syst, sener sys ane Dir plumbing works n acerdance withthe speciation and as shown i the drains. matenas ‘hi mates except those for temporary se sal be ne and of stable ely Weber ines Pipes for nse and outside tung water Ines shal be PC pipe 3k ea. 3m oA be ‘in BUC Rees Saritay Drainage System Sol Stacks shal be 1GOnen de. X 3m PAC pe wlth PYC isn. Vent system ‘vert res shal be potviny chore pe (PV). Stor Dranage System [Nidowrspouts fr inside buicings stall be Pir da. (orenge cok) storm dra x. ELECTRICAL WORKS. Scope of wore "res wank shal include furihing and netalton of al iaber, materials and en apmert, tos Zknd tancporatcn necessary to complete the decical work a indcaled the cawngs and ‘As spected here. ‘Sandra Product “al mterials to be incorporated inthis ker shal bea product of reputable manufacturer an ‘te latest standard design that comples wit the specication requrement. Xa, PRINTING WORKS Scope of work ‘The work emvered by ts section consist of fusing al bor, easipment teal an ater performing al operations connection wath painting ant Hing, ieuding &

You might also like