Project [REPAIR AND RENOVATION OF THE BUILDING OF NPQSD_
STATION 6, MICP
Location "ManlaInterationa Container Port, sla Putting Bato, Tondo
uration 120 Calendar Days
owner Pr. NPQSD
MOBILIZATION AND DEMOBILIZATION
Scope of Work
"The portion ofthe work specie by this section inches mobization, dembization,
Erection and maintenance of temporary feaites, safety prowsion, secure Of necessary
Permits and licenses, bonds and insurence’s and uives Ste aderk.
Mobitzation and Demebization
“The Contractor shal have the sole responsibilty of brnging the manpower and
‘equipment/tools tothe job ste needed inthe efficient and satisfactory performance ofthe
subject project. Lkewise, shal be responsibilty ofthe Contractor to move out his men and
‘equipment/tools upon completion ofthe project. a
TL. _ REMOVAL WORKS
Scope of works.
“The Contractor shall remove he ensing roo! shee, rot trusses and cling
‘Stoo materias removed from the bulling shal be hauled and stacked propery na
desinated area,
TIE. CONCRETE WORKS
Scope of Work
“The work indudes concrete construction complete in accordance withthe plans and standaré
Speccatins for concrete and reinforced concrete Works.
Proportions
‘Strength requirements shal be 3,000 psi concrete shapes dimensions and reinforcements 35
‘shown in the plans for reinforced concrete columns, refered concrete beams, sab and
concrete stars.
IV, MASONRY WORK
‘Scope of Work
“The work incide furishng of labor, equipment and materi, and performing al operations
Required to complete concrete masonry works as Shown and specified on the drawings ane‘Specncatons
Mora sal te mixed inte volumetric proportons of one part Portard cement, nd tree
ars sano.
Meterals
Fer lead bearing walle use 600 pi pareve unit and 1000 psifor (5) units secon the
‘Average gross area
(Use 4% 6° 16° CHB for imerir parton and 9° x8" x 26" for ener wl Al joints re
Calle shal be soli lied frm te face ote Nocs to the dest of the face, completely ané
compact.
‘surface Fishes
“The surface ofthe val shal thorughiy wetted, and shal be Paster of 3/8" tick.
Smocth fish
ROOFING MATERIALS AND ACCESSORIES
Scope of Work
“The work ncudes fuming foro and instalation cf rotng sheets and
pecesores.
meters »
Rb type ong span sheets sal be comtmunus Hotip Zire~nated ste! cot a nara ano
‘anenet, tepcont/baccoot with of fee palyestr, roofing sheet shall not es than 040mm
‘and sable length orto have us re exc leopho
Vi DOORS AND GLASS WINDOWS
Scope of Wot
“Tis work shall nude furshing of llaber, materi, supples and equpment and
Perfrming al operators In conmecion wt te fericiuon and rstalaton of doors and
Vicor incuding miscsloneovs works complete n abict compliance with the drawings
this specications.
Genera
A doors and windows and misceenecus shal bo of the de and type ndcated on the
an o 2s drecte by the Engine and sal be products of rpuiable krown tobe approved
By the Engineer
vi. CEILING WORKS
Seope of Work
‘Tis tem of works shal ncuces tuning, faoncaton afd Wstattion Of ceting materials
Inelding cabinet cover
Pyboare
M2ARE anne pyvood for cable cover, AF! macine hywoed for Iceror clingunbers
Use lube: of approved quality, wallseasoned tteroughy hed and fee from large loose
vim. TILE WORK
sonpe of work
‘The work const of fuishing all materia, bor and performing all operations in connection
witht ishing of faor and was,
ats
‘Ceramic es sal be ungiaved, vtreous ties for fers and olazed , seni-itreus tes for
Walt. Tey shal conferm to te requreents of ceramic ts, whase samples Sol be
‘Submited othe end user for approval.
1% PLUMBING WORKS.
Scope of Work
“Tis Secon cris of performing esse work in fumshing an Inzalng pba
Haterale nceseary tn cneuct and conpiee the vete supply syst, sener sys ane
Dir plumbing works n acerdance withthe speciation and as shown i the drains.
matenas
‘hi mates except those for temporary se sal be ne and of stable ely
Weber ines
Pipes for nse and outside tung water Ines shal be PC pipe 3k ea. 3m oA be
‘in BUC Rees
Saritay Drainage System
Sol Stacks shal be 1GOnen de. X 3m PAC pe wlth PYC isn.
Vent system
‘vert res shal be potviny chore pe (PV).
Stor Dranage System
[Nidowrspouts fr inside buicings stall be Pir da. (orenge cok) storm dra
x. ELECTRICAL WORKS.
Scope of wore
"res wank shal include furihing and netalton of al iaber, materials and en apmert, tos
Zknd tancporatcn necessary to complete the decical work a indcaled the cawngs and
‘As spected here.
‘Sandra Product
“al mterials to be incorporated inthis ker shal bea product of reputable manufacturer an
‘te latest standard design that comples wit the specication requrement.
Xa, PRINTING WORKS
Scope of work
‘The work emvered by ts section consist of fusing al bor, easipment teal an
ater performing al operations connection wath painting ant Hing, ieuding
&