You are on page 1of 3

R E M A RKS

NOTE :
1. THE DRAWING SHOULD NOT
BE SCALED. ALL MEASUREMENTS
SHALL BE CONFIRMED IN SITE
2. ALL MEASUREMENTS IN M UNLESS
OTHERWISE STATED.
VERIFIED BY,
PREPARED BY,
No. DATE REVISION SIGN
0 28/09/18 issue for approved
PROJECT NAME
TOWER 3LEG TUBULAR 24M
DRAWING TITLE
SITE NAME -
SITE ID -
SCALE NTS DATE
DRAWING BY 30/06/18
CHECKED BY 30/06/18
APPROVED BY
CONTRACT No.
SHEET No. TOTAL SHEET
R E M A RKS
NOTE :
1. THE DRAWING SHOULD NOT
BE SCALED. ALL MEASUREMENTS
SHALL BE CONFIRMED IN SITE
2. ALL MEASUREMENTS IN M UNLESS
OTHERWISE STATED.
VERIFIED BY,
PREPARED BY,
No. DATE REVISION SIGN
0 28/09/18 issue for approved
PROJECT NAME
TOWER 3LEG TUBULAR 24M
DRAWING TITLE
SITE NAME -
SITE ID -
SCALE NTS DATE
DRAWING BY 30/06/18
CHECKED BY 30/06/18
APPROVED BY
CONTRACT No.
SHEET No. TOTAL SHEET
R E M A RKS
NOTE :
1. THE DRAWING SHOULD NOT
BE SCALED. ALL MEASUREMENTS
SHALL BE CONFIRMED IN SITE
2. ALL MEASUREMENTS IN M UNLESS
OTHERWISE STATED.
VERIFIED BY,
PREPARED BY,
No. DATE REVISION SIGN
0 28/09/18 issue for approved
PROJECT NAME
TOWER 3LEG TUBULAR 24M
DRAWING TITLE
SITE NAME -
SITE ID -
SCALE NTS DATE
DRAWING BY 30/06/18
CHECKED BY 30/06/18
APPROVED BY
CONTRACT No.
SHEET No. TOTAL SHEET

You might also like