Gorong2 Plat Beton PEHSERUT
h
0,1 m
0,2 m Volume Galian pondasi
0.2 x ( 0.4 + 1.00 + 0.4 ) x 14 = 5.04 m3
Volume Siaran 1 Pc : 2 Ps
4.00 + 1.00 x 14 = 70 m2
Bekisting cor
1.00 x 14 = 14 m2
Perhitungan Analisa
Galian pondasi (BSNI 2008)
Pekerja = 0.75 x 5.04 = 3.78 HOK
Tanggal Survei :
Batu gunung = 28 m3
Semen PC 40 Kg Gresik = 129 zak
Pasir Pasang Jawa = 15 m3
Kayu Usuk 5/7 = 15 ljr
Papan Randu = 70 lbr
Paku = 6 kg
Besi beton 10 mm = 40.2413 ljr
Kawat bendrat = 4 kg
Koral 2/3 = 2.08 m3
Pekerja = 76 HOK
Tukang = 36 HOK
Kepala Tukang = 4 HOK
2 - ( 0.15 x 0.15 x 14 x 2 ) = 22.4 m3
Banyaknya gorong2 yang sama = 1 unit
Batu gunung = 28 m3
Total Pas. Batu 1 Pc : 4 Ps = 23.59 m3 Semen PC 40 Kg Gresik = 129 zak
Pasir Pasang Jawa = 15 m3
Kayu Usuk 5/7 = 15 ljr
Papan Randu = 70 lbr
Paku = 6 kg
Besi beton 10 mm = 40 ljr
Kawat bendrat = 4 kg
Koral 2/3 = 2.08 m3
Pekerja = 76 OH
Tukang = 36 OH
Kepala Tukang = 4 OH
bh
m' 40 ljr
Dibuat oleh :
a b c d
1. BAHAN
1.1. Batu gunung 28 m3 Rp 202,900
1.2. Semen PC 40 Kg Gresik 129 zak Rp 51,100
1.3. Pasir Pasang 15 m3 Rp 295,500
1.4. Kayu Usuk 5/7 15 ljr Rp 99,400
1.5. Papan Randu 70 lbr Rp 20,800
1.6. Paku 6 kg Rp 15,200
1.7. Besi beton 10 mm 40 ljr Rp 59,400
1.8. Kawat bendrat 4 kg Rp 16,600
1.9. Koral 2/3 2.08 m3 Rp 341,200
Sub Total 1)
2. ALAT
1. Cangkul 1 Rp 61,300
2. Timba 5 Rp 5,600
3. Skrop 1 Rp 86,400
Sub Total 2)
3. UPAH
3.1. Pekerja 76 OH Rp 70,000
3.2. Tukang 36 OH Rp 85,000
3.2. Kepala Tukang 4 OH Rp 90,000
Sub Total 3 )
Total Biaya
Pehse
Dibuat oleh :
Tenaga Teknis Tim P
.................................. .......
- 24 -
-
Pelaksanaan Pembangunan Desa
Gorong2 Plat Beton
e=bxd f
Rp 5,681,200 Rp 5,681,200
Rp 6,591,900 Rp 6,591,900
Rp 4,432,500 Rp 4,432,500
Rp 1,491,000 Rp 1,491,000
Rp 1,456,000 Rp 1,456,000
Rp 91,200 Rp 91,200
Rp 2,376,000 Rp 2,376,000
Rp 66,400 Rp 66,400
Rp 709,700 Rp 709,700
Rp 22,895,900 Rp 22,895,900
Rp 61,300 Rp 61,300
Rp 28,000 Rp 28,000
Rp 86,400 Rp 86,400
Rp 175,700 Rp 175,700
Rp 5,320,000 Rp 5,320,000
Rp 3,060,000 Rp 3,060,000
Rp 360,000 Rp 360,000
Rp 8,740,000 Rp 8,740,000
Rp 31,811,600 Rp 31,811,600
Pehserut, .....................
..................................
REKAPITULASI RENCANA ANGGARAN BIAYA (R-RAB) INFRAS
Jenis Prasarana : Jalan Telford, GG Plat Beton dan TPT Pas. Batu
Provinsi : Jawa Timur Kecamatan :
Kabupaten : Nganjuk Desa :
Jenis Kegiatan :
Ukuran/ Dimensi :
Bobot Jumlah Total Bobot
Jumlah :
% (Rp.) %
No. RAB :
Jumlah Dana
(Rp.)
22,895,900 71.97343
175,700 0.552314
8,740,000 27.47425
31,811,600 100.00
850,400
32,662,000
Pehserut, .....................
Mengetahiu :
KEPALA DESA PEHSERUT
..................................
- 23 -
GAMBAR RENC
DENAH SITUASI
- 23 -
GAMBAR RENCAN
KABUPATEN
NGANJUK
KECAMATAN
0
DESA
0
JENIS PRASARAN
Jalan Rabat Beton
LOKASI
Dsn. .........................
JUDUL GAMBAR
Gambar Denah Situ
Digambar Oleh
0
Diperiksa dan Disetuju
Dinas PU Kab. Ngan
0
NIP.
Lembar…..Dari…..Lem
- 23 -
GAMBAR RENCANA
KABUPATEN
NGANJUK
KECAMATAN
0
DESA
0
JENIS PRASARANA
Jalan Rabat Beton
LOKASI
Dsn. ................................
JUDUL GAMBAR
Gambar Denah Situasi
Digambar Oleh
0
Diperiksa dan Disetujui oleh :
Dinas PU Kab. Nganjuk
0
NIP.
Lembar…..Dari…..Lembar
1 m 0,15 m 0,15 m
0,15 m 0,1 m
0,15
2 m
0,1 m
0,2 m Cor Beton Bertulang 1 PC : 2 PS : 3 KR
0,40 m
0,15
POT. MELINTANG 0,1 m
1.3 m
14 m
Beton K-175 0,15 m Pas. Batu 1 PC : 4 PS
TAMPAT ATAS
Besi beton dia. 10 - 15 cm
Tulangan 2 lapis Cor Beton Bertulang 1 PC : 2 PS : 3 KR
Besi Beton dia. 10 - 15 cm
Cor Beton 1 PC : 2 PS : 3 KR
0,15 m
1
Pas. Batu 1 PC : 4 PS
0,1 m
Lantai gorong2
POT. MEMANJANG
DETAIL TULANGAN
GORONG2 PLAT BETON
0,1 m KABUPATEN
0,15 m NGANJUK
KECAMATAN
SUKOMORO
1 m DESA
PEHSERUT
JENIS PRASARANA
0,15 m GORONG2 PLAT BETON
0,1 m
LOKASI
Dsn.Pehserut
JUDUL GAMBAR
Gambar Potongan dan Detail
Digambar Oleh
Tim Pelaksana Kegiatan (TPK)
0,15 m
1 m
0,1 m