Malla Tuberia Q(m3/s) Rt HT HT/Q ∆Q

Ficticia 0 20 0
4 0.15 100 2.25 15 -0.249
3 0.02 200 0.08 4 -0.249
I
2 -0.08 500 -3.2 40 -0.249
1 -0.15 100 -2.25 15 -0.249
Suma 16.88 74
2 0.08 500 3.2 40 -0.030
Iteracion 1
8 0.1 300 3 30 -0.030
II 7 0.08 400 2.56 32 -0.030
6 -0.07 300 -1.47 21 -0.030
Suma 7.29 123
3 -0.02 200 -0.08 4 -0.021
5 0.13 400 6.76 52 -0.021
III
8 -0.1 300 -3 30 -0.021
Suma 3.68 86
Q(M3/s)

###
###
###
###

0.29955504
0.0917612
0.05036585
-0.0996341

0.20779384
0.10860465
-0.0917612
Malla Tuberia Q(m3/s) Rt HT HT/Q ∆Q Q(M3/s)
Ficticia -20
1 1.28490355 30 49.5293141 38.5471066 0.000 1.285
I
2 -1.2150964 20 -29.529188 24.301929 0.000 -1.215
Suma 0.00 62.8490355